Sl. Reference of Enquiry Document Bidder’s Query EIL’s Reply
No. Part / Vol. Page No. Clause No. Subject

Technical Pre-bid queries


1 Part-III Page Table LIST OF Mandatory spares list referred is generic in Bidder’s understanding is correct,
1395 to MANDATOR nature and includes items such as Generator For clarifications refer note-1 of Doc.no.
B224-501- 1399 of & Power Transformer which are not B224-501-16-50-SL-8700 Rev. A.
16-50-SL- 5882
Y SPARES:
8700 ELECTRICAL applicable for this package.
Rev. A We will submit the prices of the mandatory
spares for the items applicable for this
package only. Kindly confirm.

Alternatively kindly provide revised


mandatory spares list applicable for this
package.

Page 1 of 1
FORMAT FOR BIDDER'S QUERIES - 2ND SET
NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES), EPCC-16 AT RAJASTHAN REFINERY COMPLEX AT PACHPADRAFOR RAJASTHAN REFINERY PROJECT (RRP) OF M/s HRRL
BIDDING DOCUMENT : B224-501-17-44-PA-T-8700

REFERENCE OF ENQUIRY DOCUMENT


S.NO BIDDER'S QUERY EIL REPLY
PART/VOL. PAGE NO. CLAUSE NO. SUBJECT
PROCESS & MECHANICAL
Tendernotice_4 1290 of 5882 B224-17-44-501-1111, Rev : 0 RO Permeate water to Treated water Reservoir - 20" line
Both the clauses are contradictory. Please confirm
1 20" line to be considered.
Tendernotice_4 1301 of 5882 B224-17-44-501-1122, Rev : 0 RO Permeate from RO-DMP to Treated water reservoir - 18" which clause to be followed.

1.0 B224-79-41-DB-502 These are reference


We have not received these documents along with
2 Tendernotice_3 43 of 5882 15. Reference Documents/Drawings 2.0 B224-79-41-DB-509 documents shall not be
the tender. Kindly provide these documents.
provided in tender.
3 Tendernotice_3 862 of 5882 B224-502-17-44-DS-1039 RO-III Feed Pumps (VFD Driven) - MOC - SDSS Please provide us the UNS code for SDSS. Please follow tender
Please confirm whether Ball valve shall be provided Please follow tender
4 General
for instrument isolation. specifications
Please confirm whether Cooling Tower scope is a part Cooling Tower scope is not
5 General
of this package. part of contractor scope.
We would like to inform that the solid consistency of
the centrifuge feed pump shall be more than 2%. Please follow tender
6 Tendernotice_3 917 of 5882 B224-501-17-44-DS-1020 , Rev B Centrifuge Feed Pump type is mentioned as Horizontal centrifugal
Hence, we recommend screw pump instead of specifications
Horizontal centrifugal pumps. Please confirm.

We would like to inform that the solid consistency of


the HRSCC-I Sludge transfer pmps shall be more than Please follow tender
6 Tendernotice_3 969 of 5882 B224-502-17-44-DS-1012 , Rev 0 HRSCC-I Sludge Transfer pumps
2%. Hence, we recommend screw pump instead of specifications
Horizontal centrifugal pumps.Please confirm.

We would like to inform that the solid consistency of


the HRSCC-II Sludge transfer pmps shall be more than Please follow tender
7 Tendernotice_3 1032 of 5882 B224-502-17-44-DS-1063 , Rev 0 HRSCC-II Sludge Transfer pumps
2%. Hence, we recommend screw pump instead of specifications
Horizontal centrifugal pumps.Please confirm.

914 of 5882 B224-501-17-44-DS-1017 , Rev 0 Clarified water transfer pumps - 425 m3/hr @ 6.5 kg/cm2
Both the clauses are contradictory. Please confirm shall be provided in
7 Tendernotice_3
which capacity to be followed. amendment
847 of 5882 B224-501-17-44-DS-1017 Clarified water transfer pumps - 200 m3/hr @ 40 mwc

847 of 5882 B224-501-17-44-DS-1021 Centrifuge - 25 m3/hr


Both the clauses are contradictory. Please confirm shall be provided in
8 Tendernotice_3
which capacity to be followed. amendment
917 of 5882 B224-501-17-44-DS-1021 , Rev 0 Centrifuge - 32 m3/hr
Please confirm whether we can provide Filter press
9 Tendernotice_3 970 of 5882 B224-501-17-44-DS-1013 , Rev 0 Centrifuge - 21 m3/hr
instead of Centrifuge. Please follow tender
Please confirm whether we can provide Filter press specifications
10 Tendernotice_3 918 of 5882 B224-501-17-44-DS-1021 , Rev 0 Centrifuge - 32 m3/hr
instead of Centrifuge.
Please provide the CTBD Header size to be shall be provided in
11 Tendernotice_4 1319 of 5882 B224-17-44-502-1112 , Rev 0 CTBD Header
considered. amendment
The line size from ABF to the Treated water reservoir Please follow tender
12 Tendernotice_4 1301 of 5882 B224-17-44-502-1122 , Rev 0 From ABF
is mentioned as 18". Please re-confirm the size. specifications
The line size of suction line of HRSCC -I Feed Pump is Please follow tender
13 Tendernotice_4 1319 of 5882 B224-17-44-502-1112 , Rev 0 Suction line of HRSCC -I Feed Pump - 16"
mentioned as 16". Please re-confirm the size. specifications

The line size of suction line of Clarified water Transfer Please follow tender
14 Tendernotice_4 1322 of 5882 B224-17-44-502-1115 , Rev 0 Suction line of Clarified water Transfer Pump - 16"
Pump is mentioned as 16". Please re-confirm the size. specifications
In the cartridge filter inlet and outlet manual
butterfly valve shall be provided. The same shall be
Automatic valves are not
15 Tendernotice_4 1331 of 5882 B224-17-44-502-1124 , Rev 0 Cartridge filters used for vessel isolation. Hence, we are not providing
required
automatic valves in the inlet and outlet. Please
confirm.
At the outlet of each cartridge filter we don’t
Please follow tender
16 Tendernotice_4 1331 of 5882 B224-17-44-502-1124 , Rev 0 Cartridge filters anticipate any flow meter. Flow meter shall be
specifications
provided in the common outlet. Please confirm.
The auto dump valve at the outlet of the cartridge
Please follow tender
17 Tendernotice_4 1332 of 5882 B224-17-44-502-1125 , Rev 0 Line From Cartridge Filter filter shall be automatic butterfly valve. Please
specifications
confirm.
Please re-confirm the painting/coating/lining Acid/Alkali Resistant Tiling shall
18 Tendernotice_3 1033 of 5882 B224-502-17-44-DS-1064 , Rev 0 Solar Pond Feed Sump
requirement of Solar Pond feed sump be considered
Please provide the datasheet for Y-strainer and T -
19 General Strainer & static mixers
Strainer
datasheet shall be developed
by contractor during detail
20 General Please provide the datasheet for Static mixer
engineering

The total flow expected to the permeate water tank


Capacity of the permeate transfer pump is 300 m3/hr @ 30 mwc - is 571 m3/hr as per the process. Hence 3Nos (2W+1S) Please follow tender
21 Tendernotice_3 1036 of 5882 B224-502-17-44-DS-1067
4 Nos (3W+1S) of 300 m3/hr @ 30 mwc capacity is sufficient to cater specifications
the required. Please confirm.
In case of MB feed water, we don’t anticipate any
particulate impurities . Hence, please confirm Please follow tender
22 Tendernotice_4 1335 of 5882 B224-17-44-502-1128 , Rev 0 MB Feed Pump
whether suction strainer to be provided for MB Feed specifications
Pump.
We are considering Butterfly valve for both inlet and Please follow tender
23 Tendernotice_4 1345 of 5882 B224-17-44-502-1138 , Rev 0 Auto Backwash Filter-II
outlet isolation. Please confirm. specifications
In the RO - IV cartridge filter inlet and outlet manual
butterfly valve shall be provided. The same shall be
Automatic valves are not
24 Tendernotice_4 1349 of 5882 B224-17-44-502-1142 , Rev 0 RO - IV Cartridge filters used for vessel isolation. Hence, we are not providing
required
automatic valves in the inlet and outlet. Please
confirm.
At the outlet of each RO - IV cartridge filter we don’t
Please follow tender
25 Tendernotice_4 1349 of 5882 B224-17-44-502-1142 , Rev 0 RO - IV Cartridge filters anticipate any flow meter. Flow meter shall be
specifications
provided in the common outlet. Please confirm.
CIP system for UF if
Please confirm whether we can provide common
26 General recommended by supplier shall
Cleaning system for both RO and UF System.
be separate
Please confirm whether the below documents has to
These documents are not
be submitted along with the bid:
General requirement for static 1.0 Document Control Index required with bid, however the
27 Tendernotice_7 3247 of 5882 1.0 Document Control Index
equipment 3.0 Filled-in Datasheet same shall be submitted at
3.0 Filled-in Datasheet
post order stage.
Please confirm whether the below documents has to
Documents required during
be submitted along with the bid:
Detailed engineering while
28 Tendernotice_7 2962 of 5882 Clean Agent System 1.0, 3.0, 4.0, 5.0, 6.0, 7.0, 8.0, 9.0, 10.0, 12.0, 13.0,
finalising the clean agent
14.0, 15.0, 16.0, 17.0, 18.0 & 32.0.
vendor
All dwg./ doc. tick marked
under "With bid" in
Instrumentation VDR (B224-
Please confirm whether the below documents has to
501-16-51-VDR-8700) shall be
29 Tendernotice_7 2962 of 5882 Instrumentation be submitted along with the bid:
furnished by Bidder in their
4.0, 5.0, 6.0, 10.0, 14.0, 31.0, 35.0 & 38.0.
bid (including doc. at S.no.2 for
filled-in Format for technical
compliance)
Office (space only) in control room, maintenance-cum-store room
in chemical house building (space only), laboratory (space only) Please confirm whether the same is required in both Required both in RWTP & RO-
30 Tendernotice_3 414 of 5882 4.0 Exclusion from Contrator's scope
and intercom phone facility shall be provided by M/s HRRL to the RWPT & RO-DM Package. DMP
contractor free of cost
4.0 Scope of Contractor's worl/Supply This is part of detail
31 Tendernotice_3 231 of 5882 Analyser Room (with air conditioner) Please confirm the size of the Analyser Room.
(ISBL) engineering
4.0 Scope of Contractor's worl/Supply This is part of detail
32 Tendernotice_3 258 of 5882 Analyser Room (with air conditioner) Please confirm the size of the Analyser Room.
(ISBL) engineering
15. NaOCl SHALL BE STORED IN UF SHED. STORAGE AREA FOR 20
Please confirm whether storage area (or) Storage
33 Tendernotice_3 952 of 5882 Chemical House DAYS TO BE PROVIDED IN UF SHED & 2 NOS (1W+1SB) OF Storage Area
Tank to be provided.
PNEUMATIC PUMPS SHALL BE PROVIDED IN UF SHED .

15. NaOCl SHALL BE STORED IN UF SHED. STORAGE AREA FOR 20


Please confirm whether storage area (or) Storage
34 Tendernotice_3 1096 of 5882 Chemical House DAYS TO BE PROVIDED IN UF SHED & 2 NOS (1W+1SB) OF Storage Area
Tank to be provided.
PNEUMATIC PUMPS SHALL BE PROVIDED IN UF SHED .

Chemical filter unit shall be skid mounted


accommodating pre filter, after filter, fresh air fans
with motors (1 working & 1 standby) and accessories
including suitable canopy hood over motor and belt
drive if installed outside.
OR
Chemical filtration shall be provided in fresh air
circuit of AC system (installed in AHU Room to
35 Tendernotice_7 3014 of 5405 3.10.3 Chemical Filter shall be provided in fresh air circuit Not acceptabele.
maintain air quality (G1 environment) inside
Follow Tender requriements.
substation cum control room building (Substation-
95). Chemical filters shall be selected to capture
Group-A gases as per ISA-71- 04 standard (from GX
environment at outside to G1 environment at
inside).
We will consider fresh air fans with pre filter and fine
filter.
Kindly consider BGRE in the Approved vendor list for
36 General HVAC vendor Not acceptabele.
HVAC System
Follow Tender requriements.
Fire protection system (All firewater headers and branch lines in
All fire Headers shall be laid on above ground using
37 Tendernotice_3 305 of 5882 1.1.1 RCC paved areas shall be laid in RCC trenches with sand filling and Please follow tender
pedastals and pipe rack wherever available
removable pre-cast cover with sealing.)
Technical specification / requirement for CCTV
Will be clarified in Technical
38 Tendernotice_3 373 of 5882 7.0 Overview of scope of work including the quantity of cameras (Building wise),
Amendment TA - 01
monitoring station etc - shall be provided
Technical specification / requirement for EPABX
Will be clarified in Technical
39 Tendernotice_3 373 of 5882 7.0 Overview of scope of work system including the quantity of IP Phones (Building
Amendment TA - 01
wise) shall be provided
We understand the Contractor's scope does not
include Building Management System , Building
Will be clarified in Technical
40 Tendernotice_3 373 of 5882 7.0 Overview of scope of work Intelligent System and Access control system since
Amendment TA - 01
the technical requirement / specification is not
covered in the tender

LAN nodes of twenty (20) nos for connecting the User


LAN points shall be provided in
PCs will be provided at each of the following
all the required buildings
buildings
under the EPCC Package for
a. Sub station - 23
the followings:
b. Sub station - 25
Data (PC, Laptops, Printers,
c. Satellite rack room 06
41 Tendernotice_3 373 of 5882 7.0 Overview of scope of work Various IT Devices),IP
d. Satellite rack room - 14
Phones,Building Intelligent
But it is to be noted that CCTV network and
Systems (BIS),CCTV in the
Telephone network (EPABX system for IP Phone
Buildings,Building
system) will be a standalone and separate network
Management System
with no connectivity with LAN.
(BMS),Access Control etc.
Please confirm
All other as per BID document.
PLC for the fire protection system will be provided Please follow tender. Fire
42 Tendernotice_3 55 of 5882 4.6 with panel mounted HMI (15 " touch screen) for the water pumping is not in
operation. Please confirm contrator scope.
Purchaser's panels for Flare system & Fire water Bidder can consider 2100mm
pumps of ten (10) nos will be housed in SRR- 14 (H) x 800mm (W) x 800mm (D).
43 Tendernotice_3 363 of 5882 2.10 Control room. However actual dimensions
Please share the dimension of these panels to locate shall be informed during
and identify in the layout detailed engg.

ETP Contractor's panels for ETP facilities of twenty


(20) nos will be housed in SRR- 06 Control room.
44 Tendernotice_3 363 of 5882 2.11 Same as point-43 above
Please share the dimension of these panels to locate
and identify in the layout
As already specified in Note-
4 of Inst. scope of work,
Bidder shall consider 10 DIs
and 10 DOs in each
Hardwired interface between Purchaser's DCS and package PLC for RWTP
package and RO-DM &
the PLC for RWTP (SRR-14) / RO-DM & CPU (SRR-06)
CPU package for achieving
is not possible as the distance is 3200 m
45 Tendernotice_3 369 of 5882 4.0 the hard-wired interface with
Hence we envisage only Soft link interface
purchaser’s control system
andDI/Dos in the respective PLCs are not considered in SRR-14 & SRR-6
Please confirm respectively.
Further cabling to
Purchaser's DCS is not in
Bidder's scope.
PRE-BID QUERIES

NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package

BIDDING DOCUMENT : B224-501-17-44-PA-T-8700


Reference of Enquiry document
Sl.No Query EIL Reply
Part / Vol.No . Page No Clause No. Subject
MECHANICAL/PROCESS
4.0 - DESIGN
Table – 1: Design Inlet Raw Water Feed &
INLET RAW
Tendernotice_3 (B224-501-17-44-PA-T- Treated Raw Water Quality:
1 24 of 5882 WATER AND Kindly confirm the form of oil, whether it free oil or emulsified oil Oil shall beTotal oil
8700) Point no 5 & 21: Oil & grease and Mineral
TREATED RAW
oils
WATER QUALITY
Tendernotice_3 (B224-501-17-44-PA-T- 4.3 - TREATED Table - 3: Treated effluent quality: point no.
2 35 of 5882 Kindly confirm the form of oil, whether it free oil or emulsified oil Oil shall beTotal oil
8700) ETP EFFLUENT 2: Oil & grease

We understand that incase of normal feed stream to RO-DM plant are not
4.4 - TREATED available (means CTBD+ treated effluent from ETP + Boiler blow down) to
In case the normal feed stream to RO-DM
RAW WATER (as RO-DM plant. In that case we can use treated raw water as feed flow to RO-
3 36 of 1135 plant are not available ……..Feed flow to RO- Bidder understanding is corrrect.
B224-501-17-44-PA-T-8700 Back-up Feed to the DM plant, and Feed flow to RO-DM plant shall be maximum 1422 m3/hr
DM : 1422 m3/hr (max)
RO-DM Plant) (max)
KIndly confirm whether our understanding is correct
Table – 4: Treated Raw Water Quality
Oil & Grease is given as BDL and
4.4 TREATED
Note 2: BDL: Below Detectable
Tendernotice_3 (B224-501-17-44-PA-T- 36 & 37 of RAW WATER (as Please note O&G shall be NIL at inlet of RO, Kindly confirm the O&G values O&G value of treated raw water shall
4 Limit/Instrument Detection Limit, BDL for Oil
8700) 5882 Back-up Feed to the ater RWTP be BDL
& grease and
RO-DM Plant)
Mineral oil are 4 mg/l & 1 mg/l respectively.

Sodium and chloride content in DM Water will contribute to conductivity.


