BACKUP

PAVING
A. Paving Lama = Panjang x Lebar
= 19.500 x 8.000 = 156.000
= 4.000 x 0.500 = 2.000 +
158.000

Paving Baru
B = Panjang x Lebar
= 32.500 x 8.000 = 260.000
= 5.000 x 0.500 = 2.500
= 1.500 x 2.500 = 3.750
= 1.500 x 2.500 = 3.750
C = 9.000 x 12.000 = 108.000 +
378.000
gudang 21.6
356.400

Kanstin =
A = 19.500 x 2.000 = 39.000
0.500 x 2.000 = 1.000
8.000 x 1.000 = 8.000
B = 34.000 x 1.000 = 34.000
0.500 x 2.000 = 1.000
32.000 x 1.000 = 32.000
2.500 x 2.000 = 5.000
1.500 x 2.000 = 3.000
3.000 x 1.000 = 3.000
C = 12.000 x 2.000 = 24.000
9.000 x 1.000 = 9.000 +
159.000

KERAMIK

Lantai Granit 60x60 P L Volume


Garasi Ambulance = 3.850 3.850 14.823
Ruang Tindakan = 3.850 2.850 10.973
Ruang Observasi = 3.850 3.850 14.823
Nurse Stasion = 2.350 3.850 9.048
Ruang IGD = 6.350 2.850 18.098
Teras = 5.850 2.850 16.673
0.600 0.100 0.060
0.600 0.100 0.060
Ruang Dokter= 3.850 2.850 10.973
KM1 = -
Depan KM1 = 1.350 0.850 1.148
R. Rekam Medik = 3.800 3.850 14.630
KM2 = -
Depan KM2 = 1.800 1.850 3.330
R. Periksa
= 5.350 2.850 15.248
R. Pegawai= 6.350 2.850 18.098
R. Periksa Umum dan Pegawai = 3.850 2.850 10.973
= 1.850 1.350 2.498
KM3 = -

Page 1 of 221
BACKUP

Ruang Farmasi = 3.350 2.850 9.548


Gudang Obat = 2.350 2.850 6.698
Dapur = 2.350 1.350 3.173
Laudry = 3.850 1.350 5.198
Mushola = 3.850 2.850 10.973
Whudu = -
Selasar = 3.875 2.850 11.044
= 7.250 8.850 64.163
= 1.830 4.850 8.876
= 8.500 1.850 15.725
= 1.500 4.500 6.750
= 5.500 1.425 7.838
Bawah Pintu = 10.800 0.150 1.620
2.400 0.150 0.360
1.784 0.150 0.268
-
Total 313.679

Lantai keramik 20x20 P L Volume


Whudu = 1.5 3 4.500

Total 4.500

Dinding (20x25) Keliling tinggi Jumlah


Whudu 7.500 1.500 1.000 11.250
Total 11.250

D1-Dinding (60x60) Keliling tinggi pengurang


Ruang Tindakan 13.400 2.150 3.400 25.410

Total 25.410

Hospital Plint P L pengurang Volume


Ruang Tindakan = 3.850 2.850 3.400 10.000

Total 10.000

Plint Aluminium P l pengurang Volume


partisi = 6.500 2.000 1.800 11.200
Total 11.200

Plint Kaca P L pengurang Volume


Garasi Ambulance = 3.850 3.850 3.850 11.550
Ruang Tindakan = -
Ruang Observasi = 3.850 3.850 4.400 11.000
Nurse Stasion = 2.350 3.850 1.800 10.600
Ruang IGD = 6.350 2.850 3.500 14.900
Teras = 5.850 2.850 5.850 11.550

Page 2 of 221
BACKUP

Ruang Dokter = 3.850 2.850 0.900 12.500


KM1 = -
Depan KM1 = 1.350 0.850 2.250 2.150
R. Rekam Medik = 3.800 3.850 0.900 14.400
KM2 = -
Depan KM2 = 1.800 1.850 2.750 4.550
R. Periksa = 5.350 2.850 0.900 15.500
R. Pegawai = 6.350 2.850 0.900 17.500
R. Periksa Umum dan Pegawai = 3.850 2.850 2.250 11.150
= 1.850 1.350 2.150 4.250
KM3 = -
Ruang Farmasi = 3.350 2.850 1.800 10.600
Gudang Obat = 2.350 2.850 0.900 9.500
Dapur = 2.350 1.350 0.900 6.500
Laudry = 3.850 1.350 0.900 9.500
Mushola = 3.850 2.850 0.900 12.500
Whudu = -
Selasar 55.750

Total 245.950
Volume = 245.950 - 11.200 = 234.750

MEJA DAPUR
DINDING = 0.800 X 0.600 X 4.000
MEJA = 5.240 X 0.600

BETON panjang lebar TB jumlah Volume


= 0.800 0.600 0.080 4.000 0.154
= 5.240 0.600 0.080 1.000 0.252

-
-
Total 0.405
PEMBESIAN p. Tulangan isi bj jumlah Volume

Ø10-150 = 0.800 5.000 0.617 4.000 9.864


Ø8-150 = 0.600 6.000 0.395 4.000 5.682

Ø10-150 = 5.240 5.000 0.617 1.000 16.152


Ø8-150 = 0.600 36.000 0.617 1.000 13.316

Total 45.014
BEGESTING pj lb jlh sisi jumlah Volume
= 0.800 0.600 2.000 4.000 3.840
0.800 0.080 1.000 4.000 0.256
= 5.240 0.600 1.000 1.000 3.144
5.240 0.080 1.000 1.000 0.419

Total 7.659

keramik MEJA 20x20 P L Pengurang Volume


= 5.240 0.600 0.400 2.744

Page 3 of 221
BACKUP

Total 2.744

Dinding MEJA DAPUR (20x25) Keliling tinggi Jumlah


5.240 0.750 1.000 3.930
5.240 0.080 1.000 0.419
0.800 0.080 4.000 0.256
Total 4.605

Page 4 of 221
BACKUP

PINTU DAN JENDELA


PEKERJAAN PINTU

kusen X Y Jumlah Volume


P2 = 1.750 5.100 1.000 6.850
Total 6.850
kayu dudukan engsel = p Jumlah Volume
P2 = 5.100 1.000 5.100
Total 5.100
pintu double plywood dilapis
HPL rangka kayu kamper = X Y Jumlah Volume
P2 = -
-
0.165
Total (0.165)
Pasang Kaca polos 5 mm X Y Jumlah Volume
P2 0.825 0.200 1.000 0.165
Total 0.165
Pekerjaan daun pintu aluminium X Y Jumlah Volume
(powder coating warna putih) +
kaca polos 5 mm
P2 = 1.650 2.200 1.000 3.630
Total 3.630
engsel pintu 140 mm = isi Jumlah Volume
P2 = 3.000 1.000 3.000
Total 3.000
handle/pegangan pintu = isi Jumlah Volume
P2 = 2.000 1.000 2.000
Total 2.000
kunci isi Jumlah Volume
P2 = 1.000 1.000 1.000
Total 1.000

PEKERJAAN GUDANG
PONDASI BATU BELAH
NO. AS A B C
A = 6.000
B = 6.000
C = 6.000
1 = 3.000 0.600
2 = 3.000 0.600
3 3.000 0.600
21.000 7.800 -

GALIAN pj lb. Atas lb. Bawah tinggi Volume


A = 21.000 0.800 0.800 1.000 16.800
B = 7.800 0.400 0.400 0.600 1.872
C = - 0.400 0.400 0.350 -
Total 18.672

urugan tanah kembali = 18.672 : 3.000 = 6.224

Page 5 of 221
BACKUP

urugan pasir pj lb. Atas lb. Bawah tinggi Volume


A = 21.000 0.800 0.800 0.050 0.840
B = 7.800 0.400 0.400 0.050 0.156
C = - 0.400 0.400 0.050 -
Total 0.996

anstamping pj lb. Atas lb. Bawah tinggi Volume


A = 21.000 0.800 0.800 0.150 2.520
B = 7.800 0.400 0.400 0.150 0.468
C = - 0.400 0.400 0.200 -
Total 2.988

batu belah pj lb. Atas lb. Bawah tinggi Volume


A = 21.000 0.300 0.600 0.600 5.670
B = 7.800 0.300 0.300 0.400 0.936
C = - 0.300 0.300 0.300 -
Total 6.606

Urugan tanah Pilihan pj lb. tinggi Volume


= 3.000 4.000 0.250 3.000
= 3.000 2.000 0.250 0.750
= 0.600 4.000 0.250 0.300
= 0.600 2.000 0.250 0.150
= -
= -
= -
4.200

SLOOF
Pj = 28.800 m
X = 0.150 m
Y = 0.200 m
BETON panjang lebar tinggi jumlah Volume
= 28.800 0.150 0.200 1.000 0.864

PEMBESIAN p. Tulangan isi bj jumlah Volume

4Ø12 = 28.800 4.000 0.888 1.000 102.270


Ø6-150 = 0.600 193.000 0.222 1.000 25.701
over stek = 0.520 4.000 0.888 2.000 3.693
Total 131.664

BEGESTING pj lb jlh sisi jumlah Volume


= 28.800 0.150 - 1.000 -
= 28.800 0.200 2.000 1.000 11.520
11.520

KP
X = 0.150 X = 0.150
Y = 0.150 Y = 0.150
Tinggi = 3.000 Tinggi = 1.200
Jumlah = 6.000 Jumlah = 3.000
BETON panjang lebar tinggi jumlah Volume

Page 6 of 221
BACKUP

= 0.150 0.150 2.850 6.000 0.385


= 0.150 0.150 1.050 3.000 0.071
0.456
PEMBESIAN p. Tulangan isi bj jumlah Volume

4Ø10 = 3.480 4.000 0.617 6.000 51.490


Ø6-150 = 0.500 1.000 0.222 6.000 0.666

4Ø10 = 1.680 4.000 0.617 3.000 12.429


Ø6-150 = 0.500 1.000 0.222 3.000 0.333
Total 64.917

BEGESTING pj tinggi jlh sisi jumlah Volume


X = 0.150 2.850 2.000 6.000 5.130
Y = 0.150 2.850 - 6.000 -
Tinggi = 0.150 1.050 2.000 0.150 0.047
Jumlah = 0.150 1.050 - 0.150 -

Total 5.177

Balok Latay (11/11)


pondasi teras
Pj = 12.000 m
X = 0.110 m
Y = 0.110 m
BETON panjang lebar tinggi jumlah Volume
= 12.000 0.110 0.110 1.000 0.145

PEMBESIAN p. Tulangan isi bj jumlah Volume

4Ø8 = 12.000 4.000 0.395 1.000 18.939


Ø6-150 = 0.340 81.000 0.222 1.000 6.112
over stek = 0.400 4.000 0.395 1.000 0.631
Total 25.682

BEGESTING pj lb jlh sisi jumlah Volume


= 12.000 0.110 - 1.000 -
= 12.000 0.110 2.000 1.000 2.640
Total 2.640

rINGBALK (11/11)
NO. AS
= 6.000
= 6.000
= 3.000
= 3.000
= 3.000
=
21.000 -

= 21.000 + - = 21.000
Pj = 21.000 m

Page 7 of 221
BACKUP

X = 0.110 m
Y = 0.110 m
BETON panjang lebar tinggi jumlah Volume
= 21.000 0.110 0.110 1.000 0.254

PEMBESIAN p. Tulangan isi bj jumlah Volume

4Ø10 = 21.000 4.000 0.617 1.000 51.786


Ø6-150 = 0.340 141.000 0.222 1.000 10.640
over stek = 0.400 4.000 0.617 2.000 1.973
Total 64.399

BEGESTING pj lb jlh sisi jumlah Volume


= 21.000 0.110 - 1.000 -
= 21.000 0.110 2.000 1.000 4.620
Total 4.620

rINGGavel (11/15)
NO. AS
= 2.700
= 2.700
= 2.700
= 2.700
= 2.700
= 2.700
16.200 -

= 16.200 + - = 16.200
Pj = 16.200 m
X = 0.110 m
Y = 0.150 m
BETON panjang lebar tinggi jumlah Volume
= 16.200 0.110 0.150 1.000 0.267

PEMBESIAN p. Tulangan isi bj jumlah Volume

4Ø10 = 16.200 4.000 0.617 1.000 39.949


Ø6-150 = 0.420 109.000 0.222 1.000 10.160
over stek = 0.400 4.000 0.617 1.000 0.986
Total 51.096

BEGESTING pj lb jlh sisi jumlah Volume


= 16.200 0.110 - 1.000 -
= 16.200 0.150 2.000 1.000 4.860
Total 4.860

ATAP

gording c 100x50x20.2.3
= panjang bj volume
57.600 4.965 285.984

Page 8 of 221
BACKUP

dudukan gording panjang isi jlh kd bj volume


KD1 0.200 2.000 3.000 3.780 4.536
4.536
2x 9.072

Usuk + Reng =

2.700 7.200 2.000 38.880


38.880

Nok Genteng = pj. jlh.


7.200 1.000 = 7.200
7.200

Page 9 of 221
BACKUP

Lisplank = 2.700
2.700
2.700
2.700
7.200
7.200
25.200 25.200

Pengecatan Lisplank = 0.540 25.200 = 13.608

DINDING BATA
Pasangan Bata = p tinggi jumlah Volume
= 3.000 2.850 3.000 25.650
= 6.000 2.850 2.000 34.200
= 3.000 1.050 2.000 3.150
Total 63.000
Pengurang lebar tinggi jumlah
P1 1.450 2.150 1.000 3.118
PJ1 0.900 2.150 1.000 1.935
0.750 2.150 1.000 1.613
BV1 0.750 0.550 1.000 0.413
BV1A 0.750 0.550 1.000 0.413
BV2 1.450 0.550 1.000 0.798
-
Balok latay 12.000 0.110 1.000 1.320
Total 9.608
Volume Bata = 63.000 - 9.608 = 53.393

Plesteran Interior = 53.393 = 53.393

Acian Interior = 53.393

Cat bata Interior = 53.393

keramik p l
3.000 4.000 = 12.000
3.000 2.000 = 6.000
0.600 6.000 = 3.600
4.200 0.200 = 0.840
22.440
plafon dalam p l
3.000 4.000 = 12.000
3.000 2.000 = 6.000
18.000
plafon luar 22.800 0.750 = 17.100

Page 10 of 221
BACKUP

PINTU DAN JENDELA


PEKERJAAN PINTU

kusen X Y Jumlah Volume


P1 = 1.450 6.300 1.000 7.750
PJ1 = 2.350 5.450 1.000 7.800
Total 15.550
kayu dudukan engsel = p Jumlah Volume
P1 = 4.200 1.000 4.200
PJ1 = 4.200 1.000 4.200
Total 8.400
daun pintu alumunium krepyak
= X Y Jumlah Volume
P1 = 1.350 2.100 1.000 2.835
PJ1 = 0.800 2.100 1.000 1.680
Total 3.640
kawat harmonika X Y Jumlah Volume
P1 1.000
PJ1 0.700 1.250 1.000 0.875
Total 0.875
engsel pintu 140 mm = isi Jumlah Volume
P1 = 6.000 1.000 6.000
PJ1 = 3.000 1.000 3.000
Total 9.000
handle/pegangan pintu = isi Jumlah Volume
P1 = 2.000 1.000 2.000
PJ1 = 1.000 1.000 1.000
Total 3.000
kunci isi Jumlah Volume
P1 = 1.000 1.000 1.000
PJ1 = 1.000 1.000 1.000
Total 2.000
PEKERJAAN JENDELA
kusen X Y Jumlah Volume

BV1 1.500 0.900 1.000 2.400


BV1A 1.500 0.900 1.000 2.400
BV2 2.900 1.350 1.000 4.250
Total 9.050
Pekerjaan daun jendela X Y Jumlah Volume
aluminium (powder coating
warna putih) + kaca polos 5 mm

BV1 = 0.650 0.450 1.000 0.293


BV1A = 1.000 -
BV2 = 1.300 0.900 1.000 1.170
Total 1.463
kawat harmonika X Y Jumlah Volume
BV1A = 0.650 0.450 1.000 0.293
Total 0.293

Page 11 of 221
BACKUP

Pasang engsel jendela 110 mm = isi Jumlah Volume


BV1 = 2.000 1.000 2.000
BV1A = - 1.000 -
BV2 = 4.000 1.000 4.000
Total 6.000
Pasang Spring Knif jendela = isi Jumlah Volume
BV1 = 2.000 1.000 2.000
BV1A = - 1.000 -
BV2 = 4.000 1.000 4.000
Total 6.000
Hak Angin Stainless Steel = isi Jumlah Volume
BV1 = 1.000 1.000 1.000
BV1A = - 1.000 -
BV2 = 2.000 1.000 2.000
Total 3.000
Rambucis = isi Jumlah Volume
BV1 = 1.000 1.000 1.000
BV1A = - 1.000 -
BV2 = 2.000 1.000 2.000
Total 3.000

Page 12 of 221
PEMERINTAH
DINAS KABUPATEN
KESEHATAN BLORA

Jl. Dr. Sutomo No. 40 Blora Telp. (0296) 531127


BLORA

RENCANA ANGGARAN BIAYA


( R.A.B )

Nama Kegiatan : Pembangunan Puskesmas

Nama Paket : Pembangunan Puskesmas Jiken

Lokasi : Dinas Kesehatan Kabupaten Blora

Sumber Dana : APBD 2019

Tahun Anggaran : 2019

Pagu Anggaran : Err:509


REKAPITULASI RAB
Nama Kegiatan : Pembangunan Puskesmas
Nama Paket : Pembangunan Puskesmas Jiken
Lokasi : Dinas Kesehatan Kabupaten Blora
Sumber Dana : APBD 2019
Tahun Anggaran : 2019

NO URAIAN JUMLAH
1 2 3

I PEKERJAAN PERSIAPAN 825,000.00

II PEKERJAAN PENUTUP LANTAI DAN DINDING 122,889,519.72

III PEKERJAAN MEJA DAPUR 5,887,581.61

IV PEKERJAAN PINTU DAN BACKDROOP 17,881,776.09

V PEKERJAAN HALAMAN 96,587,696.61

VI PEKERJAAN GUDANG 89,928,427.00

VII PEKERJAAN TAMBAH DAYA DAN KELENGKAPANNYA 66,000,000.00

JUMLAH TOTAL 400,000,001.03

Blora, 5 Juli 2019


Dibuat oleh,
CV LIMA KARSA

RATNO
Direktur
JADWAL PELAKSANAAN (TIME SCHEDULE)

Nama Kegiatan : Pembangunan Puskesmas


Nama Paket : Pembangunan Puskesmas Jiken
Lokasi : Dinas Kesehatan Kabupaten Blora
Sumber Dana : APBD 2019
Tahun Anggaran : 2019

PERIODE PELAKSANAAN
B
O MINGGU KE
KET.
NO URAIAN PEKERJAAN B 1 2 3 4 5 6 7 8 9 10 11 12
JUMLAH HARGA PROGRES
O
HARI KE (%)
T
% 1-7 8-14 15-21 22-28 29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84

I PEKERJAAN PERSIAPAN 825,000.00 0.21 0.21 100%


II PEKERJAAN PENUTUP LANTAI DAN DINDING 122,889,519.72 30.72 10.24 10.24 10.24
III PEKERJAAN MEJA DAPUR 5,887,581.61 1.47 1.47
IV PEKERJAAN PINTU DAN BACKDROOP 17,881,776.09 4.47 4.47 50%
V PEKERJAAN HALAMAN 96,587,696.61 24.15 8.05 8.05 8.05
VI PEKERJAAN GUDANG 89,928,427.00 22.48 7.49 7.49 7.49
VII PEKERJAAN TAMBAH DAYA DAN KELENGKAPANNYA 66,000,000.00 16.50 8.25 8.25 0%

JUMLAH 400,000,001.03 100.00


TOTAL 7.70 7.49 7.49 10.24 10.24 10.24 5.94 8.05 8.05 8.05 8.25 8.25 %
TOTAL KOMULATIF 7.70 15.19 22.69 32.93 43.17 53.41 59.35 67.40 75.45 83.50 91.75 100.00 %

KETERANGAN : Blora, 05 Juli 2019


a. Jangka Waktu Pelaksanaan : 90 ( Sembilan Puluh ) hari kalender Dibuat Oleh :
b. Jangka Waktu Pemeliharaan : 180 ( Seratus Delapan Puluh ) hari kalender CV LIMA KARSA
RATNO
Direktur
RENCANA ANGGARA
(RAB)
Nama Kegiatan : Pembangunan Pusk
Nama Paket : Pembangunan Pusk
Lokasi : Dinas Kesehatan Ka
Sumber Dana : APBD 2019
Tahun Anggaran : 2019

NO. URAIAN PEKERJAAN VOLUME SATUAN

1 2 3 4

I PEKERJAAN PERSIAPAN
1. Brak Kerja 1.00 Ls
II PEKERJAAN PENUTUP LANTAI DAN DINDING
1. Bongkaran Lantai 1.00 Ls
2. Memasang Lantai granito ex. Lokal 60 x 60 cm 313.68 m2
3. Memasang Lantai keramik 20 x 20 cm 4.50 m2
4. Memasang dinding granito ex. Lokal 60 x 60 cm (Ruang 25.41 m2
Tindakan)
5. Memasang dinding keramik 20 x 25 cm (Tempat Wudhu) 11.25 m2
6. Memasang Hospital Plint (ruang tindakan) 10.00 m1
7. Memasang Plint Kaca 234.75 m1
8. Memasang Plint Aluminium (dinding partisi gipsum) 11.20 m1
III PEKERJAAN MEJA DAPUR
1. Beton K. 225 0.41 m3
2. Pembesian 45.01 kg
3. Begesting 7.66 m2
4. Keramik meja 20 x 20 cm 2.74 m2
5. Keramik dinding 20 x 25 cm 4.61 m2
6. Kitchen Sink 1.00 Unit

Halaman 17 dari 221


NO. URAIAN PEKERJAAN VOLUME SATUAN

1 2 3 4
IV PEKERJAAN PINTU DAN BACKDROOP
a Pekerjaan Pintu
1. Pekerjaan kusen aluminium 4" (powder coating warna putih) 6.85 m1

2. Penambahan kayu dudukan engsel pada kusen alumunium 5.10 m1

3. Pekerjaan daun pintu aluminium (powder coating warna 3.63 m2


putih) + kaca 5 mm
4. Pasang kaca 5 mm 0.17 m2
6. Pasang engsel pintu 140 mm 3.00 Bh
7. Pasang handle/pegangan pintu 2.00 set
8. Pasang kunci 1.00 Buah
b Pekerjaan Backdroop
1. Backdroop ukuran 400 cm x 225 cm 1.00 Ls
2. Meja backdroop 400 cm x 60 cm x 75 cm 1.00 Ls
3. Letter Block Acliric timbul nyala "UPT PUSKESMAS JIKEN"
170.00 cm
tinggi 10 cm jumlah huruf 17
V PEKERJAAN HALAMAN
1. Bongkaran Paving Lama 158.00 m2
2. Pemasangan Paving Lama 158.00 m2
3. Paving K. 300 tb. 8 cm 356.40 m2
4. Kantin Beton 10-18-40 159.00 m1
VI PEKERJAAN GUDANG
VI.A PEKERJAAN TANAH
1. Galian tanah pondasi 18.67 m3
2. Urugan tanah kembali pondasi 6.22 m3
3. Urugan pasir (bawah pondasi bt. belah) 1.00 m3
4. Mengurug Tanah urug Pilihan 4.20 m3
5. Pemadatan Tanah (per 20 cm) 4.20 m3
VI.B PEKERJAAN PONDASI
1. Pemasang Batu Kosong/Anstamping (Bawah Pondasi) 2.99 m3
2. Pemasangan Pondasi Batu Belah 1SP : 5 PP 6.61 m3

Halaman 18 dari 221


NO. URAIAN PEKERJAAN VOLUME SATUAN

1 2 3 4
VI.C PEKERJAAN BETON
Sloof S1 (15/20)
1. Pembesian 131.66 kg
2. Begesting 11.52 m2
3. Beton K.225 0.86 m3
Kolom KP 15/15
1. Pembesian 64.92 kg
2. Begesting 5.18 m2
3. Beton K.225 0.46 m3
Balok Latay 11/11
1. Pembesian 25.68 kg
2. Begesting 2.64 m2
3. Beton K.225 0.15 m3
Ringbalk 11/11
1. Pembesian 64.40 kg
2. Begesting 4.62 m2
3. Beton K.225 0.25 m3
Ring Gavel 11/15
1. Pembesian 51.10 kg
2. Begesting 4.86 m2
3. Beton K.225 0.27 m3
VI.D PEKERJAAN DINDING DAN PENYEKAT
1. Pemasangan Dinding bata merah (5x11x22) cm tebal 1/2 53.39 m2
batu dgn campuran 1PPC : 5PP
VI.E PEKERJAAN PLESTERAN dan ACIAN
1. Plesteran dinding bata dalam campuran 1PPC : 5PP 53.39 m2
2. Plesteran dinding bata luar 53.39 m2
3. Plesteran (Sloof+Kolom+balok latay) 23.06 m2
4. Acian 129.84 m2
5. Pekerjaan Sponengan 11.40 m1
VI.F PEKERJAAN PENUTUP LANTAI dan DINDING
1. Rabat beton K. 100 Tb. 5 cm 1.12 m3
2. Memasang Lantai keramik 40x40 cm 22.44 m2
VI.G PEKERJAAN LANGIT-LANGIT (PLAFON)

Halaman 19 dari 221


NO. URAIAN PEKERJAAN VOLUME SATUAN

1 2 3 4
1. Pek. Langit-Langit Gypsum 120 cm x 240 cm (tebal 9 mm) + 18.00 m2
rangka
2. Pek. Langit-Langit Kalsiboard 120 cm x 240 cm (tebal 9 17.10 m2
mm) + rangka
VI.H PEKERJAAN PENGECATAN
1. Pengecatan dinding bata luar sekualitas dulux 53.39 m2
2. Pengecatan dinding bata dalam sekualitas catylac 53.39 m2
3. Pengecatan (Sloof+KP+balok latay+Ringbalk+Ringgavel) 23.06 m2
sekualitas catylac
4. Pengecatan plafon dalam sekualitas catylac 18.00 m2
5. Pengecatan plafon luar sekualitas dulux 17.10 m2
6. Pengecatan Kalsiplank 6.82 m2
VI.I PEKERJAAN ATAP
1. Gording canal dobel C 100x50x20x2,3 285.98 kg
2. Dudukan Gording L 50x50x5 9.07 kg
3. Pengecatan Gording 1.00 Ls
4. Reng dan usuk baja ringan 38.88 m2
5. Atap Genteng Keramik Glazur Sekualitas Kanmuri 38.88 m2
6. Nok Genteng Keramik Glazur Sekualitas Kanmuri 7.20 m1
7. Pemasangan Kalsiplank lb. 25 cm 13.61 m1
VI.I PEKERJAAN PINTU dan JENDELA
Pekerjaan Jendela
1. Pekerjaan kusen aluminium 4" (powder coating warna putih) 9.05 m1

2. Pekerjaan daun jendela aluminium (powder coating warna 1.46 m2


putih) + kaca polos 5 mm
3. Pasang kawat harmonika 0.29 m2
4. Pasang engsel jendela 110 mm 6.00 Bh
5. Pasang Spring Knif jendela 6.00 Bh
6. Hak Angin Stainless Steel 3.00 Bh
7. Pasang Rambucis 3.00 Bh
Pekerjaan Pintu
1. Pekerjaan kusen aluminium 4" (powder coating warna putih) 15.55 m1

2. Penambahan kayu dudukan engsel pada kusen alumunium 8.40 m1


3. Pekerjaan daun pintu aluminium (powder coating warna 3.64 m2
putih) + alumunium krepyak

Halaman 20 dari 221


NO. URAIAN PEKERJAAN VOLUME SATUAN

1 2 3 4
4. Pasang kawat harmonika 0.88 m2
6. Pasang engsel pintu 140 mm 9.00 Bh
7. Pasang handle/pegangan pintu 3.00 set
8. Pasang kunci 2.00 Bh

Halaman 21 dari 221


NO. URAIAN PEKERJAAN VOLUME SATUAN

1 2 3 4
VI.J PEKERJAAN INSTALASI LISTRIK
Pek. Instalasi titik Lampu
1. Pasang instalasi titik lampu 4.00 Titik
2. Pasang lampu RM 2 x 18 watt lengkap dengan box armatur 4.00 set

Pek. Instalasi Stop Kontak


1. Pasang instalasi titik stop kontak 2.00 Titik
2. Pasang Stop kontak sekwa Broco 2.00 Bh
Pek. Instalasi Saklar
1. Pasang instalasi titik Saklar 3.00 Titik
2. Pasang Saklar Tunggal sekwa Broco 3.00 Bh

VII PEKERJAAN TAMBAH DAYA DAN KELENGKAPANNYA


1. Pekerjaan tambah daya menjadi 23000 VA & 1.00 Ls
Kelengkapannya

Halaman 22 dari 221


ANGGARAN BIAYA
(RAB)
Pembangunan Puskesmas
Pembangunan Puskesmas Jiken
Dinas Kesehatan Kabupaten Blora
APBD 2019

HARGA SATUAN
KODE ANALISA PAJAK 10% TOTAL (Rp)
(Rp)

5 6 7 = (3X6)X10/110 8 = (3X6) + 7

Taksir 750,000.00 75,000.00 825,000.00

Taksir 2,000,000.00 200,000.00 2,200,000.00


A.4.4.3.9.a 253,870.10 7,963,380.80 87,597,188.75
A.4.4.3.36 181,461.50 81,657.68 898,234.43
A.4.4.3.50.b 281,672.60
715,730.08 7,873,030.84
A.4.4.3.50.a 192,293.20 216,329.85 2,379,628.35
A.4.4.3.39.a 130,783.40 130,783.40 1,438,617.40
A.4.4.3.39.b 75,783.40 1,779,015.32 19,569,168.47
A.4.4.3.39.c 75,783.40 84,877.41 933,651.49
- -
A.4.1.1.7 1,096,431.50 44,418.63 488,604.96
A.4.1.1.17.A 14,224.93 64,032.60 704,358.55
Hitung A - 05 164,129.17 125,709.81 1,382,807.95
A.4.4.3.36 181,461.50 49,793.04 547,723.39
A.4.4.3.50.a 192,293.20 88,554.86 974,103.51
A.5.1.1.5.a 1,627,257.50 162,725.75 1,789,983.25

Halaman 23 dari 221


HARGA SATUAN
KODE ANALISA PAJAK 10% TOTAL (Rp)
(Rp)

5 6 7 = (3X6)X10/110 8 = (3X6) + 7

A.4.2.1.11 130,935.20
89,690.61 986,596.73
Taksir 25,000.00
12,750.00 140,250.00
Taksir 265,000.00
96,195.00 1,058,145.00

A.4.6.2.17 136,755.85 2,256.47 24,821.19


Taksir 16,500.00 4,950.00 54,450.00
Taksir 190,000.00 38,000.00 418,000.00
A.4.6.2.2 192,739.25 19,273.93 212,013.18
-
Taksir 5,000,000.00 500,000.00 5,500,000.00
Taksir 6,500,000.00 650,000.00 7,150,000.00
Taksir 12,500.00 212,500.00 2,337,500.00

Dihitung.A1 9,192.98 145,249.01 1,597,739.06


Dihitung.A2 86,055.48 1,359,676.51 14,956,441.56
A.7.1.1.2 (b) 177,630.48 6,330,750.13 69,638,251.42
A.7.1.1.3 (a) 59,435.48 945,024.05 10,395,264.58

A.2.3.1.1 58,368.75 108,986.13 1,198,847.43


A.2.3.1.9 19,456.25 12,109.57 133,205.27
A.2.3.1.11 221,347.50 22,046.21 242,508.32
A.2.3.1.14.A 185,968.75 78,106.88 859,175.63
A.2.3.1.10 41,937.50 17,613.75 193,751.25

A.3.2.1.9 435,022.50 129,984.72 1,429,831.95


A.3.2.1.3 795,404.50 525,444.21 5,779,886.34

Halaman 24 dari 221


HARGA SATUAN
KODE ANALISA PAJAK 10% TOTAL (Rp)
(Rp)

5 6 7 = (3X6)X10/110 8 = (3X6) + 7
- -
- -
A.4.1.1.17.A 14,224.93 187,290.61 2,060,196.66
Hitung A - 02 70,395.49 81,095.60 892,051.65
A.4.1.1.7 1,096,431.50 94,731.68 1,042,048.50
- -
A.4.1.1.17.A 14,224.93 92,344.59 1,015,790.44
Hitung A - 04 72,228.82 37,394.67 411,341.32
A.4.1.1.7 1,096,431.50 49,956.16 549,517.76
- -
A.4.1.1.17.A 14,224.93 36,533.03 401,863.29
Hitung A - 04 72,228.82 19,068.41 209,752.49
A.4.1.1.7 1,096,431.50 15,920.19 175,122.04
- -
A.4.1.1.17.A 14,224.93 91,606.53 1,007,671.84
Hitung A - 04 72,228.82 33,369.71 367,066.86
A.4.1.1.7 1,096,431.50 27,860.32 306,463.57
- -
A.4.1.1.17.A 14,224.93 72,683.70 799,520.65
Hitung A - 04 72,228.82 35,103.21 386,135.27
A.4.1.1.7 1,096,431.50 29,307.61 322,383.76
- -
A.4.4.1.10 97,768.55
522,010.73 5,742,118.04
- -
A.4.4.2.5 52,638.74 281,051.39 3,091,565.32
A.4.4.2.5 52,638.74 281,051.39 3,091,565.32
A.4.4.2.5 52,638.74 121,370.46 1,335,075.05
A.4.4.2.27 30,401.25 394,736.67 4,342,103.37
A.4.4.2.20 49,208.50 56,097.69 617,074.59
- -
A.4.1.1.1 934,929.68 104,899.11 1,153,890.21
A.4.4.3.36.a 163,449.00 366,779.56 4,034,575.12
- -

Halaman 25 dari 221


HARGA SATUAN
KODE ANALISA PAJAK 10% TOTAL (Rp)
(Rp)

5 6 7 = (3X6)X10/110 8 = (3X6) + 7
taksir 140,000.00
252,000.00 2,772,000.00
taksir 140,000.00
239,400.00 2,633,400.00

