Qualification and Experience: B.E CIVIL ENGINEER –11 years of relevant professional
experience in the field of Expressways including bridges and interchanges, expressway, National
Highways & State Highways.Design and Estimates of Residential and commercial Buildings.
`
Experience:
1) Position: Civil Superintended Duration: Jun 2017 to Present
Employer: China Geo Engineering Corporation, Saudi Arabia Branch
Type of Project: Road to area A and Port, Ras Al Khair RC (Royal Commission) project
includes 6 Bridges
Scope of Employer’s Contract:
Scope of Work:
1. Supervising reinforcement and shuttering works.
2. Checking setting out of Structures and their levels.
3. Responsible for raising TQ (Technical Query) as per the site requirement
4. Preparing bar bending schedules, for all the Structures as per RC and ACI Specification.
(Bridges, Culverts, Catch basins, Hand holes, Lighting Pole Foundations Etc.)
5. Finalizing the BBS with the supplier and preparing Purchase Orders (PO) for steel with
procurement Dept.
6. Calculate the quantities for Structures and compare with the BOQ (Bill of Quantities).
7. Prepared some detail step by step concreting procedure during submittal for
consultant reference (Method Statements).
Personal Details:
Name: Mohammed Imran Father’s name: Abdul KhaderJeelani
Permanent Address: Raichur: 584101, Karnataka, India
Date of Birth: 15th Dec 1985 Sex: Male
Nationality: Indian Religion: Islam
Marital status: Married Passport expiry: 2025
E-mail:imrancvlzone@gmail.com , imrancvlzone@yahoo.co.in Saudi Driving License: Valid
ROYAL COMMISSION FOR JUBAIL AND YANBU
MADINAT AL-JUBAIL AL-SINAIYAH
CONSTRUCTION DEPARTMENT
SUBMITTAL REVIEW
REVIEWER :
✔ WORK MAY PROCEED
1 CS 3 CS REVISE AND
RESUBMIT, WORK MAY
DATE IN : 7/27/2017 NOT PROCEED
2 CS REVISE AND
RESUBMIT, WORK MAY
COMPLETE PROCEED SUBJECT TO 4 CS REVIEW NOT
INCORPORATION OF REQUIRED, WORK MAY
DOC/DWG. NO 01-023-00 REV: 0 CHANGES INDICATED
SIGN: A. Razzaq
Date: 2017.08.02
08:07:26 +03'00' DATE August 2, 2017
RC TRANSMITTAL NO :
IMPORTANT:
AS MUCH AS POSSIBLE, COMMENTS MUST BE WRITTEN ON THIS FORM OR ATTACHED PAGES. COMMENTS WHICH
CAN ONLY BE POSSIBLE ON THE CONTRACTOR'S SUBMITTAL MUST BE INDEXED ON THIS FORM.
DOCUMENT STATUS APPLIES TO TECHNICAL CONTENT ONLY. USE OF FOREIGN MATERIALS, EQUIPMENT AND
SERVICES IS SUBJECT TO ROYAL COMMISSION'S APPROVAL. ONCE THIS TECHNICAL SUBMITTAL IS GIVEN CODE 1 OR
2 STATUS, CONTRACTOR SHALL SUBMIT VENDOR APPROVAL(WITH TECHNICAL SUBMITTAL PACKAGE) FOR ROYAL
COMMISSION'S REVIEW. PROCUREMENT PRIOR TO THIS APPROVAL IS DONE AT THE CONTRACTOR'S OWN RISK.