Você está na página 1de 5

Address

Plot No -29, Road - 7 ( Left Side) Submit to


Park Road , Baridhara Director
INTRACO icon Project Intraco Group

Contact No - 01913528781 Jolil

Shore Piling Works Dia 500 mm 42


Pile Should be Construted in between Exisiting Shore Pile Line and Boundary Wall

Quantity Length Total Length Rate


nos ft m m Tk
Pile Type -1 18 38 11.59 208.54 4,000.00

Pile Type -2 24 32 9.76 234.15 4,000.00

42 442.68

Final Submitted Amount 2,000,000.00 4517.9063

Mobiliztn Adv 50% 1,000,000.00

1st R/A BILL 50% 1,000,000.00


from Advance 50% 500,000.00
Net Valuation 500,000.00

Payment Received 1,500,000.00

2nd R/A BILL 50% 1,000,000.00


from Advance 500,000.00
Net Valuation 500,000.00

Payment Received 2,000,000.00

Batching Plant
Consumption rate of CEMENT 350.00 kg
Capacity of the Batching Plant 22.50 m3
Daily Operation of the Batching Plant 10.00 Hour
Consumption of the Cement Per Hour 7,875.00 kg
Daily Consumption of the Cement Per Day 78,750.00 kg
Frequency of the Cement Supply 3.00 Day
Capacity of the Silo 236,250.00 kg

Specifc Gravity of the Cement 3,150.00 Kg/m3


Volume of the Silo 75.00 m3

Height of the Flange 2.00 m


Height of the Silo 13.00 m
Area of the Silo 5.77 m2
Dia of the Silo 2.71 m
2,710.97 mm

Height 40 ft 12.20
Dia 9 ft 2.74

Height of the Flange 2 m


Nos

Amount
Tk
834,146.34

936,585.37

1,770,731.71 10 17,707,317.07

Two Million Tk and No Poisa

Per m3 As per Mix Design of Concrete


Per Hour As per Specification of the Batching Plant
As per Project Operation Data
Input Data
3.15 g/cm3 1 cm3 3.15
1.00 1.00 1.00
cm cm cm

100.00 100.00 100.00 3,150,000.00


cm cm cm
1.00 1.00 1.00
m m m

1.00 m3 3,150.00
m
m
g

kg

Você também pode gostar