- -
A.4.7.1.10.A 43,468.98 232,091.72 2,553,008.97
A.4.7.1.10.B 23,558.98 125,787.26 1,383,659.83
A.4.7.1.10.B 23,558.98
54,320.52 597,525.69
A.4.7.1.10.B 23,558.98 42,406.16 466,467.71
A.4.7.1.10.A 43,468.98 74,331.95 817,651.42
A.4.7.1.10.A 43,468.98 29,663.23 326,295.51
- -
A.4.2.1.1 31,869.75 911,423.86 10,025,662.44
A.4.2.1.1 31,869.75 28,912.24 318,034.61
taksir 200,000.00 20,000.00 220,000.00
taksir 79,500.00 309,096.00 3,400,056.00
A.4.5.2.2.A 194,722.00 757,079.14 8,327,870.50
A.4.5.2.5.A 206,992.50 149,034.60 1,639,380.60
taksir 75,000.00 102,060.00 1,122,660.00
- -
- -
A.4.2.1.11 130,935.20
118,496.36 1,303,459.92
Taksir 265,000.00
38,756.25 426,318.75
taksir 121,505.00 3,554.02 39,094.23
Taksir 12,500.00 7,500.00 82,500.00
Taksir 20,000.00 12,000.00 132,000.00
Taksir 12,500.00 3,750.00 41,250.00
taksir 30,000.00 9,000.00 99,000.00
- -
A.4.2.1.11 130,935.20
203,604.24 2,239,646.60
Taksir 25,000.00 21,000.00 231,000.00
Taksir 265,000.00
96,460.00 1,061,060.00

Halaman 26 dari 221


HARGA SATUAN
KODE ANALISA PAJAK 10% TOTAL (Rp)
(Rp)

5 6 7 = (3X6)X10/110 8 = (3X6) + 7
taksir 121,505.00 10,631.69 116,948.56
Taksir 16,500.00 14,850.00 163,350.00
Taksir 190,000.00 57,000.00 627,000.00
A.4.6.2.2 192,739.25 38,547.85 424,026.35

Halaman 27 dari 221


HARGA SATUAN
KODE ANALISA PAJAK 10% TOTAL (Rp)
(Rp)

5 6 7 = (3X6)X10/110 8 = (3X6) + 7
- -
- -
Taksir 175,000.00 70,000.00 770,000.00
Taksir 270,000.00
108,000.00 1,188,000.00

- -
Taksir 180,000.00 36,000.00 396,000.00
Taksir 30,000.00 6,000.00 66,000.00
- -
Taksir 190,000.00 57,000.00 627,000.00
Taksir 30,000.00 9,000.00 99,000.00
- -
- -
Taksir 60,000,000.00
6,000,000.00 66,000,000.00

JUMLAH TOTAL Rp 400,000,001.03

Blora, 5 Juli 2019


Dibuat oleh,
CV LIMA KARSA

RATNO
Direktur

Halaman 28 dari 221


DAFTAR HAR GA SAT UAN PE K E R JAAN

Nama Kegiatan : Pembangunan Puskesmas


Nama Paket : Pembangunan Puskesmas Jiken
Lokasi : Dinas Kesehatan Kabupaten Blora
Sumber Dana : APBD 2019
Tahun Anggaran : 2019

HARGA SATUAN
NO. KODE URAIAN PEKERJAAN SAT PEKERJAAN
(Rp)
HARGA SATUAN PEKERJAAN PERSIAPAN
1 Taksir Brak Kerja Ls 750,000.00
2 Taksir Bongkaran Lantai m3 2,000,000.00

HARGA SATUAN PEKERJAAN TANAH


1 A.2.3.1.1 Menggali Tanah Biasa Sedalam 1 m m3 58,368.75
2 A.2.3.1.9 Pengurugan Kembali m3 19,456.25
Pengurugan Kembali di hitung dari 1/3 kali koefisien Pekerjaan galian
3 A.2.3.1.10 Pemadatan Tanah (per 20 cm) m3 41,937.50
4 A.2.3.1.11 Urugan Pasir m3 221,347.50
5 A.2.3.1.14.A Mengurug tanah pilihan m3 185,968.75

HARGA SATUAN PEKERJAAN PONDASI


1 A.3.2.1.3 Pemasangan Pondasi Batu Belah 1SP : 5 PP m3 795,404.50
2 A.3.2.1.9 Pemasang Batu Kosong/Anstamping m3 435,022.50

HARGA SATUAN PEKERJAAN BETON


1 A.4.1.1.1 Membuat Beton mutu f'c=7,4 Mpa (K100), slum (12±2)cm, w/c = 0,87 m3 934,929.68
2 A.4.1.1.7 Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 m3 1,096,431.50
3 A.4.1.1.17.A Pembesian dg Besi Polos atau Besi Ulir Kg 14,224.93
5 Hitung A - 02 Memasang Bekisting untuk Sloof m2 70,395.49
7 Hitung A - 04 Memasang Bekisting untuk Kolom Praktis m2 72,228.82
8 Hitung A - 05 Memasang Bekisting untuk Balok m2 164,129.17

HARGA SATUAN PEKERJAAN PASANGAN DINDING


1 A.4.4.1.10 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 5PP m2 97,768.55

HARGA SATUAN PEKERJAAN PLESTERAN


1 A.4.4.2.20 Pemasangan Plesteran Skoning 1 Pc : 2Pp, lebar 10 mm m1 49,208.50
2 A.4.4.2.5 Pemasangan Plesteran 1 Pc : 5 Pp Tebal 15 mm m2 52,638.74
3 A.4.4.2.27 Pemasangan Acian m2 30,401.25

HARGA SATUAN PEKERJAAN PENUTUP ATAP


1 A.4.5.2.2.A Pemasangan Atap Genteng Keramik/Glazur Sekualitas Kanmuri m2 194,722.00
2 A.4.5.2.5.A Pemasangan Genteng Bubung Keramik/Glazur m' 206,992.50

HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


1 A.5.1.1.5.a Memasang Kitchen Sink Unit 1,627,257.50

HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM


1 A.4.2.1.1 Pemasangan Besi Profil Kg 31,869.75
2 A.4.2.1.11 Pemasangan Kusen Pintu Allumunium m' 130,935.20
3 taksir Pekerjaan daun pintu/jendela aluminium (powder coating warna putih) + kaca 5 mm m2 265,000.00
4 taksir Pekerjaan daun pintu aluminium (powder coating warna putih) + alumunium krepyak m2 265,000.00
5 taksir Pasang kawat harmonika m2 121,505.00
6 taksir Usuk reng baja ringan m2 79,500.00

HARGA SATUAN PEKERJAAN KUNCI dan KACA


1 A.4.6.2.2 Pemasangan Kunci Tanam Biasa Buah 192,739.25

Page 29 of 221
HARGA SATUAN
NO. KODE URAIAN PEKERJAAN SAT PEKERJAAN
(Rp)
2 A.4.6.2.17 Pemasangan Kaca tebal 5 mm m2 136,755.85
3 Taksir Pasang engsel jendela 110 mm Bh 12,500.00
4 Taksir Pasang Spring Knif jendela Bh 20,000.00
5 Taksir Pasang hak angin engsel salon Bh 12,500.00
6 Taksir Pasang Rambucis Bh 30,000.00
7 Taksir Pasang engsel pintu 140 mm Bh 16,500.00
8 Taksir Pasang handle/pegangan pintu set 190,000.00

HARGA SATUAN PEKERJAAN K A Y U


1 Taksir Penambahan kayu dudukan engsel pada kusen alumunium m1 25,000.00

HARGA SATUAN PEKERJAAN LANGIT-LANGIT


1 Taksir Pemasangan Langit-Langit Gypsum 120 cm x 240 cm (tebal 9 mm) + rangka m2 140,000.00
2 Taksir Pek. Langit-Langit Kalsiboard 120 cm x 240 cm (tebal 9 mm) + rangka m2 140,000.00

HARGA SATUAN INSTALASI LISTRIK


1 Taksir Pasang instalasi titik lampu Titik 175,000.00
2 Taksir Pasang lampu RM 2 x 18 watt lengkap dengan box armatur set 270,000.00
3 Taksir Pasang instalasi titik stop kontak Titik 180,000.00
4 Taksir Pasang Stop kontak sekwa Broco Bh 30,000.00
5 Taksir Pasang instalasi titik Saklar Titik 190,000.00
6 Taksir Pasang Saklar Tunggal sekwa Broco Bh 30,000.00
7 Taksir Pekerjaan tambah daya menjadi 23000 VA & Kelengkapannya Ls 60,000,000.00

HARGA SATUAN PEKERJAAN PENUTUP LANTAI dan DINDING


1 A.4.4.3.36 Pemasangan Lantai Keramik 20 x 20 cm m2 181,461.50
2 A.4.4.3.36.a Pemasangan Lantai Keramik 40 x 40 cm m2 163,449.00
3 A.4.4.3.39.a Pemasangan Hospital Plint Keramik Ukuran 10x30 cm m' 130,783.40
4 A.4.4.3.39.b Pemasangan Plint Kaca Ukuran 10x30 cm m' 75,783.40
5 A.4.4.3.39.c Pemasangan Plint Aluminium Ukuran 10x30 cm m' 75,783.40
6 A.4.4.3.9.a Pemasangan 1 m2 Lantai Granito Ex. Lokal (60 cm x 60 cm) m2 253,870.10
7 A.4.4.3.50.a Pemasangan Dinding Keramik 20x25 cm, m2 192,293.20
8 A.4.4.3.50.b Pemasangan Dinding Granito Ex. Lokal (60 cm x 60 cm) m2 281,672.60

HARGA SATUAN PEKERJAAN PENGECATAN


1 A.4.7.1.10.A Pengecat Tembok Baru Exterior (1lap.Plamir, 1lap Cat Dasar m2 43,468.98
2 lap. Cat Penutup)
2 A.4.7.1.10.B Pengecat Tembok Baru Interior (1lap.Plamir, 1lap Cat Dasar m2 23,558.98
2 lap. Cat Penutup)
3 Taksir Pengecatan Gording Ls 200,000.00

HARGA SATUAN PEKERJAAN JALAN LINGKUNGAN


1 A.7.1.1.2 (b) 1 m2 Pasang Paving Block tebal 8 cm K.300 m2 177,630.48
2 Dihitung.A1 1 m2 Bongkaran paving m2 9,192.98
3 Dihitung.A2 1 m2 Pemasangan paving lama m2 86,055.48
4 A.7.1.1.3 (a) 1 m' Pasang Kanstin Beton (10-18-40) m1 59,435.48

HARGA SATUAN PEKERJAAN LAIN-LAIN


1 taksir PemasanganKalsiplank lb. 25 cm m1 75,000.00
2 taksir Backdroop ukuran 400 cm x 225 cm Ls 6,370,000.00
3 taksir Meja backdroop 400 cm x 60 cm x 75 cm Ls 7,200,000.00
4 taksir Letter Block Acliric timbul nyala "UPT PUSKESMAS JIKEN" tinggi 10 cm jumlah huruf 17 cm 12,500.00

Blora, 5 Juli 2019


Dibuat oleh,
CV LIMA KARSA

RATN O
Direktur

Page 30 of 221
ANALISA HARGA SATUAN PEKERJAAN

No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH

1 A.2.3.1.1 1 m3 Menggali Tanah Biasa Sedalam 1 m


A TENAGA
0.7500 OH Pekerja
0.0250 OH Mandor
B BAHAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

2 A.2.3.1.9 1 m3 Pengurugan Kembali


Pengurugan Kembali di hitung dari 1/3 kali koefisien Peke
A TENAGA
0.2500 OH Pekerja
0.0083 OH Mandor
B BAHAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

3 A.2.3.1.10 1 m3 Pemadatan Tanah (per 20 cm)


A TENAGA
0.5000 OH Pekerja
0.0500 OH Mandor
B BAHAN
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

4 A.2.3.1.11 1 m3 Urugan Pasir


OH Pekerja
0.3000 OH Pekerja
0.0100 OH Mandor
B BAHAN
1.2000 m3 Pasir Urug
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

5 A.2.3.1.14.A 1 m3 Mengurug tanah pilihan


A TENAGA
0.2500 OH Pekerja
0.0250 OH Mandor
B BAHAN
1.2000 m3 Tanah Pilihan (Merah)
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI

1 A.3.2.1.3 1 m3 Pemasangan Pondasi Batu Belah 1SP : 5 PP


A TENAGA
1.5000 OH Pekerja
0.7500 OH Tukang Batu
0.0750 OH Kepala Tukang
0.0750 OH Mandor
B BAHAN
1.2000 m3 Batu Belah
136.0000 Kg Portland Sement
0.5440 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

2 A.3.2.1.9 1 m3 Pemasang Batu Kosong/Anstamping


A Tenaga
0.7800 OH Pekerja
0.3900 OH Tukang Batu
0.0390 OH Kepala Tukang
0.0390 OH Mandor
B Bahan
1.2000 m3 Batu Belah
0.4320 m3 Pasir Urug
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

A.4.1.1 HARGA SATUAN PEKERJAAN BETON

1 A.4.1.1.1 1 m3 Membuat Beton mutu f'c=7,4 Mpa (K100), slum (12±2)cm


A Tenaga
1.6500 OH Pekerja
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

0.2750 OH Tukang Batu


0.0280 OH Kepala Tukang
0.0830 OH Mandor
B Bahan
247.0000 Kg Portland Semen
869.0000 Kg Pasir Beton
999.0000 Kg Kerikil (maksimum 30 mm)
215.0000 ltr Air
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

2 A.4.1.1.7 1 m3 Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)c


A Tenaga
1.6500 OH Pekerja
0.2750 OH Tukang Batu
0.0280 OH Kepala Tukang
0.0830 OH Mandor
B Bahan
371.0000 Kg Portland Semen
698.0000 Kg Pasir Beton
1,047.0000 Kg Kerikil (maksimum 30 mm)
215.0000 ltr Air
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

3 A.4.1.1.17.A 1 Kg Pembesian dg Besi Polos atau Besi Ulir


A Tenaga
0.0070 OH Pekerja
0.0070 OH Tukang Besi
0.0007 OH Kepala Tukang
0.0004 OH Mandor
B Bahan
1.0500 Kg Besi Beton (polos/ulir)
0.0150 Kg Kawat Beton
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

5 Hitung A - 02 1 m2 Memasang Bekisting untuk Sloof


A Tenaga
L.01 0.1733 OH Pekerja
L.02 0.0867 OH Tukang Kayu
L.03 0.0087 OH Kepala Tukang
L.04 0.0087 OH Mandor
B Bahan
0.0228 m3 Kayu papan bekisting kelas 3
0.1000 Kg Paku Biasa 2" - 5"
0.1000 Ltr Minyak Bekisting
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

7 Hitung A - 04 1 m2 Memasang Bekisting untuk Kolom Praktis


A Tenaga
L.01 0.1733 OH Pekerja
L.02 0.0867 OH Tukang Kayu
L.03 0.0087 OH Kepala Tukang
L.04 0.0087 OH Mandor
B Bahan
0.0228 m3 Kayu papan bekisting kelas 3
0.1333 Kg Paku Biasa 2" - 5"
0.2000 Ltr Minyak Bekisting
C PERALATAN
D Jumlah A + B + C
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

E Overhead & Profit


F Harga Satuan Pekerjaan (D+E)

8 Hitung A - 05 1 m2 Memasang Bekisting untuk Balok


A Tenaga
L.01 0.6600 OH Pekerja
L.02 0.3300 OH Tukang Kayu
L.03 0.0330 OH Kepala Tukang
L.04 0.0330 OH Mandor
B Bahan
- m3 Kayu papan bekisting kelas 3
0.2667 Kg Paku Biasa 2" - 5"
0.2000 Ltr Minyak Bekisting
0.0060 m3 Balok Kayu Klas III
0.1167 Lbr Multipleks 120 x 240 tb. 9 mm
0.6667 Btg Bambu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


1 A.4.4.1.10 1 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm T
A Pekerja
0.3000 OH Pekerja
0.1000 OH Tukang Batu
0.0100 OH Kepala Tukang
0.0150 OH Mandor
B Bahan
70.0000 Buah Bata Lokal
9.6800 Kg Portland Semen
0.0450 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN

1 A.4.4.2.20 1 m' Pemasangan Plesteran Skoning 1 Pc : 2Pp, lebar 10 mm


A Tenaga

L.01 0.080 OH Pekerja

L.02 0.40 OH Tukang batu

L.03 0.040 OH Kepala Tukang

L.04 0.004 OH Mandor


B Bahan
0.5 Kg Portland Semen
0.013 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)

2 A.4.4.2.5 1 m2 Pemasangan Plesteran 1 Pc : 5 Pp Tebal 15 mm


A Tenaga
0.3000 OH Pekerja
0.1500 OH Tukang batu
0.0150 OH Kepala Tukang
0.0150 OH Mandor
B Bahan
5.1840 Kg Portland Semen
0.0260 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

3 A.4.4.2.27 1 m2 Pemasangan Acian

Tenaga
0.2000 OH Pekerja
0.1000 OH Tukang batu
0.0100 OH Kepala Tukang
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

0.0100 OH Mandor
Bahan
3.2500 Kg Portland Semen
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP


1 A.4.5.2.2.A 1 m2 Pemasangan Atap Genteng Keramik/Glazur Sekualitas K

A Tenaga
0.1500 OH Pekerja
0.0750 OH Tukang Kayu

0.0080 OH Kepala Tukang


0.0080 OH Mandor

B Bahan
14.5000 Buah Genteng Glazur Sekualitas Kanmuri
C PERALATAN

D Jumlah A + B + C
E Overhead & Profit

F Harga Satuan Pekerjaan (D+E)


No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

2 A.4.5.2.5.A 1 m' Pemasangan Genteng Bubung Keramik/Glazur

A Tenaga
0.4000 OH Pekerja
0.2000 OH Tukang Kayu

0.0200 OH Kepala Tukang


0.0020 OH Mandor

B Bahan
5.0000 Buah Genteng Bubung Glazur
8.0000 Kg Portland Semen

0.0320 m3 Pasir Pasang


C PERALATAN

D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GED


3 A.5.1.1.5.a 1 Unit Memasang Kitchen Sink
A Tenaga
1.2000 OH Pekerja
1.4500 OH Tukang Batu
0.1500 OH Kepala Tukang
0.0600 OH Mandor
B Bahan
1.2000 Buah Kitchen Sink
0.1200 - Perlengkapan 30% Harga Wastafel
6.0000 Kg Portland Semen
0.0100 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

A.4.2.1 HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM


No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

1 A.4.2.1.1 1 Kg Pemasangan Besi Profil

A Tenaga
0.0600 OH Pekerja

0.0600 OH Tukang Besi


0.0060 OH Kepala Tukang
0.0030 OH Mandor

B Bahan
1.1500 Kg Besi Profil

0.0600 Kg Meni Besi


C PERALATAN
D Jumlah A + B + C

E Overhead & Profit


F Harga Satuan Pekerjaan (D+E)

3 A.4.2.1.11 1 m' Pemasangan Kusen Pintu Allumunium


A Tenaga

0.0430 OH Pekerja
0.0430 OH Tukang Besi

0.0043 OH Kepala Tukang


0.0021 OH Mandor

B Bahan
1.1000 m' Profil Allumunium
2.0000 buah Skrup Fixer

0.0600 Tube Sealant


C PERALATAN

D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI dan KACA


1 A.4.6.2.2 1 Buah Pemasangan Kunci Tanam Biasa
A Tenaga
L.01 0.01 OH Pekerja
L.02 0.5 OH Tukang Kayu
L.03 0.05 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
1 Buah Kunci Tanam Biasa 2 Slag
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

1 A.4.6.2.17 1 m2 Pemasangan Kaca tebal 5 mm


A Tenaga
0.0150 OH Pekerja
0.1500 OH Tukang Kayu
0.0150 OH Kepala Tukang
0.0008 OH Mandor
B Bahan
1.1000 m2 Kaca tebal 5mm
0.0500 Kg Sealant
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI dan


12 A.4.4.3.36 1 m2 Pemasangan Lantai Keramik 20 x 20 cm

A Tenaga
L.01 0.70 OH Pekerja
L.02 0.35 OH Tukang Batu
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

L.03 0.035 OH Kepala Tukang


L.04 0.035 OH Mandor
B Bahan
26.5 Buah Keramik 20 x 20 cm
10.40 Kg Portland Semen
0.50 Kg Semen Warna
0.045 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

12 A.4.4.3.36.a 1 m2 Pemasangan Lantai Keramik 40 x 40 cm


A Tenaga
L.01 0.70 OH Pekerja
L.02 0.35 OH Tukang Batu
L.03 0.035 OH Kepala Tukang
L.04 0.035 OH Mandor
B Bahan
6.5 Buah Keramik 40 x 40 cm
10.40 Kg Portland Semen
0.50 Kg Semen Warna
0.045 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

1 A.4.4.3.9.a 1 m2 Pemasangan 1 m2 Lantai Granito Ex. Lokal (60 cm x 60 c

A Tenaga
0.7000 OH Pekerja
0.3500 OH Tukang Batu
0.0350 OH Kepala Tukang

0.0350 OH Mandor
B Bahan
1.0684 m2 Granito 60 x 60 (lokal)

10.0000 kg Portland Pozzolan Cement / PPC


0.0450 m3 Pasir Pasang (ex. Bengawan Solo)

1.5000 kg Portland Pozzolan Cement / PPC - Warna


C PERALATAN
D Jumlah A + B + C

E Overhead & Profit


F Harga Satuan Pekerjaan (D+E)

14 A.4.4.3.39.a 1 m' Pemasangan Hospital Plint Keramik Ukuran 10x30 cm


A Tenaga
L.01 0.09 OH Pekerja
L.02 0.09 OH Tukang Batu
L.03 0.035 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
3.333 Buah Hospital Plint Keramik Ukuran 10x30 cm
1.14 Kg Portland Semen
0.003 m3 Pasir Pasang
0.025 Kg Semen Warna
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

14 A.4.4.3.39.b 1 m' Pemasangan Plint Kaca Ukuran 10x30 cm


A Tenaga
L.01 0.09 OH Pekerja
L.02 0.09 OH Tukang Batu
L.03 0.035 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
3.333 Buah Plint Kaca Ukuran 10x30 cm
1.14 Kg Portland Semen
0.003 m3 Pasir Pasang
0.025 Kg Semen Warna
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)

14 A.4.4.3.39.c 1 m' Pemasangan Plint Aluminium Ukuran 10x30 cm


A Tenaga
L.01 0.09 OH Pekerja
L.02 0.09 OH Tukang Batu
L.03 0.035 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
3.333 Buah Plint Aluminium Ukuran 10x30 cm
1.14 Kg Portland Semen
0.003 m3 Pasir Pasang
0.025 Kg Semen Warna
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

22 A.4.4.3.50.a 1 m2 Pemasangan Dinding Keramik 20x25 cm,


A Tenaga
L.01 0.9 OH Pekerja
L.02 0.45 OH Tukang Batu
L.03 0.045 OH Kepala Tukang
L.04 0.045 OH Mandor
B Bahan
20.0 Buah Keramik 20x25 cm
9.3 Kg Portland Semen
0.018 m3 Pasir Pasang
1.94 Kg Semen Warna
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

1 A.4.4.3.50.b 1 m2 Pemasangan Dinding Granito Ex. Lokal (60 cm x 60 cm)


A Tenaga
L.01 0.9000 OH Pekerja
L.02 0.4500 OH Tukang Batu
L.03 0.0450 OH Kepala Tukang
L.04 0.0450 OH Mandor

B Bahan
1.0684 m2 Granito 60 x 60 (lokal)

10.0000 kg Portland Pozzolan Cement / PPC


0.0450 m3 Pasir Pasang (ex. Bengawan Solo)
1.5000 kg Portland Pozzolan Cement / PPC - Warna

C PERALATAN
D Jumlah A + B + C

E Overhead & Profit


F Harga Satuan Pekerjaan (D+E)
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

XIV A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN


1 A.4.7.1.10.A 1 m2 Pengecat Tembok Baru Exterior (1lap.Plamir, 1lap Cat Da
2 lap. Cat Penutup)
A Tenaga
L.01 0.0200 OH Pekerja
L.02 0.0630 OH Tukang Cat
L.03 0.0063 OH Kepala Tukang
L.04 0.0030 OH Mandor
B Bahan
0.1000 Kg Cat Dasar
0.2600 Kg Cat Penutup 2 kali
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

2 A.4.7.1.10.B 1 m2 Pengecat Tembok Baru Interior (1lap.Plamir, 1lap Cat Das


2 lap. Cat Penutup)
A Tenaga
L.01 0.0200 OH Pekerja
L.02 0.0630 OH Tukang Cat
L.03 0.0063 OH Kepala Tukang
L.04 0.0030 OH Mandor
B Bahan
0.1000 Kg Plamir
0.1000 Kg Cat Dasar
0.2600 Kg Cat Penutup 2 kali
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

A.7.1.1 HARGA SATUAN PEKERJAAN JALAN LINGKUNGAN


A.7.1.1.2 (b) 1 m2 Pasang Paving Block tebal 8 cm K.300

No. Uraian Kode Satuan

A. TENAGA
Pekerja L.12 OH
Tukang Batu L.15 OH
Kepala Tukang Batu L.02 OH
Mandor L.09 OH
JU
B. BAHAN
Paving Block tb. 8 cm K.300 m2
Pasir Urug m3
JU
C. PERALATAN

JUMLA
D. Jumlah harga tenaga, bahan dan peralatan
E. Overhead & Keuntungan
F. Harga satuan pekerjaan

Dihitung.A1 1 m2 Bongkaran paving

No. Uraian Kode Satuan

A. TENAGA
Pekerja L.12 OH
Mandor L.09 OH
JU
B. BAHAN
JU
C. PERALATAN

JUMLA
D. Jumlah harga tenaga, bahan dan peralatan
E. Overhead & Keuntungan
F. Harga satuan pekerjaan

Dihitung.A2 1 m2 Pemasangan paving lama

No. Uraian Kode Satuan

A. TENAGA
Pekerja L.12 OH
Tukang Batu L.15 OH
Kepala Tukang Batu L.02 OH
Mandor L.09 OH
JU
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

B. BAHAN
JU
C. PERALATAN

JUMLA
D. Jumlah harga tenaga, bahan dan peralatan
E. Overhead & Keuntungan
F. Harga satuan pekerjaan

A.7.1.1.3 (a) 1 m' Pasang Kanstin Beton (10-18-40)

No. Uraian Kode Satuan

A. TENAGA
Pekerja L.12 OH
Tukang Batu L.15 OH
Kepala Tukang Batu L.02 OH
Mandor L.09 OH
JU
B. BAHAN
Kanstin Beton (10-18-40) bh
Pasir Urug m3
JU
C. PERALATAN

JUMLA
D. Jumlah harga tenaga, bahan dan peralatan
E. Overhead & Keuntungan
F. Harga satuan pekerjaan
RGA SATUAN PEKERJAAN

HARGA
URAIAN PAKERJAAN BAHAN/UPAH JUMLAH
Rp Rp

53,062.50
68,000.00 51,000.00
82,500.00 2,062.50

53,062.50
10% 5,306.25
58,368.75

Kembali di hitung dari 1/3 kali koefisien Pekerjaan galian


17,687.50
68,000.00 17,000.00
82,500.00 687.50

17,687.50
10% 1,768.75
19,456.25

38,125.00
68,000.00 34,000.00
82,500.00 4,125.00
HARGA
URAIAN PAKERJAAN BAHAN/UPAH JUMLAH
Rp Rp

38,125.00
10% 3,812.50
41,937.50

21,225.00
68,000.00 20,400.00
82,500.00 825.00
180,000.00
150,000.00 180,000.00

201,225.00
10% 20,122.50
221,347.50

19,062.50
68,000.00 17,000.00
82,500.00 2,062.50
150,000.00
125,000.00 150,000.00

169,062.50
10% 16,906.25
185,968.75
HARGA
URAIAN PAKERJAAN BAHAN/UPAH JUMLAH
Rp Rp

174,375.00
68,000.00 102,000.00
80,000.00 60,000.00
82,500.00 6,187.50
82,500.00 6,187.50
548,720.00
200,000.00 240,000.00
1,350.00 183,600.00
230,000.00 125,120.00

723,095.00
10% 72,309.50
795,404.50

90,675.00
68,000.00 53,040.00
80,000.00 31,200.00
82,500.00 3,217.50
82,500.00 3,217.50
304,800.00
200,000.00 240,000.00
150,000.00 64,800.00

395,475.00
10% 39,547.50
435,022.50

on mutu f'c=7,4 Mpa (K100), slum (12±2)cm, w/c = 0,87


143,357.50
68,000.00 112,200.00
HARGA
URAIAN PAKERJAAN BAHAN/UPAH JUMLAH
Rp Rp

80,000.00 22,000.00
82,500.00 2,310.00
82,500.00 6,847.50
706,578.57
1,350.00 333,450.00
178.57 155,178.57
207.41 207,200.00
50.00 10,750.00

849,936.07
10% 84,993.61
934,929.68

on mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58


143,357.50
68,000.00 112,200.00
80,000.00 22,000.00
82,500.00 2,310.00
82,500.00 6,847.50
853,398.41
1,350.00 500,850.00
178.57 124,642.86
207.41 217,155.56
50.00 10,750.00

996,755.91
10% 99,675.59
1,096,431.50
HARGA
URAIAN PAKERJAAN BAHAN/UPAH JUMLAH
Rp Rp

1,126.75
68,000.00 476.00
80,000.00 560.00
82,500.00 57.75
82,500.00 33.00
11,805.00
11,000.00 11,550.00
17,000.00 255.00

12,931.75
10% 1,293.18
14,224.93

20,155.90
68,000.00 11,784.40
80,000.00 6,936.00
82,500.00 717.75
82,500.00 717.75
43,840.00
1,800,000.00 41,040.00
17,000.00 1,700.00
11,000.00 1,100.00

63,995.90
10% 6,399.59
70,395.49

20,155.90
68,000.00 11,784.40
80,000.00 6,936.00
82,500.00 717.75
82,500.00 717.75
45,506.67
1,800,000.00 41,040.00
17,000.00 2,266.67
11,000.00 2,200.00

65,662.57
HARGA
URAIAN PAKERJAAN BAHAN/UPAH JUMLAH
Rp Rp

10% 6,566.26
72,228.82

76,725.00
68,000.00 44,880.00
80,000.00 26,400.00
82,500.00 2,722.50
82,500.00 2,722.50
72,483.33
1,800,000.00 -
17,000.00 4,533.33
11,000.00 2,200.00
6,500,000.00 39,000.00
115,000.00 13,416.67
20,000.00 13,333.33

149,208.33
10% 14,920.83
164,129.17

AN PEKERJAAN PASANGAN DINDING


Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 5PP
30,462.50
68,000.00 20,400.00
80,000.00 8,000.00
82,500.00 825.00
82,500.00 1,237.50
58,418.00
500.00 35,000.00
1,350.00 13,068.00
230,000.00 10,350.00

88,880.50
10% 8,888.05
97,768.55
HARGA
URAIAN PAKERJAAN BAHAN/UPAH JUMLAH
Rp Rp

Plesteran Skoning 1 Pc : 2Pp, lebar 10 mm 49,208.50


41,070.00
68,000.00 5,440.00
80,000.00 32,000.00
82,500.00 3,300.00
82,500.00 330.00
3,665.00
1,350.00 675.00
230,000.00 2,990.00

44,735.00
10% 4,473.50
49,208.50

Plesteran 1 Pc : 5 Pp Tebal 15 mm
34,875.00
68,000.00 20,400.00
80,000.00 12,000.00
82,500.00 1,237.50
82,500.00 1,237.50
12,978.40
1,350.00 6,998.40
230,000.00 5,980.00

47,853.40
10% 4,785.34
52,638.74

23,250.00
68,000.00 13,600.00
80,000.00 8,000.00
82,500.00 825.00
HARGA
URAIAN PAKERJAAN BAHAN/UPAH JUMLAH
Rp Rp

82,500.00 825.00
4,387.50
1,350.00 4,387.50

27,637.50
10% 2,763.75
30,401.25

UAN PEKERJAAN PENUTUP ATAP


Atap Genteng Keramik/Glazur Sekualitas Kanmuri

17,520.00
68,000.00 10,200.00
80,000.00 6,000.00

82,500.00 660.00
82,500.00 660.00

159,500.00
11,000.00 159,500.00

177,020.00
10% 17,702.00

194,722.00
HARGA
URAIAN PAKERJAAN BAHAN/UPAH JUMLAH
Rp Rp

45,015.00
68,000.00 27,200.00
80,000.00 16,000.00

82,500.00 1,650.00
82,500.00 165.00

143,160.00
25,000.00 125,000.00
1,350.00 10,800.00

230,000.00 7,360.00

188,175.00
10% 18,817.50
206,992.50

UAN PEKERJAAN SANITASI DALAM GEDUNG

214,925.00
68,000.00 81,600.00
80,000.00 116,000.00
82,500.00 12,375.00
82,500.00 4,950.00
1,264,400.00
950,000.00 1,140,000.00
950,000.00 114,000.00
1,350.00 8,100.00
230,000.00 2,300.00

1,479,325.00
10% 147,932.50
1,627,257.50

UAN PEKERJAAN BESI & ALLUMUNIUM


HARGA
URAIAN PAKERJAAN BAHAN/UPAH JUMLAH
Rp Rp

9,622.50
68,000.00 4,080.00

80,000.00 4,800.00
82,500.00 495.00
82,500.00 247.50

19,350.00
15,000.00 17,250.00

35,000.00 2,100.00

28,972.50

10% 2,897.25
31,869.75

130,935.20
6,532.00

60,000.00 2,580.00
80,000.00 3,440.00

80,000.00 344.00
80,000.00 168.00

112,500.00
100,000.00 110,000.00
200.00 400.00

35,000.00 2,100.00

119,032.00
10% 11,903.20
130,935.20
HARGA
URAIAN PAKERJAAN BAHAN/UPAH JUMLAH
Rp Rp

UAN PEKERJAAN KUNCI dan KACA


192,739.25
45,217.50
68,000.00 680.00
80,000.00 40,000.00
82,500.00 4,125.00
82,500.00 412.50
130,000.00
130,000.00 130,000.00

175,217.50
10% 17,521.75
192,739.25

14,323.50
68,000.00 1,020.00
80,000.00 12,000.00
82,500.00 1,237.50
82,500.00 66.00
110,000.00
100,000.00 110,000.00
35,000.00 1,750.00

124,323.50
10% 12,432.35
136,755.85

UAN PEKERJAAN PENUTUP LANTAI dan DINDING


181,461.50

81,375.00
68,000.00 47,600.00

80,000.00 28,000.00
HARGA
URAIAN PAKERJAAN BAHAN/UPAH JUMLAH
Rp Rp

82,500.00 2,887.50

82,500.00 2,887.50
83,590.00
2,200.00 58,300.00
1,350.00 14,040.00
1,800.00 900.00
230,000.00 10,350.00

164,965.00
10% 16,496.50
181,461.50

163,449.00
81,375.00
68,000.00 47,600.00

80,000.00 28,000.00
82,500.00 2,887.50

82,500.00 2,887.50
67,215.00
6,500.00 41,925.00
1,350.00 14,040.00
1,800.00 900.00
230,000.00 10,350.00

148,590.00
10% 14,859.00
163,449.00
HARGA
URAIAN PAKERJAAN BAHAN/UPAH JUMLAH
Rp Rp

1 m2 Lantai Granito Ex. Lokal (60 cm x 60 cm)

81,375.00
68,000.00 47,600.00
80,000.00 28,000.00
82,500.00 2,887.50

82,500.00 2,887.50
149,416.00
115,000.00 122,866.00

1,350.00 13,500.00
230,000.00 10,350.00

1,800.00 2,700.00

230,791.00

10% 23,079.10
253,870.10

Hospital Plint Keramik Ukuran 10x30 cm 130,783.40


16,620.00
68,000.00 6,120.00
80,000.00 7,200.00
82,500.00 2,887.50
82,500.00 412.50
102,274.00
30,000.00 100,000.00
1,350.00 1,539.00
230,000.00 690.00
1,800.00 45.00