Guaranteed Conductivity of the DM water is 0.20 micro-Siemen/cm and
Tendernotice_3 (B224-501-17-44-PA-T- 5 - TREATED
5 37 of 5882 Point no. 5: DM water quality Sodium and Chloride shall be as present in DM water corresponding to 0.20 Please follow tender specifications
8700) WATER QUALITY
micro-Siemen/cm conductivity value hence These should not be any
separate guarantee required for sodium.
Tendernotice_3 (B224-501-17-44-PA-T- Point no. 3 & 4 : Flash mixing tank - I and Separate Flash mixing tank and flash mixer is not require for HRSCC. Kindly
6 857 of 5882 Equipment list Please follow tender specifications
8700) Flash mixer - I confirm
Tendernotice_3 (B224-501-17-44-PA-T- The type and size of ACF-I is given as Vertical and Dia: 4.3 m, Ht.: 3.6 m
7 858 of 5882 Equipment list Point no. 9 : Activated carbon filters - I Please follow tender specifications
8700) (T/T), We propose to Horizontal ACF-I instead of vertical
Tendernotice_3 (B224-501-17-44-PA-T- Point no. 24: Cartridge Filter-I Feed We propose pump MOC as C: SS316 and I: SS316 instead of SS316L, as
8 859 of 5882 Equipment list Please follow tender
8700) Pumps, MOC : SS316L the TDS of inlet water is low
Tendernotice_3 (B224-501-17-44-PA-T- Point no. 29: RO-II Feed Pumps (VFD We propose pump MOC as C: SS316 and I: SS316 instead of SS316L, as
9 860 of 5882 Equipment list Shall be considered as SS 316
8700) Driven) the TDS of inlet water is low
Point no. 29: RO-II Feed Pumps (VFD
Driven), Capacity 306 m3/hr Head 195 m The discharge pressure shown in equipment list and in datasheet are
Tendernotice_3 (B224-501-17-44-PA-T- Discharge pressure indicated in
10 860 of 5882 Equipment list and in datahsteet discharge pressure contradict, however disharge pressure will be as per RO projection with
8700) datasheet is absolute pressure.
metioned as 20.5 Kg/cm2(g) with Note-4 as consideraton of NOTE-4 given in datasheet.
Minimum
PRE-BID QUERIES

NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package

BIDDING DOCUMENT : B224-501-17-44-PA-T-8700


Reference of Enquiry document
Sl.No Query EIL Reply
Part / Vol.No . Page No Clause No. Subject

Point no. 31, 32, 35, 41, 49, 50, 51, 55 & 60:
MOC CS with Glass Flake Vinyl Ester Lining
for Degasser Tower, MB Feed tank, Mixed
Tendernotice_3 (B224-501-17-44-PA-T- We propose CS with natrual rubberlining for lined pressure vessels/tanks
11 861 of 5882 Equipment list bed exchanger, RO-III Feed Tank, Dual Please follow tender specifications
8700) which is suitable for application
Media Filters-II, Activated Carbon Filters-II,
Auto Backwash Filters-II, RO-IV Feed Tank
& RO-IV Cartridge Filters

Tendernotice_3 (B224-501-17-44-PA-T- Point no. 31: Degasser Tower: Dia 3.2 m X We propose lower diameter of DGT by maintaining the velocity up 55
12 861 of 5882 Equipment list Please follow tender
8700) Ht. 4.0 m3/hr/m2
Tendernotice_3 (B224-501-17-44-PA-T- Point no. 44 & 45: Flash mixing tank - II and Separate Flash mixing tank and flash mixer is not require for HRSCC.-II
13 862 of 5882 Equipment list Please follow tender
8700) Flash mixer - II Kindly confirm
Schematic Flow SFD for CPU package is not available in tender document. Kindly provide P&ID's of CPU already provided in
14 Tender Notice 4 General Schematic flow diagram for CPU package
diagram the same. tender. Please follow that

Tendernotice_3 (B224-501-17-44-PA-T- Contractor shall provide neutalization


15 General Neutralization Datasheet for Neutralization Datasheet for neutrailization facility is not given in tender document
8700) facility as per requirement

PIPING
The Order of Precedence of documents
shall be as follows with document at level 1
4. Job specifications(specific to Particular
Tender Notice - 1 - General Terms & 2 (PDF page
16 1.7 Job only)
Condition of Work Contract no. 195)
5. Drawings
In case of any conflicts between various documents/Drawings, we presume
6.Special Condition of contract
that the Line MOC & Line size specified in the Tender P&ID Stands valid. Line size & MOC specified in tender
7.Technical Specification
P&ID's are minimum requirements.
In case, different material & line size is Please confirm.
specified in the tender drawings
Tender Notice-3 - Scope of
(Schematic Flow Diagram, PFDs, P&IDs,
17 works/supply(Plot plan & water) B224- 234 of 5882 5
etc.), the material & line size
501-17-44-SS-1001, Rev. 0
specified in the drawings shall be provided
as a minimum
P&ID (Plot plan & water) B224-501-17- 01 of 05 to 05
- P&ID with PMS and Line size
44-DWI-1001, Rev. 0 of 05
Line Size Criteria to be based on following
pipe/line velocities:

Tender Notice-3 - Scope of


works/supply(Plot plan & water) B224- 234 of 5882 5
In case, different material & line size is
501-17-44-SS-1001, Rev. 0
specified in the tender drawings
(Schematic Flow Diagram, PFDs, P&IDs,
etc.), the material & line size We presume that the bidder shall follow the tender P&ID’s for pipe sizes as
specified in the drawings shall be provided Minimum .
18 Bidder understanding is corrrect.
as a minimum
Please confirm.
PRE-BID QUERIES

NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package

BIDDING DOCUMENT : B224-501-17-44-PA-T-8700


Reference of Enquiry document We presume that the bidder shall follow the tender P&ID’s for pipe sizes as
Sl.No Query .
Minimum EIL Reply
18 Part / Vol.No . Page No Clause No. Subject Bidder understanding is corrrect.

Line Size Criteria to be based on following Please confirm.


pipe/line velocities:

Tender Notice-3 - Scope of


works/supply(Plot plan & water) B224- 261 of 5882 5
In case, different material & line size is
501-17-44-SS-1001, Rev. 0
specified in the tender drawings
(Schematic Flow Diagram, PFDs, P&IDs,
etc.), the material & line size
specified in the drawings shall be provided
as a minimum
We assume that, we have to provide Ioslation and By-pass (Butterfly type)
P&ID - Cascade Aerator for RWTP - Butterfly valve shall be considered in
19 - - Inlet control Valve for Cascade Aerator Valves to be provided for Control Valve.
upstream of each MOV
RWTP B224-17-44-501- 1112, Rev. 0
Please confirm.
UF Skid system piping MOC and size shall be developed by Bidder based
P&ID - Ultra Filtration Skids - RWTP P&ID - Ultra Filtration Skids - RWTP
20 - - on UF system Supplier and submitted alongwith Technical offer. Please follow tender specifications
B224-17-44-501- 1121, Rev. 0 Note :2 & 7
Please confirm.
P&ID - Ultra Filtration Skids - RWTP PID, Standard Symbols and Nomenclature B068-79-41-00-1191 Rev-1, does
P&ID - Ultra Filtration Skids - RWTP
21 - - Pneumatic Operated Butterfly Valves for UF not specify Pneumatic Operated Butterfly Valve, we assume that, we shall provide as per tender P&ID
B224-17-44-501- 1121, Rev. 0
Skid Operation provide the same as per PID. Please confirm.
P&ID - Treated Water Reseroir and
RO Permeate from RO-DMP line 18" - A1K
Drinking Water sump - RWTP B224- - - Please follow tender specifications
with Pneumatic Operated Gate Valve
17-44-501- 1122, Rev. 0
Tender Notice -7 - PMS - B-224-6-44- Based on good Engg. Practice and earlier experience with EIL, we suggest
22 For Restriction and use of Ball, Plug and to use Pneumatic Operatd Butterfly Valve for A1K Class for ON-OFF
0005-8700- Rev-A 3383 of 5882 Note - 7 Please follow tender specifications
Butterfly Valves refer General Notes Service. Please confirm.
A1K Piping class
Tender Notice -7 - PMS General
Table for Pressure, Temperature rating of
Notes - B-224-6-44-0005-A1- Rev-A 3450 of 5882 Table Please follow tender specifications
Ball, Plug and Butterfly valve

RWTP B224-17-44-501- 1122, Rev. 0 RO Permeate from RO DMP 18" - A1K with
P&ID - RO Based DM Plant - RO-1 Pneumatic Operated Gate Valve
Catridge Filters - RWTP B224-17-44- Catridge Filter Inlet and Outlet 10" - A1K with Based on good Engg. Practice and earlier experience with EIL, we suggest
23 502- 1124, Rev. 0; - - Pneumatic Operated Gate Valve to use Pneumatic Operatd Butterfly Valve for A1K Class for ON-OFF Please follow tender specifications
P&ID - RO Based DM Plant RO III RO-III to Permeate Tank & RO-II Feed Tank Service. Please confirm.
Skids B224-17-44-502- 1132, Rev. 0; 10" - A1K with Pneumatic Operated Gate
Valve
RO Permeate tank line 14" - A1K Isolation
P&ID - RO Based DM Plant - Reverse
Gate Valve
Osmosis Skid-1 - RWTP B224-17-44- Based on good Engg. Practice and earlier experience with EIL, we suggest
24 - - Please follow tender specifications
502- 1126, Rev. 0 to use Butterfly Valve for A1K Class. Please confirm.
RO-II Feed pumps suction line - 24" A1K
RWTP B224-17-44-502- 1125, Rev. 0
Gate Vavle
Tender Notice - 5 - Standard
specification for Electromagamnetic 1601 OF 5882 - Electromagamnetic Flow meter We presume that, Isolation and By-pass valve is not required for Magnetic
Flow meter 6-52-0002, Rev. 4 flowmeter. isolation valves for magnetic flow meter is
25
Please confirm. not required
P&ID (Plot plan & water) B224-501-17-
01 of 05 - P&ID
44-DWI-1001, Rev. 0
PRE-BID QUERIES

NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package

BIDDING DOCUMENT : B224-501-17-44-PA-T-8700


Reference of Enquiry document
Sl.No Query EIL Reply
Part / Vol.No . Page No Clause No. Subject
Tender Notice-3 - Scope of
Effluent/Treated water line service : Gate &
works/Supply for RO-DMP 261 of 5882 5 As per PIDs and Process requirement, we have to use Butterfly Valves for Please follow tender specifications
Globe Valve/ Butterfly Valve
B224-502-17-44-55-1001 Rev.0 A1K, A1N, A21V & B21V. Based on previous exeuted projects with EIL, we
26
Tender Notice - 7 -Piping Material shall submit the Data sheet for these Butterfly Valves along with our
Butterfly Valve for A1K, A1N, A21V & B21V Technical offer. Please confirm.
Specifications 3369 of 5882 - Please follow tender specifications
Spec
B224-6-44-0005-8700, Rev. A
Scope of works/supply(Plot plan &
water) B224-501-17-44-SS-1001, Rev. 16 of 23 5 A91A Piping Material Specifications
0 Piping material specification for A91A is not available . Kindly provide the PMS shall be provided along with
28
Tender Notice - 7 -Piping Material same Technical Amendement.
Specifications 3369 of 5882 -
B224-6-44-0005-8700, Rev. A
Tender Notice-3 - Scope of
works/supply(Plot plan & water) B224- 19 of 28 5 A5Y Piping Material Specifications
502-17-44-SS-1001, Rev. 0 Piping material specification for A5Y is not available . Kindly provide the PMS shall be provided along with
29
Tender Notice - 7 -Piping Material same Technical Amendement.
Specifications 3369 of 5882 -
B224-6-44-0005-8700, Rev. A

P&ID (Plot plan & water) B224-501-17- B/L FIRE WATER TAPPING LINE
30 01 of 05 - P&ID- Battery limits Please provide the B/L Fire water tapping line size .
44-DWI-1001, Rev. 0 SIZE IS IN BIDDERS'S SCOPE
P&ID (Plot plan & water) B224-501-17- Shall be provided during detail
31 01 of 05 - P&ID- Battery limits Please provide the B/L Plant air tapping line size .
44-DWI-1001, Rev. 0 engineering
P&ID (Plot plan & water) B224-501-17- Shall be provided during detail
32 01 of 05 - P&ID- Battery limits Please provide the B/L LP Steam tapping line size .
44-DWI-1001, Rev. 0 engineering
P&ID (Plot plan & water) B224-501-17- Shall be provided during detail
33 01 of 05 - P&ID- Battery limits Please provide the B/L CW supply tapping line size .
44-DWI-1001, Rev. 0 engineering
P&ID (Plot plan & water) B224-501-17- 4" Drinking Water Tapping shall be
34 01 of 05 - P&ID- Battery limits Please provide the B/L Drinking water tapping line size .
44-DWI-1001, Rev. 0 provided at B/L.

Supply of Instrument Air & Plant Air till Supply of Instrument Air & Plant Air till
commissioning & during operation of 3 commissioning of RWTP & RO-DM
Tender Notice - 3 - Process Design
months after commissioning of RWTP Plant & during operation of 3 months
Basis B224-501-17-44-DB-1001, Rev. 28 of 5882 9) Note - 1
shall be in scope of RWTP Contractor after commissioning of RWTP & RO-
1
since RWTP shall be commissioned Bidder assumes that, Bidder should provide for Instrument Air & Plant Air DM Plant shall be in scope of
before commissioning.. piping for RWTP and RO DM Plant with provision of connection with Contractor since RWTP & RO-DMP
35
Compressors supplied by Bidder and Plant Compressed Air System. Please shall be commissioned before
confirm. commissioning of compressed air
system (Plant Air & Instrument Air).
Cooling water supply for the
compressed air system shall be in
scope of RWTP contractor.
PRE-BID QUERIES Supply of Instrument Air & Plant Air till
commissioning of RWTP & RO-DM
Plant & during operation of 3 months
after commissioning of RWTP & RO-
Bidder assumes that, Bidder should provide for Instrument Air & Plant Air DM Plant shall be in scope of
NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package
piping for RWTP and RO DM Plant with provision of connection with Contractor since RWTP & RO-DMP
35
Compressors supplied by Bidder and Plant Compressed Air System. Please shall be commissioned before
BIDDING DOCUMENT : B224-501-17-44-PA-T-8700 confirm. commissioning of compressed air
Reference of Enquiry document system (Plant Air & Instrument Air).
Sl.No Query EIL Reply
Cooling water supply for the
Part / Vol.No . Page No Clause No. Subject compressed air system shall be in
Supply of Instrument Air & Plant Air till scope of RWTP contractor.
commissioning & during operation of 3
Tender Notice - 3 - Scope of
months after commissioning of RWTP
works/supply(Plot plan & water) B224- 231 of 5882 4
shall be in scope of RWTP Contractor
501-17-44-SS-1001, Rev. 0
since RWTP shall be commissioned
before commissioning..
Tender Notice - 3 -Process Design Cooling Water supply for the compressed
Bidder assumes that, Bidder to provide Cooling water supply system for the
36 Basis B224-501-17-44-DB-1001, Rev. 28 of 5882 9) Note - 1 Air system shall be in scope of RWTP bidder understanding is correct
Compressors supplied by Bidder and not Others. Please confirm.
1 Contractor.
Contractor shall design, engineer, supply
Tender Notice - 3 - Scope of and install the fire protection system
works/supply(Plot plan & water) B224- 304 of 5882 1.1.1 inside Package (Water Block) facilities viz. Bidder presumes that scope of work shall be as per the layout drawing ( fire
37 501-17-44-SOW-5000, Rev. A (RWTP, RO-DM, CPU & Associated water P&ID DWG) given along with the Tender for RWTP, RO-DM and CPU BIDDER TO FOLLOW BID
Facilities) DOCUMENT
only. Please clarify about the associated faclties scope.
Fire water P&ID B224-501-17-44- Fire water P&ID for RWTP, RO DM , CPU &
- -
10101, Rev. A Associated Facilities
Tender Notice - 3 - Scope of
Contracor shall supply the piping in Based on site conditions, Bidder shall select Prefabricated spool pieces Bidder can select based on site
38 Supply/Works(Piping) B224-501-16-43- 333 of 5882 3
Prefabricated Spool Pieces requirement and site assembly and welding for Piping. Please confirm. condition.
SOW-8700, Rev. A
ELECTRICAL
1.Bidder's understanding is correct.
1. As per document no : B224-501-16-50-sow-8700(Rev A) Scope of Supply
& Work (Page 339 of 5882) only Power Transformers 66/6.9KV and
Distribution Transformers 6.6/0.433KV are in the scope. Tie Transformer
5. Canopy shall be provided for all
and Generator Transformer or its related STG Panels/parralel operation with
outdoor equipments except transformers
grid / CPP Equipments mentioned in the tender document are not applicable
3.GENERAL / & Capacitor Banks. However, Roof slab
in this project. please confirm
39 Tender 3 (B224-501-17-44-PA-T-8700) 180 of 5882 DESIGN for all transformers, Capacitor banks and
CONSIDERATIONS removable type shed for Generator 2. Bidder's understanding is NOT correct.
2.As Per Tender Document 4 - Page 116/248 - B224-000-16-50-DS-1003 -
transformers & Tie transformers shall be Bidder to follow tender requirement for
for Power Transformer and Page 111/248 - B224-000-16-50-DS-1004 - for
provided. the provision of roof slab for the
Distribution Transformer , in the datasheet both are outdoor installation. We
transformer bay.
understand that both Power transformer and distribution transformer shall be
installed outdoor without roof slab/shed. Please confirm

Note:
1. The rating and number of emergency 1. Bidder understands that Emergency Power at 6.6KV Level will be
1.Bidder's understanding is correct.
DG set shall be finalized during detailed provided by client ( Refer : B224-501-16-50-sow-8700(Rev A) Scope of
5.2 Power Source engineering. The emergency DG set for the Supply & Work - Exclusions point no:4.3 - page356 OF 5882).
40 Tender 3 (B224-501-17-44-PA-T-8700) 183 of 5882
details plant shall cater to emergency loads of Hence, Emergency DG(either in 6.6KV or 415V) is not in bidder scope.
various units, utility and offsite areas… Please confirm.
2.Bidder's understanding is correct.
2. 1 no. Dedicated DG for the black start 2. Black start is not in bidder's scope. Please confirm
shall be considered.
PRE-BID QUERIES

NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package

BIDDING DOCUMENT : B224-501-17-44-PA-T-8700


Reference of Enquiry document
Sl.No Query EIL Reply
Part / Vol.No . Page No Clause No. Subject

7. For critical/long feeders and plant feeders


connected to main power generation and
5.4.3.3 RELAY distribution bus. A plant feeder implies
41 Tender 3 (B224-501-17-44-PA-T-8700) 192 of 5882 PROTECTION outgoing feeders from one switchboard to Bidder's understanding is correct
PHILOSOPHY another switchboard of same voltage level.
Pilot wire communication for feeder Bidder understands that this point is related to the Generation plant part & it
differential relay shall be throuch OFC. is not applicable for the bidder. Please confirm

16. One set of bus differential relays


(87B) and bus wire supervision relay (95
42 Tender 3 (B224-501-17-44-PA-T-8700) 193 of 5882 S.No:16 B) for each bus section shall be Bidder's understanding is correct
provided for HV switchboards connected
directly to generation buses.

