2) How to create tasks. What are the maximum number of tasks you were created in
you are previous project?
Creating a Task
Purpose
You can create tasks using the Task wizard. Task creation takes place in a simple one
page screen allowing for creation of a task where workflow controls the lifecycle of the
task.
You may assign the task to a group of users as a whole or each individually.
Alternatively, you can define a sequence of separate multiple step task, assigned to a
single user or separate users. Once created, additional properties can be set using the task
Details page. Completed tasks may require an additional approval step or the process can
be finished by a task completion step.
Some of the frequently used terms which are present on the Collaboration Task user
interface and also in this guide are listed below:
Task
A task is a request for a work process to one or more users. These users are called the
assignees. In this document the user creating the task has also been referred to as the
creator or the initiator of the task.
Trackers
A task also has users responsible for tracking the progress of the work time, these users
are called the trackers. The user creating the task is a tracker by default. For a simple one
step task, also known as the quick task, the tracker is an approver for that task as well.
A tracker can :
Nominator
Nominee
...
3. On the Task wizard enter the required information. For details on the fields see section
Wizard Details below. The required fields are marked by asterisk (*).
Wizard Details
Description of Parameters
Parameter Description
Title Title or subject to identify the task. It is a required field.
Assigned to Select or enter the Ids of those users you want to assign the task
to. You also have an option to decide whether the assignees can
decline the tasks, and also decide if you want to separate the
tasks for each assignee.
Priority Defines the workflow priority. This affects the urgency of the
tasks that will be generated by the workflow.
Due Defines the deadlines for the process step by entering due date
and time. Choose the calendar icon to select the due date or
enter manually in mm/dd/yyyy format. Select the time from the
dropdown selection or enter manually in hh:mm format. (Note:
the date and time you enter here refers to the date and time on
the server machine).
Task Actions
An assignee (user to whom the task is assigned) can confirm or decline a task.
A user can decline a task only if the option Assignees can decline task is selected by the
task creator.
The following figure shows the possible steps a task assignee can perform after the task
has been assigned.
Confirming a Task
When a single step task is rejected by a tracker it is sent back to the task assignee(s). The
progress of the task is automatically set to 50 percent and its status is In Progress. The
task assignee can then submit the task again to the tracker by choosing Complete Task.
The status of the task changes to Confirmed. To break the cycle the tracker can either
delete or approve the task.
Deleting a Task
Once a task is deleted, all related tasks are also deleted. See example below for further
clarification.
User 1 creates a feedback task, assigns it to user 2 and user 3.
User 1 receives the task declined by user 3. User 1 deletes the task.
At this point, the task (item) from user 2 is also deleted, user 1 is not able to see it from
tracking anymore.
...
The terms rejecting and declining a task can be confused in the context of Collaboration
Tasks.
An approver of an approval step in a task may choose to reject - this means that he/she
does not approve of the previous Action Item(s) and requires these previous steps to be
redone and resubmitted for approval.
When an assignee declines a task, this means that the assignee refuses to participate in the
task. That is, the assignee may not have even examined any steps in the task and / or has
done no work on his assigned step. In this case, the task trackers are notified of the
declination, and may reassign the task to some other users.
Result
The approvers / recipients / assignees see the workflow item in their task list.
Depending on the notifications selected in the creation wizard, the workflow’s users
tracking the task will receive status notifications as the workflow assignees perform work
or respond to approve / reject tasks. The workflow creator can also view the status of an
active workflow by going to the Tasks screen in the Universal Worklist and viewing
details of the appropriate process. All steps that have been executed in the process so far
are displayed.
After completion of a process, all steps along with the comments entered by the process
participants are displayed in the Completed Requests screen in the Universal Worklist of
the initiator of the workflow.
How do you release change requests in your module and how often do you release them
- Go to the Transport Organizer and choose Display to find out which change requests
you are assigned to.
- Position the cursor on the request you want to release and choose Release directly.
If you are not the owner of the request, release your own task(s) and ask the request
owner to release the request.
It depends on your situation to release the change request. We have release strategy every
quarter unless there is a production issue.
2. How do you create tasks? What is the max number of tasks you created in your
previous projects
You can add new tasks to an existing change request by choosing Add user. The tasks are
assigned to the user that you enter here.
If you have the appropriate authorizations, you yourself may add a task to an existing
request belonging to another user.