118,894.00
10% 11,889.40
130,783.40
HARGA
URAIAN PAKERJAAN BAHAN/UPAH JUMLAH
Rp Rp

75,783.40
16,620.00
68,000.00 6,120.00
80,000.00 7,200.00
82,500.00 2,887.50
82,500.00 412.50
52,274.00
15,000.00 50,000.00
1,350.00 1,539.00
230,000.00 690.00
1,800.00 45.00

68,894.00
10% 6,889.40
75,783.40

Plint Aluminium Ukuran 10x30 cm 75,783.40


16,620.00
68,000.00 6,120.00
80,000.00 7,200.00
82,500.00 2,887.50
82,500.00 412.50
52,274.00
15,000.00 50,000.00
1,350.00 1,539.00
230,000.00 690.00
1,800.00 45.00

68,894.00
10% 6,889.40
75,783.40
HARGA
URAIAN PAKERJAAN BAHAN/UPAH JUMLAH
Rp Rp

192,293.20
104,625.00
68,000.00 61,200.00
80,000.00 36,000.00
82,500.00 3,712.50
82,500.00 3,712.50
70,187.00
2,500.00 50,000.00
1,350.00 12,555.00
230,000.00 4,140.00
1,800.00 3,492.00

174,812.00
10% 17,481.20
192,293.20

Dinding Granito Ex. Lokal (60 cm x 60 cm)


106,650.00
70,000.00 63,000.00
80,000.00 36,000.00
85,000.00 3,825.00
85,000.00 3,825.00

149,416.00
115,000.00 122,866.00

1,350.00 13,500.00
230,000.00 10,350.00
1,800.00 2,700.00

256,066.00

10% 25,606.60
281,672.60
HARGA
URAIAN PAKERJAAN BAHAN/UPAH JUMLAH
Rp Rp

UAN PEKERJAAN PENGECATAN


mbok Baru Exterior (1lap.Plamir, 1lap Cat Dasar

7,167.25
68,000.00 1,360.00
80,000.00 5,040.00
82,500.00 519.75
82,500.00 247.50
32,350.00
37,500.00 3,750.00
110,000.00 28,600.00

39,517.25
10% 3,951.73
43,468.98

mbok Baru Interior (1lap.Plamir, 1lap Cat Dasar

7,167.25
68,000.00 1,360.00
80,000.00 5,040.00
82,500.00 519.75
82,500.00 247.50
14,250.00
14,000.00 1,400.00
37,500.00 3,750.00
35,000.00 9,100.00

21,417.25
10% 2,141.73
23,558.98
HARGA
URAIAN PAKERJAAN BAHAN/UPAH JUMLAH
Rp Rp

Harga Satuan Jumlah Harga


Koefisien
(Rp) (Rp)

0.5000 68,000.00 34,000.00


0.5000 80,000.00 40,000.00
0.0500 82,500.00 4,125.00
0.0013 82,500.00 107.25
JUMLAH TENAGA KERJA 78,232.25

1.0100 75,000.00 75,750.00


0.0500 150,000.00 7,500.00
JUMLAH HARGA BAHAN 83,250.00

-
JUMLAH HARGA PERALATAN -
(A+B+C) 161,482.25
10.00% x D 16,148.23
(D+E) 177,630.48

Harga Satuan Jumlah Harga


Koefisien
(Rp) (Rp)

0.1000 82,500.00 8,250.00


0.0013 82,500.00 107.25
JUMLAH TENAGA KERJA 8,357.25

JUMLAH HARGA BAHAN -

-
JUMLAH HARGA PERALATAN -
(A+B+C) 8,357.25
10.00% x D 835.73
(D+E) 9,192.98

Harga Satuan Jumlah Harga


Koefisien
(Rp) (Rp)

0.5000 68,000.00 34,000.00


0.5000 80,000.00 40,000.00
0.0500 82,500.00 4,125.00
0.0013 82,500.00 107.25
JUMLAH TENAGA KERJA 78,232.25
HARGA
URAIAN PAKERJAAN BAHAN/UPAH JUMLAH
Rp Rp

JUMLAH HARGA BAHAN -

-
JUMLAH HARGA PERALATAN -
(A+B+C) 78,232.25
10.00% x D 7,823.23
(D+E) 86,055.48

Harga Satuan Jumlah Harga


Koefisien
(Rp) (Rp)

0.1375 68,000.00 9,350.00


0.0375 80,000.00 3,000.00
0.0075 82,500.00 618.75
0.0038 82,500.00 313.50
JUMLAH TENAGA KERJA 13,282.25

2.5000 16,000.00 40,000.00


0.0050 150,000.00 750.00
JUMLAH HARGA BAHAN 40,750.00

-
JUMLAH HARGA PERALATAN -
(A+B+C) 54,032.25
10.00% x D 5,403.23
(D+E) 59,435.48

Blora, 5 Juli 2019


Dibuat oleh,
CV LIMA KARSA

RATNO
Direktur
DAFTAR UPAH PEKERJA

Nama Kegiatan : Pembangunan Puskesmas


Nama Paket : Pembangunan Puskesmas Jiken
Lokasi : Dinas Kesehatan Kabupaten Blora
Sumber Dana : APBD 2019
Tahun Anggaran : 2019

HARGA
NO. JENIS BAHAN SATUAN KET.
(Rp)
1 Pekerja Hr 68,000.00
2 Mandor Hr 82,500.00
3 Tukang Kayu Hr 80,000.00
4 Kepala Tukang Hr 82,500.00
5 Tukang Batu Hr 80,000.00
6 Tukang Besi Hr 80,000.00
7 Tukang Cat Hr 80,000.00

Blora, 5 Juli 2019


Dibuat oleh,
CV LIMA KARSA

RATNO
Direktur

Page 67 of 221
DAFTAR HARGA BAHAN

Nama Kegiatan : Pembangunan Puskesmas


Nama Paket : Pembangunan Puskesmas Jiken
Lokasi : Dinas Kesehatan Kabupaten Blora
Sumber Dana : APBD 2019
Tahun Anggaran : 2019

HARGA
NO. JENIS BAHAN SATUAN KET.
(Rp)
1 Pasir urug m3 150,000.00
2 Tanah Urug Pilihan m3 125,000.00
3 Batu Belah putih m3 200,000.00
4 Portland Pozzolan Cement / PPC (40 kg) Zak 54,000.00
5 Pasir Pasang m3 230,000.00
6 Pasir beton (Kasar) (ex. Bengawan Solo) m3 250,000.00
7 Kerikil (maksimum 30 mm) m3 280,000.00
8 Air m3 50,000.00
9 Besi Beton (polos/ulir) kg 11,000.00
10 Kawat Beton kg 17,000.00
11 Kayu papan bekisting kelas 3 m3 1,800,000.00
12 Paku Biasa 2" - 5" Kg 17,000.00
13 Minyak Bekisting Ltr 11,000.00
14 Kayu balok klas 3 (Kruing) m3 6,500,000.00
15 Multipleks 120 x 240 tb. 9 mm Lbr 115,000.00
16 Bambu dia 2", pjg 6m Btg 20,000.00
17 Bata lokal bh 500.00
18 Genteng Keramik/Glazur (KIA, M-CLASS, KANMURI) Natural bh 11,000.00
19 Genteng Bubung Keramik/Glazur bh 25,000.00
20 Baja profil " L " atau " C " Kg 15,000.00
21 Meni Besi Kg 35,000.00
22 Profil Allumunium POWDER COATING PUTIH m' 100,000.00
23 Skrup Fixer buah 200.00
24 Sealant kg 35,000.00
25 Kaca tebal 5mm m2 100,000.00
26 Keramik 20 x 20 cm bh 2,200.00
27 Keramik 40 x 40 cm bh 6,500.00
28 Keramik 20 x 25 cm bh 2,500.00
29 Granito 60 x 60 (lokal) m2 115,000.00
30 Portland Pozzolan Cement / PPC - Warna kg 1,800.00
31 Plamir kg 14,000.00
32 Cat Dasar kg 37,500.00
33 Cat Penutup 2 kali (exterior sekualitas DULUX WHEATERSHIELD) kg 110,000.00
34 Cat Penutup 2 kali (interior sekualitas Catylac) kg 35,000.00
35 Hospital Plint Keramik Ukuran 10x30 cm bh 30,000.00
36 Plint Kaca Ukuran 10x30 cm bh 15,000.00
37 Plint Aluminium Ukuran 10x30 cm bh 15,000.00
38 Kunci Tanam Biasa 2 Slag Buah 130,000.00
39 Kitchen Sink bh 950,000.00
40 Paving Block tb. 8 cm K.300 m2 75,000.00
42 Kanstin Beton (10-18-40) bh 16,000.00

Blora, 5 Juli 2019


Dibuat oleh,
CV LIMA KARSA

RATNO
Direktur

Page 68 of 221
HARGA BAHAN/UPAH JUMLAH

No. SNI KODE KOEF SAT. URAIAN PAKERJAAN MINIMUM MINIMUM


Rp Rp

XIV A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN

1 A.4.7.1.10 1 m2 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 39,361.30


2 lap. Cat Penutup)
A Tenaga 7,183.00
L.01 0.02 OH Pekerja 68,000.00 1,360.00
L.02 0.063 OH Tukang Cat 80,000.00 5,040.00
L.03 0.0063 OH Kepala Tukang 85,000.00 535.50
L.04 0.0030 OH Mandor 82,500.00 247.50
B Bahan 28,600.00
0.1 Kg Plamir 14,000.00 1,400.00
0.1 Kg Cat Dasar 38,000.00 3,800.00
0.26 Kg Cat Penutup 2 kali 90,000.00 23,400.00
C PERALATAN
D Jumlah A + B + C 35,783.00
E Overhead & Profit (contoh 10%) 10% 3,578.30
F Harga Satuan Pekerjaan (D+E) 39,361.30

2 A.4.7.1.16 1 m2 Pengecatan Permukaan Baja dg Meni Besi 24,982.38


A Tenaga 19,266.25
L.01 0.02 OH Pekerja 68,000.00 1,360.00
L.02 0.2 OH Tukang Cat 80,000.00 16,000.00
L.03 0.020 OH Kepala Tukang 85,000.00 1,700.00
L.04 0.0025 OH Mandor 82,500.00 206.25
B Bahan 3,445.00
0.1 Kg Meni Besi 31,250.00 3,125.00
0.01 Kg Perekat / Lem 32,000.00 320.00
C PERALATAN
D Jumlah A + B + C 22,711.25
E Overhead & Profit (contoh 10%) 10% 2,271.13
F Harga Satuan Pekerjaan (D+E) 24,982.38

Blora, 5 Juli 2019


Dibuat oleh,
CV LIMA KARSA
0

RATNO
Direktur
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
MINIMUM MINIMUM
Rp Rp

XIII A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI dan DINDING

1 A.4.4.3.9.a 1 m2 Pemasangan 1 m2 Lantai Keramik Granito Ex. Lokal (60 cm x 60 cm) 282,642.05
A Tenaga 81,462.50
L.01 0.700 OH Pekerja 68,000.00 47,600.00
L.02 0.350 OH Tukang Batu 80,000.00 28,000.00
L.03 0.035 OH Kepala Tukang 85,000.00 2,975.00
L.04 0.035 OH Mandor 82,500.00 2,887.50

B Bahan 175,484.82
1.07 m2 Granito 60 x 60 (lokal) 124,800.00 133,336.32

10.0 kg Portland Pozzolan Cement / PPC 1,350.00 13,500.00


0.045 m3 Pasir Pasang (ex. Bengawan Solo) 243,300.00 10,948.50
1.500 kg Portland Pozzolan Cement / PPC - Warna 11,800.00 17,700.00
C PERALATAN

D Jumlah A + B + C 256,947.32

E Overhead & Profit (contoh 10%) 10% 25,694.73


F Harga Satuan Pekerjaan (D+E) 282,642.05

Blora, 5 Juli 2019


Dibuat oleh,
CV LIMA KARSA
0

RATNO
Direktur
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp

XII A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI dan KACA


1 A.4.6.2.2 1 Buah Pemasangan Kunci Tanam Biasa 187,376.75
A Tenaga 45,342.50
L.01 0.01 OH Pekerja 68,000.00 680.00
L.02 0.5 OH Tukang Kayu 80,000.00 40,000.00
L.03 0.05 OH Kepala Tukang 85,000.00 4,250.00
L.04 0.005 OH Mandor 82,500.00 412.50
B Bahan 125,000.00
1 Buah Kunci Tanam Biasa 2 Slag 125,000.00 125,000.00
C PERALATAN
D Jumlah A + B + C 170,342.50
E Overhead & Profit (contoh 10%) 10% 17,034.25
F Harga Satuan Pekerjaan (D+E) 187,376.75
Overhead & Profit (contoh 10%)
2 A.4.6.2.3 1 Buah Pemasangan Kunci Kamar Mandi 131,821.25
A Tenaga 44,837.50
L.01 0.005 OH Pekerja 68,000.00 340.00
L.02 0.5 OH Tukang Kayu 80,000.00 40,000.00
L.03 0.05 OH Kepala Tukang 85,000.00 4,250.00
L.04 0.003 OH Mandor 82,500.00 247.50
B Bahan 75,000.00
1 Buah Kunci Tanam Kamar Mandi 1 Slag 75,000.00 75,000.00
C PERALATAN
D Jumlah A + B + C 119,837.50
E Overhead & Profit (contoh 10%) 10% 11,983.75
F Harga Satuan Pekerjaan (D+E) 131,821.25

3 A.4.6.2.4 1 Buah Pemasangan Kunci Selinder 186,821.25


A Tenaga 44,837.50
L.01 0.005 OH Pekerja 68,000.00 340.00
L.02 0.5 OH Tukang Kayu 80,000.00 40,000.00
L.03 0.05 OH Kepala Tukang 85,000.00 4,250.00
L.04 0.003 OH Mandor 82,500.00 247.50
B Bahan 125,000.00
1 Buah Kunci Selinder 2 Slag 125,000.00 125,000.00
C PERALATAN
D Jumlah A + B + C 169,837.50
E Overhead & Profit (contoh 10%) 10% 16,983.75
F Harga Satuan Pekerjaan (D+E) 186,821.25

4 A.4.6.2.5 1 Buah Pemasangan Engsel Pintu 32,297.10


A Tenaga 14,361.00
L.01 0.015 OH Pekerja 68,000.00 1,020.00
L.02 0.15 OH Tukang Kayu 80,000.00 12,000.00
L.03 0.015 OH Kepala Tukang 85,000.00 1,275.00
L.04 0.0008 OH Mandor 82,500.00 66.00
B Bahan 15,000.00
1 Buah Engsel pintu Nylon Kupu-Kupu 15,000.00 15,000.00
C PERALATAN
D Jumlah A + B + C 29,361.00
E Overhead & Profit (contoh 10%) 10% 2,936.10
F Harga Satuan Pekerjaan (D+E) 32,297.10

5 A.4.6.2.6 1 Buah Pemasangan Engsel Jendela Kupu-kupu 29,778.38


A Tenaga 9,571.25
L.01 0.01 OH Pekerja 68,000.00 680.00
L.02 0.1 OH Tukang Kayu 80,000.00 8,000.00
L.03 0.01 OH Kepala Tukang 85,000.00 850.00
L.04 0.001 OH Mandor 82,500.00 41.25
B Bahan 17,500.00
1 Buah Engsel Jendela Kupu-Kupu Biasa 17,500.00 17,500.00
C PERALATAN
D Jumlah A + B + C 27,071.25
E Overhead & Profit (contoh 10%) 10% 2,707.13
F Harga Satuan Pekerjaan (D+E) 29,778.38

6 A.4.6.2.7 1 Buah Pemasangan Engsel Angin 56,695.38


A Tenaga 24,541.25
L.01 0.10 OH Pekerja 68,000.00 6,800.00
L.02 0.20 OH Tukang Kayu 80,000.00 16,000.00
L.03 0.02 OH Kepala Tukang 85,000.00 1,700.00
L.04 0.0005 OH Mandor 82,500.00 41.25
B Bahan 27,000.00
1 Buah Engsel Angin 27,000.00 27,000.00
C PERALATAN
D Jumlah A + B + C 51,541.25
E Overhead & Profit (contoh 10%) 10% 5,154.13
F Harga Satuan Pekerjaan (D+E) 56,695.38

7 A.4.6.2.9 1 Buah Pemasangan Kait Angin 31,960.50


A Tenaga 14,955.00
L.01 0.015 OH Pekerja 68,000.00 1,020.00
L.02 0.15 OH Tukang Kayu 80,000.00 12,000.00
L.03 0.015 OH Kepala Tukang 85,000.00 1,275.00
L.04 0.008 OH Mandor 82,500.00 660.00
B Bahan 14,100.00
1 Buah Kait Angin 14,100.00 14,100.00
C PERALATAN
D Jumlah A + B + C 29,055.00
E Overhead & Profit (contoh 10%) 10% 2,905.50
F Harga Satuan Pekerjaan (D+E) 31,960.50

8 A.4.6.2.10 1 Buah Pasang Door Closer 103,947.25


A Tenaga 47,897.50
L.01 0.05 OH Pekerja 68,000.00 3,400.00
L.02 0.5 OH Tukang Kayu 80,000.00 40,000.00
L.03 0.05 OH Kepala Tukang 85,000.00 4,250.00
L.04 0.0030 OH Mandor 82,500.00 247.50
B Bahan 46,600.00
1 Buah Door Closer 46,600.00 46,600.00
C PERALATAN
D Jumlah A + B + C 94,497.50
E Overhead & Profit (contoh 10%) 10% 9,449.75
F Harga Satuan Pekerjaan (D+E) 103,947.25

9 A.4.6.2.11 1 Buah Pemasangan Kunci Selot 29,691.75


A Tenaga 19,142.50
L.01 0.02 OH Pekerja 68,000.00 1,360.00
L.02 0.2 OH Tukang Kayu 80,000.00 16,000.00
L.03 0.02 OH Kepala Tukang 85,000.00 1,700.00
L.04 0.001 OH Mandor 82,500.00 82.50
B Bahan 7,850.00
1 Buah Kunci Selot 7,850.00 7,850.00
C PERALATAN
D Jumlah A + B + C 26,992.50
E Overhead & Profit (contoh 10%) 10% 2,699.25
F Harga Satuan Pekerjaan (D+E) 29,691.75

10 A.4.6.2.13 1 Buah Pemasangan Door Stop 62,196.75


A Tenaga 9,942.50
L.01 0.01 OH Pekerja 68,000.00 680.00
L.02 0.1 OH Tukang Kayu 80,000.00 8,000.00
L.03 0.01 OH Kepala Tukang 85,000.00 850.00
L.04 0.0050 OH Mandor 82,500.00 412.50
B Bahan 46,600.00
1 Buah Door Stop 46,600.00 46,600.00
C PERALATAN
D Jumlah A + B + C 56,542.50
E Overhead & Profit (contoh 10%) 10% 5,654.25
F Harga Satuan Pekerjaan (D+E) 62,196.75

11 A.4.6.2.14 1 Buah Pemasangan Rel Pintu Dorong 239,170.25


A Tenaga 57,427.50
L.01 0.06 OH Pekerja 68,000.00 4,080.00
L.02 0.6 OH Tukang Kayu 80,000.00 48,000.00
L.03 0.06 OH Kepala Tukang 85,000.00 5,100.00
L.04 0.003 OH Mandor 82,500.00 247.50
B Bahan 160,000.00
1 Buah Rel Pintu Dorong 160,000.00 160,000.00
C PERALATAN
D Jumlah A + B + C 217,427.50
E Overhead & Profit (contoh 10%) 10% 21,742.75
F Harga Satuan Pekerjaan (D+E) 239,170.25

12 A.4.6.2.15 1 Buah Pemasangan Kunci Lemari 31,825.48


A Tenaga 23,932.25
L.01 0.025 OH Pekerja 68,000.00 1,700.00
L.02 0.25 OH Tukang Kayu 80,000.00 20,000.00
L.03 0.025 OH Kepala Tukang 85,000.00 2,125.00
L.04 0.00130 OH Mandor 82,500.00 107.25
B Bahan 5,000.00
1 Buah Kunci Lemari 5,000.00 5,000.00
C PERALATAN
D Jumlah A + B + C 28,932.25
E Overhead & Profit (contoh 10%) 10% 2,893.23
F Harga Satuan Pekerjaan (D+E) 31,825.48

13 A.4.6.2.16 1 m2 Pemasangan Kaca tebal 3 mm 104,553.35


A Tenaga 14,361.00
L.01 0.015 OH Pekerja 68,000.00 1,020.00
L.02 0.15 OH Tukang Kayu 80,000.00 12,000.00
L.03 0.015 OH Kepala Tukang 85,000.00 1,275.00
L.04 0.00080 OH Mandor 82,500.00 66.00
B Bahan 80,687.50
1.100 m2 Kaca tebal 3mm 73,125.00 80,437.50
0.050 Kg Sealant 5,000.00 250.00
C PERALATAN
D Jumlah A + B + C 95,048.50
E Overhead & Profit (contoh 10%) 10% 9,504.85
F Harga Satuan Pekerjaan (D+E) 104,553.35

1 A.4.6.2.17 1 m2 Pemasangan Kaca tebal 5 mm 123,487.10


A Tenaga 14,361.00
L.01 0.015 OH Pekerja 68,000.00 1,020.00
L.02 0.15 OH Tukang Kayu 80,000.00 12,000.00
L.03 0.015 OH Kepala Tukang 85,000.00 1,275.00
L.04 0.00080 OH Mandor 82,500.00 66.00
B Bahan 97,900.00
1.10 m2 Kaca tebal 5mm 89,000.00 97,900.00
0.05 Kg Sealant 20,000.00 1,000.00
C PERALATAN
D Jumlah A + B + C 112,261.00
E Overhead & Profit (contoh 10%) 10% 11,226.10
F Harga Satuan Pekerjaan (D+E) 123,487.10

15 A.4.6.2.18 1 m2 Pemasangan Kaca Cermin tebal 5 mm 197,950.50


A Tenaga 14,955.00
L.01 0.015 OH Pekerja 68,000.00 1,020.00
L.02 0.15 OH Tukang Kayu 80,000.00 12,000.00
L.03 0.015 OH Kepala Tukang 85,000.00 1,275.00
L.04 0.00800 OH Mandor 82,500.00 660.00
B Bahan 165,000.00
1.1 m2 Kaca Cermin 150,000.00 165,000.00
C PERALATAN
D Jumlah A + B + C 179,955.00
E Overhead & Profit (contoh 10%) 10% 17,995.50
F Harga Satuan Pekerjaan (D+E) 197,950.50

Blora, 5 Juli 2019


Dibuat oleh,
CV LIMA KARSA
0

RATNO
Direktur

Page 71 of 221
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN
Rp Rp

XI A.4.2.1 HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM


1 A.4.2.1.1 1 Kg Pemasangan Besi Profil 28,476.25
A Tenaga 9,637.50

L.01 0.06 OH Pekerja 68,000.00 4,080.00


L.02 0.06 OH Tukang Besi 80,000.00 4,800.00

L.03 0.006 OH Kepala Tukang 85,000.00 510.00


L.04 0.003 OH Mandor 82,500.00 247.50

B Bahan 16,250.00
1.15 Kg Besi Profil 12,500.00 14,375.00

0.06 Kg Meni Besi 31,250.00 1,875.00


C PERALATAN
D Jumlah A + B + C 25,887.50

E Overhead & Profit (contoh 10%) 10% 2,588.75


F Harga Satuan Pekerjaan (D+E) 28,476.25

Overhead & Profit (contoh 10%)


2 A.4.2.1.2 1 kg Pemasangan Rangka Kuda-kuda Baja IWF 26,413.75

A Tenaga 9,637.50
L.01 0.06 OH Pekerja 68,000.00 4,080.00

L.02 0.06 OH Tukang Besi 80,000.00 4,800.00


L.03 0.006 OH Kepala Tukang 85,000.00 510.00
L.04 0.003 OH Mandor 82,500.00 247.50

B Bahan 14,375.00
1.15 kg Besi Baja IWF 12,500.00 14,375.00

C PERALATAN
D Jumlah A + B + C 24,012.50

E Overhead & Profit (contoh 10%) 10% 2,401.25


F Harga Satuan Pekerjaan (D+E) 26,413.75

3 A.4.2.1.11 1 m' Pemasangan Kusen Pintu Allumunium 131,563.03


A Tenaga 6,902.75

L.01 0.043 OH Pekerja 68,000.00 2,924.00


L.02 0.043 OH Tukang Besi 80,000.00 3,440.00

L.03 0.0043 OH Kepala Tukang 85,000.00 365.50


L.04 0.0021 OH Mandor 82,500.00 173.25
B Bahan 112,700.00
1.1 m' Profil Allumunium 100,000.00 110,000.00

2 buah Skrup Fixer 750.00 1,500.00


0.06 Tube Sealant 20,000.00 1,200.00
C PERALATAN

D Jumlah A + B + C 119,602.75
E Overhead & Profit (contoh 10%) 10% 11,960.28

F Harga Satuan Pekerjaan (D+E) 131,563.03

Blora, 5 Juli 2019


Dibuat oleh,
CV LIMA KARSA

RATNO

Direktur

Page 72 of 221
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp

X A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


1 A.5.1.1.1 1 Unit Memasang Closet Duduk / Mono Blok 1,991,495.00
A Tenaga 326,450.00
L.01 3.3 OH Pekerja 68,000.00 224,400.00
L.02 1.1 OH Tukang Batu 80,000.00 88,000.00
L.03 0.010 OH Kepala Tukang 85,000.00 850.00
L.04 0.16 OH Mandor 82,500.00 13,200.00
Buah Bahan 1,484,000.00
1 Buah Kloset Duduk / Monoblok 1,400,000.00 1,400,000.00
0.06 Kelengkapan 6% dari harga Kloset 1,400,000.00 84,000.00
C PERALATAN
D Jumlah A + B + C 1,810,450.00
E Overhead & Profit (contoh 10%) 10% 181,045.00
F Harga Satuan Pekerjaan (D+E) 1,991,495.00
Overhead & Profit (contoh 10%)
2 A.5.1.1.2 1 Unit Memasang Closet Jongkok Porselen 384,431.30
A Tenaga 213,950.00
L.01 1.00 OH Pekerja 68,000.00 68,000.00
L.02 1.50 OH Tukang Batu 80,000.00 120,000.00
L.03 0.15 OH Kepala Tukang 85,000.00 12,750.00
L.04 0.16 OH Mandor 82,500.00 13,200.00
B Bahan 135,533.00
1 Buah Kloset Jongkok 125,000.00 125,000.00
6 Kg Portland Semen 1,350.00 8,100.00
0.01 m3 Pasir Pasang 243,300.00 2,433.00
C PERALATAN
D Jumlah A + B + C 349,483.00
E Overhead & Profit (contoh 10%) 10% 34,948.30
F Harga Satuan Pekerjaan (D+E) 384,431.30

3 A.5.1.1.5 1 Unit Memasang Wastafel 713,056.30


A Tenaga 215,300.00
L.01 1.200 OH Pekerja 68,000.00 81,600.00
L.02 1.450 OH Tukang Batu 80,000.00 116,000.00
L.03 0.150 OH Kepala Tukang 85,000.00 12,750.00
L.04 0.060 OH Mandor 82,500.00 4,950.00
B Bahan 432,933.00
1.200 Buah Wastafel 320,000.00 384,000.00
0.120 - Perlengkapan 30% Harga Wastafel 320,000.00 38,400.00
6.000 Kg Portland Semen 1,350.00 8,100.00
0.010 m3 Pasir Pasang 243,300.00 2,433.00
C PERALATAN
D Jumlah A + B + C 648,233.00
E Overhead & Profit (contoh 10%) 10% 64,823.30
F Harga Satuan Pekerjaan (D+E) 713,056.30

4 A.5.1.1.16 1 bh Pemasangan Bak Kontrol Pas.Batu Bata 45 x 45 tinggi 50 cm 612,988.20

Page 73 of 221
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp

A Tenaga 311,855.00
L.01 3.200 OH Pekerja 68,000.00 217,600.00
L.02 1.150 OH Tukang Batu 80,000.00 92,000.00
L.03 0.011 OH Kepala Tukang 85,000.00 935.00
L.04 0.016 OH Mandor 82,500.00 1,320.00
B Bahan 245,407.00
70.00 bh Batu Bata 750.00 52,500.00
77.00 kg Semen Portland 1,350.00 103,950.00
0.13 m3 Pasir Pasang 243,300.00 31,629.00
0.09 m3 Pasir Beton Ex Bengawan Solo 270,600.00 24,354.00
0.02 m3 Kerikil 296,700.00 5,934.00
2.60 kg Baja Tulangan 10,400.00 27,040.00
C PERALATAN
D Jumlah A + B + C 557,262.00
E Overhead & Profit (contoh 10%) 10% 55,726.20
F Harga Satuan Pekerjaan (D+E) 612,988.20

5 A.5.1.1.19 1 bh Pemasangan Kran Ø ½" atau Ø ¾" 60,808.00


A Tenaga 36,492.50
L.01 0.010 OH Pekerja 68,000.00 680.00
L.02 0.400 OH Tukang Batu 80,000.00 32,000.00
L.03 0.040 OH Kepala Tukang 85,000.00 3,400.00
L.04 0.005 OH Mandor 82,500.00 412.50
B Bahan 18,787.50
1.00 bh Kran Air 18,750.00 18,750.00
0.0250 bh Sealtape 1,500.00 37.50
C PERALATAN
D Jumlah A + B + C 55,280.00
E Overhead & Profit (contoh 10%) 10% 5,528.00
F Harga Satuan Pekerjaan (D+E) 60,808.00

6 A.5.1.1.26 1 m' Pemasangan Pipa PVC tipe AW Ø ¾" 19,073.18


A Tenaga 7,923.00
L.01 0.036 OH Pekerja 68,000.00 2,448.00
L.02 0.060 OH Tukang Batu 80,000.00 4,800.00
L.03 0.006 OH Kepala Tukang 85,000.00 510.00
L.04 0.002 OH Mandor 82,500.00 165.00
B Bahan 9,416.25
1.20 m' Pipa PVC Ø ¾" 6,075.00 7,290.00
0.35 Ls Perlengkapan 35% x pipa 6,075.00 2,126.25
C PERALATAN
D Jumlah A + B + C 17,339.25
E Overhead & Profit (contoh 10%) 10% 1,733.93
F Harga Satuan Pekerjaan (D+E) 19,073.18

7 A.5.1.1.28 1 m' Pemasangan Pipa PVC tipe AW Ø 1½" 23,118.24


A Tenaga 11,884.50

Page 74 of 221
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp

L.01 0.054 OH Pekerja 68,000.00 3,672.00


L.02 0.090 OH Tukang Batu 80,000.00 7,200.00
L.03 0.009 OH Kepala Tukang 85,000.00 765.00
L.04 0.003 OH Mandor 82,500.00 247.50
B Bahan 9,132.08
1.20 m' Pipa PVC Ø 1½" 5,891.67 7,070.00
0.35 Ls Perlengkapan 35% x pipa 5,891.67 2,062.08
C PERALATAN
D Jumlah A + B + C 21,016.58
E Overhead & Profit (contoh 10%) 10% 2,101.66
F Harga Satuan Pekerjaan (D+E) 23,118.24

8 A.5.1.1.31 1 m' Pemasangan Pipa PVC tipe AW Ø 3" 55,049.36


A Tenaga 17,785.50
L.01 0.081 OH Pekerja 68,000.00 5,508.00
L.02 0.135 OH Tukang Batu 80,000.00 10,800.00
L.03 0.0135 OH Kepala Tukang 85,000.00 1,147.50
L.04 0.004 OH Mandor 82,500.00 330.00
B Bahan 32,259.38
1.20 m' Pipa PVC Ø 3" 20,812.50 24,975.00
0.35 Ls Perlengkapan 35% x pipa 20,812.50 7,284.38
C PERALATAN
D Jumlah A + B + C 50,044.88
E Overhead & Profit (contoh 10%) 10% 5,004.49
F Harga Satuan Pekerjaan (D+E) 55,049.36

9 A.5.1.1.32 1 m' Pemasangan Pipa PVC tipe AW Ø 4" 73,953.55


A Tenaga 17,785.50
L.01 0.081 OH Pekerja 68,000.00 5,508.00
L.02 0.135 OH Tukang Batu 80,000.00 10,800.00
L.03 0.014 OH Kepala Tukang 85,000.00 1,147.50
L.04 0.004 OH Mandor 82,500.00 330.00
B Bahan 49,445.00
1.20 m' Pipa PVC Ø 4" 31,900.00 38,280.00
0.35 Ls Perlengkapan 35% x pipa 31,900.00 11,165.00
C PERALATAN
D Jumlah A + B + C 67,230.50
E Overhead & Profit (contoh 10%) 10% 6,723.05
F Harga Satuan Pekerjaan (D+E) 73,953.55

Blora, 5 Juli 2019


Dibuat oleh,
CV LIMA KARSA
0

Page 75 of 221
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp

RATNO
Direktur

Page 76 of 221
HARGA BAHAN/UPAH JUMLAH

No. SNI KODE KOEF SAT. URAIAN PEKERJAAN


Rp Rp

VIII A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP

1 A.4.5.2.1 1 m2 Pemasangan Atap Genteng Plentong Kecil 54,997.25

A Tenaga 17,497.50

L.01 0.15 OH Pekerja 68,000.00 10,200.00


L.02 0.075 OH Tukang Kayu 80,000.00 6,000.00

L.03 0.0075 OH Kepala Tukang 85,000.00 637.50

L.04 0.008 OH Mandor 82,500.00 660.00

B Bahan 32,500.00
25 Buah Genteng Plentong 1,300.00 32,500.00

C PERALATAN

D Jumlah A + B + C 49,997.50

E Overhead & Profit (contoh 10%) 10% 4,999.75

F Harga Satuan Pekerjaan (D+E) 54,997.25

Overhead & Profit (contoh 10%)