26. 415V DG set shall be provided with


protection but not limited to
51V,51G,40,46,86,95,80,64R etc for
43 Tender 3 (B224-501-17-44-PA-T-8700) 193 of 5882 S.No:26 generator rated above 500KVA and Bidder understands that 415 V DG is not in bidder scope. Please confirm Bidder's understanding is correct
Generator rated less than 500KVA shall
have 51V,51G,40,46,86,95,80 unless
otherwise agreed with the owner.
5.6.1.1 EHV
Outdoor switchyard is not applicable for this 66KV system as per 5.5.2 -
44 Tender 3 (B224-501-17-44-PA-T-8700) 199 of 5882 OUTDOOR Outdoor Switchyard Bidder's understanding is correct
5.5.2 EHV SWITCHYARD Notes 2 (Page 197). Please confirm
SWITCHYARD

Bidder understands that, for both Fire alarm and Telephone system, DC
45 Tender 3 (B224-501-17-44-PA-T-8700) 205 of 5882 5.6.14 DC SYSTEM 1.5 Fire Alaram and 1.6Telephone System source can taken from Plant Main DC system itself. Separate DC Panel is Bidder's understanding is correct
not required for Fire alaram and Telephone system. Please confirm

5.7.2 CABLE As per Tender document 6, sheet 72/1000 S.No:345 the cable tray is
4 - Type of cable trays : Galvanized Bidder to refer Engineering Design Basis
46 Tender 3 (B224-501-17-44-PA-T-8700) 208 of 5882 LAYING mentioned as FRP. Please confirm the type of cable trays to be considered
prefabricated for material of cable tray.
PHILOSOPHY by bidder

Point no. 5 - Confirm that electrical


documents, all Drawings / Data
TECHNICAL
requirements as per scope of work and as
CONFIRMATION Being issued through technical
47 Tender 5 1411 of 5882 per specifications and codes attached and Please provide B224-109-16-50-VDR-7205.
LIST amendment.
referred to have been included and
(ELECTRICAL)
shall be submitted as per Vendor data
Requirements B224-109-16-50-VDR-7205.

2.0 PROJECT
CONTRACTOR shall refer the Key Single Key Single Line Diagram is not found in the Tender Documents . Please Being issued through technical
48 Tender 3 (B224-501-17-44-PA-T-8700) 491 of 5882 DESCRIPTION/
Line Diagram (attached with tender) furnish the same amendment.
DATA
PRE-BID QUERIES

NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package

BIDDING DOCUMENT : B224-501-17-44-PA-T-8700


Reference of Enquiry document
Sl.No Query EIL Reply
Part / Vol.No . Page No Clause No. Subject
Bi metal overload relays of various current
ranges required for motors likely to be
connected to a contactor must be identical in As per the SLD (Ref : Tender Notice 4, Page No:1205 of 5882, Drawing No:
dimension for inter-changeability. In case B224-109-16-50-D5-1026 (Sheet5)(RevA)) for <=55KW rated motors, the
Being issued through technical
49 Tender 8 4418 of 5882 8.5.2 offered relays are with different dimension Electronic Motor Protection relay is provided. We understand that, Bidder
amendment.
for any particular starter module, special can consider bimetallic relay for motors rating <=55kW(less than or equal to
mounting plate suitable for mounting 55kW. Please confirm.
different relays shall be provided in all the
modules of that size.
For EHV or HV indoor GIS /HV Panel only
50 Tender 6 2524 of 5882 Item Code :13BG Vendors - GE and Siemens to be included in the Vendor List Bidder to follow Bid requiremnent
ABB is mentioned in the Vendor List

51 Tender 6 2527 of 5882 Item Code :14CC General Please provide vendor list for 66kV Isolating breaker panel Bidder to follow Bid requiremnent

SPECIFICATION 5.1 Busbars of busduct shall be made of


FOR high conductivity electrolytic aluminium or
52 Tender 8 4598 of 5882
MV AND HV BUS copper flats/
DUCT channels.

SPECIFICATION
FOR 5.3.2 Bus bars shall be of high conductivity Bidder understands that Bidder can decide high conductivity Electroytic Being issued through technical
53 Tender 8 4349 of 5882
High Voltage electrolytic aluminium or copper Aluminium or Copper conductor material for the busbars. Please confirm amendment.
Switchboards

SPECIFICATION
FOR 5.27.1 Bus bars shall be of high conductivity
54 Tender 8 4413 of 5882
Medium Voltage electrolytic aluminium or copper
Switchboards
O&M
Labor required for carrying out other sundry
activities shall be hired by the
Bidder understanding is correct in
contractor on as required & as agreed with
general. For detail scope, Refer Scope
HRRL. However, contractor shall Bidder understands that contractor shall include cost for other required
Tendernotice_3 (B224-501-17-44-PA-T- of Works/Supply
55 410 of 5882 2.0- General augment the above list of manpower as per manpowers like helpers, store keeper , and sweeper in his quoted lump sum
8700) Operation Contract
the instructions of HRRL for price for operation period. Please confirm.
Specifications ( Doc No:B224-
carrying out trouble free and successful
501/502/509-17-44-OM-1001)
operation of RO-DMP, CPU and
RWTP.

4.0 EXCLUSIONS M/s HRRL shall provide/arrange for the


Tendernotice_3 (B224-501-17-44-PA-T- FROM following during Operation contract Bidder understands that contractor is not laible for failure in meeting
56 414 of 5882 Bidder understanding is correct
8700) CONTRACTOR’S duration: required output during power supply failure by client. Please confirm.
SCOPE Power (free of cost) at motor control centre.

M/s HRRL shall provide/arrange for the


4.0 EXCLUSIONS
following during Operation contract
Tendernotice_3 (B224-501-17-44-PA-T- FROM Bidder understands that potable water for operation personnel duirng
57 414 of 5882 duration: Bidder understanding is correct
8700) CONTRACTOR’S operation period shall be provided by Client. Please confirm.
Utilities (free of cost) at RO-DMP, CPU and
SCOPE
RWTP battery limit
PRE-BID QUERIES

NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package

BIDDING DOCUMENT : B224-501-17-44-PA-T-8700


Reference of Enquiry document
Sl.No Query EIL Reply
Part / Vol.No . Page No Clause No. Subject
M/s HRRL shall provide/arrange for the
following during Operation contract
duration:
4.0 EXCLUSIONS Disposal of exhausted filters media (DMF,
BIdder understands that disposal of sludge from RWTPalso excluded from
Tendernotice_3 (B224-501-17-44-PA-T- FROM ACF, Degasser, etc.),
58 415 of 5882 Contractors scope (including transportation & tipping fee) . Bidder understanding is correct
8700) CONTRACTOR’S cartridges, resins, membranes (UF & RO)
Please confirm.
SCOPE and other process consumables
from the RO-DMP, CPU and RWTP to the
disposal location (including
transportation)
GENERAL
PDF pg 7 of As per Tender the Time Schedule for Project Bidder has executed many projects in this sectors and in our view the time
59 Tendernotice_1 - Invitation For Bid 3 Bidder to follow Bid requirement.
400 Completion is 18 Months frame for execution of similar project required is 26 Months.
Tendernotice_1 - Invitation For Bid: 4. PDF pg 8 of As per Tender the last date of pre bid Bidder requests employer for acceptance of pre bid queries till the day prior
60 e Queries were accepted till 15/07/2019
Salient Features 400 queries submission is 09-JUL-2019 to the Pre Bid Meeting.
PIPING
Mixed Bed Frontal Piping Moc A1K . Bidder's recommendation is for Moc Rubber lined pipes are not envisaged.
PART – III: TECHNICAL SECTION
61 1362 of 5882 Piping & Instrumamentation Diagram A3Y (CSRL) for Mixed Bed Frontal Because which is suitable for HCL. CPVC or equivalent MOC specified in
(Tendernotice_4)
Please confirm. EIL PMS may be provided
PART – III: TECHNICAL SECTION B224-6-44-0005-
62 3368 of 5882 Piping Material Specification A3Y PMS are not provided. Please provide the same Refer reply to point. No 69
(Tendernotice_7) 8700,REV A
CIVIL
Tendernotice_3- Scope of work and
supply PPG lining is not acceptable.
Bidder presumes that PPG lining shall also be acceptable for its versatile
63 (Civil-Structural & Architectural) 322 of 5882 2.0 x) Acid / alkali proof tile lining Acid/Alkali tile lining shall be as per
application. Please confirm.
Doc No B224-501-81-41-SOW-8700 Spec No.6-65-0061 & 6-65-0062.
Rev. C

All membranes and coating shall be as


1)Bidder presumes all membranes / coatings shall be applied at any time
Tendernotice_3- Protective coating per Job Spec No. B224-000-81-41-SP-
All membranes / coatings shall be applied at after completion of 28 days of curing.
system for concrete structure. 0001. No approved Manufacturer list
64 554 of 5882 1.1.1 not less than seven days and not more than
Doc No B224-000-81-41-SP-0001 is available for these items. All
28 days after curing is completed. 2) Manufacturer's name is not available in vendor's list. Please provide the
Rev. B material shall be supplied as per Job
same.
Spec No. B224-000-81-41-SP-0001.

Tendernotice_3- Equipment list for


raw water treatment plant RCC tanks with internal epoxy lining (EL) at
65 844 of 5882 Serial no 2, 4, 5 Specification for epoxy lining is not found. Kindly provide. shall be provided in amendment
Doc No B224-501-17-44-EL-1001 liquid contact area.
Rev. 0

Bored cast-in-situ piles (with permanent MS


Tendernotice_3- Geotechnical data Bidder to note that use of permanent
liner of 6mm thickness with minimum Bidder Presumes that this Bored Cast-in-situ piles doesn't require any MS
66 Doc No B224-501-81-41-GTD-8700 815 of 5882 6.1 liner as specified in tender document
embedment of 300mm into hard clay layer / lining it will be directly in contact with ground.
Rev. 0 is a mandatory requirement.
soft rock)
PRE-BID QUERIES

NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package

BIDDING DOCUMENT : B224-501-17-44-PA-T-8700


Reference of Enquiry document
Sl.No Query EIL Reply
Part / Vol.No . Page No Clause No. Subject

Not Acceptable.
Piles shall be terminated with minimum embedment of 300mm into hard clay
Tendernotice_3- Geotechnical data Termination criteria of piles has been
layer / soft rock subject to SPT N-value more than 50. If this condition is
67 Doc No B224-501-81-41-GTD-8700 815 of 5882 6.1.1 Termination of piles clearly specified in tender document
achieved within or less than 15.0m below cut-off-level, pile termination can
Rev. 0 and the same shall be religiously
be permitted at this level. Please confirm if this is acceptable.
followed.
PROCESS
We asked carbon media vendor to confirm for the fluoride removal from
activated carbon media but vendor does not given guarantee for fluoride
removal from 1.6 ppm to 1.0 ppm for drinking water application.

As per vendor "carbon is used for Drinking water application for taste &
4.0 Design Inlet Raw
Tendernotice_3 (B224-501-17-44-PA-T- 24, 25 & 948 Notes: point no. 6: Fluoride level in drinking odour application but not for fluoride. Carbon may remove Fluoride but can
68 water and treated Please follow tender
8700) of 5882 water shall be < 1 ppm after treatment not guarantee that inlet value of 1.6 ppm will be reduced to 1 ppm. "
raw water quality
Please note that as per IS10500 drinking water standards permissible limit
for fluoride is 1.5 ppm (max).

Kindly confirm
Process Datasheet Activated carbon filter - I & II: As per tender
Tendernotice_3 (B224-501-17-44-PA-T- 965 & 1013 of ACF backwash velocity shall be maintained same as service water velocity.
69 no: B224-502-17-44- backwash rate (velocity) for ACF is given as Please follow tender
8700) 5882 Hence Service water and Backwash water flow will remain same.
DS-1009 & 1047 18 m3/hr/m2

Activated carbon filter - I & II: As per tender


air scouring for ACF requirement : YES
Process Datasheet
Tendernotice_3 (B224-501-17-44-PA-T- 966 & 1014 of Bidder requests employer to remove the air scouring for ACF.As air scouring
70 no: B224-502-17-44- Please follow tender
8700) 5882 Air scouring rate : 750 Nm3/hr and duration is not required for ACF
DS-1009 & 1047
for air scouring given as 5 minutes and
elsewhere
Process Datasheet Please note that MB vessels are internally lined hence corrosion allowance
Mixed Bed Exchanger
Tendernotice_3 (B224-501-17-44-PA-T- no: B224-502-17-44- is not applicable and shall be as NIL. Corrosion allowance will be applicable
71 997 of 5882 Corrosion allowance for shell / Ends (mm) Please follow tender
8700) DS-1035, Sheet 2 of for only unlined vessels.
as 1.5 / 1.5 and elsewhere
3
6.0 Format for
Tendernotice_3 (B224-501-17-44-PA-T- 6.2 : Maximum consumption figures for Bidder requests employer to allow use of chlorine gas instead sodium
72 240 of 5882 chemical and utility Please follow tender
8700) chemicals chlorite for RWTP
consumption figures

Please note that RO III high pressurized reject water is directly feeding to
HRSCC II and other source of water from backwash/centrate waste holding
sump - II is feeding to HRSCC II.
Schematic flow diagram: RO-DMP: It is
Drawing No.: B224- being observed that as per flow diagram RO In this case there will not be proper blending of two different water source in
73 Tendernotice_4 1281 of 5882 Please follow tender
17--44-502-0101 III reject water is directly feed HRSCC II HRSCC II,

Hence bidder propose to pass the RO III reject water in backwash/centrate


waste holding sump II (by increasing sufficient volume of sump) for proper
mixing and laminar flow can be transferred to HRSCC - II
PRE-BID QUERIES

NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package

BIDDING DOCUMENT : B224-501-17-44-PA-T-8700


Reference of Enquiry document
Sl.No Query EIL Reply
Part / Vol.No . Page No Clause No. Subject
GENERAL

Yes, Bidder’s understanding is correct.


However, Bidder shall ensure all
safety & illumination requirement etc
and shall also ensure necessary
approvals from HRRL for working
74 - - - Night Shift We presume that night shift work shall be permitted. Kindly confirm the same. during night.
Since this is a technology-oriented project, considerable time is required for design, Bidder to follow Bid requirement.
engineering and procurement (mainly of long lead imported items). Also
Time Schedule For considering tough weather conditions at site we request you to provide at least 24
75 Tender Notice - 1 7 of 400 IFB CLAUSE 3.0 Completion months of project duration. Kindly confirm the same.
GTC Clause 10.0 (Pg We request the Client to waive off the Milestone LD completely as the project Not acceptable, Bidder to follow Bid
76 Tender Notice - 1 220 OF 400 220) Milestone LD duration is short. requirent

We observed that only one vendor is approved for GRE pipes. We request you to Please folloe tender
77 Tender Notice 2887 of 5882 Vendor List GRE Pipes Vendor propose additional vendors which helps in getting competitive prices.
We presume that graded site shall be handed over to the successful bidder for the Refer Clause No. 1.0 of Part-C (UG
proposed water block package area and the same is not in the scope of this Civil) of Doc No. B224-501-81-41-
78 Tender Notice 109 of 5882 A.4.1.1 Site grading package. Please confirm. SOW-8700.
In the referred clause, we understand that compound wall is in bidders No compound wall in Bidder's scope.
79 Tender Notice 48 of 5882 3.1 Compound wall scope, Please furnish the length of the compound wall
As per the referred clause, settlement are mentioned as 25 mm / 40 mm for Bidder to follow Bid requirement.
B 4.1.1 Isolated footing & rafts. However, actual settlement could be adopted based
80 Tender Notice 130 of 5882 Sr. No. 5.1 to 5.3 Foundation Design Minimum requirements. on the IS 1904 (Table-1). Please confirm.
UF system shall be designed based
on outlet HRSCC TSS < 30 ppm.
As per specified clause document, UF has to be designed with raw water
qualities as mentioned in Table 1 of doc: B224-501-17-44-DB—1001, but
inlet TSS as per table 1 i.e. 350 max raw water quality, which is not treated
outlet of HRSCC to design UF module . Hence, kindly confirm that bidder can
81 B224-501-17-44-DS--1008 904 of 5882 - Feed water qualities for UF design design UF system as per TSS value at the outlet of HRSCC.
The UF recovery of 90 % with inlet TSS of 30 mg of l (outlet of HRSCC) Please follow tender
Document No : B224-501-17-44-DB-- seems to be on higher side. Therefore kindly allow bidder to design UF
82 1001 26 of 5882 5.1 Recovery of UF min 90 % recovery as per UF system supplier design .
Kindly allow bidder to Design of UF system including recovery, operating Please follow tender
Document No : B224-501-17-44-DS-- flux, backwash system shall be as per UF manufacturer recommendation with
83 1010 906 of 5882 - UF backwash system respect to feed water qualities. Kindly confirm.
We have understood from bid document that, one part of clarified water from Bidder understanding is correct
HRSCC (backwash will be routed to UF feed tank by gravity & other part will
Document No : B224-501-17-44-DB-- Routing of clarified water from HRSCC routed to HRSCC (process ) by pump with provision of routing to horticulture
84 1001 27 of 5882 6 backwash water tank. Kindly confirm.
As per mentioned clause maximum flow is higher than design flow, & as per Please follow cascade aerator
schematic diagram of RWTP, feed flow to cascade aerator is 6507 m3 of hr. datasheet
Document No : B224-501-17-44-DS-- we presume that cascade aerator should be designed for 6507 m3 of hr .kindly
85 1001 895 of 5882 - Design flow of cascade aerator confirm
PRE-BID QUERIES

NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package

BIDDING DOCUMENT : B224-501-17-44-PA-T-8700


Reference of Enquiry document
Sl.No Query EIL Reply
Part / Vol.No . Page No Clause No. Subject
Document No : B224-501-17-44- 4" Drinking Water Tapping to be
DS—1001 29 of 5882 11 & provided as indicated in Scope
& 1290 of P&ID of Battery Drawing No. B224-501-81-41-04551
& 5882 limit
B224-17-44-501—1111
86 Drinking water supply Pl provide pipe size of drinking water supply available at RWTP battery limit.
Document No: B224-501-17-44- Pl provide the battery limit condition of fire water available at RWTP battery BIDDER TO REFER BID DOCUMENT
87 DS—1001 29 of 5882 11 Fire water supply limit.
Characteristics cooling tower blow down is not ionically balanced & not Ionic balanced feed streams consists
matching with TDS of 1428 mg of l, therefore we presumed that RO will be of CTBD, ETP Treated water & boiler
Document No: B224-501-17-44- designed based TDS value & adjust sodium, chloride to match with TDS. blowdown shall be considered for
Cooling tower blow down characteristics for
designing of RO
88 DB—1001 34 of 5882 4.1 design of RO-DM plant Kindly check & confirm
refer point no.101

Document No: B224-501-17-44- Combination of treated raw water used as In order to design RO DM plant with correct TDS value, Kindly confirm the
89 DB—1001 36 of 5882 4.4 feed water for RO-DM plant combination of treated raw water can be used as feed water for RO-DM plant.
We presumed that there is no OSID is applicable for both RWTP & RO DM OISD norms shall be followed by
Document No: B224-501-17-44- OSID for overall plot plan of RWTP & RO plant layout preparation & the complete RWTP & RO DM plant is classified contractor
90 DB—1001 47 of 5882 3.1 DM plant under Non-hazardous area. Kindly confirm.
In order to avoid space occupied by Hypo dosing system & in the view hypo Please follow tender
storage, safety handlingfacilities, we request you to allow bidder to dose clo2
Schematic flow in drinking water’s disinfection instead of Hypo since we are already dosing
91 Drg No: B224-501-17-44-1001 1278 of 5882 diagram Hypo dosing for Drinking water disinfection ClO2 in RWTP pretreatment. Kindly confirm
Document No : B224-502-17-44-SS- Recovery of RO-IV skids shall be 55%
1001 250 of 5882 2.13 There is a discrepancy between two clauses on recovery of RO skid. We (minimum)
Document No : B224-502-17-44-DS- presumed that recovery of RO-IV skid can be designed with min 50 %
92 1060 1028 of 5882 PDS Recovery of RO-IV skid recovery.
Document No : B224-501-17-44-SS- HCl & NaoH shall be free supply to
1001 223 of 5882 bidder by HRRL
& & 247 of 5882
B224-502-17-44-SS-1001 2.1
95 B224-17-44-501-1135 1314 of 5882
& &
B224-17-44-502-1149 1356 of 5882 There is a discrepancy between two clauses on supply of HCl required for both
RWTP & RO DM plant. We presumed that HCl will be supplied by HRRP to
96 P&ID Supply of HCl contractor on free supply. Kindly confirm.
Indicative layout of We understood from indicative RWTP layout, width of road way within Please follow tender specifications
97 B224-501-17-44-1002 1276 of 5882 RWTP Width of roadway inside Treatment plant treatment plant battery limit is 6 m. kindly confirm
There is a discrepancy between two clauses on capacity of clarified water shall be provided in amendment
B224-501-17-44-EL-1001 847 of 5882 S.No: 16 storage tank. But We presumed that capacity of tank will be 300 m3 . Kindly
98 B224-501-17-44-DS-1016 913 of 5882 - Capacity of clarified water storage tank confirm.
There is a discrepancy between two clauses on capacity of centrifuge to be shall be provided in amendment
B224-501-17-44-EL-1001 847 of 5882 S.No: 21 designed. But we presumed that capacity of centrifuge will be 25 m3 of hr .
99 B224-501-17-44-DS-1021 918 of 5882 - Capacity of Centrifuge Kindly confirm.
B224-501-17-44-EL-1001 847 of 5882 S.No 17 There is a discrepancy between two clauses on capacity of pump. But we shall be provided in amendment
100 Capacity of clarified water transfer pumps presumed that capacity of pump will be 425 m3 of hr. Kindly confirm.
PRE-BID QUERIES

NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package

BIDDING DOCUMENT : B224-501-17-44-PA-T-8700


Reference of Enquiry document
Sl.No Query EIL Reply
Part / Vol.No . Page No Clause No. Subject There is a discrepancy between two clauses on capacity of pump. But we shall be provided in amendment
100 B224-501-17-44-DS-1017 914 of 5882 - Capacity of clarified water transfer pumps presumed that capacity of pump will be 425 m3 of hr. Kindly confirm.
B224-501-17-44-EL-1001 849 of 5882 S.No 31 MOC of Polyelectrolyte Solution Dosing There is a discrepancy between two clauses on MOC of pump. But we shall be provided in amendment
101 B224-501-17-44-DS-1031 929 of 5882 - pumps (HRSCC Process ) presumed that MOC of pump will be PP. Kindly confirm.
B224-501-17-44-EL-1001 852 of 5882 S.No 54 There is a discrepancy between two clauses on width of chemical house. But shall be provided in amendment
102 B224-502-17-44-DS-1126 951 of 5882 - Width of chemical house we presumed that width of chemical house will be 25 m. Kindly confirm.
There is a discrepancy between two clauses on size of soda ash dosing tank shall be provided in amendment
B224-502-17-44-EL-1001 873 of 5882 S.No: 124 ,But we presumed that size of soda ash will be 3.7 m dia x 3.5 m LD m.
103 B224-502-17-44-DS-1119 1088 of 5882 - Size of Soda Ash Dosing Tanks : Kindly confirm.
There is a discrepancy between two clauses on capacity of tank, but we shall be provided in amendment
B224-509-17-44-EL-1001 879 of 5882 S.No 3 CPU Feed tank capacity presumed that effective capacity will be 5712 m3. Kindly confirm.
There is a discrepancy between two clauses on capacity of tank, but we shall be provided in amendment
104 B224-509-17-44-DS-1001 1097 of 5882 - CPU Feed tank capacity presumed that effective capacity will be 5712 m3. Kindly confirm.
B224-509-17-44-EL-1001 878 of 5882 S.No 4 There is a discrepancy between two clauses on capacity of pump, but we shall be provided in amendment
105 B224-509-17-44-DS-1002 1098 of 5882 - CPU Feed pumps capacity presumed that capacity of pump will be 125 m3 of hr. Kindly confirm.
B224-509-17-44-EL-1001 878 of 5882 S.No 8 There is a discrepancy between two clauses on capacity of tank, but we shall be provided in amendment
106 B224-509-17-44-DS-1006 1106 of 5882 - Capacity of condensate polished tank presumed that capacity of tank will be 5712 m3. Kindly confirm.
B224-509-17-44-EL-1001 879 of 5882 S.No 9 There is a discrepancy between two clauses on head of pump, but we shall be provided in amendment
107 B224-509-17-44-DS-1007 1107 of 5882 - Head of polished condensate transfer pumps presumed that capacity of tank will be 110 m. Kindly confirm.
Please follow indicative layout in
Indicative tender (Doc No:B224-501-17-44-
layout of Raw 1002)
- water treatment -
FIRE WATER
P&ID FOR
WATER
BLOCK
(RWTP, RO-
DM & CPU
AND
ASSOCIATIN Location of SRR-14 & S of S 23 are different in both the layout. Kindly
G confirm drawing number to be referred for fixing location of SRR-14 & S of S
108 - FACILITIES) - Location of SRR-14 T S of S -23 23 in RWTP.
Indicative Please follow indicative layout in
layout of RO- tender (Doc No:B224-502-17-44-
DM plant 1002)
- treatment -

Location of SRR-06 ^& S of S 25 are different in both the layout. Kindly


confirm drawing number to be referred for fixing location SRR-06 & S of S
109 Location of SRR-06 T S of S -25 25 in RO DM plant
PRE-BID QUERIES

NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package

BIDDING DOCUMENT : B224-501-17-44-PA-T-8700 Please follow indicative layout in


tender (Doc No:B224-502-17-44-
Reference of Enquiry document 1002)
Sl.No Query EIL Reply
Part / Vol.No . Page No Clause No. Subject
FIRE WATER
P&ID FOR
WATER
BLOCK
(RWTP, RO-
DM & CPU
AND
ASSOCIATIN Location of SRR-06 ^& S of S 25 are different in both the layout. Kindly
G confirm drawing number to be referred for fixing location SRR-06 & S of S
109 - FACILITIES) - Location of SRR-06 T S of S -25 25 in RO DM plant
There is discrepancy between two causes on type of Degasser air blower. But Consider Centrifugal air blower
B224-502-17-44-EL-1001 861 of 5882 33 we presumed type of air blower should be centrifugal air blower. Kindly
110 B224-502-17-44-DS-1033 994 of 5882 Process datasheet Type of degasser air blower confirm .
There is a typographical error in capacity of RO-IV feed pump in Process Please follow tender specifications.
datasheet . As per capacity of cartridge filter & capacity of RO-IV, we Pressure exchangers are envisaged
121 B224-502-17-44-DS-1059 1027 of 5882 Process datasheet Capacity of RO-IV feed pumps understood the capacity will be 112 m3 of hr. kindly confirm. as per tender.

As per process datasheet , air scouring rate of 750 m3 of hr for both DMF & Please follow tender specifications
ACF seems very high, we request you to finalize air scouring rate as per
122 B224-502-17-44-DS-1009 966 of 5882 Process datasheet Air scouring rate for DMF & ACF CPHEEO manual .
Bidder understanding is correct
As per referred clause Drinking water quality shall confirm to IS: 10500, We
Document No : B224-501-17-44-DB- presume outlet quality as per IS: 10500 is applicable only for the parameters
123 1001 (Rev.1) 24 of 5882 4 Design Raw water & Treated water quality given as inlet raw water quality in the table. Kindly clarify.
Sludge thickener is not envisaged in
As per referred datasheet the fluid handled is mentioned as thickened sludge, tender scope.
124 B224-501-17-44-DS-1021 918 of 5882 Process datasheet Fluid Handled We presume Sludge thickener is not envisaged in the scope. Kindly clarify.
As per the referred datasheet note no. 4, It is mentioned that “the pump Please follow tender
discharge shall be provided with a recirculation line with RO for pressure and
flow
125 B224-501-17-44-DS-1024 922 of 5882 Process datasheet Note No. 4 control as per the dosing requirements”. Kindly clarify the requirement.
Bidder understanding is correct.
As per referred clause the maximum pumping capacity by raw water pumps
will be 8100 m3 of hr, but the RWTP is designed with 7335 m3 of hr in-line
with net treated water production of 6500 m3 of hr . so balance 765 m3 of hr
126 B224-501-17-44-DB-1001 23 of 5882 3 Pumping flow of raw water pumps will not be treated in RWTP. Kindly check our understanding & confirm.
Kindly furnish ionic break-up for TDS of 50 mg of l for designing RO system ionic breakup in boilerblowdown may
and to meet the required DM water quality as per tender. This will help us to be considered in same ratio as
127 B224-502-17-44-DB-1001, Rev.0 35 of 5882 4.2, Table-2 TDS Value arrive blended feed characteristics to RO system. applicable for CTBD
The Incoming 52" Raw Water line
As per referred clause, incoming raw water line to cascade aerator is from Butterfly valve to RWTP shall be
provided via pipe rack at B of L (Battery limit), whereas same is shown as laid underground and shall be as
shown in Scope Dwg. No. B224-501-
PART – III tapping point TP-5 in Scope Dwg. No. B224-501-81-41-04551.
81-41-04551 (TP-5). Supply and
TECHNICAL SECTION Kindly confirm battery limit location.
installation of this line including supply
of matching flange is in scope of
128 1370 of 5882 - Clarification in B of L location package contractor.
PRE-BID QUERIES

NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package The Incoming 52" Raw Water line
from Butterfly valve to RWTP shall be
BIDDING DOCUMENT : B224-501-17-44-PA-T-8700 laid underground and shall be as
shown in Scope Dwg. No. B224-501-
Reference of Enquiry document 81-41-04551 (TP-5). Supply and
Sl.No Query EIL Reply
Part / Vol.No . Page No Clause No. installation of this line including supply
Subject
of matching flange is in scope of
128 Dwg. No. B224-501-16-43-8700 1370 of 5882 - Clarification in B of L location package contractor.
As per referred clause, two incoming utility lines are shown in pipe rack at B Refer revised Above Ground B/L dwg.
PART – III of L.

TECHNICAL SECTION Kindly provide the details of utility lines such as service, MOC, pipe size, etc.

129 Dwg. No. B224-501-16-43-8700 1370 of 5882 - Requirement of details


As per referred clause, incoming sewage line to ETP is shown at B of L pipe Refer revised Above Ground B/L dwg.
rack, whereas same is not shown in P&ID B of L Dwg. No. B224-17-44-501-
PART – III 1111.
TECHNICAL SECTION Kindly clarify.

130 Dwg. No. B224-501-16-43-8700 1370 of 5882 - Clarification in scope


As per referred clause, MOC of raw water incoming line to cascade aerator, Please follow MOC as per Dwg. No.
instrument air line are shown as B1A, A3A respectively, whereas same are B224-17-44-501-1111.
shown as A91A and A3K respectively in P&ID B of L Dwg. No. B224-17-44-501-
PART – III 1111.
Kindly confirm the MOC of incoming raw water line to cascade aerator &
TECHNICAL SECTION instrument air line.

131 Dwg. No. B224-501-16-43-8700 1370 of 5882 - Clarification in MOC


MOC of LP Steam & CW is A2A-IH &
As per referred clause, MOC of LP steam line and CW supply & return lines A91A respectively.
are shown as A2K-IT and A19A respectively, whereas in Doc. No. B224-501-17-
PART – III 44-SS-1001 (pg. 234 of 5882) they are given as A2A-IH and A91A respectively.
TECHNICAL SECTION Kindly confirm MOC of LP steam line and CW supply & return lines.

132 Dwg. No. B224-17-44-501-1111 1290 of 5882 - Clarification in MOC


PART – III Refer revised Above Ground B/L dwg.
TECHNICAL SECTION
As per referred clause, Kindly provide battery limit locations of incoming
133 Dwg. No. B224-17-44-501-1111 1290 of 5882 - Requirement of B of L location lines (LP Steam, CW Supply) and outgoing line (CW Return).
TP2:-4" OWS line with manhole at
As per referred clause, lines shown at tapping locations – TP2, TP3, TP6, TP7 battery limit shall be provided. All
PART – III are not shown in P&ID B of L Dwg. No. B224-17-44-501-1111. OWS piping within battery limit upto
TECHNICAL SECTION Kindly clarify the scope of above tappings. manhole at battery limit is in scope of
Package Contractor.
TP3:-4" Drinking water line shall be
provided at battery limit of Package.
Further distribution of Drinking water
within battery limit is in scope of
Package contractor.
TP6:-Drinking water line from RWTP
to Drinking water sump is in scope of
Package Contractor (Size shall be as
per respective P& ID).
TP7:-Treated water line from RWTP to
Treated water sump is in scope of
Package Contractor (Size shall be as
PRE-BID QUERIES

NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package
TP2:-4" OWS line with manhole at
BIDDING DOCUMENT : B224-501-17-44-PA-T-8700 battery limit shall be provided. All
OWS piping within battery limit upto
Reference of Enquiry document manhole at battery limit is in scope of
Sl.No Query EIL Reply
Part / Vol.No . Page No Clause No. Subject Package Contractor.
TP3:-4" Drinking water line shall be
provided at battery limit of Package.
Further distribution of Drinking water
within battery limit is in scope of
Package contractor.
TP6:-Drinking water line from RWTP
to Drinking water sump is in scope of
Package Contractor (Size shall be as
per respective P& ID).
TP7:-Treated water line from RWTP to
Treated water sump is in scope of
Package Contractor (Size shall be as
per respective P& ID). Updated P&ID
No: B224-17-44-501-1111 shall be
134 Dwg. No. B224-501-81-41-04551. 1368 of 5882 - Clarification in scope provided in amendment
PART – III Refer revised Above Ground B/L dwg.
TECHNICAL SECTION
As per referred clause, Kindly provide size & MOC details for all incoming
135 Dwg. No. B224-502-16-43-8700 1371 of 5882 - Requirement of details lines shown in the scope of Battery limit – 1, 2 & 3 for RO-DMP & CPU.
PART – III Refer revised Above Ground B/L dwg.
TECHNICAL SECTION
As per referred clause, Kindly provide size & MOC details for all incoming
136 Dwg. No. B224-501-16-43-8700 1370 of 5882 - Requirement of details lines shown in the scope of Battery limit for RWTP.
As per referred clause, 5 nos of CT blowdown lines are shown, whereas in Refer revised Above Ground B/L dwg.
Dwg. No. B224-502-16-43-8700 only one nos of CTBD treated water line is
PART – III shown in B of L-1.
TECHNICAL SECTION Kindly clarify.

137 Dwg. No. B224-17-44-502-1111 1317 of 5882 - Clarification in scope


As per referred clause, 2 nos of incoming lines (CPP Boiler blowdown, 20% Refer revised Above Ground B/L dwg.
Caustic storage) and 1 nos of NaOH outgoing line are shown, whereas same
PART – III are not shown in Dwg. No. B224-502-16-43-8700.
TECHNICAL SECTION Kindly clarify.

138 Dwg. No. B224-17-44-502-1111 1317 of 5882 - Clarification in B of L location


As per referred clause, outgoing lines (DMF-1 to ETP & Sludge to ETP) are Refer revised Above Ground B/L dwg.
shown in B of L-3, whereas same are not shown in P&ID B of L Dwg. No. B224-
PART – III 17-44-502-1111.
TECHNICAL SECTION Kindly clarify.

