Você está na página 1de 1

SUGGESTION BOX:-

ROAD

· ASSEMBLY POINT
14,7 14,7 10,3 10 17,5

11,76
2,35
24,16
COULD BE ALOTTED.
CEMENT
· USE SAFETY NETS
5,67

12,93
STORAGE
LABOUR
STEEL YARD,
SURROUNDING THE

14,03
9,51
BAR BENDING
COLONY

20,15
AREA AND STEEL
MATERIAL
LIFT
WASTAGE AREA CONSTRUCTION AREA.
11,62
OPEN
MATERIAL
STORAGE DESCRIPTION
13,41

(SAND,
AGGREGATE,
AND BRICK)
Color Color Description

10
2,2

Green Wall

2,5
1

Blue Rectangular
Cyan Road
R
CONSTRUCTION Black Text

22,8
O
A AREA Maroon Hatching
D
P
A Purple Dimension
R
Violet Boundry wall
49,07

K
I
8,99 15,74
N
Yellow Parking lines
3,95

SHUTTERING

7,52
G
STORAGE
10
2,96

13,63
MATERIAL
STORAGE
GARDEN AND BORING

9,6
SITE OFFICE

15 7,5 20
DATE SIGN U.V.PATEL COLLEGE OF ENGINEERING
4

SECURITY CABIN
STD.
CONSTRUCTION ENGINEERING MANAGMENT
3,05 2,75 FAIR
ADVANCE CONSTRUCTION TECHNIQUES
7,57

COMP.
ROAD
SMIT PATEL
M.TECH SEM-1 2019-21
JOB LAYOUT
EN.NO.:- SITE NAME: SUBMITTED TO:
SCALE: NOT TO SCALE GEC COLLAGE PROF. ANKIT S. PATEL

Você também pode gostar