Pile Nos.

Detail Calculation for 5000MT Tank


Inputs
Empty weight of tank 1470 kN
Operating weight of tank 51000 kN
Hydrotest Load of tank 58002 kN
Wind Load :
Bendig Moment Due to wind at Base of Tank 5233 kN.m
Shear Force 524 kN
Diameter of PileCap 20.7 m
Assumed Thickness of Pilecap 0.9 m
Total Vertical Load incl. pile cap self wt. 65570.2 kN

Arrangement of Piles
Diameter of pile 0.6 m
Nos. of Pile 69 Nos.
First Loop Geometry
Radius (R1) No. of Piles Angle
2.00 m 5 72
Second Loop Geometry
Radius (R2) No. of Piles Angle
4.00 m 7 51.43
Third Loop Geometry
Radius (R3) No. of Piles Angle
6.00 m 14 25.71
Fourth Loop Geometry
Radius (R4) No. of Piles Angle
8.00 m 18 20.0
Fifth Loop Geometry
Radius (R5) No. of Piles Angle
9.90 m 24 15.0
M.I. of Pile Group = 1 X (2 x Cos 0)^2 =
2 x ( 2 x Cos 72)^2 =
2 x ( 2 x Cos 144)^2 =
1 X (4 x Cos 0)^2 =
2 x ( 4 x Cos 51.42)^2 =
2 x ( 4 x Cos 102.85)^2 =
2 x ( 4 x Cos 205.71)^2 =
2 X (6 x Cos 0)^2 =
4 X (6 x Cos 25.71)^2 =
4 X (6 x Cos 51.43)^2 =
4 X (6 x Cos 77.14)^2 =
2 X (8 x Cos 0)^2 =
4 X (8 x Cos 20)^2 =
4 X (8 x Cos 40)^2 =
4 X (8 x Cos 60)^2 =
4 X (8 x Cos 80)^2 =
2 X (9.9 x Cos 0)^2 =
2 X (9.9 x Cos 90)^2 =
4 X (9.9 x Cos 15)^2 =
4 X (9.9 x Cos 30)^2 =
4 X (9.9 x Cos 45)^2 =
4 X (9.9 x Cos 60)^2 =
4 X (9.9 x Cos 80)^2 =
Total M.I. = 2069.12 m2

Maximum Load per pile @ 2m = (65570/69) + (5233*2/2069.12)


= 955.35 kN

Maximum Load per pile @ 4m = (65570/69) + (5233*4/2069.12)


= 960.41 kN

Maximum Load per pile @ 6m = (65570/69) + (5233*6/2069.12)


= 965.47 kN

Maximum Load per pile @ 8m = (65570/69) + (5233*8/2069.12)


= 970.53 kN

Maximum Load per pile @ 9.9m = (65570/69) + (5233*9.9/2069.12)


= 975.33 kN