2 A.4.5.2.2 1 m2 Pemasangan Atap Genteng Kodok / Glasur 143,044.00

A Tenaga 17,540.00

L.01 0.15 OH Pekerja 68,000.00 10,200.00

L.02 0.075 OH Tukang Kayu 80,000.00 6,000.00

L.03 0.008 OH Kepala Tukang 85,000.00 680.00


L.04 0.008 OH Mandor 82,500.00 660.00

B Bahan 112,500.00

25 Buah Genteng Kodok / Glasur 4,500.00 112,500.00

C PERALATAN
D Jumlah A + B + C 130,040.00

E Overhead & Profit (contoh 10%) 10% 13,004.00

F Harga Satuan Pekerjaan (D+E) 143,044.00

3 A.4.5.2.3 1 m2 Pemasangan Atap Genteng Plentong Super / Besar 65,494.00

A Tenaga 17,540.00

L.01 0.15 OH Pekerja 68,000.00 10,200.00

L.02 0.075 OH Tukang Kayu 80,000.00 6,000.00

L.03 0.008 OH Kepala Tukang 85,000.00 680.00

L.04 0.008 OH Mandor 82,500.00 660.00

B Bahan 42,000.00

12 Buah Genteng Plentong Super / Besar 3,500.00 42,000.00

C PERALATAN

D Jumlah A + B + C 59,540.00

E Overhead & Profit (contoh 10%) 10% 5,954.00


F Harga Satuan Pekerjaan (D+E) 65,494.00

3 A.4.5.2.3.a 1 m2 Pemasangan Atap Genteng Plentong Super / Besar 1,576,894.00

A Tenaga 17,540.00
L.01 0.15 OH Pekerja 68,000.00 10,200.00

L.02 0.075 OH Tukang Kayu 80,000.00 6,000.00

L.03 0.008 OH Kepala Tukang 85,000.00 680.00

L.04 0.008 OH Mandor 82,500.00 660.00

B Bahan 1,416,000.00

12 Buah Genteng Plentong Super / Besar 118,000.00 1,416,000.00

C PERALATAN

D Jumlah A + B + C 1,433,540.00

E Overhead & Profit (contoh 10%) 10% 143,354.00

F Harga Satuan Pekerjaan (D+E) 1,576,894.00

4 A.4.5.2.4 1 m' Pemasangan Genteng Bubung Plentong 125,015.66

A Tenaga 45,065.00

L.01 0.4 OH Pekerja 68,000.00 27,200.00

L.02 0.2 OH Tukang Kayu 80,000.00 16,000.00


L.03 0.02 OH Kepala Tukang 85,000.00 1,700.00

L.04 0.002 OH Mandor 82,500.00 165.00

B Bahan 68,585.60

5 Buah Genteng Bubung Plentong 10,000.00 50,000.00

8 Kg Portland Semen 1,350.00 10,800.00

0.032 m3 Pasir Pasang 243,300.00 7,785.60

C PERALATAN

D Jumlah A + B + C 113,650.60

E Overhead & Profit (contoh 10%) 10% 11,365.06

F Harga Satuan Pekerjaan (D+E) 125,015.66

5 A.4.5.2.5 1 m' Pemasangan Genteng Bubung Kodok / Glasur 125,015.66

A Tenaga 45,065.00

L.01 0.4 OH Pekerja 68,000.00 27,200.00

L.02 0.2 OH Tukang Kayu 80,000.00 16,000.00


L.03 0.02 OH Kepala Tukang 85,000.00 1,700.00

L.04 0.002 OH Mandor 82,500.00 165.00

B Bahan 68,585.60

5 Buah Genteng Bubung Kodok / Glasur 10,000.00 50,000.00

8 Kg Portland Semen 1,350.00 10,800.00

0.032 m3 Pasir Pasang 243,300.00 7,785.60

C PERALATAN

D Jumlah A + B + C 113,650.60

E Overhead & Profit (contoh 10%) 10% 11,365.06

F Harga Satuan Pekerjaan (D+E) 125,015.66

6 A.4.5.2.6 1 m' Pemasangan Genteng Bubung Plentong Besar 114,015.66

A Tenaga 45,065.00

L.01 0.4 OH Pekerja 68,000.00 27,200.00

L.02 0.2 OH Tukang Kayu 80,000.00 16,000.00


L.03 0.02 OH Kepala Tukang 85,000.00 1,700.00

L.04 0.002 OH Mandor 82,500.00 165.00

B Bahan 58,585.60

4 Buah Genteng Bubung Plentong Besar 10,000.00 40,000.00

8 Kg Portland Semen 1,350.00 10,800.00

0.032 m3 Pasir Pasang 243,300.00 7,785.60

C PERALATAN
D Jumlah A + B + C 103,650.60

E Overhead & Profit (contoh 10%) 10% 10,365.06

F Harga Satuan Pekerjaan (D+E) 114,015.66

7 A.4.5.2.9 1 m2 Pemasangan Atap Asbes Gelombang (2,25x1,02 m) x 5 mm 90,618.00


A Tenaga 16,860.00

L.01 0.14 OH Pekerja 68,000.00 9,520.00

L.02 0.075 OH Tukang Kayu 80,000.00 6,000.00

L.03 0.008 OH Kepala Tukang 85,000.00 680.00


L.04 0.008 OH Mandor 82,500.00 660.00

B Bahan 65,520.00
0.6 Lbr Asbes Gelombang 105,000.00 63,000.00

0.12 Kg Paku Pancing 60 x 230 21,000.00 2,520.00

C PERALATAN

D Jumlah A + B + C 82,380.00
E Overhead & Profit (contoh 10%) 10% 8,238.00

F Harga Satuan Pekerjaan (D+E) 90,618.00

8 A.4.5.2.10 1 m2 Pemasangan Atap Asbes Gelombang (2,00x1,02 m) x 5 mm 78,113.75

A Tenaga 16,292.50
L.01 0.14 OH Pekerja 68,000.00 9,520.00

L.02 0.07 OH Tukang Kayu 80,000.00 5,600.00

L.03 0.007 OH Kepala Tukang 85,000.00 595.00

L.04 0.007 OH Mandor 82,500.00 577.50


B Bahan 54,720.00

0.6 Lbr Asbes Gelombang 87,000.00 52,200.00


0.12 Kg Paku Pancing 60 x 230 21,000.00 2,520.00

C PERALATAN

D Jumlah A + B + C 71,012.50

E Overhead & Profit (contoh 10%) 10% 7,101.25


F Harga Satuan Pekerjaan (D+E) 78,113.75

9 A.4.5.2.12 1 m2 Pemasangan Atap Asbes Gelombang (3,00x1,05 m) x 4 mm 55,343.75

A Tenaga 16,292.50

L.01 0.14 OH Pekerja 68,000.00 9,520.00


L.02 0.07 OH Tukang Kayu 80,000.00 5,600.00

L.03 0.007 OH Kepala Tukang 85,000.00 595.00

L.04 0.007 OH Mandor 82,500.00 577.50

B Bahan 34,020.00
0.35 Lbr Asbes Gelombang 90,000.00 31,500.00

0.12 Kg Paku Pancing 60 x 230 21,000.00 2,520.00


C PERALATAN

D Jumlah A + B + C 50,312.50

E Overhead & Profit (contoh 10%) 10% 5,031.25

F Harga Satuan Pekerjaan (D+E) 55,343.75

10 A.4.5.2.15 1 m2 Pemasangan Atap Asbes Gelombang (2,10x1,05 m) x 5 mm 57,158.75

A Tenaga 16,292.50

L.01 0.14 OH Pekerja 68,000.00 9,520.00


L.02 0.070 OH Tukang Kayu 80,000.00 5,600.00

L.03 0.007 OH Kepala Tukang 85,000.00 595.00

L.04 0.007 OH Mandor 82,500.00 577.50

B Bahan 35,670.00

0.51 Lbr Asbes Gelombang 65,000.00 33,150.00


0.12 Kg Paku Pancing 60 x 230 21,000.00 2,520.00

C PERALATAN

D Jumlah A + B + C 51,962.50

E Overhead & Profit (contoh 10%) 10% 5,196.25


F Harga Satuan Pekerjaan (D+E) 57,158.75

11 A.4.5.2.30 1 m2 Pemasangan Atap Genteng Beton 98,723.90

A Tenaga 23,275.00
L.01 0.2 OH Pekerja 68,000.00 13,600.00

L.02 0.1 OH Tukang Kayu 80,000.00 8,000.00


L.03 0.01 OH Kepala Tukang 85,000.00 850.00

L.04 0.01 OH Mandor 82,500.00 825.00

B Bahan 66,474.00

11 Lbr Genteng Beton Standrad 6,000.00 66,000.00


0.03 Kg Paku Biasa 2" - 5" 15,800.00 474.00

C PERALATAN

D Jumlah A + B + C 89,749.00

E Overhead & Profit (contoh 10%) 10% 8,974.90

F Harga Satuan Pekerjaan (D+E) 98,723.90

12 A.4.5.2.32 1 m2 Pemasangan Atap Genteng Metal 100,292.50

A Tenaga 23,275.00

L.01 0.2 OH Pekerja 68,000.00 13,600.00

L.02 0.1 OH Tukang Kayu 80,000.00 8,000.00


L.03 0.01 OH Kepala Tukang 85,000.00 850.00

L.04 0.01 OH Mandor 82,500.00 825.00

B Bahan 67,900.00

1.30 m2 Genteng Metal 50,000.00 65,000.00

0.20 Kg Paku Biasa Ø ½" - 1" 14,500.00 2,900.00


C PERALATAN

D Jumlah A + B + C 91,175.00

E Overhead & Profit (contoh 10%) 10% 9,117.50

F Harga Satuan Pekerjaan (D+E) 100,292.50

13 A.4.5.2.34 1 m2 Pemasangan Atap Sirap 98,420.30

A Tenaga 34,073.00
L.01 0.166 OH Pekerja 68,000.00 11,288.00
L.02 0.25 OH Tukang Kayu 80,000.00 20,000.00
L.03 0.025 OH Kepala Tukang 85,000.00 2,125.00
L.04 0.008 OH Mandor 82,500.00 660.00
B Bahan 55,400.00

30 Lbr Genteng Sirap 1,750.00 52,500.00

0.2 Kg Paku Biasa 1/2" - 1" 14,500.00 2,900.00

C PERALATAN

D Jumlah A + B + C 89,473.00

E Overhead & Profit (contoh 10%) 10% 8,947.30

F Harga Satuan Pekerjaan (D+E) 98,420.30

14 A.4.5.2.35 1 m' Pemasangan Nok Genteng Beton 153,676.16

A Tenaga 46,550.00
L.01 0.4 OH Pekerja 68,000.00 27,200.00
L.02 0.2 OH Tukang Kayu 80,000.00 16,000.00
L.03 0.02 OH Kepala Tukang 85,000.00 1,700.00
L.04 0.02 OH Mandor 82,500.00 1,650.00
B Bahan 93,155.60

3.5 Buah Nok Genteng Beton 20,000.00 70,000.00

0.05 Kg Paku Biasa 2" - 5" 15,800.00 790.00

10.8 Kg Portland Semen 1,350.00 14,580.00

0.032 m3 Pasir Pasang 243,300.00 7,785.60

1 Kg Semen Warna 11,800.00 11,800.00

C PERALATAN

D Jumlah A + B + C 139,705.60

E Overhead & Profit (contoh 10%) 10% 13,970.56

F Harga Satuan Pekerjaan (D+E) 153,676.16

15 A.4.5.2.37 1 m' Pemasangan Nok Genteng Metal 59,479.75


A Tenaga 31,347.50

L.01 0.250 OH Pekerja 68,000.00 17,000.00

L.02 0.150 OH Tukang Kayu 80,000.00 12,000.00

L.03 0.015 OH Kepala Tukang 85,000.00 1,275.00


L.04 0.013 OH Mandor 82,500.00 1,072.50

B Bahan 22,725.00

1.1 Buah Nok Genteng Metal 20,000.00 22,000.00


0.05 Kg Paku Biasa 1/2" - 1" 14,500.00 725.00

C PERALATAN
D Jumlah A + B + C 54,072.50
E Overhead & Profit (contoh 10%) 10% 5,407.25
F Harga Satuan Pekerjaan (D+E) 59,479.75

16 A.4.5.2.38 1 m' Pemasangan Nok Sirap 51,298.50


A Tenaga 31,120.00
L.01 0.125 OH Pekerja 68,000.00 8,500.00
L.02 0.25 OH Tukang Kayu 80,000.00 20,000.00
L.03 0.025 OH Kepala Tukang 85,000.00 2,125.00
L.04 0.006 OH Mandor 82,500.00 495.00
B Bahan 15,515.00
0.4 Lbr Seng Plaat 3" x 6" BJLS 28 35,000.00 14,000.00
0.05 Kg Paku Biasa 1/2" - 1" 14,500.00 725.00
0.05 Kg Paku Biasa 2" - 5" 15,800.00 790.00

C PERALATAN
D Jumlah A + B + C 46,635.00
E Overhead & Profit (contoh 10%) 10% 4,663.50
F Harga Satuan Pekerjaan (D+E) 51,298.50

17 A.4.5.2.39 1 m2 Pemasangan Atap Seng Gelombang 42,630.50


A Tenaga 13,965.00
L.01 0.12 OH Pekerja 68,000.00 8,160.00
L.02 0.06 OH Tukang Kayu 80,000.00 4,800.00
L.03 0.006 OH Kepala Tukang 85,000.00 510.00
L.04 0.006 OH Mandor 82,500.00 495.00
B Bahan 24,790.00
0.7 Lbr Seng Gelombang 3" x 6" BJLS 28 35,000.00 24,500.00
0.02 Kg Paku Biasa 1/2" - 1" 14,500.00 290.00
C PERALATAN
D Jumlah A + B + C 38,755.00
E Overhead & Profit (contoh 10%) 10% 3,875.50
F Harga Satuan Pekerjaan (D+E) 42,630.50

1 A.4.5.2.39.a 1 m2 Pemasangan Atap Galvalum 188,930.50


A Tenaga 13,965.00
L.01 0.12 OH Pekerja 68,000.00 8,160.00
L.02 0.06 OH Tukang Kayu 80,000.00 4,800.00
L.03 0.006 OH Kepala Tukang 85,000.00 510.00
L.04 0.006 OH Mandor 82,500.00 495.00
B Bahan 157,790.00
0.7 Lbr Galvalum Tb. 3 mm panjang 600 cm 225,000.00 157,500.00
0.02 Kg Paku Biasa 1/2" - 1" 14,500.00 290.00
C PERALATAN
D Overhead & Profit (contoh 10%) 171,755.00
E Harga Satuan Pekerjaan (D+E) 10% 17,175.50
F Harga Satuan Pekerjaan (D+E) 188,930.50

Blora, 5 Juli 2019


Dibuat oleh,
CV LIMA KARSA
0

RAT N O
Direktur

Page 77 of 221
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

VII A.4.1.1 HARGA SATUAN PEKERJAAN BETON

1 A.4.1.1.1 1 m3 Membuat Beton mutu f'c=7,4 Mpa (K100), slum (12±2)cm, w/


A Tenaga
L.01 1.65 OH Pekerja
L.02 0.275 OH Tukang Batu
L.03 0.028 OH Kepala Tukang
L.04 0.083 OH Mandor
B Bahan
247 Kg Portland Semen
869 Kg Pasir Beton
999 Kg Kerikil (maksimum 30 mm)
215 ltr Air
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)
Overhead & Profit (contoh 10%) 10%
2 A.4.1.1.7 1 m3 Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w
A Tenaga
L.01 1.650 OH Pekerja
L.02 0.275 OH Tukang Batu
L.03 0.028 OH Kepala Tukang
L.04 0.083 OH Mandor
B Bahan
371 Kg Portland Semen
698 Kg Pasir Beton
1,047 Kg Kerikil (maksimum 30 mm)
215 ltr Air
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

Page 78 of 221
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

3 A.4.1.1.17 10 Kg Pembesian dg Besi Polos atau Besi Ulir


A Tenaga
L.01 0.07 OH Pekerja
L.02 0.07 OH Tukang Besi
L.03 0.007 OH Kepala Tukang
L.04 0.004 OH Mandor
B Bahan
10.50 Kg Besi Beton (polos/ulir)
0.150 Kg Kawat Beton
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

Page 79 of 221
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

4 A.4.1.1.17.a 1 Kg Pembesian dg Besi Polos atau Besi Ulir


A Tenaga
L.01 0.0070 OH Pekerja
L.02 0.0070 OH Tukang Besi
L.03 0.0007 OH Kepala Tukang
L.04 0.0004 OH Mandor
B Bahan
1.050 Kg Besi Beton (polos/ulir)
0.015 Kg Kawat Beton
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

Page 80 of 221
HARGA BAHAN/UPAH JUMLAH

Rp Rp

mutu f'c=7,4 Mpa (K100), slum (12±2)cm, w/c = 0,87 Err:509


Err:509
68,000.00 112,200.00
80,000.00 22,000.00
Err:509 Err:509
82,500.00 6,847.50
731,723.29
1,350.00 333,450.00
193.29 167,965.29
219.78 219,558.00
50.00 10,750.00

Err:509
Err:509
Err:509

mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 Err:509


Err:509
68,000.00 112,200.00
80,000.00 22,000.00
Err:509 Err:509
82,500.00 6,847.50
876,620.76
1,350.00 500,850.00
193.29 134,913.43
219.78 230,107.33
50.00 10,750.00

Err:509
Err:509
Err:509

Page 81 of 221
HARGA BAHAN/UPAH JUMLAH

Rp Rp

Err:509
Err:509
68,000.00 4,760.00
80,000.00 5,600.00
Err:509 Err:509
82,500.00 330.00
111,543.75
10,400.00 109,200.00
15,625.00 2,343.75

Err:509
Err:509
Err:509

Page 82 of 221
HARGA BAHAN/UPAH JUMLAH

Rp Rp

Err:509
Err:509
68,000.00 476.00
80,000.00 560.00
Err:509 Err:509
82,500.00 33.00
11,154.38
10,400.00 10,920.00
15,625.00 234.38

Err:509
Err:509
Err:509

Blora, 5 Juli 2019


Dibuat oleh,
CV LIMA KARSA
0

RATNO
Direktur

Page 83 of 221
HARGA BAHAN/UPAH JUMLAH

No. SNI KODE KOEF SAT. URAIAN PAKERJAAN


Rp Rp

V A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN

1 A.4.4.2.5 1 m2 Pemasangan Plesteran 1 Pc : 5 Pp Tebal 15 mm Err:509


A Tenaga Err:509

L.01 0.3 OH Pekerja 68,000.00 20,400.00

L.02 0.15 OH Tukang batu 80,000.00 12,000.00

L.03 0.015 OH Kepala Tukang Err:509 Err:509

L.04 0.015 OH Mandor 82,500.00 1,237.50


B Bahan 13,324.20
5.184 Kg Portland Semen 1,350.00 6,998.40
0.026 m3 Pasir Pasang 243,300.00 6,325.80
C PERALATAN
D Jumlah A + B + C Err:509
E Overhead & Profit (contoh 10%) 10% Err:509
F Harga Satuan Pekerjaan (D+E) Err:509

2 A.4.4.2.27 1 m2 Pemasangan Acian Err:509

Tenaga Err:509

L.01 0.20 OH Pekerja 68,000.00 13,600.00

L.02 0.10 OH Tukang batu 80,000.00 8,000.00

L.03 0.010 OH Kepala Tukang Err:509 Err:509

L.04 0.010 OH Mandor 82,500.00 825.00


Bahan 4,387.50
3.25 Kg Portland Semen 1,350.00 4,387.50
C PERALATAN
D Jumlah A + B + C Err:509
E Overhead & Profit (contoh 10%) 10% Err:509
F Harga Satuan Pekerjaan (D+E) Err:509

Blora, 5 Juli 2019


Dibuat oleh,
CV LIMA KARSA
0

RATNO
Direktur

Page 84 of 221
HARG
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

IV A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING

1 A.4.4.1.10 1 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm


Camp. 1SP : 5PP

A Tenaga
L.01 0.30 OH Pekerja
L.02 0.1 OH Tukang Batu
L.03 0.01 OH Kepala Tukang
L.04 0.015 OH Mandor
B Bahan
70 Buah Bata Merah 5 x 11 x 22
9.68 Kg Portland Semen
0.045 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

2 A.4.4.1.21 (b) 1 m2 Pasang dinding partisi gypsum 2 muka (luar dalam) / m


A Tenaga
L.01 0.2500 OH Tukang Kayu
L.02 0.0250 OH Kepala Tukang Kayu
L.03 0.0600 OH Pekerja
L.04 0.0080 OH Mandor
B Bahan
0.7290 lbr Gypsum 9 mm (Elepant, Jaya board)
0.5455 m' Rangka Metal (Hollow 40.40.0,4 mm)
1.4545 m1 Rangka metal stud (MS 100) uk.100x34 mm
0.7500 m1 Rangka U runner (U 100) uk.100x30 mm
8.0000 bh Paku rivet
4.0000 m1 Plester sambungan gypsum
0.5000 kg Kompon gypsum

Page 85 of 221
HARG
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

16.0000 bh Sekrup gypsum


C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

3 A.4.4.3.65 1 m2 Pemasangan 1 M2 Paving Block K300 tebal 8 Cm


m2 Tenaga
0 0.50 OH Pekerja
L.01 0.5 OH Tukang Batu
L.02 0.05 OH Kepala Tukang
L.03 0.0013 OH Mandor
OH Bahan
1 m2 Paving Block K 300 tebal 8 Cm
0.05 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

Page 86 of 221
HARG
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

4 A.4.4.3.66 1 m' Pasang Kansteen Beton 10-20-40

No. Uraian Kode Satuan Koefisien

A. TENAGA
Pekerja L.01 OH 0.1375
Tukang Batu L.02 OH 0.0375
Kepala Tukang L.03 OH 0.0075
Mandor L.04 OH 0.0038
JUMLAH TE
B. BAHAN
Kansteen 40 (10-20-40) bh 2.5000
Pasir Urug m3 0.0050
JUMLAH H
C. PERALATAN

JUMLAH HARGA
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C
E. Overhead & Keuntungan 10.00%
F. Harga satuan pekerjaan (D+E)

Page 87 of 221
HARGA BAHAN/UPAH JUMLAH

Rp Rp

A SATUAN PEKERJAAN PASANGAN DINDING

angan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Err:509
1SP : 5PP

Err:509
68,000.00 20,400.00
80,000.00 8,000.00
Err:509 Err:509
82,500.00 1,237.50
76,516.50
750.00 52,500.00
1,350.00 13,068.00
243,300.00 10,948.50

Err:509
Err:509
Err:509

g dinding partisi gypsum 2 muka (luar dalam) / m2 Err:509


Err:509
68,000.00 17,000.00
80,000.00 2,000.00
Err:509 Err:509
82,500.00 660.00
130,619.48
74,000.00 53,946.00
6,300.00 3,436.36
26,133.33 38,012.12
24,366.67 18,275.00
1,000.00 8,000.00
1,000.00 4,000.00
3,500.00 1,750.00

Page 88 of 221
HARGA BAHAN/UPAH JUMLAH

Rp Rp
200.00 3,200.00

Err:509
Err:509
Err:509

Err:509
Err:509
68,000.00 34,000.00
80,000.00 40,000.00
Err:509 Err:509
82,500.00 107.25
85,250.00
75,000.00 75,750.00
190,000.00 9,500.00

Err:509
Err:509
Err:509

Page 89 of 221
HARGA BAHAN/UPAH JUMLAH

Rp Rp

Harga Satuan Jumlah Harga


(Rp) (Rp)

68,000.00 9,350.00
80,000.00 3,000.00
Err:509 Err:509
82,500.00 313.50
JUMLAH TENAGA KERJA Err:509

16,000.00 40,000.00
151,400.00 757.00
JUMLAH HARGA BAHAN 40,757.00

-
JUMLAH HARGA PERALATAN -
(A+B+C) Err:509
xD Err:509
(D+E) Err:509

Blora, 5 Juli 2019


Dibuat oleh,
CV LIMA KARSA
0

RATNO
Direktur

Page 90 of 221
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN
Rp Rp
III A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI

1 A.3.2.1.3 1 m3 Pemasangan Pondasi Batu Belah 1SP : 5 PP Err:509


A TENAGA Err:509
L.01 1.5 OH Pekerja 68,000.00 102,000.00
L.02 0.750 OH Tukang Batu 80,000.00 60,000.00
L.03 0.075 OH Kepala Tukang Err:509 Err:509
L.04 0.075 OH Mandor 82,500.00 6,187.50
B BAHAN 522,835.20
1.2 m3 Batu Belah 172,400.00 206,880.00
136 Kg Portland Sement 1,350.00 183,600.00
0.544 m3 Pasir Pasang 243,300.00 132,355.20
C PERALATAN
D Jumlah A + B + C Err:509
E Overhead & Profit (contoh 10%) 10% Err:509
F Harga Satuan Pekerjaan (D+E) Err:509

2 A.3.2.1.9 1 m3 Pemasang Batu Kosong/Anstamping Err:509


A Tenaga Err:509
L.01 0.78 OH Pekerja 68,000.00 53,040.00
L.02 0.39 OH Tukang Batu 80,000.00 31,200.00
L.03 0.039 OH Kepala Tukang Err:509 Err:509
L.04 0.039 OH Mandor 82,500.00 3,217.50
B Bahan 272,284.80
1.2 m3 Batu Belah 172,400.00 206,880.00
0.432 m3 Pasir Urug 151,400.00 65,404.80
C PERALATAN
D Jumlah A + B + C Err:509
E Overhead & Profit (contoh 10%) 10% Err:509
F Harga Satuan Pekerjaan (D+E) Err:509

Blora, 5 Juli 2019


Dibuat oleh,
CV LIMA KARSA
0

RATNO
Direktur

Page 91 of 221
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

Rp Rp
II A.2.3.1 HARGA SATUAN PEKERJAAN TANAH

1 A.2.3.1.1 1 m3 Menggali Tanah Biasa Sedalam 1 m 58,368.75


A TENAGA 53,062.50
L.01 0.75 OH Pekerja 68,000.00 51,000.00
L.04 0.025 OH Mandor 82,500.00 2,062.50
B BAHAN
C PERALATAN
D Jumlah A + B + C 53,062.50
E Overhead & Profit (contah 10%) 10% 5,306.25
F Harga Satuan Pekerjaan (D+E) 58,368.75

Overhead & Profit (contah 10%)


2 A.2.3.1.3 1 m3 Menggali Tanah Biasa Sedalam 3 m 84,620.25
A TENAGA 76,927.50
L.01 1.05 OH Pekerja 68,000.00 71,400.00
L.04 0.067 OH Mandor 82,500.00 5,527.50
B BAHAN
C PERALATAN
D Jumlah A + B + C 76,927.50
E Overhead & Profit (contah 10%) 10% 7,692.75
F Harga Satuan Pekerjaan (D+E) 84,620.25

3 A.2.3.1.9 1 m3 Pengurugan Kembali


Pengurugan Kembali di hitung dari 1/3 kali koefisien Pekerjaan galian
A TENAGA 25,642.50
L.01 0.35 OH Pekerja 68,000.00 23,800.00
L.04 0.022 OH Mandor 82,500.00 1,842.50
B BAHAN
C PERALATAN
D Jumlah A + B + C 25,642.50
E Overhead & Profit (contah 10%) 10% 2,564.25
F Harga Satuan Pekerjaan (D+E) 28,206.75

4 A.2.3.1.9.A 1 m3 Pengurugan Kembali


Pengurugan Kembali di hitung dari 1/3 kali koefisien Pekerjaan galian
A TENAGA 17,687.50
L.01 0.25 OH Pekerja 68,000.00 17,000.00
L.04 0.008 OH Mandor 82,500.00 687.50
B BAHAN
C PERALATAN
D Jumlah A + B + C 17,687.50
E Overhead & Profit (contah 10%) 10% 1,768.75
F Harga Satuan Pekerjaan (D+E) 19,456.25

5 A.2.3.1.10 1 m3 Pemadatan Tanah (per 20 cm) 41,937.50


A TENAGA 38,125.00
L.01 0.5 OH Pekerja 68,000.00 34,000.00

Page 92 of 221
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

Rp Rp
L.04 0.05 OH Mandor 82,500.00 4,125.00
B BAHAN
C PERALATAN
D Jumlah A + B + C 38,125.00
E Overhead & Profit (contah 10%) 10% 3,812.50
F Harga Satuan Pekerjaan (D+E) 41,937.50

6 A.2.3.1.11 1 m3 Urugan Pasir 223,195.50


A TENAGA 21,225.00
L.01 0.30 OH Pekerja 68,000.00 20,400.00
L.04 0.01 OH Mandor 82,500.00 825.00
B BAHAN 181,680.00
1.2 m3 Pasir Urug 151,400.00 181,680.00
C PERALATAN
D Jumlah A + B + C 202,905.00
E Overhead & Profit (contah 10%) 10% 20,290.50
F Harga Satuan Pekerjaan (D+E) 223,195.50

7 A.2.3.1.11.a 1 m3 Urugan Grosok 221,347.50


OH Mandor 21,225.00
L.01 0.30 OH Pekerja 68,000.00 20,400.00
L.04 0.01 OH Mandor 82,500.00 825.00
C PERALATAN 180,000.00
1.2 m3 Grosok 150,000.00 180,000.00
C PERALATAN
D Overhead & Profit (contah 10%) 201,225.00
E Harga Satuan Pekerjaan (D+E) 10% 20,122.50
F Harga Satuan Pekerjaan (D+E) 221,347.50

8 A.2.3.1.14.A 1 m3 Mengurug tanah pilihan (tanah merah) 86,968.75


A TENAGA 19,062.50
0.25 OH Pekerja 68,000.00 17,000.00
0.025 OH Mandor 82,500.00 2,062.50
B BAHAN 60,000.00
1.2 m3 Tanah Pilihan (Merah) 50,000.00 60,000.00
C PERALATAN
D Jumlah A + B + C 79,062.50
E Overhead & Profit (contah 10%) 10% 7,906.25
F Harga Satuan Pekerjaan (D+E) 86,968.75

Blora, 5 Juli 2019


Dibuat oleh,
CV LIMA KARSA
0

Page 93 of 221
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

Rp Rp

RATNO
Direktur

Page 94 of 221
ANALISA DIHITUNG

HARGA
JUMLAH
No. KODE KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
C HITUNG BETON
1 Hitung A - 01 1.0000 m2 Memasang Bekisting untuk Pondasi 70,298.42
A Tenaga 20,177.65
L.01 0.1733 OH Pekerja 68,000.00 11,784.40
L.02 0.0867 OH Tukang Kayu 80,000.00 6,936.00
L.03 0.0087 OH Kepala Tukang 85,000.00 739.50
L.04 0.0087 OH Mandor 82,500.00 717.75
B Bahan 43,730.00
0.0228 m3 Papan Kayu Begisting 1,800,000.00 41,040.00
0.1000 Kg Paku Biasa 2" - 5" 15,800.00 1,580.00
0.1000 Ltr Minyak Bekisting 11,100.00 1,110.00
C PERALATAN
D Jumlah A + B + C 63,907.65
E Overhead & Profit 10% 6,390.77
F Harga Satuan Pekerjaan (D+E) 70,298.42

2 Hitung A - 02 1.0000 m2 Memasang Bekisting untuk Sloof 70,298.42


A Tenaga 20,177.65
L.01 0.1733 OH Pekerja 68,000.00 11,784.40
L.02 0.0867 OH Tukang Kayu 80,000.00 6,936.00
L.03 0.0087 OH Kepala Tukang 85,000.00 739.50
L.04 0.0087 OH Mandor 82,500.00 717.75
B Bahan 43,730.00
0.0228 m3 Papan Kayu Begisting 1,800,000.00 41,040.00
0.1000 Kg Paku Biasa 2" - 5" 15,800.00 1,580.00
0.1000 Ltr Minyak Bekisting 11,100.00 1,110.00
C PERALATAN
D Jumlah A + B + C 63,907.65
E Overhead & Profit 10% 6,390.77
F Harga Satuan Pekerjaan (D+E) 70,298.42

3 Hitung A - 03 1.0000 m2 Memasang Bekisting untuk Kolom 128,479.08


A Tenaga 76,807.50
L.01 0.6600 OH Pekerja 68,000.00 44,880.00
L.02 0.3300 OH Tukang Kayu 80,000.00 26,400.00
L.03 0.0330 OH Kepala Tukang 85,000.00 2,805.00
L.04 0.0330 OH Mandor 82,500.00 2,722.50
B Bahan 39,991.67
0.0000 m3 Papan Kayu Begisting 1,800,000.00 -
0.2667 Kg Paku Biasa 2" - 5" 15,800.00 4,213.33
0.2000 Ltr Minyak Bekisting 11,100.00 2,220.00
0.0038 m3 Balok Kayu Klas III 1,800,000.00 6,750.00
0.1167 Lbr Plywood tebal 9mm 115,500.00 13,475.00
0.6667 Btg Bambu 20,000.00 13,333.33
C PERALATAN
D Jumlah A + B + C 116,799.17
E Overhead & Profit 10% 11,679.92
F Harga Satuan Pekerjaan (D+E) 128,479.08

4 Hitung A - 04 1.0000 m2 Memasang Bekisting untuk Kolom Praktis 72,098.75


A Tenaga 20,177.65
L.01 0.1733 OH Pekerja 68,000.00 11,784.40
L.02 0.0867 OH Tukang Kayu 80,000.00 6,936.00
L.03 0.0087 OH Kepala Tukang 85,000.00 739.50
L.04 0.0087 OH Mandor 82,500.00 717.75
B Bahan 45,366.67
0.0228 m3 Papan Kayu Begisting 1,800,000.00 41,040.00
0.1333 Kg Paku Biasa 2" - 5" 15,800.00 2,106.67
0.2000 Ltr Minyak Bekisting 11,100.00 2,220.00
C PERALATAN
D Jumlah A + B + C 65,544.32
E Overhead & Profit 10% 6,554.43

Page 95 of 221
HARGA
JUMLAH
No. KODE KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
F Harga Satuan Pekerjaan (D+E) 72,098.75

5 Hitung A - 05 1.0000 m2 Memasang Bekisting untuk Balok 132,934.08


A Tenaga 76,807.50
L.01 0.6600 OH Pekerja 68,000.00 44,880.00
L.02 0.3300 OH Tukang Kayu 80,000.00 26,400.00
L.03 0.0330 OH Kepala Tukang 85,000.00 2,805.00
L.04 0.0330 OH Mandor 82,500.00 2,722.50
B Bahan 44,041.67
0.0000 m3 Papan Kayu Begisting 1,800,000.00 -
0.2667 Kg Paku Biasa 2" - 5" 15,800.00 4,213.33
0.2000 Ltr Minyak Bekisting 11,100.00 2,220.00
0.0060 m3 Balok Kayu Klas III 1,800,000.00 10,800.00
0.1167 Lbr Plywood tebal 9mm 115,500.00 13,475.00
0.6667 Btg Bambu 20,000.00 13,333.33
C PERALATAN
D Jumlah A + B + C 120,849.17
E Overhead & Profit 10% 12,084.92
F Harga Satuan Pekerjaan (D+E) 132,934.08

6 Hitung A - 06 1.0000 m2 Memasang Bekisting untuk Lantai 219,199.75


A Tenaga 76,807.50
L.01 0.6600 OH Pekerja 68,000.00 44,880.00
L.02 0.3300 OH Tukang Kayu 80,000.00 26,400.00
L.03 0.0330 OH Kepala Tukang 85,000.00 2,805.00
L.04 0.0330 OH Mandor 82,500.00 2,722.50
B Bahan 122,465.00
0.0000 m3 Papan Kayu Begisting 1,800,000.00 -
0.4000 Kg Paku Biasa 2" - 5" 15,800.00 6,320.00
0.2000 Ltr Minyak Bekisting 11,100.00 2,220.00
0.0075 m3 Balok Kayu Klas III 1,800,000.00 13,500.00
0.3500 Lbr Plywood tebal 9mm 115,500.00 40,425.00
3.0000 Btg Bambu 20,000.00 60,000.00
C PERALATAN
D Jumlah A + B + C 199,272.50
E Overhead & Profit 10% 19,927.25
F Harga Satuan Pekerjaan (D+E) 219,199.75