139 Dwg. No. B224-502-16-43-8700 1371 of 5882 - Clarification in scope


As per referred clause, lines shown at tapping locations – TP1, TP3 , TP4 are TP1:-250 mm Sanitary line with
PART – III not shown in P&ID B of L Dwg. No. B224-17-44-502-1111. manhole at battery limit shall be
TECHNICAL SECTION Kindly clarify the scope of above tappings. provided. All Sanitary piping within
battery limit upto manhole at battery
limit is in scope of Package
Contractor. TP3:-
6" OWS line with manhole at battery
limit shall be provided. All OWS piping
within battery limit upto manhole at
PRE-BID QUERIES

NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package

BIDDING DOCUMENT : B224-501-17-44-PA-T-8700 TP1:-250 mm Sanitary line with


manhole at battery limit shall be
Reference of Enquiry document provided.
Sl.No Query EIL ReplyAll Sanitary piping within
Part / Vol.No . Page No Clause No. Subject battery limit upto manhole at battery
limit is in scope of Package
Contractor. TP3:-
6" OWS line with manhole at battery
limit shall be provided. All OWS piping
within battery limit upto manhole at
battery limit is in scope of Package
Contractor.
TP4:-Storm Water Drain from battery
limit to OSBL main drain is in scope of
Package Contractor.Location of drain
is as indicated in Scope Drawing no.
B224-501-81-41-04552. Updated
P&ID No: B224-17-44-502-1111 shall
be provided in amendment
140 Dwg. No. B224-502-81-41-04552. 1369 of 5882 - Clarification in scope
As per referred clause, MOC for cooling water supply &return lines, RO-III PMS shall be provided along with
234, 260 of reject and Solar pond feed pump to B of L are A91A, B21V and A5Y Technical Amendement.
PART – III 5882 respectively.
TECHNICAL SECTION (16, 19 of 23) Kindly provide missing PMS of A91A, B21V and A5Y.

141 B224-501-17-44-SS-1001, Rev. 0 5.0, 5.0 Requirement of details


As per referred clause, fire water network is to be analyzed by PIPENET ACCEPTED , Validation certificate of
PART – III 51 of 1135 software. the software to be used shall also be
TECHNICAL SECTION (8 of 18) We propose to use WATERGEMS software. Kindly confirm. furnished by EPCC

142 B224-000-17-44-EDB-0001, Rev. 0 4.3.1 (S. No. 3) Clarification of software requirement


As per referred clause, clarify whether 36”, 32”, 24” 20” & 16” Fire water ACCEPTED , Validation certificate
PART – III pipes are not under EPCC-16 scope of work. of the software to be used shall
also be furnished by EPCC
Kindly confirm that EPCC-16 scope starts from fire water tie-in point at
TECHNICAL SECTION battery limit as shown in Dwg. No. B224-17-44-502-1111 (Pg. 1318 of 5882).

143 Dwg. No. B224-501-17-44-10101 1365 of 5882 - Clarification in scope of fire water lines
As per referred clause, we understand that Fire Water Pump House & BIDDER TO REFER UPDATED P&ID
PART – III Satellite Fire Station is not under EPCC-16 scope of work. ATTACHED WITH THE
TECHNICAL SECTION Kindly confirm. AMMENDMENT

145 Dwg. No. B224-501-81-41-04551 1368 of 5882 - Clarification in scope of work


Kindly clarify whether MVWS System is required for Cable Cellar at Not required
146 - - - Clarification in scope of work Substations.
As per referred clause, “PDMS software or SP3D as applicable shall be used As specified in referred clause itself,
for 3D modeling….”. Whereas as per clause no. 1(iii) of scope of supply of software shall be as per clause 2(g) of
works Doc.NO.B224-501-16-43-SOW-8700 REV.A “SP3D Version S3D 2016” Scope of Work (SOW,Doc. No.B224-
503-16-43-SOW-8701). According to
PART – III 564 of 5882 shall be used for 3D modeling.
which SP3D version SP3D 2016 to be
We propose to use Aveva PDMS for 3D modelling for this package. Please
used.
TECHNICAL SECTION (3 of 13) confirm.

147 2 Software
PRE-BID QUERIES

As specified in referred clause itself,


NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package software shall be as per clause 2(g) of
Scope of Work (SOW,Doc. No.B224-
BIDDING DOCUMENT : B224-501-17-44-PA-T-8700 503-16-43-SOW-8701). According to
which SP3D version SP3D 2016 to be
Reference of Enquiry document used.
Sl.No Query EIL Reply
Part / Vol.No . Page No Clause No. Subject
147 B224-501-16-43-SP-8700 REV.A 2 Software
As per referred clause, “Smart P&ID’s or AVEVA P&ID or equivalent shall be As per clause 2(g) of SOW, SP3D
PART – III 564 of 5882 used for P&ID modelling”. version SP3D 2016 to be used.
Whereas as per Sr.No. 3 of Table in Doc.NO.B224-000-86-41-SP-34 Rev.0 Therefore, Smart P&ID to be used for
P&ID modelling.
TECHNICAL SECTION (3 of 13) page 6 of 17 “Smart Plant P&ID” shall be used for P&ID.
We propose to use P&ID module compatible with proposed 3D modelling
software (PDMS) for this package. Please confirm.
148 B224-501-16-43-SP-8700 REV.A 2 Software
As per clause 2(g) of SOW, SP3D
As per referred clause, “Isometric’s shall be extracted from 3D model using version SP3D 2016 to be used
PART – III 574 of 5882 Isogen software along with Bill of Material and logical pipe supports.” accordingly its module for iso
We propose to use ISO generation module compatible with proposed 3D generation to be used.
TECHNICAL SECTION (13 of 13) modeling software (PDMS) for this package.Please confirm.

149 B224-501-16-43-SP-8700 REV.A 10.3 b Isometric extraction


Refer Amendment (To be issued
“Final documents shall be submitted in the native file formats and pdf with shortly.)
1no. of license distinct each for every software used for preparing the
PART – III 1923 of 5882 handover documents (excluding MS office suite of software”) for editing “
As per clause no. 10.1 of B224-501-16-43-SP-8700 REV.A sheet 12 of 13, 3D
model along with complete project database shall be submitted at each
TECHNICAL SECTION (8 of 17) model review stage and as final as-built.

Hence as per the above clause, we presume that only 3D model database
shall be submitted to client at different model review stages. However, no
supply of licenses for 3D modeling software is considered in Bidder’s scope.
150 B224-000-86-41-SP-34 Rev.0 h Documentation and software requirements Please confirm.
From the Stated clause, we observed that “for minimum equipment rating Being issued through technical
refersingle line diagram”. However Overall Single Line Diagram is not amendment.
B224-501-16-50-SOW-8700 attached with Tender specification. Kindly provide the same for our better
151 (Electrical Scope of Supply & Work) 339 2.1 & 2.2 Key Single Line Diagram. Scope understanding.
From the stated clause, we observed that “ All motor feeders up to 55 kW Being issued through technical
shall be provided with communicable type Electronic Motor Protection amendment.
Relay”. However, we are considering Intelligent Motor Protection Relay
B068-999-16-50-EDB-1001 (IMPR) for the same to optimize the Electrical Switchgear Building
152 (Electrical Design Basis) 201 5.6.6 Motor Starter Dimension. Kindly confirm.
Bidder's understanding is correct
From the stated clause, we understood that “Emergency power will be
received at 6.6kV isolation breaker panel and will be stepped down to415V
through one number of 6.6 of 0.433 kV emergency distribution transformer”.
B224-501-16-50-SP-8700 Further it shall be connected to EPCC panel.
In this regard, we presume that 2nd incoming supply for EPCC panel shall be
153 (Job Specification- Electrical) 492 2.0, A. Emergency Power Distribution for RWTP taken from PCC outgoing feeder. Please confirm.
PRE-BID QUERIES

NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package

BIDDING DOCUMENT : B224-501-17-44-PA-T-8700


Reference of Enquiry document
Sl.No Query EIL Reply
Part / Vol.No . Page No Clause No. Subject
From the stated clause, we understood that one number of 6.6 kV Bidder's understanding is correct
Emergency power supply will be received at 6.6 kV HV Emergency
switchboard having two bussections for feeding 6.6kV Emergency loads (If
any) and will be stepped down to415V through one number of 6.6 of 0.433
kV emergency distribution transformer. And further will be provided to EPCC
B224-501-16-50-SP-8700 panel.
In this regard, we presume that 2nd incoming supply for 6.6 kV Emergency HV
switchboard shall be taken from 6.6 kV HV switchboard outgoing feeder.
nd
Emergency Power Distribution for RODM & Similarly, 2 incoming supply for EPCC panel shall be taken from PCC
154 (Job Specification- Electrical) 492 2.0, B. CPU outgoing feeder. Please confirm.
System Fault level for 6.6 kV system shall
be 40 kA for 1 sec. However, the 6.6KV
B224-501-16-50-SOW-8700 Switchboard bus bar shall be suitable for
From the stated clause, we observed that fault level for 6.6 kV system shall fault withstanding capacity of 40kA for 3
be 40 kA for 3 sec. Whereas, clause no 4.4 of JOB specification(B224-501-16- sec.
155 (Electrical Scope of Supply & Work) 340 2.1 Fault level for 6.6 kV System 50-SP-8700) calls for 40 kA for 1 sec. Kindly clarify.
We understood that owner’s free-issued items are additional equipment, Bidder's understanding is correct.
B224-501-16-50-SP-8700 which are not covered under scope of work. Only space provision for this
156 (Job Specification- Electrical) 511 4.6.16 Owner’s free-issued equipment equipment shall be provided in SS-23. Kindly confirm.
B068-999-16-50-EDB-1001 We presume that, Capacitors of each bus section of 6.6kV switchboard shall Bidder's understanding is not correct.
157 (Electrical design basis) 186 5.3.4 APFC be sized based on the respective bus loads. Kindly confirm.
From the Stated clause, we observed that all 415V Variable Frequency Drive Input transformer, as required, shall be
(VFD) shall be provided with input transformer. We presume that input provided.
B224-501-16-50-SOW-8700 transformer shall not be considered in case of achieving the system
158 (Electrical Scope of Supply & Work) 340 2.1.u VFD Input Transformer. harmonic level. Kindly confirm.
We presume that VFD drive up to 37 kW shall be kept in MCC panel itself. Kindly Bidder's understanding is not correct.
159 General - - VFD confirm.
PLC configuration & other associated
details are already specified in cl. 2.4
& its sub-clauses of Instrumentation
Job specifications doc. (B224-501-16-
51-SP-8700). Further as already
We understood from the job specification that PLC configuration shall be specifed in Guidelines for
DMR (Dual modular redundant) for system control, but as per document Instrumentation (B224-000-16-51-SP-
number B224-999-16-51-EDB-1001, Pg, 3060 of 5882 , clause 3.1.6 and 0001), SIL-3 PLC shall be considered
Document number B224-000-16-51-0001, Pg 3042 of 5882, clause 7.0 PLC where SIL-3 loops are applicable.
configuration calls for TMR (Triple modular redundant). Kindly confirm the
160 Doc no. B224-501-16-51-SP-8700 422 of 5882 2.4.3 PLC Configuration PLC configuration to be considered.
All required details are already
We request you to share Automation system configuration of RWTP, RO-DM provided in the tender. Bidder to
161 System configuration and CPU package for our better understanding. follow the same.
PRE-BID QUERIES

NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package

BIDDING DOCUMENT : B224-501-17-44-PA-T-8700


Reference of Enquiry document
Sl.No Query EIL Reply
Part / Vol.No . Page No Clause No. Subject
Supply & laying of cables for these
signals will be in Purchaser's scope,
however termination in RWTP PLC
We understood that contractor shall consider 10 DI and 10 DO for hardwire panels/ RO-DM & CPU PLC panels (as
interface between package PLC and Plant DCS. In this regard we request you applicable) shall be in Bidder's scope.
162 Doc no B224-501-16-51-SOW-8700 369 of 5882 4 Interface to confirm the scope of cables of laying between package PLC and Plant DCS.
We understood from the job specification that type of instrument shall be Bidder to follow the Instrumentation
Digital, Smart (4-20 mA + HART), but as per document number B224-999-16- Job specifications doc. (B224-501-16-
51-EDB-1001, Pg, 3074 of 5882, clause 3.5.8, field transmitter type for open 51-SP-8700).
loop is FF and interlock of shutdown and complex loop shall be HART. Kindly
163 Doc no. B224-501-16-51-SP-8700 421 of 5882 1.4 Type of instrumentation confirm the type of instrument to be considered.
Bidder to follow the Instrumentation
Job specifications doc. (B224-501-16-
51-SP-8700). However even in cl. 3.1.5-
S.no.2.2 of Engineering Design Basis-
We understood from the job specification that type of control and Instrumentation (B224-999-16-51-EDB-
monitoring shall be PLC based, but as per document number B224-999-16-51- 1001), Dedicated PLC system is
EDB-1001, Pg, 3059 of 5882, clause 3.1.5, type of control and monitoring mentioned for RWTP & for RO-DM
specified as Distributed Control System (DCS) for RWTP, RO-DM and CPU. CPU.
164 Doc no. B224-501-16-51-SP-8700 422 of 5882 2.4 Programmable logic controller Kindly confirm the type of control and monitoring system to be considered.
The referred cl. 7 of Instrumentation
scope of work doc. (B224-501-16-51-
SOW-8700) is for Logistics Support for
instrumentation items & not for LAN
scope. Bidder to follow the
Instrumentation related dwg./ docs.
attached in tender for all Hardware/
software etc. required w.r.t
Instrumentation & Control system for
this tender.
Since Electrical doc. B224-501-16-50-
OD-8700, is referred by Bidder,
Referred clause no. 4 of document
number B224-501-16-50-OD-8700
states about scope of supply on LAN
We presume that active components like switches shall be free issue to EPCC
UPS and associated cabling/wiring
units, whereas in document number B224-501-16-50-OD-8700, Page 2989 of
which will facilitate UPS power supply
5882, Sl. No 4, LAN system supply, LAN Ethernet switches is mentioned under
to LAN system.
contractor scope. In this regard, we request you to confirm the scope of
165 Doc no B224-501-16-51-SOW-8700 372 of 5882 7 LAN Scope of work supply of LAN Ethernet switch.
PRE-BID QUERIES

NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package

BIDDING DOCUMENT : B224-501-17-44-PA-T-8700


Reference of Enquiry document
Sl.No Query EIL Reply
Part / Vol.No . Page No Clause No. Subject
Instrument Air line shall be of SS316
and with SS-316 X-mas tree like
distribution pots, as specified in
Instrumentation Job specifications
doc. (B224-501-16-51-SP-8700) &
Engineering Design Basis-
Instrumentation (B224-999-16-51-EDB-
1001). SS316L as specified in cl. 3.1.3
of Engineering Design Basis-
We understood from the job specification that instrument airline material Instrumentation (B224-999-16-51-EDB-
shall be SS316, but as per document number B224-999-16-51-EDB-1001, Pg, 1001), is for Air supply tubing for
3073 of 5882, clause 3.1.3, called for SS316L material for instrument airline. further distribution downstream of the
166 Doc no. B224-501-16-51-SP-8700 433 of 5882 7.2 Instrument air line Kindly confirm the MOC to be considered for instrument airline. X-mas tree.
We understood from the job specification that positioner type shall be smart Refer reply to S.no. 163 above
(4-20mA + HART), but as per document number B224-999-16-51-EDB-1001,
Pg, 3075 of 5882, clause 3.5.9, called for Fieldbus. Kindly confirm the type of
167 Doc no. B224-501-16-51-SP-8700 426 of 5882 2.11.1 Field Positioner Type field positioner to be considered.
We understood from guidelines for instrumentation, that field transmitters Refer reply to S.no. 163 above
shall be 2 wire smart (4-20mA + HART), but as per document number B224-
999-16-51-EDB-1001, Pg, 3074 of 5882, clause 3.5.8, called for wireless
instruments for open loop. Kindly confirm the type of field transmitters to be
168 Doc no. B224-000-16-51-0001 3004 of 5882 2.16.1.3 Field Transmitter considered.
Bidder to follow the Instrumentation
related dwg./ docs. as referred in the
We presume that for EPCC-16 package scope of work for Instrumentation doc. B224-501-16-51-LL-8700 (LIST OF
(B224-501-16-51-SOW-8700) and Job specification for Instrumentation (B224- ATTACHMENTS for Inst. docs.)
169 Contract document 501-16-51-SP-8700) only to be followed. Kindly confirm.
Bidder requested to kindly provide the training requirement with the following onsite training of HRRL personnal is
Part 2, Tender Notice 3 details envisaged

SCOPE OF WORKS of SUPPLY OPERATION


CONTRACT SPECIFICATIONS (PLOT PLAN &
WATER) FOR RO-DMP, CPU & RWTP, RRP a. No of Trainees per training
b. Training duration
c. Training Frequency
171 411 of 1135 2.0 (xv) HRRL Training d. Training at Onsite of Class room training at Refinery complex
Part 2, Tender Notice 3 bidder understanding is correct in
Bidder Presumes that all the chemicals supplied by the contractor is 100% general. Billing shall be done as per
SCOPE OF WORKS of SUPPLY OPERATION reimbursable basis (excluding transportation cost) (except free supply by client & tender condition.
CONTRACT SPECIFICATIONS (PLOT PLAN cleaning chemicals) . Contractor will submit their invoice for the supplied quantity
172 &WATER) FOR RO-DMP, CPU & RWTP, RRP 411 of 1135 3.0 (iv) 3.0 PLANT OPERATION without transportation cost to HRRL on time to time. Kindly confirm.
Bidder requesting to consider the process deterioration due to variation in design Please follow tender specifications
Part 2, Tender Notice 3 feed water quality and shock load, the process may get disturbed. To restore the
process needs some additional chemicals of modifications based on the process
disturbances. The total cost incurred to restore the system shall be reimbursed by
HRRL to the contractor. During such occasion the quantity of treated water may get
reduced, and till the plant stabilization no penalty to be imposed to the contractor.
PRE-BID QUERIES

NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package

BIDDING DOCUMENT : B224-501-17-44-PA-T-8700


Reference of Enquiry document
Sl.No Bidder requesting to consider the processQuery EIL Reply
deterioration due to variation in design Please follow tender specifications
Part / Vol.No . Page No Clause No. Subject feed water quality and shock load, the process may get disturbed. To restore the
process needs some additional chemicals of modifications based on the process
disturbances. The total cost incurred to restore the system shall be reimbursed by
SCOPE OF WORKS of SUPPLY OPERATION HRRL to the contractor. During such occasion the quantity of treated water may get
CONTRACT SPECIFICATIONS (PLOT PLAN & reduced, and till the plant stabilization no penalty to be imposed to the contractor.
173 WATER) FOR RO-DMP, CPU & RWTP, RRP 411 of 1135 3.0 (iv) 3.0 PLANT OPERATION Kindly confirm.
Bidder requesting to confirm the GST rate to be filled in Note 5 of SP-7 instead of Not acceptable, Bidder to follow Bid
174 Schedule of Price for Operations SP-7 SP-7 Price Schedule for Operations Service Tax. Kindly confirm. requirent
PROCESS & MECHANICAL
Flow/Chain (Net Minimum) Outlet/Permeate
1. UF -I - 361 m3/hr
2. RO -I - 291 m3/hr
5. Treated Water
3. RO -II - 358 m3/hr
Tendernotice_3 37 of 5882 Qualities
4. MB - 200 m3/hr Please Consider the following:
Table - 7
5. RO -III - 190 m3/hr 1. UF -I - 336 m3/hr
6. UF-II - 102 m3/hr 2. RO -I - 272 m3/hr
7. RO - IV - 51 m3/hr 3. RO -II - 276 m3/hr
175 Both the clauses are contradictory. Please confirm which clause to be followed.
Flow/Chain (Net Minimum) Outlet/Permeate 4. MB - 193 m3/hr
1. UF -I - 336 m3/hr 5. RO -III - 177 m3/hr
2. RO -I - 272 m3/hr 6. UF-II - 112 m3/hr
13. Guarantee 3. RO -II - 276 m3/hr 7. RO - IV - 62 m3/hr
Tendernotice_3 42 of 5882
Parameters 4. MB - 193 m3/hr
5. RO -III - 177 m3/hr
6. UF-II - 112 m3/hr
7. RO - IV - 62 m3/hr
Treated water (UF Permeate) shall be routed by
3.0 Battery Limit Treated water (UF Permeate) shall be
Tendernotice_3 228 of 5882 the RWTP contractor up to each compartment of
Condition routed by the RWTP contractor up to each
176 existing Treated water reservoir. Both the clauses are contradictory. Please confirm which clause to be followed.
compartment of existing Treated water
Scope Drawing for reservoir.
Tendernotice_4 1368 of 5882 TP-7 - Treated Raw Water to reservoir
Package-16 (RWTP)
Treated drinking water shall be routed by the
3.0 Battery Limit
Tendernotice_3 228 of 5882 RWTP contractor up existing Drinking water Treated drinking water shall be routed by
Condition
177 Sump. Both the clauses are contradictory. Please confirm which clause to be followed. the RWTP contractor up existing Drinking
Scope Drawing for water Sump.
Tendernotice_4 1368 of 5882 TP-6 - Drinking water to Sump
Package-16 (RWTP)
Indicative Layout - Raw Legend: In legend, point no.11,12,13 & 14 are not legible. Hence, request you to provide the
178 Tendernotice_4 1276 of 5882 shall be provided in amendment
water treatment plant Point no. 11,12,13 & 14 legible copy of the Legend.
We presume that the clarified water transfer pumps differential head has been
179 Tendernotice_3 914 of 5882 Engg Datasheet Clarified water transfer pumps selected to transfer the clarified water to HRSCC-I inlet/UF Feed Tank/Horticulture Please follow tender
water tank in ETP. Please confirm.
Backwash waste line from RWTP to Horticulture
3.0 Battery Limit Please confirm the piping battery limit for Backwash waste line in RWTP. Please Backwash Waste line to be terminated at
180 Tendernotice_3 229 of 5882 Tank in ETP shall be terminated by RWTP
Condition confirm the piping distance to be considered. RWTP B/L
contractor at RWTP B/L.
Feed water shall be received at RWTP battery
3.0 Battery Limit
Tendernotice_3 228 of 5882 limit at a normal pressure of 2 kg/cm2g (at grade The Incoming 52" Raw Water line from
Condition
level) Butterfly valve to RWTP shall be laid
underground and shall be as shown in
We presume that the pipe from the battery limit to the Cascade aerator shall be in the
181 Scope Dwg. No. B224-501-81-41-04551
scope of contractor. Please confirm whether our understanding is correct
Scope Drawing for (TP-5). Supply and installation of this line
Tendernotice_4 1368 of 5882 TP-5 - Raw water line
Package-16 (RWTP) including supply of matching flange is in
scope of package contractor.
PRE-BID QUERIES

NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package

BIDDING DOCUMENT : B224-501-17-44-PA-T-8700


Reference of Enquiry document
Sl.No Query EIL Reply
Part / Vol.No . Page No Clause No. Subject
P&ID for UF Feed
UF Feed Pump Suction and discharge valve is For UF Feed Pump suction and discharge, we are considering Butterfly valve. Please
182 Tendernotice_4 1297 of 5882 Tank & Pumps - Please follow tender specifiations
gate valve confirm.
RWPT
Considering our experience with UF manufacturers. We would like to inform that none
P&ID for Ultra Filtration As per the P&ID, Individual isolation valves are shall be considered based on UF supplier
183 Tendernotice_4 1299 of 5882 of the vendor recommend to provide individual isolation valves for each modules.
Skids - RWPT provided for each UF modules. recommendations
Hence, the same is not required as per process . Please confirm.
For all water application, Horizontal centrifugal pump suction and discharge valve shall
184 General Please follow tender specifications
be Butterfly valve instead of Gate valve.Please confirm.
P&ID for UF B/W Feed ACF Feed/Backwash Pump, UF Backwash pump For ACF Feed/Backwash Pump, UF Backwash pump and Booster pump for ClO2
185 Tendernotice_4 1302 of 5882 Tank & Pumps - and Booster pump for ClO2 generator suction and generator suction and discharge valve we are considering Butterfly valve. Please Please follow tender specifications
RWPT discharge valve is gate valve confirm.
SFD for Reverse Dosings provided in HRSCC-I (Process) The cooling tower blown down is blended with Boiler blowdown and Treated effluent
Osmosis Mixed Bed 1.Lime from ETP and is fed to the RO-I system. Considering 75% recovery in the RO-I skid
Lime or Dolomite lime shall be provided by
186 Tendernotice_4 1280 of 5882 based Demineralization 2.FeCl3 the silica concentration in the reject is around 135 ppm.Hence, request you to provide
contractor.
Plant - RO-DMP - 3.Polyelectrolyte (PE) a provision for Dolomite dosing to reduce the Silica concentration in RO Feed. Please
Sheet 1 of 4 4. Soda Ash confirm.

The minimum Silica from the RO-I reject is approximately 100 ppm and above. With a
SFD for Reverse
recovery of 65%, the anticipated Silica in RO-III reject is around 300 -350 ppm. The
Osmosis Mixed Bed
The reject from RO-I is collected in RO-III Feed saturation index of Silica is exceeded and this will result in high Silica scaling. The
187 Tendernotice_4 1281 of 5882 based Demineralization Please follow tender specifications
Tank and fed to RO-III skid similar impact is also applicable for all other ions like Fluoride, Phosphates etc. Hence,
Plant - RO-DMP -
request you to provide a complete pre-treatment (HRSCC-DMF-ACF-ABF-UF) before
Sheet 2 of 4
RO-III Skid similar to RO IV skid. Please confirm.
Process Datasheet The Ultra Filtration System operating pressure is The maximum operating pressure which an Ultra Filtration system can handle is 3.0 -
maximum design pressure of UF system
188 Tendernotice_3 977 of 5882 B224-502-17-44-DS- 4.0 -5.0 kg/cm2 and the design pressure is 7.5 4.0 kg/cm2 and the maximum design pressure shall be 5.0 kg/cm2 and the same is
shall be based on supplier recommendation
1019 kg/cm2 confirmed by all the UF membrane manufacturers. Please confirm.
Process Datasheet The Ultra Filtration System operating pressure is The maximum operating pressure which an Ultra Filtration system can handle is 3.0 -
maximum design pressure of UF system
189 Tendernotice_3 906 of 5882 B224-502-17-44-DS- 3.5 -4.0 kg/cm2 and the design pressure is 6.5 4.0 kg/cm2 and the maximum design pressure shall be 5.0 kg/cm2 and the same is
shall be based on supplier recommendation
1008 kg/cm2 confirmed by all the UF membrane manufacturers. Please confirm.
SFD for Reverse Dosings provided in HRSCC-I (Process)
Osmosis Mixed Bed 1.Lime
The probability of Silica exceeding the Saturation Index is more in RO-IV reject.. Lime or Dolomite lime shall be provided by
190 Tendernotice_4 1281 of 5882 based Demineralization 2.FeCl3
Hence, request you to provide provision for Dolomite dosing in HRSCC-II contractor.
Plant - RO-DMP - 3.Polyelectrolyte (PE)
Sheet 1 of 4 4. Soda Ash

191 Tendernotice_6 2218 of 5882 Suppliers list for HRRL Vendor List for SOOT Blower Please provide us the Supplier list for Root Blowers Bidder to follow bid requirement.
12. RO-DM Plant
RO-IV Skids - 62 m3/hr permeate
41 of 5882 configuration
- 55% Recovery Recovery of RO-IV skids shall be 55%
192 Tendernotice_3 Both the clauses are contradictory. Please confirm which clause to be followed.
(minimum)
13. Guarantee RO-IV Skids - 62 m3/hr permeate
41 of 5882
Parameters - 50% Recovery
Process Datasheet The inlet solid consistency of centrifuge is mentioned as 5% which seems to be very
centrifuge to be designed based on
193 Tendernotice_3 917 of 5882 B224-501-17-44-DS- Centrifuge - Inlet solid consistency high. The expected sludge from the HRSCC will have a sludge consistency of
HRSCC sludge outlet consistency
1021 max.2%. Please confirm whether the same can be considered for our design.
Process Datasheet The inlet solid consistency of centrifuge is mentioned as 5% which seems to be very
centrifuge to be designed based on
194 Tendernotice_3 970 of 5882 B224-502-17-44-DS- Centrifuge - Inlet solid consistency high. The expected sludge from the HRSCC will have a sludge consistency of
HRSCC sludge outlet consistency
1013 max.2%. Please confirm whether the same can be considered for our design.
FEED POLISHED CONDENSATE
Please provide the process datasheet for
B224-502-17-44-EL- 1.Feed Polished Condensate Exchanger EXCHANGER & TRIIM COOLER DATA
195 Tendernotice_3 878 of 5882 1. Feed Polished Condensate Exchanger
1001 2.Trim Cooler SHEET WILL BE PROVIDED IN THE
2. Trim Cooler
TECHNICAL AMENDMENT.
PRE-BID QUERIES

NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package

BIDDING DOCUMENT : B224-501-17-44-PA-T-8700


Reference of Enquiry document
Sl.No Query EIL Reply
Part / Vol.No . Page No Clause No. Subject
Please provide the process datasheet for
B224-502-17-44-EL-
196 Tendernotice_3 861 of 5882 DM Water Transfer Pumps for CPP & Process 1. DM Water Transfer Pumps for CPP shall be provided in amendment
1001
2. DM Water Transfer Pumps for Process
Cathodic protection shall be considered for
5.0 General Design & Cathodic protection shall be considered for all
all tanks which are not provided on
197 Tendernotice_3 236 of 5882 Engineering tanks which are not provided on RCC/pile Please confirm whether cathodic protection to be provided for Tanks.
RCC/pile
requirements foundation.
foundation.
1. B224-000-16 -50-SK-4504
We have not received these documents along with the tender. Kindly provide these
198 Tendernotice_3 359 of 5882 6.9 Electrical Drawings 2. B224-000-16 -50-SK-4001 Being issued through technical amendment.
documents.
3. B224-501-16 -50-00001
Refer Process datasheet No:B224-509-79-
2.13 Performance and We have not received this document as apart of this tender. Kindly provide us this
199 Tendernotice_3 277 of 5882 1. B224-79 -41-DB-209 DS-1802 for feed condensate quality in
Guarantees document.
tender (Page No:1132 of 5882 in tender)
Standard specification for non metallic
200 General Please provide us the standard specification for Non-metallic tank (FRP/HDPE)
tanks shall be followed.
Disposal of exhausted filters media (DMF, ACF,
Degasser, etc.), cartridges, resins, membranes
4.0 Exclusions from (UF & RO) and other process consumables from
201 Tendernotice_3 414 of 5882 Please provide the distance from the plant to the disposal location. These are excluded from contractor scope
Contractor's scope. the RO-DMP, CPU and RWTP to the disposal
location (including
transportation)
Chemicals for RO-DMP/CPU (Ferric Chloride,
Sodium Chlorite, Antiscalant, Sodium Meta
Bisulphite, Lime ,Polyelectrolyte, Morpholine and
Sodium Hypochlorite) and chemicals for RWTP
(Lime, polyelectrolyte, PAC/ferric chloride, de-
watering polyelectrolyte, sodium chlorite and
Based on our process we require Soda Ash & Dolomite in RO-DM Package to achieve Soda Ash is already provided in tender.
sodium hypochlorite) shall be procured and
202 Tendernotice_3 413 of 5882 3.0 Plant Operation the performance guarantees. Hence, please confirm whether the same to be Lime or dolomite lime shall be provided by
supplied by Contractor on cost reimbursable basis
considered in HRRL scope or Bidder scope. contractor.
by HRRL. Contractor shall inform requirement to
HRRL in advance before procuring the chemicals.
HRRL shall certify the requirement & bills/invoices
and make payments to the contractor towards
cost of chemicals received at site. Transportation
cost shall be borne by the contractor.

CIVIL
Bidder to note that pile foundation shall be
Please confirm foundation system shall be decided based on detailed soil investigation
203 Tendernotice_3 815 of 5882 6.1 Foundation for major structures / Facilities adopted for all major structures/facilities as
report post bid.
per bid requirements.

Bidder to note that for minor structures not


Ground improvement, if required shall be as per approved Geotechnical investigation sensitive to settlement, appropriate ground
204 Tendernotice_3 816 of 5882 6.2 Minor strctures Not sensitives to settlement
report. please confirm. improvement system shall be designed by
bidder.
Please furnish the contour drawing page no: 1384 of 5882 not available in the Topographical and Contour Survey Drawing
205 Tendernotice_3 5 of 5882 Drawing / Topographical survey drawing document and the corresponding local cordinates with UTM coordinates mention in the in AUTOCAD format shall be provided to all
drawing. bidders.
As per Cl.No:4.4 of IS:3370 (Part 2):2009, structures that are in contact with water and Same shall be reveiwed during detailled
206 Tendernotice_3 133 of 5882 B.4.2 Design standards - RCC Structures & Foundations sewage will be designed in limit state method by limiting crack width to 0.2mm. Please engineering as per relevant codal
confirm. provisons.
PRE-BID QUERIES

NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package

BIDDING DOCUMENT : B224-501-17-44-PA-T-8700


Reference of Enquiry document
Sl.No Query EIL Reply
Part / Vol.No . Page No Clause No. Subject
RCC drain with HDG (Hot Dipped Galvanized)
grating shall be provided all around the
All RCC drains within battery limit shall be
207 Tendernotice_3 115 of 5882 A.4.1.9.1 (3) unit pavement to collect non-contaminated water. All other drains are RCC open type. Please confirm.
with HDG grating.
This drain shall be connected to main
plant drain.
208 General Plastering Tanks No plastering considered for tanks. Please confirm. Confirmed.
Protective Coating shall be as per Job
209 Tendernotice_3 555 of 5882 1.1.2 Below ground protective coating. HDPE sheet not considered for Grade slab.
Specification No. B224-000-81-41-SP-0001

CONTROL & INSTRUMENTATION


It is understood that Bidder's query is
w.r.t distance between RMCR to SRR-
14 (not SRR-1 as referred). Same is not
mentioned in tender, as Purchaser’s
DCS/PLC panels are envisaged in SRR-
Job Specifications 14 itself {refer cl. 2.13.8 of
General: S.No:1.6
Kindly provide us the distance between the following units: Instrumentation scope of work doc.
(Instrumentation)
210 Tendernotice_3 421 of 5882 Distance 1. RMCR to SRR-1 (B224-501-16-51-SOW-8700)}.
RWTP Package and
2. SRR-6 and SRR-14.
RO-DM & CPU For distance between SRR-6 & SRR-14,
Package Biidder to refer Overall instrument
cable duct and trench layout dwg.
(B229-000-16-51-00801) as attached in
tender.

Job Specifications As aleady specifed in GUIDELINES FOR


General: S.No:2.4
INSTRUMENTATION, SIL-3 PLC shall be
211 Tendernotice_3 422 of 5882 Programmable Logic TYPE Please confirm whether SIL3 or NON SIL3 type PLC's to be considered.
Controller (PLC) considered where SIL-3 loops are
Configuration. applicable.
View only operator console for RO DM
Job Specifications
General: S.No:2.4.6
In operating and Engineering console, In view only operator console - 1 no in Field & CPU Control system in SRR-6 to be
212 Tendernotice_3 423 of 5882
operator room in SRR-14, The same is applicable in SRR-6 also. Please confirm. considered as 1 no in Field operator
Operator and
Engineering Consoles For RO DM & CPU Control system in SRR-6 room in SRR-6
Job Specifications Connecting Software required between PLC to Bidder to follow the tender
We shall provide OPC UA module to handshake Purchaser DCS systems. Please
213 Tendernotice_3 424 of 5882 General: S.No:2.4.12 Purchaser's DCS in RCMR through RS422/485
confirm. requirements.
Serial Interface serial link with MODBUS RTU
PRE-BID QUERIES

NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package

BIDDING DOCUMENT : B224-501-17-44-PA-T-8700


Reference of Enquiry document
Sl.No Query EIL Reply
Part / Vol.No . Page No Clause No. Subject
Power supply requirements for
different instruments & control
systems is already specified in cl. 3.1 to
3.6 of Instrumentation Job
specifications doc. (B224-501-16-51-SP-
8700). Bidder shall follow the same.
Also as already specified in cl. 3.6 of
Instrumentation Job specifications,
230V AC shall be used for Panel
Job Specifications lighting. Futher the same shall be non-
General: S.No:3 Inside PLC Panel shall we consider the Control supply 230V AC UPS / 24VDC. Please UPS & shall be provided by Purchaser
214 Tendernotice_3 431 of 5882
Power Supply confirm
at one point in respective SRR-6 & 14,
Requirement
wherein Termination of the same in
Bidder’s PDB in respective SRR and any
further distribution / conversion to
another voltage level shall also be in
the scope of the Contractor, as
specified in Note-5 of Instrumentation
scope of work doc. (B224-501-16-51-
SOW-8700).

