PILE CAP DESIGN

4.1 DESIGN OF PILE CAP

Concrete Grade = M35


Elasticity Modulus of Concrete = 29.5 Gpa
Steel Grade = Fe500
Diameter of Pile = 1.2 m.
Equivalent dimension of Pier in Longitudinal Dir.,P L = 2.0 m.
Dimension of Pier in Transverse direction, P b = 2.0 m
Dist. bet. c.L of pier to c.L of pile in long. Dir., L2 = 1.80 m.
Dist. of Pile-centre from pile cap edge in long. Dir., L1 = 0.75 m.
Dist. bet. c.L of pier to c.L of pile in trans. Dir., B2 = 1.80 m.
Dist.of Pile-centre from pile cap edge in Trans.Dir., B1 = 0.75 m.
Distance of pier center to pile center = 2.546 m
Overall dimension of Pile Cap in Long. Direction, 2*(L1+L2) = 5.1 m.
= 5100 mm.
Overall dimension of Pile Cap in transv. Direction, 2*(B1+B2) = 5.1 m.
= 5100 mm
Depth of pile cap at edge, De = 1.8 m.
Overall depth of Pile Cap, Do = 1.8 m
1800.0
Height of Earth above Pile Cap = 0.5 m.
Unit weight of soil = 1.9 t/m3
Clear cover provided, c = 75.0 mm
Effective depth = 1709.0 mm

4.2 DESIGN OF PILE CAP UNDER SLS

Material constant

sst = 435.000 Mpa = 44370 t/m2

Maximum Pile Reaction, Rmax = 498 t

tan q = 0.67
sin f = 0.71
cos f = 0.71
Tensile Force in Longitudinal Direction = 524.52 t
Tensile Force in Transverse Direction = 524.52 t
Reinforcement required (Longitudinal Direction) = 11821.4 mm2
Reinforcement required (Transverse Direction) = 11821.4 mm2

4.3 DESIGN OF PILE CAP UNDER ULS

Material constant

sst = 435.000 Mpa = 44370 t/m2

Maximum Pile Reaction, Rmax = 704 t

tan q = 0.67
sin f = 0.71
cos f = 0.71
Tensile Force in Longitudinal Direction = 741.49 t
Tensile Force in Transverse Direction = 741.49 t
Reinforcement required (Longitudinal Direction) = 16711.4 mm2
Reinforcement required (Transverse Direction) = 16711.4 mm2

4.4 REINFORCEMENT DETAILING

Longtiudinal Direction Reinf. In band width = 13369.15 mm2


Width of Band = 1.50 m
Reinf. In Remaining Width = 6684.57 mm2
Remaining Width = 2.10 m
Top Reinf= 5508.00

Provision of Reinforcement:
Nos Dia Nos Dia Area (mm2)
Bottom Steel: Band (a1 & a3) 11 32 + 10 25 13755.5 OK
Bottom Steel: Remaining(a2 & a4) 22 20 + 0 0 6911.5 OK
Top Steel (a5 & a6) 28 16 5629.7 OK
Spacing 177
Transverse Direction Reinf. In band width = 13369.15 mm 2

Width of Band = 1.50 m


Reinf. In Remaining Width = 6684.57 mm2
Remaining Width = 2.10 m
Top Reinf= 5508.00

Provision of Reinforcement:
Nos Dia Nos Dia Area (mm2)
Bottom Steel: Band (b1 & b1a) 11 32 + 10 25 13755.5 OK
Bottom Steel: Remaining (b2 & b2a) 22 20 + 0 0 6911.5 OK
Top Steel (b3) 28 16 5629.7 OK
Spacing 177
Side Reinforcement
= 250 mm2 / m length ( As per clause 707.2.8 IRC:78:2010)
= 1275 mm2 ( Each face )
Provide Dia No Ast Spacing(mm)
12 12 1357.16802635 > 1275 412

Anchorage = 35 d
= 1,128 mm < 1760 mm OK

After allowing cover of 75mm , distance available is 600mm, so the bar will be need to
turn up, Thus the length of bar from centre line of the pile and turning up to distance 1000mm