Sr.No.

Description Unit Quantity


Material
Details of cost for 225 cum (450 tonnes) Material
Closed graded granular sub-base material as per
Grading-I of specifications
53mm to 9.5mm @ 50% = 144 cum
9.5mm to 2.36mm @ 20% = 57 cum
2.36mm below @ 30% = 86.40 cum

Stone Aggregate ( single size) : 50mm nominal size cum 72


carriage of stone aggregate 40mm nominal size & above cum 72
Stone Aggregate ( single size) : 10mm nominal size cum 72
carriage of stone aggregate below 40mm nominal size cum 72
Crushed stone 2.36mm to 12.5mm size cum 57
carriage of stone aggregate below 40mm nominal size cum 57
Stone chippings/ screening 4.75mm nominal size cum 43.2
Stone chippings / screening 150 micron nominal size cum 43.2
carriage of Course sand cum 86.4

Machinery / Hire charges :


Wet mix plant 60TPH @ 75 tonne capacity Hr 6
Generator 100 KVA/125 KVA Hr 6
Water Tanker 5 to 6KL cap. 5km lead with one trip / Hr Hr 4.5
Front end loader 1 cum bucket capacity ( incl. POL) Hr 6
Tipper 10 tonne cap. ( taking lead 10KM) = 450 x 10
Tipper 5 cum tonne km 4500
add 10% of cost of carriage to cover cost of loading/unloading
Motor Grader 3.35 metre blade Hr 6
Vibratory roller 8 to 10 tonne Hr 6

Labour
Mate day 0.4
Skilled Beldar ( for floor rubbing etc.) day 2
Belder day 8
Rate Amount

1000 72000.00
112.79 8120.88
1350 97200.00
103.77 7471.44
900 51300.00
103.77 5914.89
1400 60480.00
1400 60480.00
103.77 8965.73

800 4800.00
250 1500.00
150 675.00
900 5400.00

3 13500.00
1350.00
2450 14700.00
600 3600.00

617 246.80
617 1234.00
558 4464.00