03-021TENDER DOCUMENTS FOR MECHANICAL WORKS000000

03+000KHAADI STORE AT GUJRAT

SECTION III/A: BILL OF QUANTITIES FOR HVAC WORKS


1 2 3 4 5 6 7 8 9 10
BOQ Spec. No. Description Qty Unit Material Installation Material Installation Total Cost
No. Unit Rate Unit Rate Cost Cost

1 2 3 4 5 6 7 6x4 7x4 8+9


AIR CONDITIONING
23 81 29 Installation, Testing & Commissioning of Owner Furnished Non-Inverter Reversible split
23 23 00 units (Heat & Cool) along with painted hangers and supports, refrigerant copper piping and
accessories, elastomeric nitrile foam insulation, control and termination power wiring,
thermostats, supports complete in all respects, as per schedule, drawings and
specifications.

Indoor Units/Condensing Units


A SP-1/CU-01 3 Nos.
B SP-2/CU-02 5 Nos.
C SP-3/CU-03 1 No.
D SP-4/CU-04 1 No.
E SP-5/CU-05 1 No.
F SP-6/CU-06 1 No.
23 81 29 Installation, Testing & Commissioning of Owner Furnished Inverter Reversible split units
23 23 00 (Heat & Cool) along with painted hangers and supports, refrigerant copper piping and
accessories, elastomeric nitrile foam insulation, control and termination power wiring,
thermostats, supports complete in all respects, as per schedule, drawings and
specifications.

Indoor Units/Condensing Units


G SP-1a/CU-01a 3 Nos.
H SP-2a/CU-02a 3 Nos.

Sub Total (Page 1)

Sec-III/A - 1 of 6
03+000S. MEHBOOB & COMPANY file:///conversion/tmp/scratch/435365257.xls
435365257.xls
03-021TENDER DOCUMENTS FOR MECHANICAL WORKS000000
03+000KHAADI STORE AT GUJRAT

1 2 3 4 5 6 7 8 9 10
BOQ Spec. No. Description Qty Unit Material Installation Material Installation Total Cost
No. Unit Rate Unit Rate Cost Cost
1 2 3 4 5 6 7 6x4 7x4 8+9
23 23 00 Supply, Installation, Testing & Commissioning of Refrigerant Copper Piping with Armaflex
pipe insulation 1/2 in thick with supports, fittings, and accessories.

A 3/8" Dia. 1220 Rf


B 5/8" Dia. 1220 Rf
23 72 13 Supply, Installation, Testing and Commissioning of Regulatable flow Type Energy Recovery
13 48 00 Ventilator including foundation with noice and vibration controller as per specifications,
drawing & schedule.

C ERV-01 1 No.
23 34 33 Supply, Installation, Testing and Commissioning of Air Curtain including Interfacing Control
with Door Contact complete in all respects and, as per specifications, drawing & schedule.

D AC-01 1 No.
22 10 00 Supply, Installation & Commissioning of U-PVC piping Class- B for exhaust air including
wire mesh including supports complete in all respect as per drawings and specifications.

E 4" Diameter 49 Rf
23 21 14 Supply, Installation, Testing & Commissioning of U-PVC piping Class- B, with armaflex 0.6"
thick Insulation for condensate drain including all cutting, fixing fitting, laying, cleaning,
making good and supports complete in all respect as per drawings and specifications.

F 3/4" Diameter 352 Rf


G 1" Diameter 1 Rf

Sub Total (Page 2)

Sec-III/A - 2 of 6
03+000S. MEHBOOB & COMPANY file:///conversion/tmp/scratch/435365257.xls
435365257.xls
03-021TENDER DOCUMENTS FOR MECHANICAL WORKS000000
03+000KHAADI STORE AT GUJRAT

1 2 3 4 5 6 7 8 9 10
BOQ Spec. No. Description Qty Unit Material Installation Material Installation Total Cost
No. Unit Rate Unit Rate Cost Cost
1 2 3 4 5 6 7 6x4 7x4 8+9
23 31 00 Supply, Installation and Commissioning of G.I Sheet metal air ducts as per ASHRAE
Standards for air ducting, plenums and other sheet fabrications including splitter dampers,
take off, vanes elbows, hangers, supports and other necessary fittings.

A 24 Gauge 232 Sf
B 22 Gauge 732 Sf
23 07 00 Supply, Installation & Commissioning of Closed Cell NBR based elastomeric Insulation of
1" thickness for G.I Sheet metal air ducts with low density elastomeric thermal insulation.
Complete in all respect as mentioned in the schedule & specifications.