7 Hitung A - 07 1.0000 m2 Memasang Bekisting untuk Tangga 174,589.25


A Tenaga 76,807.50
L.01 0.6600 OH Pekerja 68,000.00 44,880.00
L.02 0.3300 OH Tukang Kayu 80,000.00 26,400.00
L.03 0.0330 OH Kepala Tukang 85,000.00 2,805.00
L.04 0.0330 OH Mandor 82,500.00 2,722.50
B Bahan 81,910.00
0.0000 m3 Papan Kayu Begisting 1,800,000.00 -
0.4000 Kg Paku Biasa 2" - 5" 15,800.00 6,320.00
0.1500 Ltr Minyak Bekisting 11,100.00 1,665.00
0.0075 m3 Balok Kayu Klas III 1,800,000.00 13,500.00
0.3500 Lbr Plywood tebal 9mm 115,500.00 40,425.00
1.0000 Btg Bambu 20,000.00 20,000.00
C PERALATAN
D Jumlah A + B + C 158,717.50
E Overhead & Profit 10% 15,871.75
F Harga Satuan Pekerjaan (D+E) 174,589.25

Blora, 5 Juli 2019


Dibuat oleh,
CV LIMA KARSA
0

RATNO
Direktur

Page 96 of 221
DAFTAR ANALISA PE K E R JAAN

0 : 0
0 : 0

No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

Err:509 A. 2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


1 A.2.2.1.2 1 m' Pagar Sementara dari Seng Gelombang Tinggi 2,00 m
A TENAGA
L.01 0.2 OH Pekerja
L.02 0.4 OH Tukang Kayu
L.03 0.02 OH Kepala Tukang
L.04 0.02 OH Mandor
B BAHAN
1.25 Btg Kayu Dolken diameter 8 - 10 / 400 cm
2.5 Kg Portland Semen
1.2 Lbr Seng Gelombang 3" - 5"
0.005 m3 Pasir Beton
0.009 m3 Koral Beton
0.072 m3 Kayu 5/7X4m Kayu Kruing
0.06 Kg Paku Biasa 2" - 5"
0.45 Kg Meni Besi
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contah 10%) 10%
F Harga Satuan Pekerjaan (D+E)
Overhead & Profit (contah 10%)

2 A.2.2.1.4 1 m' Pengukuran dan Pemasangan Bouwplank


A Tenaga
L.01 0.1 OH Pekerja
L.02 0.1 OH Tukang Kayu
L.03 0.01 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
0.012 m3 Kayu 5/7x 4m Kayu Kruing
0.02 Kg Paku Biasa 2" - 5"
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

0.007 m3 Kayu Papan 3/20 Kruing


C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contah 10%) 10%
F Harga Satuan Pekerjaan (D+E)

3 A.2.2.1.5 1 m2 Pembuatan Kantor Sementara dg Lantai Plesteran


A Tenaga
L.01 2 OH Pekerja
L.02 2 OH Tukang Kayu
L.02 1 OH Tukang Batu
L.03 0.3 OH Kepala Tukang
L.04 0.05 OH Mandor
B Bahan
1.25 Btg Kayu Dolken Ø 8 - 10 / 4 m
0.18 m3 Kayu
0.08 Kg Paku Biasa 2" - 5"
1.1 Kg Besi Strip
35 Kg Portland Sement
0.15 m3 Pasir pasang
0.1 m3 Pasir Beton
0.15 m3 Koral Beton
30 buah Batu bata Merah
0.25 Lbr Seng Plat
0.20 buah Jendela Naco
0.08 m2 Kaca Polos
0.15 buah Kunci Tanam
- buah Engsel
0.06 Lbr Plywood 4 mm
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contah 10%) 10%
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

F Harga Satuan Pekerjaan (D+E)

4 A.2.2.1.7 1 m2 Pembuatan Gudang Semen dan Peralatan


A Tenaga
L.01 1 OH Pekerja
L.02 2 OH Tukang Kayu
L.03 0.2 OH Kepala Tukang
L.04 0.05 OH Mandor
B Bahan
1.7 Btg Kayu Dolken diameter 8 - 10 / 400 cm
0.21 m3 Kayu
0.3 Kg Paku Biasa 2" - 5"
10.5 Kg Portland Semen
0.03 m3 Pasir Beton
0.05 m3 Koral Beton
1.50 Lbr Seng Gelombang BJLS 32
0.25 Lbr Seng pelat
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contah 10%) 10%

F Harga Satuan Pekerjaan (D+E)

5 A.2.2.1.9 1 m2 Membersihkan Lapangan dan Perataan


A Tenaga
L.01 0.1 OH Pekerja
L.04 0.05 OH Mandor
B Bahan
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contah 10%) 10%

F Harga Satuan Pekerjaan (D+E)

6 A.2.2.1.10 1 m2 Pembuatan Steger/Perancah dari Bambu


A Tenaga
L.01 1.00 OH Pekerja
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

L.02 2.00 OH Tukang Kayu


L.03 0.200 OH Kepala Tukang
L.04 0.0500 OH Mandor
B Bahan
1.250 Btg Bambu diameter 6 - 8 / 600 cm
0.186 Kg Tali Ijuk
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contah 10%) 10%

F Harga Satuan Pekerjaan (D+E)

7 A.2.2.1.11 1 bh Pembuatan Kotak Adukan ukuran 40cmx50cmx25cm


A Tenaga
L.02 0.300 OH Tukang Kayu
L.03 0.030 OH Kepala Tukang
B Bahan
0.036 m3 Kayu Papan Kelas III
0.014 m3 Kayu balok 5/7 kelas III
0.080 kg Paku Biasa

C PERALATAN

D Jumlah A + B + C
E Overhead & Profit (contah 10%) 10%

F Harga Satuan Pekerjaan (D+E)

8 A.2.2.1.13 1 m3 Bongkaran Beton Bertulang


A Tenaga
L.02 13.334 OH Pekerja
L.04 0.666 OH Mandor
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

B Bahan
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contah 10%) 10%

F Harga Satuan Pekerjaan (D+E)

9 A.2.2.1.14 1 m3 Bongkaran Dinding Tembok Bata Merah


B Tenaga
L.02 6.667 OH Pekerja
L.04 0.333 OH Mandor
B Bahan
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contah 10%) 10%

F Harga Satuan Pekerjaan (D+E)


ANALISA PE K E R JAAN

HARGA BAHAN/UPAH JUMLAH

Rp Rp

ara dari Seng Gelombang Tinggi 2,00 m 711,173.76


48,950.00
68,000.00 13,600.00
80,000.00 32,000.00
85,000.00 1,700.00
82,500.00 1,650.00
597,571.60
32,000.00 40,000.00
1,360.00 3,400.00
53,000.00 63,600.00
340,000.00 1,700.00
296,700.00 2,670.30
6,545,400.00 471,268.80
14,500.00 870.00
31,250.00 14,062.50

646,521.60
64,652.16
711,173.76

159,827.03
16,062.50
68,000.00 6,800.00
80,000.00 8,000.00
85,000.00 850.00
82,500.00 412.50
129,234.80
6,545,400.00 78,544.80
14,500.00 290.00
HARGA BAHAN/UPAH JUMLAH

Rp Rp
7,200,000.00 50,400.00

145,297.30
14,529.73
159,827.03

2,035,337.70
405,625.00
68,000.00 136,000.00
80,000.00 160,000.00
80,000.00 80,000.00
85,000.00 25,500.00
82,500.00 4,125.00
1,444,682.00
32,000.00 40,000.00
6,545,400.00 1,178,172.00
14,500.00 1,160.00
10,400.00 11,440.00
1,360.00 47,600.00
243,300.00 36,495.00
340,000.00 34,000.00
296,700.00 44,505.00
750.00 22,500.00
20,000.00 5,000.00
25,000.00 5,000.00
73,125.00 5,850.00
60,000.00 9,000.00
17,500.00 -
66,000.00 3,960.00

1,850,307.00
185,030.70
HARGA BAHAN/UPAH JUMLAH

Rp Rp
2,035,337.70

1,986,846.40
249,125.00
68,000.00 68,000.00
80,000.00 160,000.00
85,000.00 17,000.00
82,500.00 4,125.00
1,557,099.00
32,000.00 54,400.00
6,545,400.00 1,374,534.00
14,500.00 4,350.00
1,360.00 14,280.00
340,000.00 10,200.00
296,700.00 14,835.00
53,000.00 79,500.00
20,000.00 5,000.00

1,806,224.00
180,622.40
1,986,846.40

12,017.50
10,925.00
68,000.00 6,800.00
82,500.00 4,125.00

10,925.00
1,092.50
12,017.50

302,765.10
249,125.00
68,000.00 68,000.00
HARGA BAHAN/UPAH JUMLAH

Rp Rp
80,000.00 160,000.00
85,000.00 17,000.00
82,500.00 4,125.00
26,116.00
20,000.00 25,000.00
6,000.00 1,116.00

275,241.00
27,524.10
302,765.10

416,400.16
26,550.00
80,000.00 24,000.00
85,000.00 2,550.00
351,995.60
7,200,000.00 259,200.00
6,545,400.00 91,635.60
14,500.00 1,160.00

378,545.60
37,854.56
416,400.16

1,057,822.70
961,657.00
68,000.00 906,712.00
82,500.00 54,945.00
HARGA BAHAN/UPAH JUMLAH

Rp Rp

961,657.00
96,165.70
1,057,822.70

528,911.35
480,828.50
68,000.00 453,356.00
82,500.00 27,472.50

480,828.50
48,082.85
528,911.35
DAFTAR HARGA SATUAN BAHAN BANGUNAN

Nama Kegiatan : Pembangunan Puskesmas

Lokasi : Dinas Kesehatan Kabupaten B


Sumber Dana : APBD 2019
Tahun Anggaran : 2019

HARGA
NO. J E N I S B A H A N SATUAN
(Rp)

BAHAN DASAR
1 Bulat Belah Putih m3 172,400
2 Kerikil Beton ,2/3 m3 296,700
3 Batu bata ex lokal bh 750
4 Expose bh 1,500
5 Pasir Urug m3 151,400
6 Pasir Pasang m3 243,300
7 Pasir Pasang Cukup m3 190,000
8 Beton Kasar Ex.Bengawan Solo m3 270,600
9 Tanah Pilihan (Grosok ) m3 150,000
10 Tanah Pilihan (Merah) m3 50,000
11 Portland Cement Merk I 40 kg zak 54,000
12 Semen warna kg 11,800

BAHAN PENUTUP ATAP


1 Galvalum Tb. 3 mm panjang 600 cm lbr 225,000

BAHAN PENUTUP DINDING / LANTAI


1 Granito 60 x 60 cm (Lokal) m2 124,800

BAHAN BESI
1 besi beton ulir kg 10,400
2 Besi Profil L 4 x 0,2 mm kg 12,500
3 BESI PROFIL "L" ATAU "C" kg 12,500
4 KAWAT - Ikat beton/bendrat kg 15,625

Page 107 of 221


HARGA
NO. J E N I S B A H A N SATUAN
(Rp)

BAHAN PIPA
1 Pipa PVC DN 25 ( ¾" ) AW JIS btg 24,300
2 Pipa PVC DN 40 ( 1½" ) btg 35,350
3 Pipa PVC DN 90 ( 3" ) btg 83,250
4 Pipa PVC DN 110 ( 4" ) btg 127,600

BAHAN LANGIT-LANGIT
1 Gypsum tebal 9 mm (Elepant & Jaya Board) lbr 74,000

BAHAN FINISHING
1 Cat dasar kg 38,000
2 Plamur kg 14,000
3 Cat Tembok Baik kg 90,000
4 Menie Besi kg 31,250
5 Lem Aica Aibon kg 32,000

BAHAN KACA
1 Kaca Polos 5 mm m2 89,000

BAHAN SANITAIR
1 KLOSET DUDUK bh 1,400,000
2 KLOSET JONGKOK bh 125,000
3 WASTAFEL GANTUNG BULAT bh 320,000
4 Kran Air bh 18,750
5 Seal tape bh 1,500
6 Floor drain bh 10,000

ALAT PENGIKAT KAYU


1 PAKU - ukuran 1" s/d 4" kg 14,500

PAVING BLOCK
1 Paving Block K. 300 ( 8 cm) m2 75,000
2 Kansteen 40 (40 x 20 x 10) bh 16,000

LAIN - LAIN
1 Kusen Almunium 4" Putih m' 100,000
2 Skrup Fixer buah 750
3 Sealant kg 20,000
4 Air m3 50,000
5 Rangka Metal (Hollow 40.40.0,4 mm) m' 6,300
6 Rangka metal stud (MS 100) uk.100x34 mm m1 26,133
7 Rangka U runner (U 100) uk.100x30 mm m1 24,367
8 Paku rivet bh 1,000
9 Plester sambungan gypsum m1 1,000
10 Kompon gypsum kg 3,500
11 Sekrup gypsum bh 200

Page 108 of 221


HARGA
NO. J E N I S B A H A N SATUAN
(Rp)

Blora, 5 Juli 2019


Dibuat oleh,
CV LIMA KARSA
0

RATNO
Direktur

Page 109 of 221


GA SATUAN BAHAN BANGUNAN

Pembangunan Puskesmas

Dinas Kesehatan Kabupaten Blora

KETERANGAN

Page 110 of 221


KETERANGAN

panjang 4 m
panjang 4 m
panjang 4 m
panjang 4 m

Page 111 of 221


LAMPIRAN : KEPUTUSAN BUPAT
NOMOR / /
TANGGAL,

DAFTAR SATUAN BIAYA UPAH DAN BAHAN MATERIAL


UNTUK PEKERJAAN KONSTRUKSI
DI KABUPATEN BLORA TAHUN 2017

No Uraian Satuan

1 2 3

I UPAH TENAGA KERJA

1 Pekerja OH
2 Tukang OH
3 Kepala Tukang OH
4 Kepala Tukang Batu OH
5 Kepala Tukang Besi OH
6 Kepala Tukang Cat OH
7 Kepala Tukang Gali OH
8 Kepala Tukang Kayu OH
9 Kepala Tukang Ledeng OH
10 Kepala Tukang Plitur OH
11 Mandor OH
12 Juru ukur OH
13 Pembantu Juru ukur OH
14 Operator OH
15 Pembantu operator/mekanik alat berat OH
16 Mekanik/Teknisi alat berat OH
17 Pembantu mekanik/Teknisi alat berat OH
18 Supir truck OH
19 Supir kendaraan < 2 ton (termasuk sedan) OH
20 Pembantu Sopir/Kenek OH
21 Penjaga malam/Satpam OH
22 Tukang OH
23 Tukang Batu OH
24 Tukang Besi OH
25 Tukang Cat OH
26 Tukang Gali OH
27 Tukang Kayu OH
28 Tukang Las OH
29 Tukang Ledeng OH
30 Tukang Plitur OH
31 Drafter CAD/manual OH
32 Desain Engineer OH
33 Operator komputer/printer/ploter OH
34 Akhli muda OH
35 Akhli madya OH
36 Akhli utama OH

II DAFTAR HARGA SATUAN KEGIATAN JASA KONSULTANSI


A. BIAYA LANGSUNG NON PERSONIL
1 Biaya sewa Kendaraan Kerja
- Roda Dua bulan
- Roda Empat bulan
2 Biaya Komunikasi bulan
3 Biaya Pelaporan
- Laporan Akhir Set
- Laporan Bulanan Set
4 Biaya Sewa Alat-alat Kantor
- Biaya Sewa Komputer bulan
- Biaya Sewa Mesin Gambar bulan
5 Biaya Alat Tulis bulan

B. BIAYA LANGSUNG PERSONIL


1 Office Manager bulan
2 Sekretaris bulan
3 Sekretaris Bilingual bulan
4 Juru Gambar bulan
5 Operator Komputer bulan
6 Sopir bulan
7 Pesuruh bulan
8 Penjaga bulan
9 Asisten Muda
- S2 = 1-2 tahun bulan
- S2 = 3-4 tahun bulan
10 Teknisi
a. S0 / D3
- 1-3 tahun bulan
- 4-7 tahun bulan
- 8-11 tahun bulan
- 12-15 tahun bulan
- 16-20 tahun bulan

b. SMK / D2
- 3-7 tahun bulan
- 8-11 tahun bulan
- 12-15 tahun bulan
- 16-20 tahun bulan

11 Tenaga Ahli
a. Ahli Muda (S1)
- Pengalaman 1 tahun bulan
- Pengalaman 2 tahun bulan
- Pengalaman 3 tahun bulan
- Pengalaman 4 tahun bulan

b. A h l i
- Pendidikan S1
Pengalaman 5 tahun bulan
Pengalaman 6 tahun bulan
Pengalaman 7 tahun bulan
Pengalaman 8 tahun bulan

- Pendidikan S2
Pengalaman 1 tahun bulan
Pengalaman 2 tahun bulan
Pengalaman 3 tahun bulan
Pengalaman 4 tahun bulan

c. Ahli Utama
- Pendidikan S1
Pengalaman 9 tahun bulan
Pengalaman 10 tahun bulan
Pengalaman 11 tahun bulan
Pengalaman 12 tahun bulan

- Pendidikan S2
Pengalaman 5 tahun bulan
Pengalaman 6 tahun bulan
Pengalaman 7 tahun bulan
Pengalaman 8 tahun bulan

- Pendidikan S3
Pengalaman 1 tahun bulan
Pengalaman 2 tahun bulan
Pengalaman 3 tahun bulan
Pengalaman 4 tahun bulan

d. Ahli Kepala
- Pendidikan S1
Pengalaman 13 tahun bulan
Pengalaman 14 tahun bulan
Pengalaman 15 tahun bulan
Pengalaman 16 tahun bulan
Pengalaman 17 tahun bulan
Pengalaman 18 tahun bulan
Pengalaman 19 tahun bulan
Pengalaman 20 tahun bulan

- Pendidikan S2
Pengalaman 9 tahun bulan
Pengalaman 10 tahun bulan
Pengalaman 11 tahun bulan
Pengalaman 12 tahun bulan
Pengalaman 13 tahun bulan
Pengalaman 14 tahun bulan
Pengalaman 15 tahun bulan
Pengalaman 16 tahun bulan

- Pendidikan S3
Pengalaman 5 tahun bulan
Pengalaman 6 tahun bulan
Pengalaman 7 tahun bulan
Pengalaman 8 tahun bulan
Pengalaman 9 tahun bulan
Pengalaman 10 tahun bulan
Pengalaman 11 tahun bulan
Pengalaman 12 tahun bulan

II BAHAN / MATERIAL

A KELOMPOK AIR, TANAH, BATU DAN SEMEN

1 Abu Batu/ Abu/ F i l l e r m3


2 Abu batu (Tayu) m3
3 Abu Batu/ Abu/ F i l l e r Kg
4 Air bersih ltr
5 Air m3
6 Bahan Aditif (Caldbon, Strorox, dll) L
7 Batu bata merah expose buah
8 Batu bata merah (lokal) buah
9 Bata putih (9/12/27) bh
10 Batu belah hitam m3
11 Batu Belah Hitam 15/20 m3
12 Batu Belah Putih m3
13 Batu Bolder m3
14 Bataco Besar (10/20/40) HB.20 bh
15 Bataco Kecil (7/11/25) HB.10 bh
16 Bataco Sedang (10/15/40) HB.15 bh
17 Batu Alam (candi) m2
18 Batu muka m2
19 Batu Alam (Andesit) m2
20 Batu Alam (Candi) - Alur Lurus m2
21 Batu Alam (Candi) - Alur Patah m2
22 Batu Alam (Lempeng) - Acak m2
23 Batu Alam (Lempeng) - Berdimensi m2
24 Batu Alam (Marmo) - Bakar m2
25 Batu Alam (Marmo) - Krem m2
26 Batu alam palimanan RTM polos M2
27 Batu Bara kg
28 Bentonit kg
29 Beton Ready Mixed K-125 m3
30 Beton Ready Mixed K-175 m3
31 Beton Ready Mixed K-225 m3
32 Beton Ready Mixed K-250 m3
33 Beton Ready Mixed K-275 m3
34 Beton Ready Mixed K-300 m3
35 Beton Ready Mixed K-350 m3
36 Beton Ready Mixed K-400 m3
37 Beton Ready Mixed Fs'45 m3
38 Buis Beton ø 20 cm - 100 cm bh
39 Buis Beton ø 30 cm - 100 cm bh
40 Buis Beton ø 40 cm - 100 cm bh
41 Buis Beton dia 80 cm, panjang 1 m buah
42 Buis Beton dia 100 cm, panjang 1 m buah
43 Buis Beton U 20 cm - 100 cm bh
44 Tiang pancang beton tulang dia 10-12 cm m'
45 Tiang pancang beton tulang dia 20 cm m'
46 Tiang Pancang beton tulang 30x30 cm K.500 m'
47 Tiang Pancang beton tulang 40x40 cm K.500 m'
48 Turap beton pre-cast ukuran 30x12 cm m'
49 Turap beton pre-cast ukuran 40x20 cm m'
50 Turap beton tulang pre-cast 30x12 cm m'
51 Turap beton tulang pre-cast 40x15 cm m'
52 Turap beton tulang pre-cast 50x22 cm m'
53 Box culvert Beban Gandar 14,5 ton BC 400 x 400 lb m'
54 Box culvert Beban Gandar 14,5 ton BC 500 x 500 lb m'
55 Box culvert Beban Gandar 14,5 ton BC 600 x 600 lb m'
56 Box culvert Beban Gandar 14,5 ton BC 800 x 800 lb m'
57 Box culvert Beban Gandar 14,5 ton BC 1000 x 1000 lb m'

58 Box culvert Beban Gandar 14,5 ton BC 1200 x 1200 lb m'

59 Box culvert Beban Gandar 14,5 ton BC 1500 x 1500 lb m'

60 Box culvert Beban Gandar 14,5 ton BC 2000 x 2000 lb m'


61 Box culvert Beban Gandar 21 ton BC 400 x 400 lb m'
62 Box culvert Beban Gandar 21 ton BC 500 x 500 lb m'
63 Box culvert Beban Gandar 21 tton BC 600 x 600 lb m'
64 Box culvert Beban Gandar 21 ton BC 800 x 800 lb m'
65 Box culvert Beban Gandar 21 ton BC 1000 x 1000 lb m'
66 Box culvert Beban Gandar 21 ton BC 1200 x 1200 lb m'
67 Box culvert Beban Gandar 21 ton BC 1500 x 1500 lb m'
68 Box culvert Beban Gandar 21 ton BC 2000 x 2000 lb m'
69 Box culvert Beban Gandar 21 ton BC 400 x 400 lb m'
70 Box Culvert (Koker) 80 x 80 x 100 batang/bh
71 Box Culvert (Koker) 100 x 100 x 100 batang/bh
72 Box Culvert (Koker) 120 x 120 x 100 batang/bh
73 U Culvert Ditch ( Saluran U ) 60 x 60 x 120 batang/bh
74 U Culvert Ditch ( Saluran U ) 80 x 80 x 100 batang/bh
75 Saluran U-Ditch 400/400 m'
76 Saluran U-Ditch 500/500 m'
77 Saluran U-Ditch 600/600 m'
78 Saluran U-Ditch 800/800 m'
79 Saluran U-Ditch 1000/1000 m'
80 Genteng Beton Plat bh
81 Genteng Jatiwangi (Glazour) bh
82 Genteng Jatiwangi (Natural) bh
83 Genteng Keramik (KIA, M-CLASS, KANMURI) Natural bh
84 Genteng Kerpus Beton bh
85 Genteng Kerpus Jatiwangi bh
86 Genteng Kerpus Keramik bh
87 Genteng Kerpus Lokal bh
88 Genteng Kerpus Vlam Press bh
89 Genteng VlamPress Besar bh
90 Genteng Vlam Press Kecil bh
91 Genteng Pres Kodok bh
92 Kapur m3
93 Keramik 30 X 30 Buah
94 Keramik 10 x 25 cm (Lis) bh
95 Keramik 20 x 20 cm bh
96 Keramik 20 x 25 cm bh
97 Keramik 7,5 x 20 cm (Lis) bh
98 Keramik Putih 30 x 30 cm bh
99 Keramik Warna 40 x 40 cm bh
100 Keramik Warna 45 x 45 cm bh
101 Keramik Warna 50 x 50 cm bh
102 Granit Lokal m2
103 Granito 60 x 60 (lokal) m2
104 Grendel bh
105 Gypsum 9 mm (Elepant, Jaya board) lbr
106 Hak / Kait Angin bh
107 Harplek 30 x 200 lbr
108 Harplek 40 x 200 lbr
109 Harplek 50 x 200 lbr
110 Harplek 60 x 200 lbr
111 Jendela nako lengkap daun
112 Kaca bening 5 mm m2
113 Kaca buram 12 mm m2
114 Kaca Rayband 3 mm m2
115 Kaca Rayband 5 mm m2
116 Kaca Bening 8 mm Tempered m2
117 Kapur Pasang (padam) m3
118 Kapur sirih kg
119 Kerean sumur bh
120 Kerikil Ayak tanpa pasir m3
121 Kerikil Biasa m3
122 Kerikil Sawur / Koral m3
123 Kerikil Sungai - royalty m3
124 Lempengan rumput/ Gebalan Rumput m2
125 Pasir beton (Kasar) (ex. Bengawan Solo) m3
126 Pasir Kwarsa m3
127 Pasir Beton (ex Muntilan) M3
128 Pasir pasang kali/gunung (ex. Bengawan Solo) m3
129 Pasir teras m3
130 Pasir Pasang (Sedang) M3
131 Pasir urug (ada unsur lempung) m3
132 Portland Cement (PC 50 kg / zak) zak
133 Portland Cement / PC kg
134 Portland Cement / PC (40 kg) zak
135 Portland Cement / PC (50 kg) zak
136 Portland Cement / PC Curah kg
137 Portland Pozzolan Cement / PPC kg
138 Portland Pozzolan Cement / PPC - Warna kg
139 Portland Pozzolan Cement / PPC (40 kg) zak
140 Portland Pozzolan Cement / PPC (50 kg) zak
141 Portland Pozzolan Cement / PPC (50 kg) - warna zak
142 Paving Block K. 300 ( 6 cm) M2
143 Paving Block K. 300 ( 8 cm) M2
144 Kansteen 40 (40 x 20 x 10) biji
145 Kansteen 60 (18 x 30 x60) biji
146 Topi Uskup 30 x 6 x 21 tebal 8 cm bh
147 Semen / PC (kg) Kg
148 Sirtu m3
149 Sirtu Royalty m3
150 Tanah liat m3
151 Tanah urug di lokasi m3
152 Tanah Biasa m3
153 Tanah Liat m3
154 Tanah Padas m3
155 Tanah Urug Pilihan m3
156 Tanah Pilihan Grosok m3
157 Timbunan Tanah (pasir urug) m3
158 Bahan Tanah Timbunan m3
159 Tanah urug di Borrrow Area, jarak angkut 1 km m3
160 Bahan Pilihan (Grosok Tahunan) m3
161 Tiang pancang beton tulang dia 10-12 cm m
162 Tiang pancang beton tulang dia 20 cm m
163 Tiang Pancang beton tulang 30x30 cm m
164 Tiang Pancang beton tulang 40x40 cm m
165 Tiang Pancang Beton Pratekan Diameter 400 m
166 Tiang Pancang Beton Pratekan Diameter 350 m
167 Tiang Pancang Beton Pratekan Diameter 450 m
168 Tiang pancang beton pratekan dia.32x32x32 (segitiga) m
169 Turap beton pre-cast ukuran 30x12 cm m
170 Turap beton pre-cast ukuran 40x20 cm m
171 Turap beton tulang pre-cast 30x12 cm m
172 Turap beton tulang pre-cast 40x15 cm m
173 Turap beton tulang pre-cast 50x22 cm m
174 Unit Pracetak Voided Slab bentang 12 m Bh
175 Unit Pracetak Voided Slab bentang 13 m Bh
176 Unit Pracetak Voided Slab bentang 14 m Bh
177 Unit Pracetak Voided Slab bentang 15 m Bh
178 Unit Pracetak Voided Slab bentang 16 m Bh
179 Batu belah/Krakal putih m3
180 Pasir Beton Muntilan M3
181 Agregat Kasar/Kerikil/Koral/Agregat Beton m3
182 Agregat Kasar utk Beton (1/2+2/3) M3
183 Agregat Halus M3
184 Agregat Pecah Mesin 0-5 mm M3
185 Agregat Pecah Mesin 5-10 & 10-20 mm M3
186 Agregat Pecah Mesin 20-30 mm M3
187 Gravel M3
188 Bahan Agr.Base Kelas A M3
189 Bahan Agr.Base Kelas B M3
190 Bahan Agr.Base Kelas C M3
191 Bahan Agr.Base Kelas S M3
192 Batu Grosok (pudel) m3
193 Batu Gunung/quarry m3
194 Batu Kali Bulat (Batu Hitam) m3
195 Batu Pecah 0,5/1 (hitam) m3
196 Batu Pecah 1/1 (hitam) m3
197 Batu Pecah 1/2 (hitam) m3
198 Batu Pecah 2/3 (hitam) m3
199 Batu Pecah 3/5 (hitam) m3
200 Batu Pecah 5/7 (hitam) m3
201 Batu Pecah 7/10 (hitam) m3

B KELOMPOK KAYU

1 Bambu dia 2", pjg 6m batang


2 Bambu dia 3 - 4", pjg 6-8m batang
3 Bambu Apus btg
4 Bambu diameter 6-8 / 600 cm btg
5 Bambu diameter 10 cm M
6 Dolken kayu galam dia 10 cm, pjg 3m (Tiang pancang) batang

7 Dolken kayu galam dia 8 cm, pjg 3m (Tiang pancang) batang


8 Dolken kayu klas III dia. 5 – 7 cm, pjg 3m (stoot) batang
9 Dolken kayu klas III dia. 7 –10 cm, pjg 3m (stoot) batang
10 Dolken Jati Kampung dia. 10 cm - 15 cm m
11 Glugu m'
12 Ijuk tebal 5 cm kg
13 Kayu Bakar m3
14 Kayu Bengkirai (balok/pesagen) m3
15 Kayu Bengkirai (papan) m3
16 Kayu Dolken Sengon ø 8-10 cm, 4 m btg
17 Kayu Hutan (Rimba Campur) m3
18 Kayu Jati kampung (balok/pesagen) m3
19 Kayu Jati kampung m3
20 Kayu Jati kampung (papan) m3
21 Kaso-kaso 5/7 Jati Kampung m3
22 Kayu reng (3x4) cm Jati m3
23 Kayu Kruing (balok/pesagen) m3
24 Kayu Kruing (papan) m3
25 Kayu Kamper (balok/pesagen) m3
26 Kayu Kamper (papan) m3
27 Kayu Perancah m3
28 Kayu Randu (papan 1,5 x 20 x 200) m3
29 Rel pintu sorong set
30 Reng Kayu Bengkirai (2x3x300) btg
31 Reng Kayu Bengkirai (2x3x400) btg
32 Reng Kayu Jati (2x3x300) btg
33 Reng Kayu Jati (2x3x400) btg
34 Reng Kayu Kruing (2x3x300) btg
35 Kayu Kruing 2/3 m3
36 Kayu balok klas 2 (Kamper Banjar) m3
37 Kayu balok klas 2 (Kamper Medan/Borneo Super) m3
38 Kayu balok klas 2 (Kamper Samarinda) m3
39 Kayu balok klas 3 (Kruing) m3
40 Kayu gelondongan diameter 20 cm m'
41 Kayu papan bekisting kelas 3 m3
42 Kayu papan klas 2 (Kamper Banjar) m3
43 Kayu papan klas 2 (Kamper Medan/Borneo Super) m3
44 Kayu papan klas 2 (Kamper Samarinda) m3
45 Kayu papan klas 3 (Kruing) m3
46 Kayu kelas 2 untuk cerucuk dia 2", pjg 2,5 m batang
47 Kayu kelas 2 untuk cerucuk dia 3", pjg 2,5 m batang
48 Kayu kelas 2 untuk cerucuk dia 4", pjg 2,5 m batang
49 Kayu kelas 2 untuk cerucuk dia 6", pjg 2,5 m batang
50 Kayu usuk/kaso klas 2 (Kamper Medan/B. Super) m3
51 Kayu usuk/kaso klas 3 (Kruing) m3
52 Multiplek tebal 0,6 cm lembar
53 Multiplek tebal 0,9 cm lembar
54 Multiplek tebal 1,2 cm lembar
55 Multiplek tebal 1,8 cm lembar
56 Seseg Bambu m2
57 Multipleks 120 x 240 tb. 9 mm lbr
58 Multipleks 120 x 240 tb. 12 mm lbr
59 Tripleks 120 x 240 tb. 3 mm lbr
60 Tripleks 120 x 240 tb. 4 mm lbr
61 Tripleks 120 x 240 tb. 6 mm lbr
62 Teakwood 3mm 120 x 240 lembar
63 Teakwood 3mm uk. Pintu lembar
64 Teakwood 4mm 120 x 240 lembar
65 Teakwood 4mm uk. Pintu lembar
66 Tiang Pancang kayu kelas 2 dia 8-10 cm m
67 Tiang Pancang kayu kelas 2 dia 20 cm m
68 Triflex t=3mm lembar
69 Triflex t=4mm lembar
70 Tusuk bambu buah
71 Teak Wood 120 x 240 tb. 3 mm lbr
72 Kayu Perancah M3
73 Cerucuk diameter 10-15 cm/ Dolken Jati M
74 Usuk Kayu Bengkirai (3x5x400) btg
75 Usuk Kayu Bengkirai (4x6x400) btg
76 Kayu Bengkirai 5/7 m3
77 Usuk Kayu Jati (3x5x400) btg
78 Usuk Kayu Jati (4x6x400) btg
79 Kayu Jati Kampung 5/7 m3
80 Usuk Kayu Kruing (3x5x400) btg
81 Usuk Kayu Kruing (4x6x400) btg
82 Kayu Kruing 5/7 m3

