Escolar Documentos
Profissional Documentos
Cultura Documentos
Property boundary
(vicinity of the area) : North
South
West
East
A. HIS Impact
Remarks:
1 Access Road : No Access
Available Access: Distance to public road:
Good __________ m
Poor __________ m
Notes: Measurements from wells taken from well head. Measurements for larger facilities taken from boundary.
HIS Findings
B. FACILITY INFORMATION
Available
Material on site Remarks
(Y/N)
Concrete basin
Concrete building
Vessel tank
Steel structure
Piping (Galvanize or Stainless)
Piping (HDPE)
Piping (PVC)
Electricity - Transformer
Electricity cable
Electric pole
HDPE terpaulin
Machinery
Hydrocarbon container
Floor (pavement or concreted)
Drainage system
Others
C. OTHERS POTENTIAL IMPACT INFORMATION
2 Waste Management
Sludge/Mud Solid trash Chemical Hazardous Material
Other:
Yes No Specify: Hazardous waste segregation
Vendor Onsite Other Hazardous waste treatment
Condition of hazardous storage
Poor Good Best (criteria: concrete location, secondary
containment, roofing, tidy
Data Items
Photos :