Instruments & Control System 110V AC UPS


Spares requirements (including the
spares requirements at I/O level) are
very clearly specified in cl. 9 & its sub-
Job Specifications System Spares
System Spares shall be considered for CPU Panel only, I/O Rack wise consideration clauses in Instrumentation Job
215 Tendernotice_3 436 of 5882 9: SPARES: S.No: Bus capacity 50%
is not recommended. Please clarify and confirm in details for 9.1.2.1 to 9.2. specifications doc. (B224-501-16-51-SP-
9.1.2.1 Number of Nodes 40%
8700), which are self explanatory .
Bidder to follow the same.

Spare I/Os are already included in


PLC system (I/O count as follows shall be
these I/O counts furnished in tender.
considered by Contractor for the same : AI-30, AO-
SCOPE OF WORK 20, DI-50, DO-40) and Caustic system related
216 Tendernotice_3 366 of 5882 Kindly confirm whether spares I/O count has to be considered in the counts furnished.
(Instrumentation) , signals envisaged to be connected to RO-DM &
Clause no. 4.6 b) CPU package PLC system (I/O count as follows
shall be considered by Contractor for the same :
AI-25, AO-25, DI-50, DO-30),
ELECTRICAL
PRE-BID QUERIES

NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package

BIDDING DOCUMENT : B224-501-17-44-PA-T-8700


Reference of Enquiry document
Sl.No Query EIL Reply
Part / Vol.No . Page No Clause No. Subject
i. 415 V, ___A (current rating by Contractor), 3-
phase TPN, 65 kA for 1sec single front draw-out
type Power Control Centres (PCCs) and sandwich
type bus ducts for interconnection between
distribution transformers and PCCs.
j. 415V, ___A (current rating by Contractor), 3-
phase TPN, 65kA for 1 sec single front draw-out
type, Motor Control Centres (MCCs) for feeding
motor loads and other loads up to 55 kW including
feeders for Owner’s use as per cl. No. 2.2 of this
document.
k. 415 V, ___A (current rating by Contractor), 3- Bidder to follow Technical amendment being
2.0 Scope of Supply,
217 Tendernotice_3 345 of 5882 phase TPN, 65 kA for 1sec single front draw-out We propose PCC, 415 V, 50 KA for 1 sec.Please confirm acceptance. issued..
2.20
type Emergency Power Control Centre (EPCC)
and cables/ sandwich type busducts for
interconnection between emergency distribution
transformer and EPCC for feeding emergency
loads of package.
l. 415V, ___A (current rating by Contractor), 3-
phase TPN, 65kA for 1sec single front draw-out
type Auxiliary Service Boards (ASBs) for
miscellaneous power loads like welding sockets,
power panels, EOT cranes, etc. and spare feeders
and feeders for Owner’s use as per cl. No. 2.21 of
this document.
Bidder to follow Technical amendment being
4.4 FAULT LEVEL
218 Tendernotice_3 496 of 5882 (iii) 65 kA for 1 sec. on 415 V bus We propose Fault current for 415 V as 50 KA for 1 sec.Please confirm acceptance. issued..
SELECTION
(xvii) All HV switchboards shall have provision for Specify the LOTO requirement to be consider. Please confirm acceptance. Bidder to follow tender requirement.
219 Tendernotice_3 501 of 5882 LOTO
positive LOTO implementation.
Motors shall have grease lubricated ball or roller No deviation on the standard specification
type bearings or of the manufacturer's standard is acceptable.
type. However, 2 pole motors above 750 kW
6.4 Bearing and rating shall be provided with sleeve bearings as a Motor bearing shall be as per motor manufacturer standard. Please confirm
220 Tendernotice_8 4458 of 5882
lubrication minimum, except for motors intended to be acceptance.
installed in hazardous
area having gas group IIC. Sleeve bearings when
provided shall be of proven design.
PRE-BID QUERIES

NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package

BIDDING DOCUMENT : B224-501-17-44-PA-T-8700


Reference of Enquiry document
Sl.No Query EIL Reply
Part / Vol.No . Page No Clause No. Subject
6.1 During fabrication, the VFD shall be subject to No deviation on the standard specification
inspection by EIL / Owner, or by an agency is acceptable.
authorized by the Owner, to assess the progress
of work, as well as to ascertain that only
quality raw material is used. The manufacturer
shall furnish all necessary information
concerning the supply to EIL / Owner's inspectors.

6.2 All tests shall be carried out at the


manufacturer's works under his care and expense.
The tests
6.0 INSPECTION, shall be witnessed by an inspector of EIL/ Owner
Please note we shall submit the valid type test reports of all tests listed. Please
221 Tendernotice_8 4506 of 5882 TESTING AND or of an agency authorized by the owner.
confirm acceptance.
ACCEPTANCE Prior notice of minimum 4 weeks shall be given to
the inspector for witnessing the tests.

6.3 All Routine & Type Tests shall be conducted


as per the ITP for MV variable frequency drive
6-81-1038 on the complete VFD system (as
defined in C1.1.0 above) as per IEC 61800-2.

The following type test for High Voltage induction Please note we shall submit the valid type test reports of all tests listed. Please No deviation on the standard specification
motor confirm acceptance. is acceptable.
Full load test and measurement of Voltage,
Current, Power, Slip, Efficiency and Power
factor at 100%, 75% and 50% load
•Temp Rise test
•Momentary overload test
•Noise Level
•Over speed
6-81-1031 Rev.3 (INSPECTION AND TEST
•Measurement of Starting Torque, Starting
222 PLAN FOR HIGH VOLTAGE INDUCTION Page 5 of 6 4.2 Motor Type Test
Current , full Load Torque, Pull out torque by
MATOR)
JEC (Logarithmic proportion Current method
II).
•Tan delta test
•Measurement of radial and axial clearance
between fan and stationary parts and
Measurement of air gap.(if provision for
measurement is not available in fully
assembled motor stage records/calculations to
be reviewed)
Synchronous motors shall be provided with class No deviation on the standard specification
F insulation unless otherwise specified in the is acceptable.
data sheet. The permissible temperature rise by
6.1.1 Insulation and
223 Tendernotice_8 4481 of 5882 the resistance method, above the specified We have considered class F insulation for all motors.Please confirm
Bracing
ambient temperature shall be limited to class-B
insulation.
PRE-BID QUERIES

NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package

BIDDING DOCUMENT : B224-501-17-44-PA-T-8700


Reference of Enquiry document
Sl.No Query EIL Reply
Part / Vol.No . Page No Clause No. Subject
1.1, Contractor shall provide grid connected solar Bidder's understanding is correct.
power plant units at roof top of RWTP substation
(SS23), RODM CPU substation (SS25) & RODM
Substation (SS-25) and feed the generated solar
power to the electrical system of the complex. The
solar power shall be generated at
415V, 3 phase, 50 Hz which can support loads at
We understand that the Solar Power unit shall be considered only for the new
224 Tendernotice_3 524 of 5882 1. GENERAL 0.8 p.f.
Substation Building. Please confirm.
1.2, The scope of work for contractor includes
design, manufacture, supply, erection, testing and
Commissioning of grid connect interactive solar
PV power plants without batteries on
substation

1.2, Solar power unit shall be connected to the Bidder's understanding is correct.
nearest 415V MV switchboard for export of solar
225 Tendernotice_3 524 of 5882 1. GENERAL power. The solar power systems shall remain Solar power will be evacuated at 415 V LV. Please confirm acceptance.
synchronized with the refinery complex power
supply for generation of solar power
1.5 The minimum guaranteed supply of energy Bidder to follow Technical Specification
from the solar power systems shall be minimum requirement.
1400 KWh/year for 1 KWp PV panel in the first
year of generation after commissioning.

1.7 The agency should have designed, supplied,


installed and commissioned SPV power plants of
Guaranteed energy shall be submitted w.r.t PV SYST Report Please confirm
226 Tendernotice_3 524 of 5882 1. GENERAL cumulative installed capacity of 250 kWP or
acceptance.
above, out of which at least one plant should be of
100 kWP capacity operating satisfactorily for more
than one year. The agency shall be approved by
PMC/Owner during detail engineering based on
details furnished by contractor.

4.1.2 Array Junction boxes (AJB)/ Main Junction AJB is not applicable for string inverters as string inverters will do the function of AJB.
Bidder to follow Technical Specification
227 Tendernotice_3 527 of 5882 4. SCOPE OF WORK requirement.
boxes (MJB)/ DC Junction Boxes (DCJB) Please confirm acceptance.
5.1 Solar PV modules Bidder to follow Technical Specification
5. TECHNICAL As per Specification we understand that Solar Modules will be manufactured in India
228 Tendernotice_3 528 of 5882 5.1.6 The offered crystalline Solar PV modules requirement.
SPECIFICATIONS except Solar cell. Please confirm acceptance.
must be manufactured in India.
5.9.2 Metering and Instrumentation for display of Bidder to follow Technical Specification
systems parameters and status indication to be requirement.
5.9 Data Monitoring provided. The data monitoring system/ datalogger Separate Solar SCADA OWS will be provided for monitoring purpose. Please confirm
229 Tendernotice_3 537 of 5882
System of PV plant shall have the provision of interface of complete acceptance.
data through MODBUS TCP/IP protocol with RJ45
port
Process
230 Tender Notice:3 7 5 Treatment Scheme For The Raw Water We understand that the bidders scope begins at the inlet of cascade aerator. Raw Water Feed line from RWTP B/L
Treatment Plant : The raw water from the The raw water at the inlet of cascade aerator shall be provided by the client. to cascade aerator in scope of RWTP
battery limit shall be directly routed to a Kindly confirm. contractor.
cascade step aerator
PRE-BID QUERIES

NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package

BIDDING DOCUMENT : B224-501-17-44-PA-T-8700


Reference of Enquiry document
Sl.No Query EIL Reply
Part / Vol.No . Page No Clause No. Subject
231 Document No. Page 3 of 11 2.0-Raw Water “raw water reservoir (capacity We understand that the raw water reservoir of 3744000 m3 at Pachpadra & bidder understanding is correct
Requirement the pumping system required to pump the water to the RWTP battery limit is
in client’s scope.
B224-501-17–44–DB–1001 37,44,000 m3 designed to cater for 30 days Kindly confirm.
of normal raw water demand)… RWTP
battery limit"
Rev. 1
232 Tender Notice:4 1278 of 5882 SFD for RWTP Sheet We understand that flow at the inlet of cascade aerator of the RWTP is 6507 Please follow cascade aerator
1 of 2 m3/hr. datasheet
Kindly confirm.
233 Tender Notice:4 1278 of 5882 SFD for RWTP Sheet Kindly provide the flow that has to be sent to the Horticulture storage tank in 400 m3/hr
1 of 2 ETP from the clarified water tank at the RWTP.
234 Document No. Page 8 of 11 6.0 Effluent “Chemical Sludge- Sent to Sludge dewatering Kindly provide the location & distance of the landfill for disposal of Chemical sludge routing/disposal not
Generation And unit (dewatered dewatered sludge from the proposed RWTP. in scope of contractor
B224-501-17–44–DB–1001 Handling sludge sent for landfill disposal)”
Rev. 1
235 Tender Notice:4 1278 of 5882 SFD for RWTP Sheet Kindly provide the incoming flow from the RO permeate room Plant to the Please follow tender specifications.
1 of 2 RWTP.
We understand that the pipes required to transfer the RO permeate from the RO permeate line from RO-DM B/l to
RO permeate room plant to the proposed RWTP is in client’s scope. RWTP B/L shall be in client scope

Kindly confirm.
236 Document No. Page 3 of 13 1. INTRODUCTION “facilities has been envisaged to produce DM We understand that the Net Treated DM Water Net Treated DM Water Production is
quality water @ 1350 m3/hr
B224-502-17–44–DB–1001 1400 m3/h.” Production required is 1350 m3/hr.
Kindly confirm.
“The Design Capacity of the RO-DM Plant
shall be 1350 m3/h”
2. DESIGN CAPACITY
OF RO-DM PLANT

237 Document No. Page 6 of 13 4.4 TREATED RAW “complete backup of Treated Raw Water Kindly confirm the complete backup of treated Raw water to be considered Treated raw water shall be
B224-502-17–44–DB–1001 WATER (as Back-up ~1475 m3/h is considered from the Treated from the Treated water reservoir to the RO DM Plant incase feed streams to backup/balance water to RO-DM
Feed to the RO-DM Water Reservoir.” the RO-DM plant are not available. Plant. refer point no.101
Plant)

“Feed flow to the RO-DM Plant : ~ 1422


m3/h (Max)”
238 Document No. Page 9 of 13 Table-8: Effluent RO-IV Reject- Sent to Solar Pond We understand that the solar pond is existing and is in client’s scope. Kindly RO-IV reject shall be routed upto
Generation and confirm. contractor battery limit only.
B224-502-17–44–DB–1001 Handling
Kindly provide the location & distance of the solar pond from the proposed
RO-DMP for the disposal of the RO-IV reject.
PRE-BID QUERIES

NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package

BIDDING DOCUMENT : B224-501-17-44-PA-T-8700


Reference of Enquiry document
Sl.No Query EIL Reply
Part / Vol.No . Page No Clause No. Subject
239 Document No. Page 9 of 13 Table-8: Effluent Chemical Sludge from HRSCC-I & HRSCCII - Kindly provide the location & distance of the landfill/TSDF from the proposed Chemical sludge routing/disposal not
Generation and Sent outside RO-DMP for disposal RO-DMP for the disposal of the chemical sludge from HRSCC-I & HRSCC-II. in scope of contractor
B224-502-17–44–DB–1001 Handling (after mechanical dewatering) to
landfill/TSDF
240 We understand that two separate Chemical buildings are to be provided for Chemical house shall be provided in
both RWTP & RO-DM plant. both RWTP & RO-DMP Plants.
Kindly confirm.
GENERAL
241 B224-509-17-44-EL-1001 Page 2 of 4 Equipment List We understand that the scope of supply for CPU is as per the Equipment list Scope shall be as per tender consisting
for Condensate Polishing Unit shared in B224-509-17-44-EL-1001. of scope of work/supply, equipment
list, datasheets, P&ID's, etc.,
Condensate Kindly confirm.
Polishing Unit
242 Tender Notice-4 Piping & Kindly provide the location & distance of the CPP & ETP (Battery limit) from Refer plot plan
Instrumentation the proposed CPU.
Diagram-
Condensate
Polishing System.
243 Document No. Page 3 of 23 2.0 DETAILED SCOPE HAZOP requirements shall be Kindly clarify the scope for HAZOP requirement. HAZOP requirement shall be as per
B224-501-17-44-SS-1001, Rev. 0 OF SUPPLY / WORK as per the HAZOP specifications attached tender specifications
elsewhere in the tender.
Electrical
244 General Hazardous Area Classification Kindly provide the hazardous area classification drawing which coincides Preparation of Hazardous Area
with the plot area under this contract. classification is in bidder's scope as a
part of Basic and Detailed engineering.
Part-III 342/ 5882 2.1 rr) Tools and tackles for maintenance of all Kindly provide the nos., ratings & range of the Tools & Tackles. As per vendor/OEM recommendation.
Technical Section – Scope of Work electrical equipment and systems
245 Part-III 356 / 5882 4.1 - Exclusions Supply, laying and end termination of 66 KV We understand that 66kV cables up to the incoming terminals of the 66kV Bidder's understanding is correct.
incomer power cables up to 66 KV isolating GIS panels in RWTP substation as well as RODM & CPU substation shall be
excluded from the scope of wok of the bidder. Kindly confirm.
Technical Section – Scope of Work breaker panel Gas insulated switchgear (GIS)
within substation.
246 Part-III 356 / 5882 4.3 - Exclusions Supply, laying and end termination of 6.6 KV Kindly clarify the requirement for 6.6kV Emergency Power supply panel. This Bidder to follow tender requirement.
incomer power cable and control cables up panel is not specified in the scope of work.
tounit 6.6 KV isolating breaker panel for
Technical Section – Scope of Work incoming emergency power supply
247 Part-III 491 / 5882 2.0 A – Project CONTRACTOR shall refer the Key Single Line Single Line Diagrams for S/S-23 & S/S-25 not found in the tender. Kindly Being issued through technical
Description - RWTP Diagram(attached with tender) for the furnish the same. amendment.
Powersystem description envisaged for RAW
Technical Section – Job Specification WATER TREATMENT PLANT Substation (SS-
(Electrical) 23).
248 Part-III 339, 345 & 497 Job specification 4.4) 40 kA for 1 sec. on 6.6 kV bus In the scope of work document, fault level at 6.6kV bus is specified as 40kA System Fault level for 6.6 kV system
/ 5882 Fault level for 3 sec. shall be 40 kA for 1 sec. However, the
6.6KV Switchboard bus bar shall be
suitable for fault withstanding capacity
of 40kA for 3 sec.
PRE-BID QUERIES

NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package

BIDDING DOCUMENT : B224-501-17-44-PA-T-8700


Reference of Enquiry document
248
Sl.No 339, 345 & 497 Job specification 4.4) 40 kA for 1 sec. on 6.6 kV bus Query System Fault level for 6.6 kV system
EIL Reply
Part / Vol.No . Page No
/ 5882 FaultClause
level No. Subject shall be 40 kA for 1 sec. However, the
Technical Section – Scope of Work & Whereas, Job specification specifies Fault level as 40kA for 1 sec on 6.6kV 6.6KV Switchboard bus bar shall be
Job Specification (Electrical) bus. suitable for fault withstanding capacity
Kindly clarify. of 40kA for 3 sec.
249 General All electrical equipment shall be generally conforming to the Tender Bidder to follow tender requirement.
specification, however, shall be manufactured as per Manufacturer’s Type
Tested design.
Piping
250 DOCUMENT No. Page 17 of 19 3D MODELLING The Contractor’s scope of work shall also Kindly clarify the scope of RDB (Reference data base). 3D modelling/Scope of RDB shall be as
include generation of 3D model, shall be per Job Specification (Doc. No.: B224-
done 503-16-43-SP-8701) attached with
B224-501-81-41-SOW-8700 in SP3D version S3D 2016 version, tender document.
preparation of drawings and documents,
supply &
Rev. C procurement of all materials, positive
material identification, flexibility analysis,

supporting, maintenance provisions etc..