C KELOMPOK LOGAM

1 Allumunium pelat tebal 0,8 mm m2


2 Allumunium pelat tebal 1 mm m2
3 Allumunium pelat tebal 2 mm m2
4 Allumunium pelat tebal 3 mm m2
5 Allumunium strip lebar 8 cm m'
6 Allumunium profil siku m'
7 Allumunium profil lainnya m'
8 Rolling Door (Allumunium); tb. 0,5 mm m2
9 Rolling Door (Allumunium); tb. 0,8 mm m2
10 Rolling Door (Galfalum); tb. 0,8 mm m2
11 Baja Bergelombang Kg
12 Baja konstruksi kg
13 Baja Pelat tebal 2 mm m2
14 Baja Pelat tebal 3 mm m2
15 Baja Pelat tebal 5 mm m2
16 Baja Pelat tebal 6 mm m2
17 Baja Pelat tebal 8 mm m2
18 Baja Pelat setrip kg
19 Baja Profil IWF Ex. Jepang kg
20 Baja Profil IWF Ex. DN SII kg
21 Baja profil " IWF " kg
22 Baja profil " L " atau " C " kg
23 Baja tralis kg
24 Baja Struktur titik leleh 2400 - 2800 kg/cm2 kg
25 Baja Struktur titik leleh 3500 kg/cm2 kg
26 Baja struktur L + [ kg
27 Baja Profil CNP kg
28 Baja Profil DN SII kg
29 Baja Profil Ex. Luar Negeri kg
30 Baja Profil INP kg
31 Baja Profil siku kg
32 Baja Profil UNP kg
33 Baja Prategang kg
34 Baja Tulangan U 32 Ulir kg
35 Baja Tulangan U 39 Ulir kg
36 Baja Tulangan U 42 Ulir kg
37 Baja Tulangan (Ulir) D48 Kg
38 Baja Tulangan U 24 (besi beton biasa) Polos kg
39 Baja Tulangan U 32 Polos kg
40 Bend 45 double socket 63 mm mm
41 Bend 45 double socket 90 mm mm
42 Bend 45 double socket 110 mm mm
43 Bend 45 double socket 150 mm mm
44 Bend 90 double socket 63 mm mm
45 Bend 90 double socket 90 mm mm
46 Bend 90 double socket 110 mm mm
47 Bend 90 double socket 150 mm mm
48 Baut dia 10 mm panjang 5 cm buah
49 Baut dia 10 mm panjang 10 cm buah
50 Baut dia 12 mm panjang 5 cm buah
51 Baut dia 12 mm panjang 10 cm buah
52 Baut dia 12 mm panjang 20 cm buah
53 Besi Beton Polos kg
54 Besi Beton Ulir kg
55 Besi Plat Baja kg
56 Besi Strip kg
57 Besi Pipa ø 2 m'
58 Besi Pipa ø 1 1/2 m'
59 Besi Pipa ø 1 3/4 m'
60 Besi Pipa ø 1 m'
61 Besi Profil L (4 x 0,2) m'
62 Besi Profil L (4 x 0,1) m'
63 Besi Profil L (4 x 0,3) m'
64 Dynabolt/raamset dia 8 mm panjang 4-5 cm buah
65 Kabel baja/sling kg
66 Kabel prestress kg
67 Kabel Power NYY HY 2,5 x 3 mm m'
68 Kabel WLC 1,5 x 3 mm m'
69 Kabel 3 X 25 mm m'
70 Kabel 3 X 41 mm m'
71 Kabel 3 X 1,5 mm m'
72 Kabel 3 X 2,5 mm m'
73 Kabel 2 X 2,5 mm m'
74 Kabel 2 X 3,5 mm (NFA 2x-T) m'
75 Kabel 2 X 1,5 mm m'
76 Kawat beton / Bendrat kg
77 Kawat bronjong dia 2 - 4 mm kg
78 Kawat Bronjong Pabrikan (2 x 1 x 0,5) dia. Kawat 2,7 mm bh

79 Kawat Bronjong Pabrikan (2 x 1 x 0,5) dia. Kawat 3 mm bh


80 Kawat las listrik kg
81 Kawat seng 3mm kg
82 Kawat berduri m'
83 Kawat Bronjong kg
84 Kawat Ikat Beton/bendrat kg
85 Kawat Las Listrik kg
86 Paku kg
87 Paku biasa 1 cm - 3 cm kg
88 Paku biasa 4 cm - 7 cm kg
89 Paku seng gelombang kg
90 Paku - payung kg
91 Paku - sekrup kg
92 Paku - ukuran 1" s/d 4" kg
93 Paku - ukuran 1/4" s/d 1" kg
94 Paku - ukuran 5" s/d 10" kg
95 Paku - ukuran 10" s/d 12" kg
96 Pintu Angkat b= 30 h=30 h1=65 tr=120 buah
97 Pintu Angkat b= 30 h=40 h1=65 tr=120 buah
98 Pintu Angkat b= 30 h=50 h1=65 tr=120 buah
99 Pintu Angkat b= 30 h=60 h1=65 tr=120 buah
### Pintu Angkat b= 40 h=30 h1=95 tr=150 buah
### Pintu Angkat b= 40 h=40 h1=95 tr=150 buah
### Pintu Angkat b= 40 h=50 h1=95 tr=150 buah
### Pintu Angkat b= 40 h=60 h1=95 tr=150 buah
### Pintu Angkat b= 50 h=30 h1=120 tr=175 buah
### Pintu Angkat b= 50 h=40 h1=120 tr=175 buah
### Pintu Angkat b= 50 h=50h1=120 tr=175 buah
### Pintu Angkat b= 50 h=60 h1=120 tr=175 buah
### Pintu Angkat b= 40 h=60 h1=120 tr=175 buah
### Pintu Angkat b= 50 h=40 h1=80 tr=135 buah
### Pintu Angkat b= 50 h=50 h1=100 tr=155 buah
### Pintu Sorong Baja b= 50 h=50 h1=120 tr=200 buah
### Pintu Sorong Baja b= 50 h=60 h1=120 tr=200 buah
### Pintu Sorong Baja b= 50 h=70 h1=120 tr=200 buah
### Pintu Sorong Baja b= 50 h=80 h1=120 tr=200 buah
### Pintu Sorong Baja b= 50 h=90 h1=120 tr=200 buah
### Pintu Sorong Baja b= 50 h=100 h1=120 tr=200 buah
### Pintu Sorong Baja b= 50 h=50 h1=170 tr=250 buah
### Pintu Sorong Baja b= 50 h=60 h1=170 tr=250 buah
### Pintu Sorong Baja b= 50 h=70 h1=170 tr=250 buah
### Pintu Sorong Baja b= 50 h=80 h1=170 tr=250 buah
### Pintu Sorong Baja b= 50 h=90 h1=170 tr=250 buah
### Pintu Sorong Baja b= 50 h=100 h1=170 tr=250 buah
### Pintu Sorong Baja b= 50 h=100 h1=220 tr=300 buah
### Pintu Sorong Baja b= 50 h=100 h1=320 tr=400 buah
### Pintu Sorong Baja b= 60 h=50 h1=120 tr=200 buah
### Pintu Sorong Baja b= 60 h=60 h1=120 tr=200 buah
### Pintu Sorong Baja b= 60 h=70 h1=120 tr=200 buah
### Pintu Sorong Baja b= 60 h=80 h1=120 tr=200 buah
### Pintu Sorong Baja b= 60 h=90 h1=120 tr=200 buah
### Pintu Sorong Baja b= 60 h=100 h1=120 tr=200 buah
### Pintu Sorong Baja b= 60 h=50 h1=170 tr=250 buah
### Pintu Sorong Baja b= 60 h=60 h1=170 tr=250 buah
### Pintu Sorong Baja b= 60 h=70 h1=170 tr=250 buah
### Pintu Sorong Baja b= 60 h=80 h1=170 tr=250 buah
### Pintu Sorong Baja b= 60 h=80 h1=170 tr=250 buah
### Pintu Sorong Baja b= 60 h=90 h1=170 tr=250 buah
### Pintu Sorong Baja b= 60 h=100 h1=220 tr=300 buah
### Pintu Sorong Baja b= 60 h=100 h1=320 tr=400 buah
### Pintu Sorong Baja b= 70 h=50 h1=120 tr=200 buah
### Pintu Sorong Baja b= 70 h=60 h1=120 tr=200 buah
### Pintu Sorong Baja b= 70 h=70 h1=120 tr=200 buah
### Pintu Sorong Baja b= 70 h=80 h1=120 tr=200 buah
### Pintu Sorong Baja b= 70 h=90 h1=120 tr=200 buah
### Pintu Sorong Baja b= 70 h=100 h1=120 tr=200 buah
### Pintu Sorong Baja b= 70 h=50 h1=170 tr=250 buah
### Pintu Sorong Baja b= 70 h=60 h1=170 tr=250 buah
### Pintu Sorong Baja b= 70 h=70 h1=170 tr=250 buah
### Pintu Sorong Baja b= 70 h=80 h1=170 tr=250 buah
### Pintu Sorong Baja b= 70 h=90 h1=170 tr=250 buah
### Pintu Sorong Baja b= 70 h=100 h1=170 tr=250 buah
### Pintu Sorong Baja b= 70 h=100 h1=220 tr=300 buah
### Pintu Sorong Baja b= 70 h=100 h1=320 tr=400 buah
### Pintu Sorong Baja b= 80 h=50 h1=120 tr=200 buah
### Pintu Sorong Baja b= 80 h=60 h1=120 tr=200 buah
### Pintu Sorong Baja b= 80 h=70 h1=120 tr=200 buah
### Pintu Sorong Baja b= 80 h=80 h1=120 tr=200 buah
### Pintu Sorong Baja b= 80 h=90 h1=120 tr=200 buah
### Pintu Sorong Baja b= 80 h=100 h1=120 tr=200 buah
### Pintu Sorong Baja b= 80 h=50 h1=170 tr=250 buah
### Pintu Sorong Baja b= 80 h=60 h1=170 tr=250 buah
### Pintu Sorong Baja b= 80 h=70 h1=170 tr=250 buah
### Pintu Sorong Baja b= 80 h=80 h1=170 tr=250 buah
### Pintu Sorong Baja b= 80 h=90 h1=170 tr=250 buah
### Pintu Sorong Baja b= 80 h=100 h1=170 tr=250 buah
### Pintu Sorong Baja b= 80 h=100 h1=220 tr=300 buah
### Pintu Sorong Baja b= 80 h=100 h1=320 tr=400 buah
### Pintu Sorong Baja b= 90 h=50 h1=120 tr=200 buah
### Pintu Sorong Baja b= 90 h=60 h1=120 tr=200 buah
### Pintu Sorong Baja b= 90 h=70 h1=120 tr=200 buah
### Pintu Sorong Baja b= 90 h=80 h1=120 tr=200 buah
### Pintu Sorong Baja b= 90 h=90 h1=120 tr=200 buah
### Pintu Sorong Baja b= 90 h=100 h1=120 tr=200 buah
### Pintu Sorong Baja b= 90 h=50 h1=170 tr=250 buah
### Pintu Sorong Baja b= 90 h=60 h1=170 tr=250 buah
### Pintu Sorong Baja b= 90 h=70 h1=170 tr=250 buah
### Pintu Sorong Baja b= 90 h=80 h1=170 tr=250 buah
### Pintu Sorong Baja b= 90 h=90 h1=170 tr=250 buah
### Pintu Sorong Baja b= 90 h=100 h1=170 tr=250 buah
### Pintu Sorong Baja b= 90 h=100 h1=220 tr=300 buah
### Pintu Sorong Baja b= 90 h=100 h1=320 tr=400 buah
### Pintu Sorong Baja b= 100 h=80 h1=170 tr=250 buah
### Pintu Sorong Baja b= 100 h=90 h1=170 tr=250 buah
### Pintu Sorong Baja b= 100 h=100 h1=170 tr=250 buah
### Pintu Sorong Baja b= 100 h=120 h1=170 tr=250 buah
### Pintu Sorong Baja b= 100 h=80 h1=190 tr=270 buah
### Pintu Sorong Baja b= 100 h=90 h1=190 tr=270 buah
### Pintu Sorong Baja b= 100 h=100 h1=190 tr=270 buah
### Pintu Sorong Baja b= 100 h=120 h1=190 tr=270 buah
### Pintu Sorong Baja b= 100 h=80 h1=220 tr=300 buah
### Pintu Sorong Baja b= 100 h=90 h1=220 tr=300 buah
### Pintu Sorong Baja b= 100 h=100 h1=220 tr=300 buah
### Pintu Sorong Baja b= 100 h=120 h1=220 tr=300 buah
### Pintu Sorong Baja b= 100 h=150 h1=220 tr=300 buah
### Pintu Sorong Baja b= 100 h=80 h1=320 tr=400 buah
### Pintu Sorong Baja b= 100 h=90 h1=320 tr=400 buah
### Pintu Sorong Baja b= 100 h=100 h1=320 tr=400 buah
### Pintu Sorong Baja b= 100 h=120 h1=320 tr=400 buah
### Pintu Sorong Baja b= 100 h=150 h1=320 tr=400 buah
### Pintu Sorong Baja b= 100 h=200 h1=320 tr=400 buah
### Pintu Sorong Baja b= 100 h=80 h1=420 tr=500 buah
### Pintu Sorong Baja b= 100 h=90 h1=420 tr=500 buah
### Pintu Sorong Baja b= 100 h=100 h1=420 tr=500 buah
### Pintu Sorong Baja b= 100 h=120 h1=420 tr=500 buah
### Pintu Sorong Baja b= 100 h=150 h1=420 tr=500 buah
### Pintu Sorong Baja b= 100 h=200 h1=420 tr=500 buah
### Pintu Sorong Baja b= 100 h=250 h1=420 tr=500 buah
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
100 h=80 h1=170 tr=250
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
100 h=90 h1=170 tr=250
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
100 h=100 h1=170 tr=250
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
100 h=120 h1=170 tr=250
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
100 h=80 h1=190 tr=270
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
100 h=90 h1=190 tr=270
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
100 h=100 h1=190 tr=270
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
100 h=120 h1=190 tr=270
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
100 h=80 h1=220 tr=300
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
100 h=90 h1=220 tr=300
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
100 h=100 h1=220 tr=300
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
100 h=120 h1=220 tr=300
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
100 h=150 h1=220 tr=300
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
100 h=80 h1=320 tr=400
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
100 h=90 h1=320 tr=400
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
100 h=100 h1=320 tr=400
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
100 h=120 h1=320 tr=400
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
100 h=150 h1=320 tr=400
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
100 h=200 h1=320 tr=400
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
100 h=80 h1=420 tr=500
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
100 h=90 h1=420 tr=500
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
100 h=100 h1=420 tr=500
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
100 h=120 h1=420 tr=500
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
100 h=150 h1=420 tr=500
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
100 h=200 h1=420 tr=500
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
100 h=250 h1=420 tr=500
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
110 h=80 h1=170 tr=250
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
110 h=90 h1=170 tr=250
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
110 h=100 h1=170 tr=250
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
110 h=120 h1=170 tr=250
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
110 h=80 h1=190 tr=270
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
110 h=90 h1=190 tr=270
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
110 h=100 h1=190 tr=270
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
110 h=120 h1=190 tr=270
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
110 h=80 h1=220 tr=300
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
110 h=90 h1=220 tr=300
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
110 h=100 h1=220 tr=300
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
110 h=120 h1=220 tr=300
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
110 h=150 h1=220 tr=300
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
110 h=80 h1=320 tr=400
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
110 h=90 h1=320 tr=400
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
110 h=100 h1=320 tr=400
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
110 h=120 h1=320 tr=400
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
110 h=150 h1=320 tr=400
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
110 h=200 h1=320 tr=400
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
110 h=80 h1=420 tr=500
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
110 h=90 h1=420 tr=500
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
110 h=100 h1=420 tr=500
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
110 h=120 h1=420 tr=500
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
110 h=150 h1=420 tr=500
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
110 h=200 h1=420 tr=500
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
110 h=250 h1=420 tr=500
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
120 h=80 h1=170 tr=250
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
120 h=90 h1=170 tr=250
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
120 h=100 h1=170 tr=250
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
120 h=120 h1=170 tr=250
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
120 h=80 h1=190 tr=270
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
120 h=90 h1=190 tr=270
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
120 h=100 h1=190 tr=270
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
120 h=120 h1=190 tr=270
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
120 h=80 h1=220 tr=300
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
120 h=90 h1=220 tr=300
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
120 h=100 h1=220 tr=300
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
120 h=120 h1=220 tr=300
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
120 h=150 h1=220 tr=300
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
120 h=80 h1=320 tr=400
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
120 h=90 h1=320 tr=400
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
120 h=100 h1=320 tr=400
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
120 h=120 h1=320 tr=400
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
120 h=150 h1=320 tr=400
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
120 h=200 h1=320 tr=400
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
120 h=80 h1=420 tr=500
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
120 h=90 h1=420 tr=500
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
120 h=100 h1=420 tr=500
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
120 h=120 h1=420 tr=500
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
120 h=150 h1=420 tr=500
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
120 h=200 h1=420 tr=500
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
120 h=150 h1=520 tr=600
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
120 h=150 h1=620 tr=700
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
120 h=150 h1=720 tr=800
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
120 h=150 h1=820 tr=900
Pintu Sorong Baja dengan Rodan Gigi (stang tunggal) b=
### buah
120 h=150 h1=920 tr=1000
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
120 h=100 h1=170 tr=250
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
120 h=120 h1=170 tr=250
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
120 h=100 h1=170 tr=280
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
120 h=120 h1=200 tr=280
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
120 h=100 h1=220 tr=300
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
120 h=120 h1=220 tr=300
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
120 h=150 h1=220 tr=300
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
120 h=100 h1=270 tr=350
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
120 h=120 h1=270 tr=350
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
120 h=150 h1=270 tr=350
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
120 h=100 h1=320 tr=400
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
120 h=120 h1=320 tr=400
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
120 h=150 h1=320 tr=400
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
120 h=170 h1=320 tr=400
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
120 h=100 h1=420 tr=500
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
120 h=120 h1=420 tr=500
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
120 h=150 h1=420 tr=500
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
120 h=170 h1=420 tr=500
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
120 h=200 h1=420 tr=500
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
120 h=230 h1=420 tr=500
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
120 h=100 h1=520 tr=600
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
120 h=120 h1=520 tr=600
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
120 h=150 h1=520 tr=600
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
120 h=170 h1=520 tr=600
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
120 h=200 h1=520 tr=600
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
120 h=230 h1=520 tr=600
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
120 h=150 h1=520 tr=700
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
120 h=150 h1=720 tr=800
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
120 h=150 h1=820 tr=900
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
120 h=150 h1=920 tr=100
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
150 h=100 h1=170 tr=250
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
150 h=120 h1=170 tr=250
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
150 h=100 h1=200 tr=280
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
150 h=120 h1=200 tr=280
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
150 h=100 h1=220 tr=300
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
150 h=120 h1=220 tr=300
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
150 h=150 h1=220 tr=300
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
150 h=100 h1=270 tr=350
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
150 h=120 h1=270 tr=350
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
150 h=150 h1=270 tr=350
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
150 h=100 h1=320 tr=400
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
150 h=120 h1=320 tr=400
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
150 h=150 h1=320 tr=400
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
150 h=170 h1=320 tr=400
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
150 h=100 h1=420 tr=500
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
150 h=120 h1=420 tr=500
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
150 h=150 h1=420 tr=500
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
150 h=170 h1=420 tr=500
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
150 h=200 h1=420 tr=500
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
150 h=230 h1=420 tr=500
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
150 h=100 h1=520 tr=600
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
150 h=120 h1=520 tr=600
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
150 h=150 h1=520 tr=600
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
150 h=170 h1=520 tr=600
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
150 h=200 h1=520 tr=600
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
150 h=230 h1=520 tr=600
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
150 h=150 h1=620 tr=700
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
150 h=150 h1=720 tr=800
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
150 h=150 h1=820 tr=900
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
150 h=150 h1=920 tr=1000
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
180 h=100 h1=170 tr=250
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
180 h=120 h1=170 tr=250
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
180 h=150 h1=170 tr=250
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
180 h=100 h1=200 tr=280
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
180 h=120 h1=200 tr=280
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
180 h=150 h1=200 tr=280
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
180 h=100 h1=220 tr=300
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
180 h=120 h1=220 tr=300
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
180 h=150 h1=220 tr=300
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
180 h=100 h1=270 tr=350
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
180 h=120 h1=270 tr=350
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
180 h=150 h1=270 tr=350
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
180 h=100 h1=320 tr=400
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
180 h=120 h1=320 tr=400
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
180 h=150 h1=320 tr=400
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
180 h=170 h1=320 tr=400
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
180 h=100 h1=420 tr=500
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
180 h=120 h1=420 tr=500
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
180 h=150 h1=420 tr=500
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
180 h=170 h1=420 tr=500
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
180 h=100 h1=520 tr=600
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
180 h=120 h1=520 tr=600
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
180 h=150 h1=520 tr=600
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
180 h=170 h1=520 tr=600
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
180 h=150 h1=620 tr=700
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
180 h=150 h1=720 tr=800
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
180 h=150 h1=820 tr=900
Pintu Sorong Baja Dengan Roda Gigi ( Stang Ganda ) b=
### buah
180 h=150 h1=920 tr=1000
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
200 h=200 h1=320 tr=400
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
200 h=200 h1=420 tr=500
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
200 h=230 h1=420 tr=500
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
200 h=250 h1=420 tr=500
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
200 h=200 h1=520 tr=600
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
200 h=230 h1=520 tr=600
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
200 h=250 h1=520 tr=600
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
200 h=200 h1=620 tr=700
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
200 h=230 h1=620 tr=700
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
200 h=250 h1=620 tr=700
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
200 h=200 h1=720 tr=800
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
200 h=230 h1=720 tr=800
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
200 h=250 h1=720 tr=800
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
200 h=200 h1=820 tr=900
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
200 h=230 h1=820 tr=900
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
200 h=250 h1=820 tr=900
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
200 h=200 h1=920 tr=1000
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
200 h=230 h1=920 tr=1000
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
200 h=250 h1=920 tr=1000
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
230 h=200 h1=320 tr=400
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
230 h=200 h1=420 tr=500
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
230 h=230 h1=420 tr=500
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
230 h=250 h1=420 tr=500
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
230 h=200 h1=520 tr=600
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
230 h=230 h1=520 tr=600
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
230 h=250 h1=520 tr=600
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
230 h=200 h1=620 tr=700
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
230 h=230 h1=620 tr=700
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
230 h=250 h1=620 tr=700
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
230 h=200 h1=720 tr=800
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
230 h=230 h1=720 tr=800
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
230 h=250 h1=720 tr=800
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
230 h=200 h1=820 tr=900
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
230 h=230 h1=820 tr=900
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
230 h=250 h1=820 tr=900
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
230 h=230 h1=920 tr=1000
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
230 h=250 h1=920 tr=1000
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
250 h=200 h1=320 tr=400
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
250 h=200 h1=420 tr=500
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
250 h=230 h1=420 tr=500
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
250 h=250 h1=420 tr=500
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
250 h=200 h1=520 tr=600
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
250 h=230 h1=520 tr=600
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
250 h=250 h1=520 tr=600
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
250 h=200 h1=620 tr=700
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
250 h=230 h1=620 tr=700
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
250 h=250 h1=620 tr=700
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
250 h=200 h1=720 tr=800
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
250 h=230 h1=720 tr=800
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
250 h=250 h1=720 tr=800
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
250 h=200 h1=820 tr=900
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
250 h=230 h1=820 tr=900
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
250 h=250 h1=820 tr=900
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
250 h=200 h1=920 tr=1000
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
250 h=250 h1=920 tr=1000
Pintu Sorong Baja dengan Rodan Gigi (stang ganda) b=
### buah
250 h=200 h1=920 tr=1000
### Pintu Klep Plat Baja b= 100 h= 100 buah
### Pintu Klep Plat Baja b= 120 h= 120 buah
### Pintu Klep Plat Baja b= 150 h= 150 buah
### Pintu Klep Plat Baja b= 160 h= 160 buah
### Pintu Klep Plat Baja b= 180 h= 180 buah
### Pintu Klep Plat Baja b= 200 h= 200 buah
### Pintu Klep Plat Baja b= 250 h= 250 buah
### Profil Allumunium (kaca mati + tutup) m'
### Profil Allumunium (Moher / Ram pintu) m'
### Profil Allumunium (Motoran+ tutup) m'
### Profil Allumunium (Open back + tutup) m'
### Profil Allumunium (Ram jendela jungkit) m'
### Rangka Metal (Hollow 40.20.0,4 mm) m'
### Rangka Metal (Hollow 40.20.0,6 mm) m'
### Rangka Metal (Hollow 40.40.0,4 mm) m'
### Rangka Metal (Hollow 40.40.0,6 mm) m'
### Seng gelombang uk. 0,7 x 1,8, t=0,02 lembar
### Seng gelombang uk. 0,7 x 2,1, t=0,025 lembar
### Seng gelombang uk. 0,7 x 2,4, t=0,03 lembar
### Seng gelombang uk. 0,7 x 3,0, t=0,05 lembar
### Seng Talang BJLS 26 lebar 0,60 m'
### Seng Talang BJLS 26 lebar 0,90 m'
### Seng Talang BJLS 26 lebar 1,20 m'
### Seng pelat BJLS-26 lebar 0,6 m' m'
### Seng pelat BJLS-26 lebar 0,9 m' m'
### Seng pelat lebar 0,9 m' t=0,02 m'
### Seng pelat lebar 0,9 m' t=0,025 m'
### Seng pelat lebar 0,9 m' t=0,03 m'
### Seng pelat lebar 0,9 m' t=0,04 m'
### Seng pelat lebar 0,9 m' t=0,05 m'
### Stang besi polos diameter 12 mm buah
### Stang besi ulir diameter 16 mm buah
### Stang besi ulir diameter 16 mm + gear buah
### Stang besi ulir diameter 20 mm buah
### Stang ulir diameter 20 mm + gear buah
### Tiang pancang baja dia 30 cm m
### Tiang pancang baja kotak 30 x 30 cm m
### Tiang Pancang Baja Diameter 400 m
### Tiang pancang baja uk. /dia. 450 mm M
### Tiang pancang baja uk. /dia. 500 mm M
### Turap baja profi larsen lebar 350 mm m
### Wiremesh untuk pelat lantai beton kg
### Wiremesh utk bronjong dia 6 mm (buatan pabrik) kg
### Wiremesh utk bronjong dia 8 mm (buatan pabrik) kg
### Wiremesh utk bronjong dia 10 mm (buatan pabrik) kg
Kawat Bronjong Galvanis dia. Kawat 2,70 mm (Pabrikasi)
### bh
ukuran 2,00 x 1,00 x 0,50
Kawat Bronjong Galvanis dia. Kawat 3,00 mm (Pabrikasi)
### bh
ukuran 2,00 x 1,00 x 0,50
### Kawat las listrik kg
### Baja Wiresmesh M4 ukuran 2,1 m x 5,4 m lembar
### Baja Wiresmesh M5 ukuran 2,1 m x 5,4 m lembar
### Baja Wiresmesh M6 ukuran 2,1 m x 5,4 m lembar
### Baja Wiresmesh M7 ukuran 2,1 m x 5,4 m lembar
### Baja Wiresmesh M8 ukuran 2,1 m x 5,4 m lembar
### Baja Wiresmesh M9 ukuran 2,1 m x 5,4 m lembar
### Baja Wiresmesh M10 ukuran 2,1 m x 5,4 m lembar
### Baja Wiresmesh M12 ukuran 2,1 m x 5,4 m lembar

D KELOMPOK PIPA

1 Pipa Black Steel dia 1/2" m'


2 Pipa Black Steel dia 3/4" m'
3 Pipa Black Steel dia 1" m'
4 Pipa Black Steel dia 1,5" m'
5 Pipa Black Steel dia 2,5" m'
6 Pipa Black Steel dia 2" m'
7 Pipa Black Steel dia 3" m'
8 Pipa Black Steel dia 4" m'
9 Pipa Black Steel dia 6" m'
10 Pipa Black Steel dia 8" m'
11 Pipa DCI dia 4" m'
12 Pipa DCI dia 6" m'
13 Pipa DCI dia 8" m'
14 Pipa DCI dia 10" m'
15 Pipa DCI dia 12" m'
16 Pipa DCI dia 14" m'
17 Pipa DCI dia 400mm m'
18 Pipa DCI dia 600mm m'
19 Pipa DCI dia 800mm m'
20 Pipa DCI dia 1000mm m'
21 Pipa DCI dia 1200mm m'
22 Pipa GI tebal Class dia 1/2" m'
23 Pipa GI Medium Class dia 1/2" m'
24 Pipa GI Medium Class dia 3/4" m'
25 Pipa GI Medium Class dia 1 1/2" m'
26 Pipa GI Medium Class dia 2" m'
27 Pipa GI Medium Class dia 2 1/2" m'
28 Pipa GI Medium Class dia 3" m'
29 Pipa GI Medium Class dia 4" m'
30 Screen 4'' low carbon buah
31 Screen 6'' low carbon buah
32 Screen 8'' low carbon buah
33 Pipa PVC dia. 40 mm S.10 m'
34 Pipa PVC dia. 50 mm S.10 m'
35 Pipa PVC dia. 63 mm S.12.5 m'
36 Pipa PVC dia. 75 mm S.12.5 m'
37 Pipa PVC dia. 90 mm S.12.5 m'
38 Pipa PVC dia. 110 mm S.12,5 m'
39 Pipa PVC dia. 140 mm S.12,5 m'
40 Pipa PVC dia. 160 mm S.12,5 m'
41 Pipa PVC dia. 200 mm S.12,5 m'
42 Pipa PVC dia. 225 mm S.12,5 m'
43 Pipa PVC dia. 250 mm S.12,5 m'
44 Pipa PVC dia. 315 mm S.12,5 m'
45 Pipa PVC dia. 355 mm S.12,5 m'
46 Pipa PVC dia. 400 mm S.12,5 m'
47 Pipa PVC dia. 500 mm S.12,5 m'
48 Pipa PVC dia. 630 mm S.12,5 m'
49 Pipa PVC Maspion tipe AW ø 1/2" m'
50 Pipa PVC Maspion tipe AW ø 3/4" m'
51 Pipa PVC Maspion tipe AW ø 1" m'
52 Pipa PVC Maspion tipe AW ø 1 1/4" m'
53 Pipa PVC Maspion tipe AW ø 1 1/2" m'
54 Pipa PVC Maspion tipe AW ø 2" m'
55 Pipa PVC Maspion tipe AW ø 2 1/2" m'
56 Pipa PVC Maspion tipe AW ø 3" m'
57 Pipa PVC Maspion tipe AW ø 4" m'
58 Pipa PVC Maspion tipe AW ø 5" m'
59 Pipa PVC Maspion tipe AW ø 6" m'
60 Pipa PVC Wavin tipe AW ø 1/2" m'
61 Pipa PVC Wavin tipe AW ø 3/4" m'
62 Pipa PVC Wavin tipe AW ø 1" m'
63 Pipa PVC Wavin tipe AW ø 1 1/4" m'
64 Pipa PVC Wavin tipe AW ø 1 1/2" m'
65 Pipa PVC Wavin tipe AW ø 2" m'
66 Pipa PVC Wavin tipe AW ø 2 1/2" m'
67 Pipa PVC Wavin tipe AW ø 3" m'
68 Pipa PVC Wavin tipe AW ø 4" m'
69 Pipa PVC Wavin type S 12,5 uk. 2" m'
70 Pipa PVC Wavin type S 12,5 uk. 3" m'
71 Pipa PVC Wavin type S 12,5 uk. 4" m'
72 Pipa PVC Wavin type S 12,5 uk. 6" m'
73 Pipa PVC Wavin type S 12,5 uk. 8" m'
74 Pipa Tiang BRC 90 - 2" unit
75 Pipa Tiang BRC 120 - 2" unit
76 Plamur Kayu kg
77 Plamur Tembok kg
78 Plinkut kg
79 Screen 4'' low carbon buah
80 Screen 6'' low carbon buah
81 Screen 8'' low carbon buah
82 Pipa Galvanis Dia. 1.6" Batang
83 Pipa Galvanis Dia 3" M'
84 Pipa Galvanis Dia 1,5" M'
85 Pipa Galvanis ø 1/2" m'
86 Pipa Galvanis ø 3/4" m'
87 Pipa Galvanis ø 1" m'
88 Pipa Galvanis ø 1 1/2" m'
89 Pipa Galvanis ø 2" m'
90 Pipa Porus M'
91 Pipa Baja Kg
92 Blind Flange 40 mm mm
93 Blind Flange 50 mm mm
94 Blind Flange 80 mm mm
95 Blind Flange 100 mm mm
96 Blind Flange 150 mm mm
97 Blind Flange 200 mm mm

E KOMPONEN MATERIAL PINTU AIR


1 Besi Profil untuk komponen Pintu Air Kg
2 Besi Plat untuk komponen Pintu Air Kg
3 Besi As Drat Kg
4 Mur Brons Type Skep Kg
5 Lager Type Skep bh
6 Blok Besi Cor Type Skep bh
7 Kontra Mur Type Skep bh
8 Stang Pemutar Type Skep bh
9 Mur Brons Ronsel Kg
10 Lager Type Ronsel bh
11 Blok Besi Type Ronsel bh
12 Kontra Mur Type Ronsel bh
13 Pen Spindle Type Ronsel bh
14 Stang Pemutar Type Ronsel bh
15 Kopel/Universal Join bh
16 Roda Gigi Piringan bh
17 Roda Gigi Nanas bh
18 Penyangga Roda Gigi bh
19 Buis Brons bh
20 Mur Baut 1/2" x 4" bh
21 Mur Baut 5/8" x 4" bh
22 Mur Baut M8 Stainless bh
23 Plat Peluncur Kg
24 Grease Kg
25 Cat Meni Pintu Air Kg
26 Cat Besi Pintu Air Kg
27 Thinner ltr
28 Stang Gembok bh
29 Gembok bh

