Você está na página 1de 13

1 1.

2m diameter ANTENNA
2 1 LINK
REMARKS
SI ITEM DESCRIPTION UOM QTY PRICE
1 MOBILIZATION LOT 2 15,438.85
2 MW Technical site survey with report Site 2 8,943.48
3 MW LOS survey with report LINK 2 9,937.20
4 *Antenna Mounted Bracket/Pole Installation PCS 2 2,679.60
5 MW Installation, Commissioning & PAT (0.9/1.2m) w/ Test Eqpt LINK 2 55,648.32
6 MW Link PAT w/ Test Eqpt LINK 1 14,664.10
7 Equipment Integration Site 2 11,129.94
9
10
TOTAL
₱30,877.70
₱17,886.96
₱19,874.40
₱5,359.20
₱111,296.64
₱14,664.10
₱22,259.89
₱222,218.89
1 TEAM COST / 8 HR 6 DAYS ₱450.00 local wage
DESCRIPTION COST COST COST
SI QTY TYPE DAYS
POSITION PER DAY PER HOUR PER MONTH
1 TEAM LEADER 1 MONTHLY 26 ₱826.92 ₱103.37 ₱20,000.00
2 TECHNICIAN 2 MONTHLY 26 ₱1,384.62 ₱173.08 ₱15,000.00
7 *NOC SUPPORT 1 MONTHLY 26 ₱826.92 ₱103.37 ₱20,000.00
4 RIGGER 2 DAILY 26 ₱900.00 ₱112.50 ₱23,400.00
5 TRANSPORTATION 1 MONTHLY 26 ₱961.54 ₱120.19 ₱25,000.00
6 FUEL 1 MONTHLY 26 ₱384.62 ₱48.08 ₱10,000.00
7 DA 1 MONTHLY 26 NA NA NA
8 *HOUSE RENT 1 MONTHLY 26 ₱115.38 ₱14.42 ₱3,000.00
₱5,284.62 ₱660.58
OTHER EXPENSES
SSS/PHILHEALTH/PAG-IBIG INSURANCE OT PER DIEM TRANSPO 13th mon SL/VL
₱1,000.00 ₱500.00 ₱0.00 ₱0.00 ₱0.00 ₱0.00 ₱0.00
₱2,000.00 ₱1,000.00 ₱0.00 ₱0.00 ₱0.00 ₱0.00 ₱0.00
₱1,000.00 ₱500.00 ₱0.00 ₱0.00 ₱0.00 ₱0.00 ₱0.00
NA NA NA NA ₱300.00 NA NA
NA NA NA NA NA NA NA
NA NA NA NA NA NA NA
NA NA NA NA NA NA NA
NA NA NA NA NA NA NA
TOTAL TOTAL
COST/MONTH COST/SITE
₱21,500.00 ₱4,961.54
₱36,000.00 ₱8,307.69
₱21,500.00 ₱4,961.54
₱23,400.00 ₱5,400.00
₱25,000.00 ₱5,769.23
₱10,000.00 ₱2,307.69
NA NA
₱3,000.00 ₱692.31
₱137,400.00 ₱31,707.69
SI DESCRIPTION 1ST 2ND 3RD
1 AMB installation SITE A
2 ANTENNA ASSEMBLY BELOW SITE A
3 ANTENNA INSTALLATION SITE A
4 ODU INSTALLATION SITE A
5 IDU INSTALLATION SITE A
6 CABLE INSTALLATION SITE A
7 GROOMING SITE A
1 AMB installation SITE B
2 ANTENNA ASSEMBLY BELOW SITE B
3 ANTENNA INSTALLATION SITE B
4 ODU INSTALLATION SITE B
5 IDU INSTALLATION SITE B
6 CABLE INSTALLATION SITE B
7 GROOMING SITE B
8 PANNING/TUNING/ALIGNMENT/I&C/TESTING
9
10
11
12
3RD 4TH 5TH 6TH 7TH
PM

PC

SUBCON

NOC-1 1. TL-1 2. TL-1 3. TL-1 TL-nth

TECH -2 TECH -2 TECH -2

RIGGERS-2-3 RIGGERS-2-3 RIGGERS-2-3


PM PROJECT MANAGER
PC PROJECT COORDINATOR
SE SITE ENGINEER
TL TEAM LEADER
TECH TECHNICIAN

TL-nth
TOOLS QTY PRICE TOOLS
FULL BODY HARNESS 3 BLADE CUTTER
HELMET 5 METAL SAW
SAFETY SHOES 5 ROPE 200m
GLOOVES 5 DOUBLE PULLEY
ADJUSTABLE WRENCHES PULLEY
#32 2 ALEN RANGES
#16 2 MULTI METER
CLOSED WRENCHES SLING
#32 2 CARABINER
#16 2 SHACLES
# 10 4 SOCKET WRENCHES
#12 4
TORQUE WRENCHES 1
SCREW DRIVERS 2 SETS *SITE MASTER
HAMMER 1 *LAPTOP
CRIMPING TOOL FOR LUGS 1 *POWER DRILL WITH BITS
CRIMPING TOOL FOR RJ45 1 *SPECIAL TOOLS
DIAGONAL CUTTER 1
PLIER 1

CERTIFICATION PRICE CERTIFICATION


HUAWEI PASS ID L300 VAN
WORKING @ HEIGHTS
FIRST AID
ELECTRICAL
QTY PRICE
1
1
1
1
1
1 SET
1
2
4
4
1 SET

1
1
1

PRICE

Você também pode gostar