Você está na página 1de 7

Power & Water Utility Company for Document ID No :

Jubail and Yanbu (MARAFIQ)


Page: 1 of

Rev. No.:

Document Approval Form (DAF) Valid Until :

TITLE OF DOCUMENT Annual Inspection Check List of


Generator Step Up & Utility Power
Transformers of Y-II.
Revision No Date Revision Details Section Revised
Rev 0 01-04-2015

PREPARED BY
Signature

Name Malik Imtiaz Ahmad


Date 01 April 2015
REVIEWED BY
Immediate Superintendent PG Superintendent PG
Manager PG (O&M)
Supervisor Maintenance Operation
Signature
Gunjan Chhabilray Asif Masood Sulaiman Saleh Ali
Name Khalid H. Al- Nafey
Raval Khan Al-Ghamdi
Date
APPROVED BY
Signature

Name Sultan Turki Al-Ruhaili GM (O&M) Yanbu-II.


Date
ISSUED BY
Signature
Name
Date
DISTRIBUTION LIST
General Manager (O&M) Manager (O&M) DC- Yanbu
Manager (W.P)

PROPRIETARY NOTICE IMPORTANT


THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MARAFIQ. ANY DISCLOSURE OR USE IS
EXPRESSLY PROHIBITED EXCEPT UPON WRITTEN PERMISSION BY MARAFIQ. Only document with stamps are considered official.
Power & Water Utility Company for Document ID No :
Jubail and Yanbu (MARAFIQ)
Page: 2 of

Rev. No.:
Annual Inspection Check List of Generator
Date of Issue:
Step Up & Utility Power Transformers of Y-II.

3-PHASE OIL TYPE TRANSFORMER

Test Standard IEC60076 Check Date:


Tag No: Serial No:
Rated Voltage: Rated Current:
Rated Power: Vector Group:
Cooling Type: Manufacture:
Oil Temp: Ambient Temp:

S. No Items to be check OK Seepage Leak Remarks


01 OIL LEAKS.
a) Main tank
b) Radiators
c) Conservators
d) Neutral bushing
e) Bushing oil chambers
f) Bushing conservator
g) Oil pump # 01
h) Oil pump # 02
i) Oil pump # 03
j) Oil pump # 04
k) Oil pump # 05
l) Oil pump # 06
m) Oil pump # 07
n) Oil pump # 08
o) HV 1 Cable head

PROPRIETARY NOTICE IMPORTANT


THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MARAFIQ. ANY DISCLOSURE OR USE IS
EXPRESSLY PROHIBITED EXCEPT UPON WRITTEN PERMISSION BY MARAFIQ. Only document with stamps are considered official.
Power & Water Utility Company for Document ID No :
Jubail and Yanbu (MARAFIQ)
Page: 3 of

Rev. No.:
Annual Inspection Check List of Generator
Date of Issue:
Step Up & Utility Power Transformers of Y-II.

p) HV 2 Cable head
q) HV 3 Cable head
r) Valves
s) Fire water system
water leak check
t) Buchholz relays
u) Others
PAINTING Good Dusty Rusty
a) Tank
02 b) Radiators
c) Conservators
d) Others
GROUNDING Good Rusty
a) Main tank
b) NGR
03
c) Bushing chamber fixture
d) Surge arrester
e) Transformer area fence
AREA LIGHTING Good Poor
04
Transformer area
BREATHER MAIN TANK Good Bad
05 a) Silica gel
b) Vessel oil
06 BREATHER OLTC Good Bad
a) Silica gel

PROPRIETARY NOTICE IMPORTANT


THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MARAFIQ. ANY DISCLOSURE OR USE IS
EXPRESSLY PROHIBITED EXCEPT UPON WRITTEN PERMISSION BY MARAFIQ. Only document with stamps are considered official.
Power & Water Utility Company for Document ID No :
Jubail and Yanbu (MARAFIQ)
Page: 4 of

Rev. No.:
Annual Inspection Check List of Generator
Date of Issue:
Step Up & Utility Power Transformers of Y-II.