To create a task for a request that is not your own, proceed as follows:
- In the Enter User Name dialog box, enter the user name of the request owner.
The request overview of the user specified appears.
- Position the cursor on the request and choose Request/task -> Request -> Add user.
3. What is the difference between task and change request? Is it possible to release a
change request without releasing a task?
Task
Information carrier in the Transport Organizer for entering and managing all changes to
Repository objects and Customizing settings performed by employees within a
development project.
Change Request
An information source in the Transport Organizer that records and manages all
modifications made to Repository objects and Customizing settings during a development
project.
Customizing request
5. What is the landscape you are following? In which one do you prefer to test functional
module level changes?
6) What is the tool you are using for testing purposes in your project?
7) What is the landscape you are following, which one you prefer to test functional
module level changes?
12) What do you mean by condition index, how you configured in you project?
14) What is the difference between ERB and ERU account keys?
15) What is the difference between general item category group and item category
group ( sales org2 in MMR)?
16) What is the difference between alternative calculation type and alternative
condition base value?
17) Is it possible to have different pricing procedure for sales order and invoice?
22) Explain about common distribution channels and common divisions and
combined distribution channel and combined divisions, what is use?
26) What are the Enhancements you done as a support team member and explain
any two?
27) To get pricing in billing what are configuration you done in your project?
28) To extend material one plant to another plant what are the configuration you
done in your project?
29) What do you mean by POD(proof of delivery) what is the use of pod? What are
the con figuration you done in your project?
30) What is the significance of products under system application and products?
31) Why do you need project IMG?
32) What is the client specific data? Give two examples of client specific data?
35) In system landscape where the sand box and golden box exists?
36) What are the challenges you faced in your previous implementation project?
40) What is condition update? Can you give condition update for product, which is
already given condition update?
42) While I am creating a customer in ship to party account group you have
shipping and billing partner function tab pages, client wants to shift all important
fields in billing like payment terms, incoterms , and tax classification into shipping
tab page. He wants only shipping partner function only, how does you customize?
43) In material determination how you configure the system should propose when
product A is not available then only system substitute with product B. If A is
available 60% quantity. How do you do in the situation?
46) Sales order is created 1st November for 200 tooth pastes 100 brushes free of
goods(2+1 free goods).At the time of delivery on 15th November you have shortage
of brushes by 40. offer closed on 15th November . How do you solve in this scenario?
47) Can you assign one sales organization to multiple company codes? If yes how? If
no why?
52) Have you worked on debugging? Explain any of one of the example?
53) How many user exists have you developed in your current project? Name at
least 10 user exists you have developed and used in your current project?
54) Explain about SOP (service operating procedure) and your role in it?
55) Can you do account determination without account keys? And explain how?
57) What you done business blue print, realization, final preparation, and go live
support in your previous project?
58) How many SAP versions you know? And what is difference between them?
61) Quotation has been created for product-D, 10 quantities, sales order is created
with reference to the quotation, system copies 10 quantities in sales order. How do
you restrict in sales order end user should not change quantities, system should not
allow for changes by en user?
64) How SAP support to the client to know the customer requirements?
66) What are the training documents while giving training session for users?
68) What are the GAP analysis you identified in your project?
69) Can you explain about actual GI (gods issue) date and planned GI date? Can
actual GI date differ from planned GI date?
70) Which module integration is required in output determination? 71) What are
the two user exits you have used in your project?
72) What is the importance of release status and dynamic field check in condition
table/condition record?
79) What happens to the material listing/exclusion if the payer is different from the
sold to party?
81) An order item with different shipping point copied into the sales deliveries?
83) How does the rule MALA decide the picking location?
85) How can we process out bound deliveries without shipping point?
87) What is the use of VPRS, EK01 and Ek02? For material cost we are using VPRS
why we need EK01 and EK02?
88) When I am saving customer master (internal number range), system generating
number range like 5000211,500216and 500221 instead of giving 500211,500212 and
500213.why system generating like this?
• What is the access sequence for header conditions?
• What are the highest organizational units in SD, MM, PP and FICO?
• How will be the Ticket process flow happens in a Production support project?
processing?
What are the highest organizational units in SD, MM, PP and FICO?
What are the highest organizational units in SD, MM, PP and FICO?
What are the reports u have generated with help of ABAP?What are all the things we
need to do configure?
How will be the Ticket process flow happens in a Production support projectWhat is
transfer order?