C For 24 Gauge 232 Sf


D For 22 Gauge 732 Sf
E 23 07 00 Supply, installation & commissioning of 0.032" Aluminum cladding over Exposed Ducts
(Supply and Recovery Supply). Complete with all respects as mentioned in the schedule &
specifications. 824 Sf

23 37 13 Supply, Installation, Testing and Commissioning of Supply Air Devices including


connections with air ducts and supports arrangements, as follows:

Supply Air Grill (S.A.G)


F 12"x8" 2 No.
Return Air Grill (R.A.G)
G 12"x8" 2 No.
Fresh Air Grill (F.A.G)
H 26"x12" 1 No.
I 28"x12" 1 No.

Sub Total (Page 3)

Sec-III/A - 3 of 6
03+000S. MEHBOOB & COMPANY file:///conversion/tmp/scratch/435365257.xls
435365257.xls
03-021TENDER DOCUMENTS FOR MECHANICAL WORKS000000
03+000KHAADI STORE AT GUJRAT

1 2 3 4 5 6 7 8 9 10
BOQ Spec. No. Description Qty Unit Material Installation Material Installation Total Cost
No. Unit Rate Unit Rate Cost Cost
1 2 3 4 5 6 7 6x4 7x4 8+9
23 37 13 Supply, Installation, Testing and Commissioning of Supply Air Devices including
connections with air ducts and supports arrangements, as follows: (Continue…)

Exhaust Air Grill (E.A.G)


A 24"x12" 1 No.
B 28"x12" 1 No.
23 33 13.13 Supply, Installation, Testing and Commissioning of Dampers as per SMACNA standard and
specifications.

Non Return Damper (NRD)


C 30"x8" 1 No.
23 33 13.16 Supply, Installation, Testing & Commissioning of Volume Control Dampers as per drawings
and specifications.

D 26"x8" 1 No.
E 24"x8" 1 No.
23 34 00 Supply, Installation, Testing and Commissioning of Exhaust and Ventilation Fans as per
schedule & specifications.

F TEF-01 1 No.
G TEF-02 1 No.
H KEF-01 1 No.
I PEF-01 1 No.
J SEF-01 1 No.
K SVF-01 1 No.

Sub Total (Page 4)

Sec-III/A - 4 of 6
03+000S. MEHBOOB & COMPANY file:///conversion/tmp/scratch/435365257.xls
435365257.xls
03-021TENDER DOCUMENTS FOR MECHANICAL WORKS000000
03+000KHAADI STORE AT GUJRAT

1 2 3 4 5 6 7 8 9 10
BOQ Spec. No. Description Qty Unit Material Installation Material Installation Total Cost
No. Unit Rate Unit Rate Cost Cost
1 2 3 4 5 6 7 6x4 7x4 8+9
08 91 19 Supply, Installation, Testing and Commissioning fresh air intake with sand trap & exhaust
louvers, complete with Aluminum constructed and powder coated finished as per
specifications.

FRESH AIR LOUVERS WITH SAND TRAP


A 3.2 sf (32% Free Area) 1 Nos.
EXHAUST AIR LOUVERS
B 32 sf (65% Free Area) 2 Nos.
C 2.3 sf (42% Free Area) 1 No.
MISCELLANEOUS
D 23 05 53 Supply & Installation of brass tags for Equipment and system including all accessories
complete in all respect. 1 Job

01 00 00 Drawings
E Shop Drawings and As Built Drawings for HVAC, Plumbing, Drainage and Fire Fighting as per
specifications. 1 Job

Sundries
F Supply, installing and commissioning of items not listed in BOQ but required. (Contractor to
provide list) 1 Job

Sub Total (Page 5)

Sub Total for HVAC Works

Sec-III/A - 5 of 6
03+000S. MEHBOOB & COMPANY file:///conversion/tmp/scratch/435365257.xls
435365257.xls
BILL OF QUANTITIES FOR HVAC WORKS
BAHRIA GRAND MOSQUE, KARACHI

Section VI: Summary of HVAC Works

Airconditioning and Ventilation System

CARRIED TO COLLECTION AMOUNT

FROM PAGE VI/01

FROM PAGE VI/02

FROM PAGE VI/03

FROM PAGE VI/04

FROM PAGE VI/05

FROM PAGE VI/06

FROM PAGE VI/07

Total Cost for HVAC Works Rs. -