III KELOMPOK PERALATAN


A. Peralatan dan Alat Berat

1 Alat (pancang) Hammer 0,5 ton (manual) Unit


2 Alat (pancang) Hammer 1 ton (manual) Unit
3 Alat (pancang) Hammer 2 ton (manual) Unit
4 Alat (mesin pancang diesel) Hammer 0,5 ton Unit
5 Alat (mesin pancang diesel) Hammer 1 ton Unit
6 Alat (mesin pancang diesel) Hammer 2 ton Unit
7 Alat (mesin pancang diesel) Hammer 3 ton Unit
8 Alat (mesin pancang kompresor udara) Hammer 3 ton Unit
9 Alat (mesin pancang tenaga uap) Hammer 3 ton Unit
10 Alat penyambung tiang pancang kayu gelondongan Unit
11 Alat penyambung tiang pancang beton Unit
12 Alat penyambung turap beton Unit
13 Alat penyambung tiang pancang dolken Unit
14 Boat, Speedboat, Motor 10 HP Unit
15 Tug-boat, Motor 50 HP Unit
16 Bore Pile Machine, dia. 60 cm Unit
17 Bore Pile Machine, dia. 100 cm Unit
18 Bulldozer 50-60 HP Unit
19 Bulldozer 100-120 HP Unit
20 Bulldozer 180-220 HP Unit
21 Chainsaw Unit
22 Crane 2.5 ton Unit
23 Crane 5 ton Unit
24 Crane 10 ton Unit
25 Crane 25 ton Unit
26 Dump truck 3,5 ton Unit
27 Dump truck 5 ton Unit
28 Dump truck 7 ton Unit
29 Dump truck 10 ton Unit
30 Drilling Rig (kecil) Unit
31 Drilling Rig (sedang) Unit
32 Drilling Rig (besar) Unit
33 Excavator (kecil)/Backhoe kecil Unit
34 Excavator (standar)/Backhoe Unit
35 Excavator (long arm) Unit
36 Excavator besar (long arm) Unit
37 Generator set Unit
38 Geo Listrik Unit
39 Jack hammer…… 1 pisau Unit
40 Jack hammer…… 2 pisau Unit
41 Jack Stressing Unit
42 Kapal Keruk (kecil) Unit
43 Kapal Keruk (sedang) Unit
44 Kapal Keruk (besar) Unit
45 Las listrik 250 A diesel Unit
46 Lift sampai dengan tinggi maksimum 12m Unit
47 Loader, Wheel Unit
48 Loader, Track Unit
49 Mimic panel untuk 6 channel pintu air Unit
50 Mesin Jahit Geotekstil Unit
51 Mesin Potong Rumput Unit
52 Molen (Concrete Mixer 0.25 m3) Unit
53 Molen (Concrete Mixer 0.35 m3) Unit
54 Pemadat timbunan (vibro roller kecil/stamper) Unit
55 Pick up (Mobil) Unit
56 Pompa air diesel 2,5 KW; 3" Unit
57 Pompa air diesel 5 KW; 4" Unit
58 Pompa air diesel 10 KW; 5" Unit
59 Pompa air diesel 20 KW; 8" Unit
60 Pompa lumpur diesel 2,5 KW; 3" Unit
61 Pompa lumpur diesel 5 KW; 4" Unit
62 Pompa lumpur diesel 7,5 KW; 4" Unit
63 Pompa lumpur diesel 10 KW; 5" Unit
64 Pompa lumpur diesel 20 KW; 6" Unit
65 Pompa lumpur diesel 50 KW; 8" Unit
66 Pompa sedot pasir diesel 5 KW; 4" Unit
67 Pompa sedot pasir diesel 7,5 KW; 5" Unit
68 Pompa sedot pasir diesel 10 KW; 5" Unit
69 Pompa sedot pasir diesel 20 KW; 6" Unit
70 Pompa sedot pasir diesel 50 KW; 8" Unit
71 Pompa dan Conveyor Beton Unit
72 Perahu Unit
73 Perahu Jukung 60 T Unit
74 Ponton kecil Unit
75 Ponton sedang Unit
76 Ponton besar Unit
77 Rakit Unit
78 Roller, Peneumatic Unit
79 Roller, Three wheel 6 - 8 T Unit
80 Roller, Tire wheel Unit
81 Roller, Tandem 6 - 10 T Unit
82 Roller, Vibro Unit
83 Theodolit Unit
84 Tongkang 500 ton Unit
85 Tongkang 1000 ton Unit
86 Tongkang 2000 ton Unit
87 Truck 3,5 m3 Unit
88 Truck 5 m3 Unit
89 Truck 7 m3 Unit
90 Truck 10 m3 Unit
91 Truck 15 m3 Unit
92 Truck 20 m3 Unit
93 Trawl diameter lubang 5mm, panjang 250 m Unit
94 Tripod tinggi 5 m Unit
95 Vibrator beton (portable) Unit
96 Water Tank 3000-4500 L Unit
97 Waterpass Unit
98 Theodolit Unit
99 Tongkang 500 ton Unit
### Tongkang 1000 ton Unit
### Tongkang 2000 ton Unit
### Truck 3,5 m3 Unit
### Truck 5 m3 Unit
### Truck 7 m3 Unit
### Truck 10 m3 Unit
### Truck 15 m3 Unit
### Truck 20 m3 Unit
### Trawl diameter lubang 5mm, panjang 250 m Unit
### Tripod tinggi 5 m Unit
### Track Loader 75-100 Hp
### Wheel Loader 1.0-1.6 M3
### Three Wheel Roller 6-8 T
### Tandem Roller 6-8 T.
### Tire Roller 8-10 T.
### Vibratory Roller 5-8 T.
### Concrete Vibrator
### Stone Crusher
### Water Pump 70-100 Mm
### Water Tanker 3000-4500 L.
### Pedestrian Roller
### Tamper
### Jack Hammer
### Fulvi Mixer
### Concrete Pump
### Trailer 20 Ton
### Pile Driver + Hammer
### Crane On Track 35 Ton
### Welding Set
### Bore Pile Machine
### Asphalt Liquid Mixer
### Trailler 15 Ton
### Rock Drill Breaker
### Cold Milling
### Cold Recycler
### Hot Recycler
### Aggregat (chip) Spreader
### Asphalt Distribution
### Split Form Paver
### Concrete Pan Mixer
### Concrete Breaker
### Asphalt Tanker
### Cement Tanker
### Concrete Mixer (350)
### Vibrating Rammer
### Truk Mixer
### Bore Pile Machine Dia 60
### Crane On Track 75 - 100Ton
### Blending Equipment
### Asphalt Liquid Mixer (kap 20000)
### Alat tambahan Batubara Direct
### Alat tambahan Gas Batubara
### Chain Saw
### Vibrator beton (portable) Unit
### Water Tank 3000-4500 L Unit
### Waterpass Unit

B. Peralatan Penunjang
1 Bodem buah
2 Bor listrik Sewa-hari
3 Ember buah
4 Gergaji besi (mata gergaji) buah
5 Gunting pemotong baja buah
6 Kamera SLR Sewa-hari
7 Kayu Kasut buah
8 Kayu pemikul + tampar unit
9 Kereta dorong unit
10 Komputer utk drafting CAD sewa-bulan
11 Kotak adukan (dolak kayu) buah
12 Kuas buah
13 Kunci pembengkok tulangan (baja keras) buah
14 Linggis (Baja keras) buah
15 Pahat Beton (baja keras) buah
16 Palu/godam pemecah batu buah
17 Plotter uk. A1/A0 sewa-bulan
18 Scaner A4 sewa-bulan
19 Tang / alat pemotong kawat buah
20 Timbris Sewa-hari
21 Tusuk bambu buah

IV MATERIAL LAIN

1 Ajir acuan tanaman buah


2 Ampelas / Ambril lbr
3 Ampelas besi lbr
4 Ampelas Dico no. 120 bh
5 Ampelas Dico no. 280 bh
6 Ampelas Norton No. 3 bh
7 Asbes gelb. Kecil tb.5 mm (105 x 150) cm lbr
8 Asbes gelb. Kecil tb.5 mm (105 x 180) cm lbr
9 Asbes gelb. Kecil tb.5 mm (105 x 210) cm lbr
10 Asbes gelb. Kecil tb.5 mm (105 x 240) cm lbr
11 Asbes gelb. Kecil tb.5 mm (105 x 300) cm lbr
12 Asbes plat 100 cm x 100 cm x 5 mm lbr
13 Asbes plat 100 cm x 200 cm x 5 mm lbr
14 Asbes plat 120 cm x 240 cm x 5 mm lbr
15 Arbocell Kg.
16 Aspal/ Aspal Panas/ Aspal Bitument kg
17 Aspal Emulsi kg
18 Asbuton Halus Ton
19 Asbuton yang diproses Kg
20 Aspal Drum Kg
21 Aspal Polimer Kg
22 Bak Cuci Stainlessteel bh
23 Bak Fiberglass (1 m3) bh
24 Banner plastik printed tahan air m2
25 Banner plastik printed tahan air dan cuaca m2
26 Bensin/Premiun/BBM bersubsidi (non industri) L
27 Bensin/Premiun/BBM non subsidi (industri) L
28 Bibit Mangrove pohon
29 Pohon Anyoman (bibit Mahoni) Bt
30 Cat Besi (baik) kg
31 Cat Besi (cukup)
32 Cat Foxi kg
33 Cat Kayu (baik) kg
34 Cat Kayu (cukup)
35 Cat meni kg
36 Cat tembok baik kg
37 Cat tembok biasa kg
38 Cat Tembok Dalam (baik) kg
39 Cat Tembok Dalam (cukup) kg
40 Cat Tembok Luar (baik) kg
41 Cat Tembok Luar (cukup) kg
42 Cetakan armor kg
43 Cat Anti Karat kg
44 Cat Marka (Non Thermoplas) kg
45 refle kg
46 Copy CD (soft file) buah
47 Cuka Bibit L
48 Chipping M3
49 Chipping (kg) Kg
50 Closet Duduk Porselin bh
51 Closet Jongkok Porselin bh
52 Dempul kg
53 Ember Timbah Sumur bh
54 Engsel H bh
55 Engsel Kupu-kupu bh
56 Engsel Nylon bh
57 Eternit 4 mm (100 x 100) m2
58 Flange Socket (Rubber Ring) 63 x 50 mm
59 Flange Socket (Rubber Ring) 90 x 80 mm
60 Flange Socket (Rubber Ring) 110 x 100 mm
61 Flange Socket (Rubber Ring) 160 x 150 mm
62 Flange Socket (Rubber Ring) 200 x 200 mm
63 Floordrain (Plastik) bh
64 Floordrain (Stainlessteel) bh
65 Folding gate; tb. 0,4 mm m2
66 Folding gate; tb. 0,5 mm m2
67 Folding gate; tb. 0,8 mm m2
68 Formika lbr
69 Galfalum (lebar 0,7 m) m'
70 Elastomer Logam buah
71 Elastomer jenis 1 (300x350x36) buah
72 Elastomer jenis 2 (350x400x39) buah
73 Elastomer jenis 3 (400x450x45) buah
74 Expansion Tipe Joint Asphaltic Plug M
75 Expansion Join Tipe Rubber M
76 Expansion Join Baja Siku M
77 Expansion Cap M2
78 Marmer Nama Jembatan Buah
79 Kerb Type A Buah
80 Foto Album buah
81 Foto Film Selulosa Kimia rol
82 Geotekstil A (tipis) m2
83 Geotekstil B (sedang)-Polyfelt, dll. m2
84 Geotekstil C (tebal) m2
85 Geotekstil tali m
86 Geotekstil mesin jahit Sewa-hari
87 Geotextile Woven (3,85 x 150 m) M2
88 Glass Bead Kg
89 Karung plastik / bagor buah
90 Karung goni/terpal m2
91 Kertas HVS 80 gr ukuran A0 lembar
92 Kertas HVS 80 gr ukuran A1 lembar
93 Kertas HVS 80 gr ukuran A2 lembar
94 Kertas HVS 80 gr ukuran A3 lembar
95 Kertas HVS 70 gr ukuran A4/legal/letter/B5 lembar
96 Kertas HVS 80 gr ukuran A4/legal/letter/B5 lembar
97 Kertas Kalkir 80 gr ukuran A0 (lebar 90 cm) rol
98 Kertas Kalkir 80 gr ukuran A1 (lebar 60 cm) rol
99 Meni / ter / solinem kg
100 Meni Ltr
101 Minyak bekisting L
102 Minyak Fluks Liter
103 Minyak tanah/ Kerosen (industri) L
104 Minyak Tanah / Kerosene ( non industri )
105 Motor 2 KW 1350 rpm + pengkabelan buah
106 Motor 5 KW 1350 rpm + pengkabelan buah
107 Motor 10 KW 1350 rpm + pengkabelan buah
108 Minyak Pelumas / Olie (Alat Berat) L
109 Olie mesin (Mesran 40 SAE) L
110 Oli hidraulic L
111 Oli transmisi L
112 Olie / Minyak pelumas (SAE 140) ltr
113 Olie / Minyak pelumas (SAE 40) ltr
114 Olie / Minyak pelumas (SAE 50) ltr
115 Pagar BRC 90 lbr
116 Pagar BRC 120 lbr
117 Pena Rapido buah
118 Perlengkapan ruang jaga meja kursi set
119 Pemantul Cahaya (Reflector) Bh.
120 Plastik Filter M2
121 Pelat Rambu (Eng. Grade)
122 Pelat Rambu (High I. Grade)
123 Rel Pengaman
124 Solar bersubsidi (non industri) L
125 Solar non subsidi (industri) L
126 Pertamina Dex ltr
127 Reducer Socket (Rubber Ring) 90x63 mm
128 Reducer Socket (Rubber Ring) 110x63 mm
129 Reducer Socket (Rubber Ring) 110x90 mm
130 Reducer Socket (Rubber Ring) 160x110 mm
131 Reducer Socket (Rubber Ring) 160x90 mm
132 Reducer Socket (Rubber Ring) 200x160 mm
133 Reducer Socket (Rubber Ring) 200x110 mm
134 Residu ltr
135 Stempet kg
136 Slurry Seal Kg
137 Thinner LITER
138 Tali pengikat/Tambang Nylon m
139 Tinta Printer botol
140 Tinta Rapido (Hitam) botol
141 Waterstop PVC.150 m
142 Waterstop PVC.200 m
143 Waterstop PVC.270 m
144 Waterstop Rubber lebar 150mm - 200mm m
145 Bahan pengawet: kreosot liter
146 Mata Kucing buah
147 Anchorage buah
148 Anti strpping agent liter
149 Bahan Modifikasi Kg
150 Ducting (Kabel prestress) M'
151 Ducting (Strand prestress) M'
152 Mini Timber Pile Buah
153 Expansion Joint Tipe Torma M1
154 Strip Bearing Buah
155 Joint Socket Pile 35x35 Set
156 Joint Socket Pile 16x16x16 Set
157 Mini Pile 32x32x32 M1
158 Matras Concrete Buah
159 Assetilline Botol
160 Oxygen Botol
161 Joint Sealent Kg
162 Polytene 125 mikron Kg
163 Curing Compound Ltr
164 Kayu Acuan M3
165 Additive Ltr
166 Casing M2
167 Pasir Tailing M3
168 Polimer
169 Kerb jenis 1 Buah
170 Kerb jenis 2 Buah
171 Kerb jenis 3 Buah
172 Bahan Modifikasi Kg
173 Aditif anti pengelupasan Kg
174 Bahan Pengisi (Filler) Tambahan (Semen) Kg
175 Elastomer Alam Kg
176 Elastomer Sintesis Kg
177 Geonet M2
178 Kran Air bh
179 Kunci Lemari bh
180 Kunci Silinder bh
181 Kunci Tanam Besar bh
182 Kunci Tanam Kecil bh
183 Kuwas 3" bh
184 Lampu downlight 3" (Panasonic) bh
185 Lampu downlight 4" (Panasonic) bh
186 Lampu Armature Sirip/Kisi-kisi isi 2 X 18 watt set
187 Lampu Armature Sirip/Kisi-kisi isi 2 X 36 watt set
188 Lampu TL 14 watt Philips ( kecil ) bh
189 Lampu LED selang roll
190 Lapisan Kedap Air kg
191 Lem Kayu (fox) kg
192 Lem Kuning (aica aibon) kg
193 Lis Gypsum m'
194 Lis Kayu 2/3 m'
195 Lis Kayu Profil m'
196 Marmer Lampung bh
197 Marmer Tulungagung bh
198 Material Pilihan (tras) m3
199 Melamin kg
200 Menie Kayu kg
201 Menie Besi kg
202 Mesin Pompa 1 lt / dt bh
203 Mesin Pompa 1-1/2 lt / dt bh
204 Mesin Diesel 22 Pk unit
205 Mesin Diesel 25 Pk unit
206 Mur Baut dan Ring utk Flange 40 mm mm
207 Mur Baut dan Ring utk Flange 50 mm mm
208 Mur Baut dan Ring utk Flange 63 mm mm
209 Mur Baut dan Ring utk Flange 90 mm mm
210 Mur Baut dan Ring utk Flange 110 mm mm
211 Mur Baut dan Ring utk Flange 160 mm mm
212 Mur Baut dan Ring utk Flange 200 mm mm
213 Minyak Beton & bekisting ltr
214 Minyak Tanah ltr
215 Mur Baut 3-8" bh
216 Mur Baut 9" bh
217 Nok Asbes bh
218 Nok Galfalum m'
219 Nok Seng Gelombang m'
220 Oker Putih kg
221 Oker Warna kg
222 Rubber Ring 63 mm mm
223 Rubber Ring 90 mm mm
224 Rubber Ring 110 mm mm
225 Rubber Ring 160 mm mm
226 Rubber Ring 200 mm mm
227 Roll Cat bh
228 Roster Beton 25 x 25 bh
229 Roster Kayu 25 x 25 bh
230 Sabun kg
231 Saklar tunggal Broco bh
232 Saklar ganda Broco bh
233 Stop Kontak Broco bh
234 Sealant (Dokorning) kg
235 Sealtape bh
236 Sekrup Asbes bh
237 Sekrup Baja ringan bh
238 Sekrup Fixer (Allumunium) bh
239 Selang spiral 3" m'
240 Sock overloop / reducer 3"-2" bh
241 Sock overloop / reducer 4"-3" bh
242 Sirlax kg
243 Soda Api kg
244 Solar (minyak diesel) ltr
245 Spiritus ltr
246 Stabilizer 175 watt bh
247 Stempet kg
248 Stop Kontak Broco bh
249 Sunscreen Allumunium m2
250 Tali Ijuk kg
251 Tali karet m'
252 Tangki Air fiber glass 2.000 lt (Pinguin) bh
253 Tangki Air fiber glass 3.000 lt (Pinguin) bh
254 Tee Rubber Ring 63 x 63 x 63 mm mm
255 Tee Rubber Ring 90 x 90 x 90 mm mm
256 Tee Rubber Ring 110 x 110 x 110 mm mm
257 Tee Rubber Ring 160 x 160 x 160 mm mm
258 Tee Equal & Reducer Flange 63 x 50 x 63 mm mm
259 Tee Equal & Reducer Flange 90 x 80 x 90 mm mm
260 Tee Equal & Reducer Flange 90 x 50 x 90 mm mm
261 Tee Equal & Reducer Flange 110 x 100 x 100 mm mm
262 Tee Equal & Reducer Flange 110 x 80 x 110 mm mm
263 Tee Equal & Reducer Flange 110 x 50 x 110 mm mm
264 Tee Equal & Reducer Flange 160 x 100 x 160 mm mm
265 Tee Equal & Reducer Flange 160 x 80 x 160 mm mm
266 Thinner A ltr
267 Thinner Super Daimaru ltr
268 Thosen Klep 1 " bh
269 Thosen Klep 2 " bh
270 Thosen Klep 3 " bh
271 Tras m3
272 Urinoir bh
273 Wastafel Besar bh
274 Wastafel Kecil bh
275 Waterdrain bh
276 Wiremesh / jaring kawat baja dilas m2
277 Wood filer (INFRA) kg
278 Waterproofing kg
279 Watermeter Include Coupling dia. 20 mm (3/4") unit

V LAIN-LAIN
1 Blue/black print uk A1 lembar
2 Blue/black print uk A2 lembar
3 Blue/black print uk A3 lembar
4 Foto, cuci film selulosa kimia rol
5 Foto printing lembar
6 Foto copy kalkir A1 ke kalkir lembar
7 Foto copy kertas Letter, Legal, A4 lembar
8 Menjilid pakai kertas di lakban A4 buah
9 Menjilid pakai kertas langsung A4 buah
10 Menjilid pakai kertas langsung A4 + laminasi buah
11 Menjilid uk A1 buah
12 Menjilid uk A2 buah
13 Menjilid uk A3 buah
14 Reduksi kalkir A2 ke kertas A4 lembar
15 Reduksi kalkir dari A1 ke A2 lembar

DJOKO NU

Jabatan
Sekda
Asisten
Ka DPU
LAMPIRAN : KEPUTUSAN BUPATI BLORA
NOMOR / / 2016
TANGGAL,

BIAYA UPAH DAN BAHAN MATERIAL


PEKERJAAN KONSTRUKSI
UPATEN BLORA TAHUN 2017

Harga
Satuan Dasar Ket.
( Rp. )
4 5

60,000
78,000
78,000
78,000
78,000
78,000
78,000
78,000
78,000
78,000
78,000
78,000
60,000
78,000
60,000
78,000
75,000
78,000
78,000
60,000
60,000
78,000
78,000
78,000
78,000
78,000
78,000
78,000
78,000
78,000
100,000
200,000
78,000
200,000
280,000
360,000

1,500,000
3,000,000
460,000

300,000
80,000

828,000
250,000
345,000

2,500,000
2,100,000
1,725,000
1,725,000
1,725,000
1,950,000
1,438,100
1,438,100

2,300,000
3,100,000

2,530,000
3,105,000
4,140,000
5,865,000
7,475,000

2,070,000
3,105,000
4,140,000
5,865,000

2,300,000
2,587,500
2,875,000
3,162,500

3,450,000
3,737,500
4,025,000
4,312,500

3,450,000
3,737,500
4,025,000
4,312,500

4,600,000
4,887,500
5,175,000
5,462,500

4,600,000
4,887,500
5,175,000
5,462,500

4,600,000
4,887,500
5,175,000
5,462,500

5,750,000
6,037,500
6,325,000
6,612,500
6,900,000
7,187,500
7,475,000
7,762,500

5,750,000
6,037,500
6,325,000
6,612,500
6,900,000
7,187,500
7,475,000
7,762,500

5,750,000
6,037,500
6,325,000
6,612,500
6,900,000
7,187,500
7,475,000
7,762,500

156,250
200,000
500
50
50,000
66,000
1,500
750
1,200
208,600
208,600
190,000
150,000
4,500
4,000
4,250
120,000
46,350
140,000
120,000
125,000
75,000
120,000
135,000
105,000
100,000
800
8,500
869,000
900,000
958,000
999,000
1,039,000
1,083,000
1,140,000
1,187,000
1,200,000
50,000
65,000
85,000
300,000
360,000
45,000
50,000
120,000
407,600
688,800
45,000
136,000
50,000
105,000
310,000
643,500
830,500
1,012,000
1,452,000
2,233,000

3,267,000

5,808,000

7,931,000
789,800
654,500
1,320,000
2,486,000
3,091,000
4,044,150
6,408,600
8,860,500
1,875,000
2,625,000
3,375,000
1,875,000
2,250,000
313,500
473,000
550,000
825,000
1,413,500
6,000
4,500
3,000
11,000
20,000
10,000
25,000
2,000
2,000
2,000
1,300
1,300
300,000
4,050
7,500
2,400
2,650
3,500
4,050
7,200
14,000
18,750
120,000
120,000
6,000
74,000
6,000
17,500
20,000
22,500
25,000
75,000
100,000
125,000
94,500
126,000
375,000
300,000
900
22,000
100,000
35,000
30,000
60,000
15,500
270,600 *
150,000
340,000
243,300 *
243,300
243,300
151,400
67,500 *
1,350
54,000
68,000
1,250
1,350
11,800
54,000
68,000
68,000
65,000
75,000
16,000
50,000
5,400
1,350
230,100
65,000
100,000
128,000
70,000
100,000
80,000
128,000
150,000
80,000
128,000
75,000
150,000
50,000
120,000
336,000
588,000
491,800
352,300
604,900
236,600
63,000
136,000
141,000
231,000
409,000
70,810,300
79,925,500
86,586,600
95,351,200
99,558,100
172,400
340,000
296,700 *
296,700
296,700
296,700
296,700
296,700
322,800
292,674
289,876
217,083
284,981
150,000
180,100
208,600
296,700
296,700
296,700
296,700
273,300
204,100
204,100

20,000
26,000
20,000
20,000
3,250
115,000

70,250
18,000
24,000
47,500
250,000
6,000
139,100
8,727,200
9,400,000
54,500
7,000,000
6,545,400
6,545,400
9,818,100
6,000,000
6,545,400
6,545,400
7,200,000
7,636,300
7,636,300
1,800,000
1,263,600
135,000
210,000
275,000
450,000
600,000
202,500
9,163,500
7,636,300
7,636,300
7,636,300
6,545,400
350,000
1,800,000
7,636,300
7,636,300
7,636,300
7,200,000
54,500
100,000
112,500
120,000
7,636,300
6,545,400
77,000
115,500
161,200
180,000
18,600
115,500
161,200
50,000
66,000
77,000
200,000
125,000
112,000
67,500
47,500
95,000
50,000
66,000
1,000
135,000
1,800,000
47,500
42,500
70,000
9,381,700
55,000
60,000
7,200,000
30,000
50,000
7,666,800

375,000
468,750
937,500
1,406,250
15,600
60,000
43,300
350,000
400,000
300,000
12,500
10,400
157,000
235,500
392,500
475,000
628,000
15,000
15,000
13,600
13,600
12,500
13,600
13,600
15,000
12,500
12,500
12,500
12,500
12,500
12,500
12,500
31,000
12,500
15,000
16,000
17,000
10,000
12,500
38,000
83,000
148,000
440,000
50,000
103,000
211,000
514,500
2,200
3,200
5,600
8,600
10,500
10,000
10,000
15,000
15,000
17,500
15,000
14,250
12,500
12,500
8,500
15,000
5,000
30,000
36,500
38,500
9,000

18,000
8,000
10,500
8,500
28,000
6,000
17,000
25,000
317,300

353,400
28,000
25,000
2,000
25,000
17,000
28,000
17,000
17,000
17,000
21,000
21,000
30,000
17,000
17,000
15,800
15,800
2,422,000
2,616,000
2,811,000
3,005,000
2,890,000
3,096,000
3,304,000
3,511,000
3,300,000
3,520,000
3,740,000
3,960,000
3,794,000
3,066,000
3,513,000
10,751,000
10,904,000
11,056,000
11,208,000
11,359,000
11,512,000
11,750,000
11,900,000
12,053,000
12,206,000
12,357,000
12,510,000
13,508,000
15,502,000
10,994,000
11,164,000
11,334,000
11,503,000
11,673,000
11,842,000
11,993,000
12,162,000
12,331,000
12,501,000
12,670,000
12,839,000
13,837,000
15,832,000
11,237,000
11,425,000
11,610,000
11,798,000
11,984,000
12,172,000
12,234,000
12,422,000
12,609,000
12,795,000
12,982,000
13,169,000
14,166,000
16,162,000
11,480,000
11,685,000
11,889,000
12,093,000
12,297,000
12,502,000
12,478,000
12,682,000
12,886,000
13,090,000
13,295,000
13,498,000
14,496,000
16,490,000
11,723,000
11,944,000
12,166,000
12,388,000
12,610,000
12,830,000
12,721,000
12,943,000
13,163,000
13,386,000
13,607,000
13,828,000
14,826,000
16,819,000
13,535,000
13,762,000
13,988,000
14,439,000
13,934,000
14,160,000
14,387,000
14,839,000
14,534,000
14,759,000
14,985,000
15,438,000
16,115,000
16,527,000
16,754,000
16,979,000
17,432,000
18,110,000
19,240,000
18,522,000
18,748,000
18,975,000
19,426,000
20,105,000
21,235,000
22,366,000
24,704,000

25,225,000

25,748,000

26,793,000

25,164,000

25,685,000

26,207,000

27,252,000

25,852,000

26,374,000

26,896,000

27,941,000

29,507,000

28,150,000

28,671,000

29,193,000

30,239,000

31,805,000

34,415,000

30,447,000

30,968,000

31,490,000

32,535,000
34,102,000

36,713,000

39,323,000

25,172,000

25,716,000

26,260,000

27,348,000

25,632,000

26,174,000

26,719,000

27,806,000

26,320,000

26,864,000

27,408,000

28,496,000

30,127,000

28,618,000

29,162,000

29,705,000

30,793,000

32,425,000

35,142,000

30,915,000

31,459,000
32,004,000

33,091,000

34,721,000

37,440,000

40,159,000

25,640,000

26,206,000

26,771,000

27,903,000

26,100,000

26,666,000

27,230,000

28,362,000

26,789,000

27,355,000

27,921,000

29,051,000

30,747,000

29,087,000

29,652,000

30,217,000

31,348,000

33,043,000

35,871,000
31,385,000

31,948,000

32,515,000

33,646,000

35,341,000

38,167,000

37,638,000

39,935,000

42,232,000

44,529,000

46,826,000

42,454,000

43,346,000

43,592,000

44,483,000

44,349,000

45,240,000

46,580,000

46,243,000

47,136,000

48,474,000

48,137,000

49,030,000

50,369,000
51,261,000

51,925,000

52,818,000

54,157,000

55,050,000

56,388,000

57,726,000

55,714,000

56,605,000

57,945,000

58,838,000

60,176,000

61,514,000

61,734,000

65,522,000

69,309,000

73,098,000

44,372,000

45,368,000

45,508,000

46,505,000

46,266,000

47,263,000

48,756,000
48,161,000

49,157,000

50,649,000

50,054,000

51,051,000

52,543,000

53,540,000

53,842,000

54,838,000

56,332,000

57,328,000

58,824,000

60,317,000

57,630,000

58,627,000

60,121,000

61,117,000

62,612,000

64,104,000

63,909,000

67,697,000

71,485,000

75,274,000

46,288,000
47,389,000

49,038,000

47,424,000

48,524,000

50,175,000

48,182,000

49,282,000

50,932,000

50,076,000

51,176,000

52,826,000

51,970,000

53,070,000

54,721,000

55,820,000

55,759,000

56,859,000

58,509,000

59,609,000

59,547,000

60,647,000

62,296,000

63,397,000

66,085,000
69,874,000

73,661,000

77,450,000

69,650,000

74,436,000

76,866,000

78,484,000

79,224,000

81,652,000

83,270,000

84,011,000

86,439,000

88,057,000

88,797,000

91,226,000

92,843,000

93,583,000

96,012,000

97,630,000

98,370,000

100,797,000

102,417,000

72,806,000

77,592,000
80,253,000

82,029,000

82,379,000

85,040,000

86,815,000

87,166,000

89,826,000

91,602,000

91,952,000

94,612,000

96,389,000

96,738,000

99,399,000

101,174,000

104,186,000

105,960,000

74,908,000

79,695,000

82,512,000

84,390,000

84,481,000

87,299,000

89,177,000

89,268,000
92,086,000

93,964,000

94,055,000

96,872,000

98,750,000

98,842,000

101,658,000

103,537,000

103,628,000

106,445,000

108,323,000
23,813,000
27,183,000
32,579,000
34,469,000
38,383,000
42,479,000
53,510,000
60,000
51,100
50,800
58,300
43,300
4,800
5,500
6,300
7,000
40,000
45,000
52,000
64,000
21,000
27,000
45,000
21,000
27,000
22,000
26,250
29,000
29,000
35,000
63,000
136,000
189,000
267,000
325,000
630,000
630,000
558,900
724,300
968,100
140,000
27,000
29,000
29,000
29,000
413,250

450,000
36,000
111,750
166,500
234,000
318,750
416,250
540,000
666,000
971,250

1,600
2,900
4,400
8,400
12,400
17,000
27,600
46,500
88,300
152,300
97,600
219,500
390,600
550,000
732,000
940,000
1,730,000
2,585,000
3,460,000
4,320,000
5,190,000
18,700
15,000
19,000
35,000
42,000
81,800
106,700
155,600
750,000
1,500,000
3,250,000
12,400
19,100
30,600
45,000
63,000
94,500
0
197,500
308,000
0
468,000
747,000
0
1,201,000
1,883,000
744,000
6,000
5,000
9,000
12,500
16,000
22,500
29,000
42,000
60,000
96,250
126,000
4,250
4,500
6,250
9,000
10,000
12,500
18,500
22,500
42,500
30,600
63,000
94,500
197,500
308,000
90,000
145,000
26,000
14,000
26,500
750,000
1,500,000
3,250,000
255,000
66,600
35,000
15,000
19,000
22,500
35,000
42,000
49,600
12,500
168,000
217,000
366,500
54,200
1,065,000
1,403,000

26,500
26,500
31,500
165,000
535,000
800,000
215,000
485,000
165,000
700,000
1,175,000
265,000
80,000
900,000
425,000
1,325,000
800,000
425,000
325,000
13,000
15,000
15,000
160,000
52,500
25,000
65,000
25,000
60,000
80,000

6,000,000
12,000,000
24,000,000
325,000,000
500,000,000
750,000,000
1,000,000,000
625,000,000
625,000,000
5,000,000
5,000,000
5,000,000
5,000,000
425,000,000
3,750,000,000
1,170,000,000
3,795,000,000
500,000,000
756,000,000
1,000,000,000
8,000,000
369,360,000
369,360,000
369,360,000
751,680,000
184,680,000
369,360,000
560,000,000
700,000,000
600,000,000
1,125,000,000
2,100,000,000
350,000,000
492,480,000
900,000,000
2,625,000,000
379,080,000
125,000,000
132,600,000
250,000,000
21,750,000
15,090,000,000
29,026,250,000
61,022,500,000
132,250,000
2,550,000,000
511,920,000
226,800,000
120,000,000
5,000,000
3,500,000
12,500,000
20,000,000
8,100,000
90,000,000
5,000,000
8,000,000
15,000,000
21,600,000
140,000,000
262,500,000
367,500,000
490,000,000
875,000,000
1,750,000,000
332,500,000
490,000,000
612,500,000
1,120,000,000
2,100,000,000
324,000,000
50,000,000
62,500,000
125,000,000
250,000,000
375,000,000
15,000,000
19,140,000
181,440,000
398,520,000
427,680,000
324,000,000
22,500,000
2,125,000,000
4,650,000,000
10,500,000,000
184,680,000
369,360,000
560,000,000
700,000,000
1,120,000,000
1,400,000,000
45,000,000
62,500,000
4,320,000
145,800,000
10,000,000
22,500,000
2,125,000,000
4,650,000,000
10,500,000,000
492,480,000
369,360,000
560,000,000
700,000,000
1,120,000,000
1,400,000,000
45,000,000
62,500,000
226,800,000
511,920,000
181,440,000
427,680,000
398,520,000
324,000,000
4,320,000
1,477,440,000
21,600,000
145,800,000
158,760,000
8,100,000
108,000,000
48,600,000
324,000,000
298,080,000
139,320,000
751,680,000
29,160,000
5,391,360,000
189,000,000
324,000,000
492,480,000
2,721,600,000
2,721,600,000
2,721,600,000
234,360,000
129,600,000
10,800,000
46,008,000
492,480,000
46,980,000
46,980,000
35,640,000
14,040,000
438,480,000
5,391,360,000
839,160,000
55,080,000
189,000,000
0
0
12,960,000
4,320,000
145,800,000
10,000,000

2,000
56,000
40,000
16,500
8,250
125,000
155,000
7,400
12,000
3,500 *
52,500
52,500
37,500
90,000
250,000
10,000
25,000 *
75,000 *
75,000
72,000
144,600
270,000
4,200
300,000
3,000
3,500
3,500
3,500
3,500
3,500
65,000
56,000
65,000
73,500
90,000
16,500
40,000
57,520
39,700
8,250
9,000
1,591,300
8,900
9,000
14,300
150,000
200,000
125,000
155,000
7,400
12,000
3,500
13,400
52,500
46,000
35,000
52,500
50,000
37,500
90,000
48,000
22,000
17,500
90,000
65,000
250,000
49,000
28,500
36,000
10,000
25,000
258,200
100
1,032,000
459,000
27,000
15,000
10,000
17,500
15,000
16,500
273,500
425,500
620,500
1,010,000
1,595,000
10,000
36,000
320,000
350,000
380,000
115,000
45,000
372,600
807,300
869,400
931,500
2,025,500
1,490,400
1,242,000
9,800
496,800
80,700
75,000
75,000
60,000
120,500
225,000
3,500
250,000
11,300
11,700
2,500
1,500
3,500
1,850
1,000
500
250
200
120,000
75,000
37,500
29,500
11,100
17,000
15,500
12,500
10,000,000
40,000,000
100,000,000
30,600
30,600
37,500
38,500
37,500
40,000
38,000
135,000
155,000
75,000
1,000,000
16,800
18,600
371,400
496,800
690,000
6,900
13,000
10,500
97,500
138,500
139,000
267,000
255,000
424,000
413,000
5,000
86,000
11,700
22,000
2,500
35,000 *
40,000 *
75,000
90,000
115,000
125,000
6,200
136,600
1,863,000
57,500
1,300
204,900
140,300
219,000
1,639,400
313,500
829,900
92,200
219,000
553,300
313,500
156,800
55,000
31,200
62,500
1,591,600
62,500
17,200
347,400
60,300
61,400
68,300
75,100
100,600
62,100
1,350
40,200
40,200
2,600
22,500
13,000
34,000
130,000
90,000
9,800
50,000
57,500
290,000
410,000
28,500