b) Vessel oil
BREATHER BUSHING OIL
Good Bad
CHAMBER
07 a) Silica gel
b) Vessel oil
OIL LEVEL OK Low
a) Main tank
08 b) On Load Tap Changer
c) Bushing chamber
d) Neutral bushing
HV CABLE OIL PRESSURE OK Low
HV 1
09
HV 2
HV 3
SF-6 GAS PRESSURE OK Low
HV 1
10
HV 2
HV 3
11 TAP POSITION & TAP COUNTER
12 SURGE COUNTER
13 TEMPERATURE READING Present Max:
a) Winding Temp # 01
b) Winding Temp # 02
c) Winding Temp # 03
d) Winding Temp # 04

PROPRIETARY NOTICE IMPORTANT


THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MARAFIQ. ANY DISCLOSURE OR USE IS
EXPRESSLY PROHIBITED EXCEPT UPON WRITTEN PERMISSION BY MARAFIQ. Only document with stamps are considered official.
Power & Water Utility Company for Document ID No :
Jubail and Yanbu (MARAFIQ)
Page: 5 of

Rev. No.:
Annual Inspection Check List of Generator
Date of Issue:
Step Up & Utility Power Transformers of Y-II.

e) Oil Temp # 01
f) Oil Temp # 02
MARSHALLING CABINET OK Faulty
a) General condition
b) Main Breakers
c) Relays
d) M.C.B
e) Isolators
f) Selector switches
14
g) Control Supply
h) Cooler group
i) Space heater
j) Internal lighting
k) Thermostats setting
l) Wire terminal screws
m) Door seals and locks
n) Receptacle power supply
15 TRANSFORMER OIL
a) Type
b) Date of last dehydration
c) Dielectric strength top
d) Dielectric strength bottom
EARTH GROUNDING
16
CONNECTION
17 EARTH RESISTANCE

PROPRIETARY NOTICE IMPORTANT


THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MARAFIQ. ANY DISCLOSURE OR USE IS
EXPRESSLY PROHIBITED EXCEPT UPON WRITTEN PERMISSION BY MARAFIQ. Only document with stamps are considered official.
Power & Water Utility Company for Document ID No :
Jubail and Yanbu (MARAFIQ)
Page: 6 of

Rev. No.:
Annual Inspection Check List of Generator
Date of Issue:
Step Up & Utility Power Transformers of Y-II.

18. NEUTRAL GROUNDING RESISTANCE


Housing
Cleanliness Insulator Structure grounding
structure
X winding
Y winding

19. TRANSFORMER FAN AND PUMP MOTOR CURRENT & I.R.

FM1 FM2 FM3 FM4 FM5 FM6 FM7 FM8 FM9 FM10
A
B
C
I.R
FM11 FM12 FM13 FM14 FM15 FM16 FM17 FM18 FM19 FM20
A
B
C
I.R
FM21 FM22 FM23 FM24 FM25 FM26 FM27 FM28 FM29 FM30
A
B
C
I.R
FM31 FM32 FM33 FM34 FM35 FM36 FM37 FM38 FM39 FM40
A

PROPRIETARY NOTICE IMPORTANT


THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MARAFIQ. ANY DISCLOSURE OR USE IS
EXPRESSLY PROHIBITED EXCEPT UPON WRITTEN PERMISSION BY MARAFIQ. Only document with stamps are considered official.
Power & Water Utility Company for Document ID No :
Jubail and Yanbu (MARAFIQ)
Page: 7 of

Rev. No.:
Annual Inspection Check List of Generator
Date of Issue:
Step Up & Utility Power Transformers of Y-II.

B
C
I.R
FM41 FM42 FM43 FM44 FM45 FM46 FM47 FM48 FM49 FM50
A
B
C
I.R
FM51 FM52 PM1 PM2 PM3 PM4 PM5 PM6 PM7 PM8
A
B
C
I.R

Inspected By: Foreman:


Date: Supervisor:
Date:

PROPRIETARY NOTICE IMPORTANT


THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MARAFIQ. ANY DISCLOSURE OR USE IS
EXPRESSLY PROHIBITED EXCEPT UPON WRITTEN PERMISSION BY MARAFIQ. Only document with stamps are considered official.

Você também pode gostar