Note:
-1-
THE SCHEDULE OF RATES ARE "FORD" INCLUSIVE OF ALL
APPLICABLE DUTIES, TAXES AND FREIGHT & INSURANCE
CHARGES.
New Materials
-2-
In the previous SRs a number of sizes of Aerial Bunched Cables were
included. Many of the sizes are not required for use in ESCOMs and
was causing confusion while preparing the estimates. It was decided
to include only the following sizes of AB Cables in the Common SR
2010-11.
H.T.:
1. 11kV (3x95) + (1x70) with bare messenger.
2. 11kV (3x120) + (1x95) with bare messenger.
L.T.:
1. (3x95) (for Phase conductor) + (1x70) (insulated messenger neutral)
+ (1x16) for street light control.
2. (3x95) (for Phase conductor) + (1x70) (insulated messenger neutral)
+ (1x25) for street light control.
3. (3x95) (for Phase conductor) + (1x70) (insulated messenger neutral)
+ (1x35) for street light control.
10.0 LABOUR
-3-
The Special Locality Allowance for the localities already
approved in Common SR 2009-10 is approved to be increased by
an additional 5% over and above the existing rate of Special
Locality Allowance.
Considering the request made by Gulbarga Zone, it was
approved to include and allow 15% Special Loacality Allowance for
the following places.
Note:
a. The list of places eligible for special locality allowance is detailed
in Annexure - A in page. No.-----. This Special Locality
allowance at the rates noted be given over and above the
schedule of labour for the listed areas.
Statutary Payments
General Guidelines
1. The Common SR 2010-11 will come into effect from 01.07.10. This
schedule
of rates is not applicable to REC works.
2. The squirrel ACSR conductor shall not be used for any new works (B.O.
No.
B19/6723/95-96/21.06.2000 of KEB.
(A) 11 KV lines:
-4-
Minimum size of the conductor to be used for all new 11 KV lines
shall be Rabbit ACSR only.
(B) LT lines:
a) Urban areas: Minimum size of conductor to be used for phases
and neutral shall be Rabbit ACSR conductor.
8. Material code number for all materials have been provided in the SR
and the same has to be used while preparation of the estimate and
in the indents.
9. All the field officers and inspecting officers should ensure that the
materials used shall conform to the relevant IS specifications and the
works executed are in accordance with the approved drawings /
stipulated norms. The UG cable/PVC wires used for the work shall
carry ISI markings.
10. Guy set includes Anchor Rod, Turn buckle, Guy wire, Strain
insulator, Guy
clamp with Bolts, Nuts and Washers.
b) While working out the cost data sheet provision has been
made for all the materials and hence no separate provision
is made for conductor accessories.
14. For short lines less than 1 KM, the estimates shall be
prepared as per actual requirement of the materials.
5. CONCRETING:
18. Cost data sheets for providing HT< over head lines, Aerial bunched
cables, distribution transformers centres for 63/100 KVA on single 9
Mtr. RCC poles of square section, RLM unit for 25/63/100 KVA
transformer centres, compact RMUs & package sub-stations have
been worked out and included in the SR for easy reference. However
-6-
any modification or addition / deletion may be considered depending
on the field conditions.
19. The LEC’s carrying out works on labour contract basis are
authorized to purchase small items other than poles,
conductors, transformers, lightning arrestors and GOS at SR
rates wherever the execution of the work is held up due to
non availability of such materials provided the cost of such
purchase is limited to 5% of the total estimated amount.
20. If the scrap value of the cable proposed to be released is less than the
sum of estimated labour for such release, Depreciated value of the
cable, road cutting charges payable to BMP and other civic bodies,
then the releasing of the cable need not be resorted to. Otherwise the
releasing work has to be taken up as per the prevailing rates in SR.
22. Labour charges for releasing of materials shall be at 90% of the cost
of erection. (Please see Corporate Office circular No. BESCOM/BC-
35/07-08/CYS-86/DT: 23.10.07) (See page No_____)
23. While executing the reconductoring work the released conductor shall
be returned to stores as credit in accordance with circular No.
BESCOM/GM (T)/BC-20/F-664/05-06/CYS-174, Dt: 10.01.06. (See page
no. ______)
-8-