45,000
16,200
25,400
25,000
3,900
4,000
1,300,000
850,000
162,500
43,500
26,000
37,500
8,500,000
15,500,000
8,500,000
12,500,000
30,000
30,000
30,000
63,000
69,000
250,000
268,000
11,100
15,500
4,000
6,000
35,000
40,000
21,000
7,500
25,000
6,500
9,000
11,500
20,500
29,750
10,000
28,000
25,000
13,500
10,000
13,000
11,000
35,000
1,500
1,000
200
200
50,000
50,000
50,000
85,000
15,000
13,000
12,000
1,200,000
27,500
11,000
20,000
6,000
10,000
2,800,000
8,000,000
438,000
575,000
657,500
1,455,500
1,135,000
1,310,000
1,192,000
1,875,000
1,545,500
1,610,000
2,575,000
2,755,000
22,500
15,000
58,000
215,000
245,000
137,500
1,100,000
275,000
175,000
10,000
90,000
32,000
45,000
140,000

2,600
2,000
1,250
55,000
1,500
6,500
250
7,500
10,000
13,500
17,500
11,500
6,750
16,500
12,500

BUPATI BLORA

DJOKO NUGROHO

PARAF Tanggal
file:///conversion/tmp/scratch/436913527.xlsx

No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

VI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


1 A.4.6.1.1 1 m3 Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu
A Tenaga
L.01 7 OH Pekerja
L.02 21 OH Tukang Kayu
L.03 2.10 OH Kepala Tukang
L.04 0.35 OH Mandor
B Bahan
1.1 m3 Kayu Klas I (Jati) , Balok
1.25 kg Paku Biasa 2" - 5 "
1 kg Lem Kayu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

2 A.4.6.1.2 1 m3 Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu


Tenaga
L.01 6.00 OH Pekerja
L.02 18.00 OH Tukang Kayu
L.03 1.80 OH Kepala Tukang
L.04 0.30 OH Mandor
Bahan
1.2 m3 Kayu Klas II (Kamfer) , Balok
1.25 kg Paku Biasa 2" - 5 "
1 kg Lem Kayu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

3 A.4.6.1.3 1 m2 Pembuatan & Pemasangan Pintu KlampStandard Kayu K


A Tenaga
L.01 0.35 OH Pekerja
L.02 1.05 OH Tukang Kayu
L.03 0.105 OH Kepala Tukang

436913527.xlsx 221/188 abk 6-14


file:///conversion/tmp/scratch/436913527.xlsx

No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

L.04 0.018 OH Mandor


B Bahan
0.040 m3 Kayu Klas II (Kamfer), papan
0.05 Kg Paku Biasa 2" - 5 "
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

4 A.4.6.1.4 1 m2 Pembuatan & Pemasangan Daun Pintu Klamp Sederhana


Tenaga
L.01 0.35 OH Pekerja
L.02 1.05 OH Tukang Kayu
L.03 0.105 OH Kepala Tukang
L.04 0.018 OH Mandor
Bahan
0.040 m3 Kayu Klas II (Kamfer), papan
0.05 Kg Paku Biasa 2" - 5 "
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

5 A.4.6.1.5 1 m2 Pembuatan & Pemasangan Daun Pintu Panel, Kayu Klas


A Tenaga
L.01 1.00 OH Pekerja
L.02 3.00 OH Tukang Kayu
L.03 0.30 OH Kepala Tukang
L.04 0.05 OH Mandor

436913527.xlsx 221/189 abk 6-14


file:///conversion/tmp/scratch/436913527.xlsx

No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

B Bahan
0.04 m3 Kayu Klas II (Kamfer), papan
0.500 kg Lem Kayu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

6 A.4.6.1.6 1 m2 Pembuatan & Pemasangan Pintu & Jendela Kaca Kayu K


A Tenaga
L.01 0.800 OH Pekerja
L.02 2.400 OH Tukang Kayu
L.03 0.240 OH Kepala Tukang
L.04 0.040 OH Mandor
B Bahan
0.024 m3 Kayu Klas II (Kamfer), papan
0.300 kg Lem Kayu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

7 A.4.6.1.7 1 m2 Pembuatan & Pemasangan Pintu & Jendela Jalusi Kayu K


A Tenaga
L.01 1 OH Pekerja
L.02 3 OH Tukang Kayu
L.03 0.3 OH Kepala Tukang
L.04 0.05 OH Mandor
B Bahan
0.064 m3 Kayu Klas I (Jati), papan
0.5 kg Lem Kayu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

436913527.xlsx 221/190 abk 6-14


file:///conversion/tmp/scratch/436913527.xlsx

No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

8 A.4.6.1.8 1 m2 Pembuatan&Pemasangan Pintu kayu lapis (Plywood) Rangkap

A Tenaga
L.01 0.700 OH Pekerja
L.02 2.100 OH Tukang Kayu
L.03 0.210 OH Kepala Tukang
L.04 0.035 OH Mandor
B Bahan
0.025 m3 Kayu Klas II (Kamfer), papan
0.030 Kg Paku Biasa 1/2" - 1"
0.500 kg Lem Kayu
1.000 Lbr Plywood tebal 4 mm uk.90x210cm
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

9 A.4.6.1.9 1 m2 Pembuatan&Pemasangan Pintu Plywood rangkap, rangka


A Tenaga
L.01 0.800 OH Pekerja
L.02 2.400 OH Tukang Kayu
L.03 0.240 OH Kepala Tukang
L.04 0.040 OH Mandor
B Bahan
0.0256 m3 Kayu Klas II (Kamfer), papan
0.03 Kg Paku Biasa 1/2" - 1"
0.5 Kg Lem Kayu
1 Lbr Plywood tebal 4 mm uk.90x210cm
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

436913527.xlsx 221/191 abk 6-14


file:///conversion/tmp/scratch/436913527.xlsx

No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

10 A.4.6.1.10 1 m2 Pembuatan & Pemasangan Jalusi mati Kosen Kayu Klas


A Tenaga
L.01 0.670 OH Pekerja
L.02 2.000 OH Tukang Kayu
L.03 0.200 OH Kepala Tukang
L.04 0.335 OH Mandor
B Bahan
0.06 m3 Kayu Klas I (Jati), papan
0.15 Kg Paku Biasa 1/2" - 1"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

11 A.4.6.1.11 1 m2 Pembuatan & Pemasangan Pintu Teakwood Rangkap, Ra


A Tenaga
L.01 0.80 OH Pekerja
L.02 2.40 OH Tukang Kayu
L.03 0.24 OH Kepala Tukang
L.04 0.04 OH Mandor
B Bahan
0.025 m3 Kayu Klas I (Jati), papan
0.03 Kg Paku Biasa 1/2" - 1"
0.3 kg Lem Kayu
1 Lbr Teakwood (90 x 210) cm x 4 mm
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

12 A.4.6.1.12 1 m2 Pembuatan&Pemasangan Pintu Teakwood Rangkap Lapis Form

A Tenaga
L.01 0.850 OH Pekerja
L.02 2.550 OH Tukang Kayu
L.03 0.255 OH Kepala Tukang
L.04 0.043 OH Mandor

436913527.xlsx 221/192 abk 6-14


file:///conversion/tmp/scratch/436913527.xlsx

No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

B Bahan
0.025 m3 Kayu Klas II (Kamfer), papan
0.03 Kg Paku Biasa 1/2" - 1"
0.80 kg Lem Kayu
1 Lbr Teakwood (90 x 210) cm x 4 mm
0.5 Lbr Formika
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

13 A.4.6.1.13 1 m3 Pembuatan&Memasang Konstruksi Kuda-kuda Konvensi


A Tenaga
L.01 4 OH Pekerja
L.02 12 OH Tukang Kayu
L.03 1.2 OH Kepala Tukang
L.04 0.2 OH Mandor
B Bahan
1.1 m3 Kayu Kamfer, balok
15 Kg Besi Strip
5.6 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

14 A.4.6.1.14 1 m3 Pembuatan&Pemasangan Konstruksi Kuda-kuda Expose


A Tenaga
L.01 6.7 OH Pekerja
L.02 20.1 OH Tukang Kayu
L.03 2.01 OH Kepala Tukang
L.04 0.335 OH Mandor

436913527.xlsx 221/193 abk 6-14


file:///conversion/tmp/scratch/436913527.xlsx

No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

B Bahan
1.2 m3 Kayu Klas I (jati), balok
15 Kg Besi Strip
5.6 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

15 A.4.6.1.15 1 m3 Pemasangan konstruksi Gording, Kayu Klas II


A Tenaga
L.01 6.7 OH Pekerja
L.02 20.1 OH Tukang Kayu
L.03 2.01 OH Kepala Tukang
L.04 0.335 OH Mandor
B Bahan
1.1 m3 Kayu Klas I (Kamfer), balok
15 Kg Besi Strip
3 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

16 A.4.6.1.16 1 m2 Pemasangan Rangka Atap Genteng Keramik, Kayu Klas I


A Tenaga
L.01 0.1 OH Pekerja
L.02 0.1 OH Tukang Kayu
L.03 0.01 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
0.014 m3 Kayu Klas II (Kamfer), Kaso-kaso (5x7) cm
0.0036 m3 Reng (2x3) cm
0.25 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C

436913527.xlsx 221/194 abk 6-14


file:///conversion/tmp/scratch/436913527.xlsx

No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

17 A.4.6.1.17 1 m2 Pemasangan Rangka Atap Genteng Beton, Kayu Klas II


A Tenaga
L.01 0.1 OH Pekerja
L.02 0.1 OH Tukang Kayu
L.03 0.01 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
0.014 m3 Kayu Klas II (Kamfer), Kaso-kaso (5x7) cm
0.0570 m3 Reng (2x3) cm
0.25 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

18 A.4.6.1.18 1 m2 Pemasangan Rangka Atap Sirap, Kayu Klas II


A Tenaga
L.01 0.12 OH Pekerja
L.02 0.12 OH Tukang Kayu
L.03 0.012 OH Kepala Tukang
L.04 0.006 OH Mandor
B Bahan
0.014 m3 Kayu Klas II (Kamfer), balok
0.057 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

436913527.xlsx 221/195 abk 6-14


file:///conversion/tmp/scratch/436913527.xlsx

No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

19 A.4.6.1.19 1 m2 Pemasangan Rangka Langit-langit (50x1,00) m, kayu Kla


A Tenaga
L.01 0.15 OH Pekerja
L.02 0.30 OH Tukang Kayu
L.03 0.030 OH Kepala Tukang
L.04 0.075 OH Mandor
B Bahan
0.0154 m3 Kayu Klas II (Kamfer), balok
0.2 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

20 A.4.6.1.20 1 m2 Pemasangan Rangka Langit-langit (60x60) cm, kayu Klas


A Tenaga
L.01 0.2 OH Pekerja
L.02 0.3 OH Tukang Kayu
L.03 0.03 OH Kepala Tukang
L.04 0.01 OH Mandor
B Bahan
0.0163 m3 Kayu Klas II (Kamfer), balok
0.25 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

21 A.4.6.1.21 1 m' Pemasangan Listplank Uk. (3x20)cm Kayu klas I atau II


A Tenaga
L.01 0.1 OH Pekerja
L.02 0.2 OH Tukang Kayu
L.03 0.020 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
0.0108 m3 Kayu klas I (Jati), papan

436913527.xlsx 221/196 abk 6-14


file:///conversion/tmp/scratch/436913527.xlsx

No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

0.10 Kg Paku Biasa 2" - 5"


C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

22 A.4.6.1.22 1 m' Pemasangan Listplank Uk. (3x30)cm Kayu klas I atau klas
A Tenaga
L.01 0.1 OH Pekerja
L.02 0.2 OH Tukang Kayu
L.03 0.02 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
0.011 m3 Kayu klas II (Kamfer), papan
0.05 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

23 A.4.6.1.23 1 m2 Pemasangan Rangka Dinding Pemisah (60x120) cm Kay


A Tenaga
L.01 0.15 OH Pekerja
L.02 0.45 OH Tukang Kayu
L.03 0.045 OH Kepala Tukang
L.04 0.008 OH Mandor
B Bahan
0.028 m3 Kayu klas II (Kamfer), balok
0.15 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

436913527.xlsx 221/197 abk 6-14


file:///conversion/tmp/scratch/436913527.xlsx

No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

24 A.4.6.1.24 1 m2 Pemasangan Dinding Pemisah Teakwood Rangkap Rangk


A Tenaga
L.01 0.15 OH Pekerja
L.02 0.45 OH Tukang Kayu
L.03 0.045 OH Kepala Tukang
L.04 0.008 OH Mandor
B Bahan
0.028 m3 Kayu klas II (Kamfer), balok
0.15 Kg Paku Biasa 2" - 5"
0.86 Lbr Teakwood 120 x 240 cm tebal 4mm
0.56 Kg Lem
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

25 A.4.6.1.25 1 m2 Pemasangan Dinding Pemisah Plywood Rangkap Rangka


A Tenaga
L.01 0.200 OH Pekerja
L.02 0.600 OH Tukang Kayu
L.03 0.060 OH Kepala Tukang
L.04 0.010 OH Mandor
B Bahan
0.028 m3 Kayu klas II (Kamfer), balok
0.15 Kg Paku Biasa 2" - 5"
0.86 Lbr Plywood 120 x 240 cm tebal 4mm
0.56 kg Lem
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

26 A.4.6.1.26 1 m2 Pemasangan Dinding Lambriziring dari Papan klas I


A Tenaga
L.01 0.6 OH Pekerja
L.02 1.8 OH Tukang Kayu

436913527.xlsx 221/198 abk 6-14


file:///conversion/tmp/scratch/436913527.xlsx

No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

L.03 0.18 OH Kepala Tukang


L.04 0.03 OH Mandor
B Bahan
0.007 m3 Kayu klas I (Jati), papan
0.1 Kg Paku Biasa 2" - 5"
0.15 Kg Paku Sekrup 3,5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

27 A.4.6.1.27 1 m2 Pemasangan Dinding Lambriziring dari Plywood ukuran


A Tenaga
L.01 0.025 OH Pekerja
L.02 0.075 OH Tukang Kayu
L.03 0.0080 OH Kepala Tukang
L.04 0.0010 OH Mandor
B Bahan
0.4 Lbr Plywood (120 X 240) cm x 4mm
0.05 Kg Paku Biasa 1/2" - 1"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

28 A.4.6.1.28 1 m2 Pemasangan Dinding Bilik, Rangka Kayu Klas III atau IV


A Tenaga
L.01 0.1 OH Pekerja
L.02 0.05 OH Tukang Kayu
L.03 0.005 OH Kepala Tukang
L.04 0.005 OH Mandor

436913527.xlsx 221/199 abk 6-14


file:///conversion/tmp/scratch/436913527.xlsx

No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

B Bahan
1.500 m2 Bilik Bambu
0.014 m3 Kayu Klas III (Meranti)
0.012 Kg Paku Biasa 1/2" - 1"
0.003 m' List Kayu 2/4
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

436913527.xlsx 221/200 abk 6-14


file:///conversion/tmp/scratch/436913527.xlsx

HARGA BAHAN/UPAH JUMLAH

Rp Rp

asangan Kosen Pintu & Jendela Kayu klas I 10,576,571.50


2,363,375.00
68,000.00 476,000.00
80,000.00 1,680,000.00
85,000.00 178,500.00
82,500.00 28,875.00
7,251,690.00
6,545,400.00 7,199,940.00
15,800.00 19,750.00
32,000.00 32,000.00

9,615,065.00
961,506.50
10,576,571.50

asangan Kosen Pintu & Jendela Kayu klas II atau III 12,365,166.00
2,025,750.00
68,000.00 408,000.00
80,000.00 1,440,000.00
85,000.00 153,000.00
82,500.00 24,750.00
9,215,310.00
7,636,300.00 9,163,560.00
15,800.00 19,750.00
32,000.00 32,000.00

11,241,060.00
1,124,106.00
12,365,166.00

asangan Pintu KlampStandard Kayu Klas II (Kayu Kamfer) 466,897.20


118,210.00
68,000.00 23,800.00
80,000.00 84,000.00
85,000.00 8,925.00

436913527.xlsx 221/201 abk 6-14


file:///conversion/tmp/scratch/436913527.xlsx

HARGA BAHAN/UPAH JUMLAH

Rp Rp

82,500.00 1,485.00
306,242.00
7,636,300.00 305,452.00
15,800.00 790.00

424,452.00
42,445.20
466,897.20

asangan Daun Pintu Klamp Sederhana Kayu Klas III 466,897.20


118,210.00
68,000.00 23,800.00
80,000.00 84,000.00
85,000.00 8,925.00
82,500.00 1,485.00
306,242.00
7,636,300.00 305,452.00
15,800.00 790.00

424,452.00
42,445.20
466,897.20

asangan Daun Pintu Panel, Kayu Klas I atau II 724,984.70


337,625.00
68,000.00 68,000.00
80,000.00 240,000.00
85,000.00 25,500.00
82,500.00 4,125.00

436913527.xlsx 221/202 abk 6-14


file:///conversion/tmp/scratch/436913527.xlsx

HARGA BAHAN/UPAH JUMLAH

Rp Rp

321,452.00
7,636,300.00 305,452.00
32,000.00 16,000.00

659,077.00
65,907.70
724,984.70

asangan Pintu & Jendela Kaca Kayu Klas I atau II 509,268.32


270,100.00
68,000.00 54,400.00
80,000.00 192,000.00
85,000.00 20,400.00
82,500.00 3,300.00
192,871.20
7,636,300.00 183,271.20
32,000.00 9,600.00

462,971.20
46,297.12
509,268.32

asangan Pintu & Jendela Jalusi Kayu Klas I atau II (jati) 1,080,181.74
337,625.00
68,000.00 68,000.00
80,000.00 240,000.00
85,000.00 25,500.00
82,500.00 4,125.00
644,358.40
9,818,100.00 628,358.40
32,000.00 16,000.00

981,983.40
98,198.34
1,080,181.74

436913527.xlsx 221/203 abk 6-14


file:///conversion/tmp/scratch/436913527.xlsx

HARGA BAHAN/UPAH JUMLAH

Rp Rp

angan Pintu kayu lapis (Plywood) Rangkap rangka Kayu Klas II (lbr s/d 562,340.90
236,337.50
68,000.00 47,600.00
80,000.00 168,000.00
85,000.00 17,850.00
82,500.00 2,887.50
274,881.50
7,636,300.00 190,907.50
15,800.00 474.00
32,000.00 16,000.00
67,500.00 67,500.00

511,219.00
51,121.90
562,340.90

sangan Pintu Plywood rangkap, rangka expose kayu klas I atau I 604,519.61
270,100.00
68,000.00 54,400.00
80,000.00 192,000.00
85,000.00 20,400.00
82,500.00 3,300.00
279,463.28
7,636,300.00 195,489.28
15,800.00 474.00
32,000.00 16,000.00
67,500.00 67,500.00

549,563.28
54,956.33
604,519.61

436913527.xlsx 221/204 abk 6-14


file:///conversion/tmp/scratch/436913527.xlsx

HARGA BAHAN/UPAH JUMLAH

Rp Rp

asangan Jalusi mati Kosen Kayu Klas I atau II 925,604.35


250,197.50
68,000.00 45,560.00
80,000.00 160,000.00
85,000.00 17,000.00
82,500.00 27,637.50
591,261.00
9,818,100.00 589,086.00
14,500.00 2,175.00

841,458.50
84,145.85
925,604.35

asangan Pintu Teakwood Rangkap, Rangka Expose Kayu Klas I 652,396.25


270,100.00
68,000.00 54,400.00
80,000.00 192,000.00
85,000.00 20,400.00
82,500.00 3,300.00
322,987.50
9,818,100.00 245,452.50
14,500.00 435.00
32,000.00 9,600.00
67,500.00 67,500.00

593,087.50
59,308.75
652,396.25

angan Pintu Teakwood Rangkap Lapis Formika,Rangka expose Kayu Kl 691,861.50


287,022.50
68,000.00 57,800.00
80,000.00 204,000.00
85,000.00 21,675.00
82,500.00 3,547.50

436913527.xlsx 221/205 abk 6-14


file:///conversion/tmp/scratch/436913527.xlsx

HARGA BAHAN/UPAH JUMLAH

Rp Rp

341,942.50
7,636,300.00 190,907.50
14,500.00 435.00
32,000.00 25,600.00
67,500.00 67,500.00
115,000.00 57,500.00

628,965.00
62,896.50
691,861.50

asang Konstruksi Kuda-kuda Konvensional Kayu I; II & III Bentan 10,986,393.00


1,350,500.00
68,000.00 272,000.00
80,000.00 960,000.00
85,000.00 102,000.00
82,500.00 16,500.00
8,637,130.00
7,636,300.00 8,399,930.00
10,400.00 156,000.00
14,500.00 81,200.00

9,987,630.00
998,763.00
10,986,393.00

sangan Konstruksi Kuda-kuda Expose, Kayu Klas I 11,397,152.25


2,262,087.50
68,000.00 455,600.00
80,000.00 1,608,000.00
85,000.00 170,850.00
82,500.00 27,637.50

436913527.xlsx 221/206 abk 6-14


file:///conversion/tmp/scratch/436913527.xlsx

HARGA BAHAN/UPAH JUMLAH

Rp Rp

8,098,960.00
6,545,400.00 7,854,480.00
10,400.00 156,000.00
15,800.00 88,480.00

10,361,047.50
1,036,104.75
11,397,152.25

11,951,959.25
2,262,087.50
68,000.00 455,600.00
80,000.00 1,608,000.00
85,000.00 170,850.00
82,500.00 27,637.50
8,603,330.00
7,636,300.00 8,399,930.00
10,400.00 156,000.00
15,800.00 47,400.00

10,865,417.50
1,086,541.75
11,951,959.25

gka Atap Genteng Keramik, Kayu Klas II 169,852.52


16,062.50
68,000.00 6,800.00
80,000.00 8,000.00
85,000.00 850.00
82,500.00 412.50
138,348.88
7,636,300.00 106,908.20
7,636,300.00 27,490.68
15,800.00 3,950.00

154,411.38

436913527.xlsx 221/207 abk 6-14


file:///conversion/tmp/scratch/436913527.xlsx

HARGA BAHAN/UPAH JUMLAH

Rp Rp

15,441.14
169,852.52

gka Atap Genteng Beton, Kayu Klas II 618,408.78


16,062.50
68,000.00 6,800.00
80,000.00 8,000.00
85,000.00 850.00
82,500.00 412.50
546,127.30
7,636,300.00 106,908.20
7,636,300.00 435,269.10
15,800.00 3,950.00

562,189.80
56,218.98
618,408.78

139,792.18
19,275.00
68,000.00 8,160.00
80,000.00 9,600.00
85,000.00 1,020.00
82,500.00 495.00
107,808.80
7,636,300.00 106,908.20
15,800.00 900.60

127,083.80
12,708.38
139,792.18

436913527.xlsx 221/208 abk 6-14


file:///conversion/tmp/scratch/436913527.xlsx

HARGA BAHAN/UPAH JUMLAH

Rp Rp

gka Langit-langit (50x1,00) m, kayu Klas II atau III 180,066.17


42,937.50
68,000.00 10,200.00
80,000.00 24,000.00
85,000.00 2,550.00
82,500.00 6,187.50
120,759.02
7,636,300.00 117,599.02
15,800.00 3,160.00

163,696.52
16,369.65
180,066.17

gka Langit-langit (60x60) cm, kayu Klas II atau III 186,336.36


40,975.00
68,000.00 13,600.00
80,000.00 24,000.00
85,000.00 2,550.00
82,500.00 825.00
128,421.69
7,636,300.00 124,471.69
15,800.00 3,950.00

169,396.69
16,939.67
186,336.36

lank Uk. (3x20)cm Kayu klas I atau II 145,780.78


24,912.50
68,000.00 6,800.00
80,000.00 16,000.00
85,000.00 1,700.00
82,500.00 412.50
107,615.48
9,818,100.00 106,035.48

436913527.xlsx 221/209 abk 6-14


file:///conversion/tmp/scratch/436913527.xlsx

HARGA BAHAN/UPAH JUMLAH

Rp Rp

15,800.00 1,580.00

132,527.98
13,252.80
145,780.78

lank Uk. (3x30)cm Kayu klas I atau klas II 120,671.98


24,912.50
68,000.00 6,800.00
80,000.00 16,000.00
85,000.00 1,700.00
82,500.00 412.50
84,789.30
7,636,300.00 83,999.30
15,800.00 790.00

109,701.80
10,970.18
120,671.98

gka Dinding Pemisah (60x120) cm Kayu klas II atau III 293,558.54


50,685.00
68,000.00 10,200.00
80,000.00 36,000.00
85,000.00 3,825.00
82,500.00 660.00
216,186.40
7,636,300.00 213,816.40
15,800.00 2,370.00

266,871.40
26,687.14
293,558.54

436913527.xlsx 221/210 abk 6-14


file:///conversion/tmp/scratch/436913527.xlsx

HARGA BAHAN/UPAH JUMLAH

Rp Rp

ing Pemisah Teakwood Rangkap Rangka Kayu Klas II 455,170.54


50,685.00
68,000.00 10,200.00
80,000.00 36,000.00
85,000.00 3,825.00
82,500.00 660.00
363,106.40
7,636,300.00 213,816.40
15,800.00 2,370.00
150,000.00 129,000.00
32,000.00 17,920.00

413,791.40
41,379.14
455,170.54

ing Pemisah Plywood Rangkap Rangka Kayu Klas II 473,694.54


67,525.00
68,000.00 13,600.00
80,000.00 48,000.00
85,000.00 5,100.00
82,500.00 825.00
363,106.40
7,636,300.00 213,816.40
15,800.00 2,370.00
150,000.00 129,000.00
32,000.00 17,920.00

430,631.40
43,063.14
473,694.54

305,119.87
202,575.00
68,000.00 40,800.00
80,000.00 144,000.00

436913527.xlsx 221/211 abk 6-14


file:///conversion/tmp/scratch/436913527.xlsx

HARGA BAHAN/UPAH JUMLAH

Rp Rp

85,000.00 15,300.00
82,500.00 2,475.00
74,806.70
9,818,100.00 68,726.70
15,800.00 1,580.00
30,000.00 4,500.00

277,381.70
27,738.17
305,119.87

ing Lambriziring dari Plywood ukuran (120x240) cm 76,106.25


8,462.50
68,000.00 1,700.00
80,000.00 6,000.00
85,000.00 680.00
82,500.00 82.50
60,725.00
150,000.00 60,000.00
14,500.00 725.00

69,187.50
6,918.75
76,106.25

ing Bilik, Rangka Kayu Klas III atau IV 136,866.51


11,637.50
68,000.00 6,800.00
80,000.00 4,000.00
85,000.00 425.00
82,500.00 412.50

436913527.xlsx 221/212 abk 6-14


file:///conversion/tmp/scratch/436913527.xlsx

HARGA BAHAN/UPAH JUMLAH

Rp Rp

112,786.60
20,000.00 30,000.00
5,900,000.00 82,600.00
14,500.00 174.00
4,200.00 12.60

124,424.10
12,442.41
136,866.51

436913527.xlsx 221/213 abk 6-14


No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

IX A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT


1 A.4.5.1.1 1 m2 Pemasangan Langit-langit Asbes (1,00x1,00) m, tebal 4 mm,

A Tenaga
L.01 0.03 OH Pekerja
L.02 0.07 OH Tukang Kayu
L.03 0.007 OH Kepala Tukang
L.04 0.004 OH Mandor

B Bahan
1.1 Lbr Plat Asbes

0.01 Kg Paku
C PERALATAN
D Jumlah A + B + C

E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

Overhead & Profit (contoh 10%)


2 A.4.5.1.2 1 m2 Pemasangan Langit-langit Akustik Ukuran (30x30) cm
A Tenaga
L.01 0.12 OH Pekerja
L.02 0.12 OH Tukang Kayu
L.03 0.012 OH Kepala Tukang
L.04 0.006 OH Mandor
B Bahan

12.0 Lbr Akustik Uk.30 x 30 cm


0.05 Kg Paku

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

3 A.4.5.1.3 1 m2 Pemasangan Langit-langit Akustik Ukuran (30x60) cm


A Tenaga
L.01 0.12 OH Pekerja
L.02 0.12 OH Tukang Kayu

436913527.xlsx 221/214 abk 9-14


No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

L.03 0.01 OH Kepala Tukang


L.04 0.006 OH Mandor

B Bahan
5.80 Lbr Akustik

0.05 Kg Paku
C PERALATAN
D Jumlah A + B + C

E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

4 A.4.5.1.4 1 m2 Pemasangan Langit-langit Akustik Ukuran (60x120) cm


A Tenaga
L.01 0.10 OH Pekerja
L.02 0.10 OH Tukang Kayu
L.03 0.01 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan

1.50 Lbr Akustik


0.05 Kg Paku

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

5 A.4.5.1.5 1 m2 Memasang Langit-langit Tripleks Uk (120x240) cm, Tebal 3 m


A Tenaga
L.01 0.10 OH Pekerja
L.02 0.10 OH Tukang Kayu
L.03 0.01 OH Kepala Tukang
L.04 0.005 OH Mandor

436913527.xlsx 221/215 abk 9-14


No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

B Bahan
0.375 Lbr Tripleks (4 mm)

0.03 Kg Paku Tripleks


C PERALATAN

D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

6 A.4.5.1.6 1 m2 Memasang Langit-langit Lambriziring Kayu Jati, tebal 6 mm

A Tenaga
L.01 0.8 OH Pekerja
L.02 0.8 OH Tukang Kayu
L.03 0.08 OH Kepala Tukang
L.04 0.04 OH Mandor

B Bahan
0.015 m3 Kayu Jati,Papan
0.01 Kg Paku

C PERALATAN
D Jumlah A + B + C

E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

7 A.4.5.1.7 1 m2 Memasang Langit-langit Gypsu Board, Uk (120x240) tebal 9


A Tenaga
L.01 0.1 OH Pekerja
L.02 0.05 OH Tukang Kayu
L.03 0.005 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan

0.364 Lbr Gypsum Board


0.11 Kg Paku Sekrup
C PERALATAN

D Jumlah A + B + C

436913527.xlsx 221/216 abk 9-14


No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

8 A.4.5.1.8 1 m2 Memasang Langit-langit Akuatik Uk (60x120) cm & Rangka A

A Tenaga
L.01 0.5 OH Pekerja
L.02 0.5 OH Tukang Kayu
L.03 0.05 OH Kepala Tukang
L.04 0.025 OH Mandor

B Bahan
3.6 m' Profil Allumunium "T"
0.15 kg Kawat Ø 4 mm
1.05 bh Ramset
1.5 lmb Akuatik 60 x 120 cm
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

9 A.4.5.1.9 1 m1 List Langit-Langit Kayu Profil


A Tenaga
L.01 0.05 OH Pekerja
L.02 0.05 OH Tukang Kayu
L.03 0.005 OH Kepala Tukang
L.04 0.003 OH Mandor
B Bahan
1.05 m1 List Kayu Profil
0.01 Kg Paku
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

436913527.xlsx 221/217 abk 9-14


HARGA BAHAN/UPAH JUMLAH

Rp Rp

git Asbes (1,00x1,00) m, tebal 4 mm, 5 mm & 6 mm 28,955.30

8,565.00
68,000.00 2,040.00

80,000.00 5,600.00
85,000.00 595.00
82,500.00 330.00

17,758.00
16,000.00 17,600.00

15,800.00 158.00

26,323.00

2,632.30
28,955.30

89,391.50
19,275.00

68,000.00 8,160.00
80,000.00 9,600.00

85,000.00 1,020.00
82,500.00 495.00
61,990.00

5,100.00 61,200.00
15,800.00 790.00

81,265.00
8,126.50

89,391.50

101,821.50
19,275.00
68,000.00 8,160.00

80,000.00 9,600.00

436913527.xlsx 221/218 abk 9-14


HARGA BAHAN/UPAH JUMLAH

Rp Rp

85,000.00 1,020.00
82,500.00 495.00

73,290.00
12,500.00 72,500.00

15,800.00 790.00

92,565.00

9,256.50
101,821.50

81,237.75
16,062.50

68,000.00 6,800.00
80,000.00 8,000.00

85,000.00 850.00
82,500.00 412.50
57,790.00

38,000.00 57,000.00
15,800.00 790.00

73,852.50
7,385.25

81,237.75

Tripleks Uk (120x240) cm, Tebal 3 mm, 4 mm & 6 mm 45,415.15


16,062.50
68,000.00 6,800.00

80,000.00 8,000.00
85,000.00 850.00

82,500.00 412.50

436913527.xlsx 221/219 abk 9-14


HARGA BAHAN/UPAH JUMLAH

Rp Rp

25,224.00
66,000.00 24,750.00

15,800.00 474.00

41,286.50
4,128.65
45,415.15

Lambriziring Kayu Jati, tebal 6 mm 303,522.45

128,500.00
68,000.00 54,400.00
80,000.00 64,000.00

85,000.00 6,800.00
82,500.00 3,300.00

147,429.50
9,818,100.00 147,271.50
15,800.00 158.00

275,929.50

27,592.95
303,522.45

Gypsu Board, Uk (120x240) tebal 9 mm 46,060.85


11,637.50

68,000.00 6,800.00
80,000.00 4,000.00
85,000.00 425.00

82,500.00 412.50
30,236.00

74,000.00 26,936.00
30,000.00 3,300.00

41,873.50

436913527.xlsx 221/220 abk 9-14


HARGA BAHAN/UPAH JUMLAH

Rp Rp

4,187.35
46,060.85

Akuatik Uk (60x120) cm & Rangka Allumunium 572,948.75

80,312.50
68,000.00 34,000.00
80,000.00 40,000.00

85,000.00 4,250.00
82,500.00 2,062.50

440,550.00
100,000.00 360,000.00
6,500.00 975.00
21,500.00 22,575.00
38,000.00 57,000.00

520,862.50
52,086.25
572,948.75

13,904.55
8,072.50
68,000.00 3,400.00
80,000.00 4,000.00
85,000.00 425.00
82,500.00 247.50
4,568.00
4,200.00 4,410.00
15,800.00 158.00

12,640.50
1,264.05
13,904.55