2
Update of Renewable Resource Development in Ontario
3
The FIT Program in Ontario
4
Korean Consortium Agreement
5
High Level of Renewable Development Interest in Ontario
6
Map of Launch Period and Korean Consortium Phase 1 Renewables by
Region
7
Transmission Availability following Launch Period FIT and Korean
Consortium Phase 1 projects
8
Illustration: Network vs. Connection Facility
Distribution System
9
Incorporating Renewable Resources is the Primary Driver for
Mid-Term Transmission Development
• The new Bruce to Milton line will provide about 1200 MW of new
capability in the Bruce area, and about 300 MW west of London
10
Purpose of the ECT Process
11
Guiding Principles for the Design of the ECT
12
Summary of Economic Assessment in the ECT
13
Costs Considered in the ECT
Major Bulk
Distribution
Transmission
System
System
Connection Enabler
Facility Facility
14
The OPA’s Role in Carrying Out the ECT
15
Economic Connection Test Process
Approx.
6 months
Transmission and
Individual Project Cluster and Economic Documentation
Distribution
Assessments (IPA) Enabler Formation Assessment and Reporting
Expansion Planning
ECT Results
Pre-ECT
ECT Process and
Activities
Post ECT Process
17
Transmission Options for FIT and the Korean Consortium
18
Aspects Considered with the Updated Transmission Plan
19
Planning Considerations for Transmission Development
20
OEB’s Transmission Project Development Plan
Source: OEB
21
Process for Transmitter Designation and Transmission Project Development Plan Approval
Possible Transmission Development Process
OPA’s IPSP
OPA’s ECT
OEB’s TPDP process
for system expansion
& enablers
Transmitter’s development
work
22
In Closing,