251 General General (Piping) If during laying of new pipes any modification/relocation is required in the Battery Limit drawings are provided
existing piping, it shall be considered as extra scope work and shall have a along with the tender. Inside the
commercial impact. battery limit is bidder's scope.
252 General General (Piping) Kindly provide the Underground Piping Layout for the area located for this Battery Limit drawings are provided
package. along with the tender. Inside the
battery limit is bidder's scope.
253 General General (Piping) Kindly provide the Pipe Support standard to be followed. Bidder to follow its own support
standard. Same shall be submitted for
Record.
Instrumentation
254 SCOPE OF WORK 361 of 5882 1.1 All assembling in SRR (Satellite rack room) – We understand hardware & consoles are required for RWTP / RO-DM & CPU Bidder to refer Instrumentation scope
14 & 6, PLC system of work doc. (B224-501-16-51-SOW-
INSTRUMENTATION installation of control system and associated 8700), Instrumentation Job
specifications doc. (B224-501-16-51-SP-
RWTP & RO-DM/CPU hardware/ consoles/ workstations in SRR-14 8700) & other Instrumentation related
& 6, documents attached in tender, which
RRP, M/s HRRL supply, laying and termination of cables; are self explanatory.
255 SCOPE OF WORK 364 of 5882 2.13.8 Serial interface cable between Contractor’s Please provide distance of RO-DM & CPU package PLC and Purchaser’s Bidder to refer cl. 1.7-a) of
RO-DM & CPU package PLC and Purchaser’s DCS/PLC in Instrumentation Job specifications
INSTRUMENTATION DCS/PLC in RMCR RMCR doc. (B224-501-16-51-SP-8700).
RWTP & RO-DM/CPU
RRP, M/s HRRL
PRE-BID QUERIES

NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package

BIDDING DOCUMENT : B224-501-17-44-PA-T-8700


Reference of Enquiry document
Sl.No Query EIL Reply
Part / Vol.No . Page No Clause No. Subject
256 SCOPE OF WORK 366 of 5882 2.13.8 Serial interface cable between Contractor’s As per clause 2.13.8 RWTP package PLC and Purchaser’s DCS/PLC are in SRR- For routing of cables from SRR-14 to
RWTP package PLC and Purchaser’s DCS/PLC 14 then why duct is required for For interfacing of system cables from SRR- RMCR, since Purchaser's contractor for
in SRR-14. Serial interface cable between 14 to RMCR. laying ducts in offsite area, can not
Contractor’s RO-DM & CPU package PLC and enter in the Battery limits of any
Purchaser’s DCS/PLC in RMCR. Package, as per their defined scope, so
Bidder shall consider duct from SRR-14
INSTRUMENTATION upto Purchaser’s offsite pipe rack near
RWTP & RO-DM/CPU For interfacing of system cables from SRR-14 unit battery limit, as specified in
to RMCR, Instrumentation scope of work doc.
RRP, M/s HRRL contractor shall consider 1 no. duct 400 Wx (B224-501-16-51-SOW-8700). For more
200 H mm details refer Instrumentation scope of
upto Purchaser’s offsite pipe rack work doc. & Instrumentation Job
specifications doc. (B224-501-16-51-SP-
8700) attached in tender.

4.7

257 SCOPE OF WORK 366 of 5882 4.6 For cables of instruments which although We understand for Service water & Cooling water For the signals referred in the query,
not in Instrumentation cables from
INSTRUMENTATION Contractor’s scope, however their make-up pumps signals, DM plant feed pumps instrument to JB, JB to PLC is not in
connectivity is Bidder scope of supply & also erection
RWTP & RO-DM/CPU envisaged in RWTP package PLC based signals, Treated water reservoir & sump signals, of the same is not included in Bidder's
control system and RO-DM & CPU package scope.
PLC based control system like Service water Drinking water system cable from PLC
& Cooling water make-up pumps signals, DM to MCC Not in bidders'cope.
plant feed pumps signals, Treated water
reservoir & sump signals, Drinking water
system signals envisaged to be connected to
RWTP package PLC system

RRP, M/s HRRL Drinking water system cable from instrument to JB, JB to PLC & PLC to MCCis
not in Voltas scope of supply , also erection of the same is not included in our
scope, please confirm.
258 SCOPE OF WORK 370 of 5882 5. Power Supply The supply and laying of the power cables Please provide length of cable need to consider for power cable from RO-DM Bidder to refer cl. 1.7-b) of
corresponding to these UPS supply to -CPU UPS to ETP cabinet (BY other) & Purchaser’s DCS/PLC. Or do we have to Instrumentation Job specifications
consider separate UPS for ETP PLC system. doc. (B224-501-16-51-SP-8700).
INSTRUMENTATION ETP cabinets (by others) &Purchaser’s
DCS/PLC cabinet in SRR-6 shall be by
Contractor
RWTP & RO-DM/CPU
RRP, M/s HRRL
259 JOB SPECIFICATIONS 421 of 5882 1.6 a) Approximate cable As per RWTP layout provided with tender page no. 1256 SRR-14 are shown in Bidder to follow the cable distance
RWTP area (300 X 125m), specified in Instrumentation Job
specifications doc. (B224-501-16-51-SP-
8700).
PRE-BID QUERIES

NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package

BIDDING DOCUMENT : B224-501-17-44-PA-T-8700


Reference of Enquiry document
259
Sl.No 421 of 5882 1.6 Query Bidder to follow the cable distance
EIL Reply
Part / Vol.No . Page No Clause No. Subject specified in Instrumentation Job
INSTRUMENTATION distance between Similar is the contradiction for RO-DM CPU plant. Please confirm what to specifications doc. (B224-501-16-51-SP-
consider specified distance (500m & 600m) or cable as per layout. 8700).
RWTP & RO-DM/CPU RWTP package battery
RRP, M/s HRRL limit and SRR-14
Approx. 500 m
b) Approximate cable
distance between RODM
& CPU package
battery limit and SRR-6
Approx. 600 m
260 JOB SPECIFICATIONS 421 of 5882 1.7 b) Approximate cable As per clause no. 1.3 in JOB SPECIFICATIONS INSTRUMENTATION Purchaser’s For location of SRRs, RMCR etc.,
INSTRUMENTATION distance within Main plant DCS is at RMCR. please provide exact location of SRR-14, SRR-6 Biidder to refer Overall instrument
RWTP & RO-DM/CPU respective SRR (i.e and purchaser DCS and distance between SRR-6 to RMCR is given as 3200m cable duct and trench layout dwg.
RRP, M/s HRRL between Purchaser’s please provide distance between SRR-16 to RMCR. (B229-000-16-51-00801) as attached in
DCS/PLC system tender.
panels & Contractor’s It is understood that Bidder's query is
Package PLC , w.r.t distance between SRR-14 (not
between ETP vendor’s SRR-16 as referred) to RMCR. Same is
PDB panel & UPS Dist. not mentioned in tender, as
Board etc Purchaser’s DCS/PLC panels are
envisaged in SRR-14 itself {refer cl.
2.13.8 of Instrumentation scope of
work doc. (B224-501-16-51-SOW-
8700)}.

261 JOB SPECIFICATIONS 432 of 5882 5.9 Contractor shall route the major runs of Cable duct drawings are provided for MS duct, please provide drawing for The duct fabrication drawing (7-52-
multi-pair FRP duct. 0254) as attached in tender shall be
INSTRUMENTATION (home-run) cables on FRP cable ducts only referred. However, referred drawing is
for GI Duct (not MS). Bidder shall
RWTP & RO-DM/CPU develop suitable drawing for FRP duct
RRP, M/s HRRL based on it. The FRP ducts shall be
designed to withstand the load of
cables with 100% capacity as per the
respective duct sizes.

262 GUIDELINES FOR 3042 of 5882 7 PLC Configuration shall be TMR or Quad, SIL- Please confirm requirement of SIL3 PLC configuration. Provide area As already specified in GUIDELINES
3 certified for all the process units as per classification for WTP plant FOR INSTRUMENTATION doc., SIL-3
INSTRUMENTATION IEC61508 PLC shall be considered where SIL-3
loops are applicable.
Preparation of Area classification is in
bidder's scope.
PRE-BID QUERIES

NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package

BIDDING DOCUMENT : B224-501-17-44-PA-T-8700


Reference of Enquiry document
Sl.No Query EIL Reply
Part / Vol.No . Page No Clause No. Subject
263 Please provide typical hook up drawing & PLC system architecture drawing. All required details are already
provided in the tender. Bidder to
follow the same.
264 Part-III 25 / 5882 4.0, Fluoride: 1.6mg/l. Kindly provide treatment scheme for Fluoride removal as it is not specified in Please follow tender
Sl.no.28 Note6: Fluoride level in drinking water shall be tender. It may be noted that Fluoride will not be removed in ACF, UF & Clarifiers.
less than 1ppm
265 Part-III 25 &26 / 5882 5 ……….. routed to activated carbon filter (ACF) ACF is not required at UF outlet for the following reasons- Please follow tender
(Paragraph-6) and then routed to a separate drinking ………  ACF will remove residual ClO2 present in UF treated water.
 ACF will contaminate UF filtered water.
 ACF can increase turbidity level in treated water.
Kindly accept removal of ACF in the downstream of UF system.
266 Part-III 39& 40 / 5882 7 RO reject recovery section: RO reject does not have any organics, hence, ACF is not required. Kindly confirm. Please follow tender
………….. The clarified water from HRSCC-II shall
be further treated in Dual Media Filter (DMF-II)
for filtration followed by Activated Carbon Filters
(ACF-II) for organics removal………

267 Part-III 34 / 5882 4 Design inlet stream. Individual water qualities are specified in tender. However, we request Customer to Please follow tender
Cooling water BD quality provide combined water quality which will be fed to RO plant for Design purpose.
Boiler blow down quality
Treated ETP effluent
268 Part-III 414 / 5882 4 Utilities free of cost at RODMP, CPU & RWTP Please clarify as the two statements are contradictory. Plant Air & instrument air shall be
provided by contractor till 3 months
after commissioning
1278 / 5882 Note:8 – supply of instrument air & plant air till
commng. & 3month operation by Contractor.

Schematic flow
diagram RWTP

269 Part-III 356/5882 B224-501-16-50-SOW- Supply, laying and end termination of 66 KV Please furnish the following for our information.
8700 incomer power cables up to 66 KV isolating
Rev. A breaker panel Gas insulated switchgear (GIS) 1) Location of Upstream 66 KV switchgear.
within substation. However, plug/socket 1. Upstream 66 KV switchgear shall be
installed in CPP substation.
arrangement for termination of 66KV cables 2) Make & model of existing 66 KV breaker.
shall be part of the GIS panel to be supplied by 2. Shall be informed to successful bidder.

4. EXCLUSIONS the contractor.


4.1 & 4.2
269 Part-III 356/5882 PRE-BID QUERIES

1. Upstream 66 KV switchgear shall be


NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package installed in CPP substation.

BIDDING DOCUMENT : B224-501-17-44-PA-T-8700 2. Shall be informed to successful bidder.

Reference of Enquiry document


Sl.No Query EIL Reply
Part / Vol.No . Page No Clause No. Subject
Supply, laying and end termination of incoming
control cables, pilot wire differential protection

FO cable from upstream 66KV switchgear to


66KV GIS Isolator breaker panels in substation.

270 Part-III 2980/5882 TECHNICAL 4.0) All cable trays, fittings and accessories shall We understand that, inter-plant cabling, solar plant shall be GI trays, whereas inside As per Instrumentation job specifications
REQUIREMENTS be made of the fiberglass and shall be buildings FRP type trays to be used. Kindly confirm. (B224-501-16-51-SP-8700), Instrument
corrosionresistant and fire retardant cable trays (for Instrumentation related
Complete cable tray work, GI cable trays, tray cables) shall be fabricated from FRP.
covers, supports, racks, cable trenchesfor intra-
plant, plant communication Bidder to refer Engineering Design Basis
for material of cable tray.

ll.
347/5882 mm.
271 Part-III 211/5882 5.9.5 Process plant / Building / Please note that we do not have any underground cables which are prone to Bidder to follow tender requirement.
ShedSubstation (Cable Cellar) - Armoured cable mechanical damage. Except for underground cables, we would like to use
unarmored cable. Kindly accept

As an exception within substation areas,


unarmoured cables may be used, if specifically

4773/5882 5.13.7 agreed upon.


272 Part-III 1176/5882 Block Diagram Dual 2X100 % battery indicated in the referred Block Please confirm the redundancy configuration in battery 2X100% or 1X100%. For each UPS system as shown in the
redundant UPS & PDB diagram block diagram, the battery configuration
shall be 1x100% in line with Engineering
Design Basis.
5.6.11 UPS SYSTEM 5.6.11 UPS1X100 Nicd is indicated.

203/5882
273 Part-III 3061/5882 3.1.7 Flameproof- No As we have not envisaged any hazards in water treatment plant, We are considering Bidder to follow bid requirement.
the proposed water treatment plants as Non-hazardous area and safe.

Local Panel
requirement
Note-3 In general, the local control panel shall In view of this , we are offerings the electrical equipment without explosion proof /
be weatherproof with explosion-proof / flame- flame proof.
proof
(EExd) JB, push-buttons, selector switches, lamps
etc. and Intrinsically safe HMI & Alarm

annunciator in hazardous area 1)Motors


2) instruments
3)Junction box
4) Local control panel
PRE-BID QUERIES

NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package

BIDDING DOCUMENT : B224-501-17-44-PA-T-8700


Reference of Enquiry document
Sl.No Query EIL Reply
Part / Vol.No . Page No Clause No. Subject

Kindly confirm.

274 Part-III 359/5882 6.9) Key Single Line Diagram We could not locate the referred drawing. We request customer to furnish the Being issued through technical
B224-501-16-50- same. amendment.
SOW-8700
Rev. A B224-501-16 -50-
00001
275 Part-III 4407 / 5882 - SPECIFICATION FOR MEDIUM VOLTAGE We understand this specification is applicable for 415V Switchgear Boards.Pl. Bidder's understanding is correct.
SWITCHBOARD clarify.
276 Part-III 4412 / 5882 5.16 …...However circuit breaker panels and fixed We propose fixed type switchboard shall be doublefront execution as it reduces the Bidder to follow tender requiremnet.
type switchboard shall be in single front length of the board.
execution only.
277 Part-III 4413 / 5882 5.27.1 Bus bars shall be of high conductivity electrolytic We have considered Aluminium bus bar. Bidder to follow tender requiremnet.
aluminium or copper supported on…….

278 Part-III 4413 / 5882 5.27.5 The hot spot temperature of bus bars, including Temperature rise shall be as per relevant IEC/IS standard. Bidder to follow tender requiremnet.
joints, at design ambient temperature shall not
exceed 95 ° C under normal operating
conditions. However, for silver plated joints, the
allowable maximum temperature shall be 115°C.

279 Part-III 4417 / 5882 8.1 Generally the feeders of three main categories Kindly specify whether MCCB or SFU to be used as SCPD(Short circuit protecting Bidder to follow tender requirement and
are identified as circuit breaker, motor starters device) for Supply and Motor feeders. technical amendment.
and MCCB or switch fuse.
280 Part-III 4418 / 5882 8.4 Control transformer shall be provided for each We propose Control supply for the modules will be provided through control supply Bidder to follow tender requirement and
FVR/FVNR/SFC starter/MCCB+C starter/feeder bus which takes the supply from one no. of adequate rated CST in each bus section. technical amendment.
modules or bus section of the PMCC/MCC Each motor feeder/module will not be provided with individual CST because the
switchboard having contactor control feeders as above arrangement will meet the requirement.
specified in the datasheet/job specification or
elsewhere.
281 Part-III 4418 / 5882 9.1.1 Circuit breakers shall be air break, draw-out type We understand this clause is applicable for Air circuit breaker and for Bidder's understanding is correct.
and 3/4 poles as specified in the datasheet/job MCCB/MPCB/MCB. All applicable MCCB/MPCB/MCB shall be fixed type only.
specifications.
282 Part-III 422 / 5882 2.4.1 PLC make: As per vendor list attached in this BHEL make Valmet DNA (Erstwhile-Metso DNA) based control system is proposed As per the tender requirements,
tender for control & monitoring of RWTP, RO-DM & CPU Package. Bidder to follow the Vendor list
attached in tender.
Location This system is manufactured by BHEL at Electronics Division, Bangalore under
collaboration with valmet Automation, Finland and is the latest hardware having
powerful features. BHEL is offering similar controls for unit ratings upto 800MW
supercritical sets.
2.4.2 RWTP: PLC control system in SRR-14 rack room,
PLC system Engineering consoles, Operator
consoles & View only Operator Console in SRR-
14
Engineering room. Please confirm the acceptance.
282 Part-III 422 / 5882 As per the tender requirements,
Bidder to follow the Vendor list
PRE-BID QUERIES
attached in tender.

NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package

BIDDING DOCUMENT : B224-501-17-44-PA-T-8700


Reference of Enquiry document
Sl.No Query EIL Reply
Part / Vol.No . Page No Clause No. Subject

RO-DM & CPU: PLC control system in SRR-6 rack


room, PLC system Engineering consoles,
Operator consoles & View only Operator Console
in SRR-6 Engineering room.

283 Part-III 350 / 5882 2.39 Electrical control system (ECS) We understand that ECS/SAS system is not part of RWTP bid package, please inform Bidder to follow technical bid
whether bidder's understanding is correct. requirement.

The plant-wide ECS is to be supplied and


commissioned by Owner/Others after
integrating the signal interface provided by
CONTRACTOR.
1.2 (Last Line)
Scope of Supply
CONTRACTOR is required to supply the
following:

Interposing relays mounted in interposing relay


panel for hardwired DO signals....... battery
limit.

Please clarify the bidder's scope related to interposing relay panel, transducer panel
& dummy panel and its battery limit.
2.1 to 2.6
284 Part-III 206/ 5882 5.6.15 VARIABLE FREQUENCY DRIVE Please inform the voltage level to be considered for motor rating more than 6.6KV to be considered for motor rating
MV Inverter 700kW? more than 700kW
i) Motor kW rating less than 315kW at 415V
without bypass ,
ii) More than 315kW & up to 700kW at voltage
upto 690V without bypass (refer Note-2)

HV Inverter Motor rating more than 700kW