I. General
1. Project Information
Project Name: Yemen: Road Asset Management Project
Country: Yemen
Grant P125135
Project ID & Grant/Credit Numbers: :
2. Bank's approval date of Procurement Pla Original:
Revision 1: December 19, 2012
Revision 2: September 9, 2013
Revision 3:March, 2015
Prior Review Threshold. Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the
Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be
determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing
agency’s capacity.]
1.
5. Any Other Special Procurement Arrangements: Including advance procurement and retroactive financing, if applicable
NA
6. Procurement Packages with Methods and Time Schedule: See attached "Goods and Works" sheet
Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines
1. Selection and Employment of Consultants:
2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less
than$ 300.000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of
paragraph 2.7 of the Consultant Guidelines. NA
3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable]
NA
4. Consultancy Assignments with Selection Methods and Time Schedule:
Bank’s No
No Objection No Objection Objection to
Bank’s No
Review from Bank for from Bank for Contract Bid
Goods/ Domestic Prequalifi Objection to Contract Value Name, City, and Expenditure
SL Package/ Reference by Bank Method of Draft Evaluation of Preparation of Bid Bid Invitation Bid Closing Bid Opening Award Evaulation Contract Signed Contract Completion of Expenditure incurred to
Description of Goods/ Works Works/ Preferenc cation Bidding commencement date +Vartion Order Expenditure Commitments Currency Contract No. Country of Contractor incurred from Remarks
No. No. (Prior/ Selection Prequalificatio Prequalificatio Document (Date) (Date) (Date) (Date) Decision Report and (Date) Contract (Date) Date
NCS e (yes/no) (yes/no) Document (US$) (incl. Zip Code if US) phase
Post) n documents n Application (Date) Contract
(Date)**
(Date)** (Date)** Award
(Date)**
Actual
20-Oct-13 28-Oct-13 02-Dec-13 15-Jan-14 15-Jan-14 14-Apr-14 11-Apr-14 25-Jun-14
Planned 15-Sep-18
01-May-12 01-Jun-12 20-Jun-12 05-Aug-12 05-Aug-12 05-Oct-12 15-Oct-12 15-Nov-12
Revised Mukbil Mubarak &
Term maintenance contract for Taiz with Civil 30-Mar-13 29-Apr-13 19-May-13 18-Jul-13 18-Jul-13 16-Sep-13 06-Oct-13 05-Nov-13 BROS EST For 12-Oct-18 Suspended on
3 RAMP/CW#03 Prior ICB No No 12-Oct-14 $8,250,000.00 1,234,183.89 US$ RAMP CW#03 1,234,183.89
Small-scale (road safety) civil works Works Trading Agencies 19/4/2015
Revised
30-Mar-14 29-Apr-14 19-May-14 03-Jul-14 03-Jul-14 17-Aug-14 06-Sep-14 06-Oct-14 Oil Fild Services
Actual
25-Feb-14 05-Mar-14 23-Mar-14 07-May-14 07-May-14 30-Jun-14 25-Jun-14 11-Aug-14
Planned 15-Sep-18
01-Nov-12 01-Dec-12 20-Dec-12 05-Feb-13 05-Feb-13 05-Apr-13 15-Apr-13 15-May-13
Revised
Term maintenance Contract for Ibb with Civil 01-Mar-13 31-Mar-13 20-Apr-13 19-Jun-13 19-Jun-13 18-Aug-13 07-Sep-13 07-Oct-13 National Bridges 20-Dec-18 Suspended on
4 RAMP/CW#04 Prior ICB No No 20-Dec-14 $8,932,735.00 1,070,470.82 US$ RAMP CW#04 1,070,470.82
Small-scale (road safety) civil works Works & Roads Co.Ltd 26/3/2015
Revised
30-Mar-14 29-Apr-14 19-May-14 03-Jul-14 03-Jul-14 17-Aug-14 06-Sep-14 06-Oct-14
Revised
25-Feb-14 06-Mar-14 23-Mar-14 08-May-14 08-May-14 30-Jun-14 27-Jun-14 29-Sep-14
Planned 20-Sep-53
01-Nov-12 01-Dec-12 20-Dec-12 05-Feb-13 05-Feb-13 05-Apr-13 15-Apr-13 15-May-13
Revised
25-Feb-13 27-Mar-13 16-Apr-13 31-May-13 31-May-13 15-Jul-13 04-Aug-13 03-Sep-13 AL SHATEY FOR 25-Aug-18
Term maintenance contract for Lahj Civil Suspended on
5 RAMP/CW#05 Prior NCB No No 25-Aug-14 $8,363,833.83 1,018,669.48 US$ RAMP/CW#05 ENGINEERING & 1,018,669.48
with Small-scale (road safety) civil works Works 26/3/2015
Revised CONTRACTING
30-Sep-13 30-Sep-13 20-Oct-13 04-Dec-13 04-Dec-13 18-Jan-14 07-Feb-14 09-Mar-14
Actual
04-Dec-13 26-Dec-13 12-Jan-14 03-Mar-14 03-Mar-14 14-Apr-14 11-Apr-14 26-May-14
Planned 1-Mar-14
Construction of 2 permanent axle-load 01-Sep-12 01-Oct-12 20-Oct-12 05-Dec-12 05-Dec-12 05-Feb-13 15-Feb-13 15-Mar-13
AL SHATEY FOR
control stations with Supply and Civil Suspended on
Revised 6 RAMP/CW#06 Post NCB No No 16-Nov-14 $1,297,727.00 419,708.98 US$ RAMP/CW#06 ENGINEERING & 16-Jul-15 419,708.98
installation two weigh stations (A- Works 20-Jan-13 19-Feb-13 11-Mar-13 25-Apr-13 25-Apr-13 25-May-13 14-Jun-13 04-Jul-13 26/3/2015
CONTRACTING
Alam,AlAnad)
Actual 23-Apr-14 26-May-14 26-May-14 22-Jul-14
22-Mar-14 15-Apr-14 NA 22-Oct-14
Planned
Construction of 2 permanent axle-load 01-Mar-14
01-Sep-12 01-Oct-12 20-Oct-12 05-Dec-12 05-Dec-12 05-Feb-13 15-Feb-13 15-Mar-13 Tarebah for trading.
control stations with Supply and Civil
7 RAMP/CW#07 Post NCB No No $1,305,381.00 0 US$ RAMP/CW#07 General Contracting 20-Aug-15 0 don't start yet
Revised
installation two weigh stations AlRyan & Works 20-Jan-13 19-Feb-13 11-Mar-13 25-Apr-13 25-Apr-13 25-May-13 14-Jun-13 04-Jul-13 and Oil Services
Brum)
Actual 22-Mar-14 15-Apr-14 23-Apr-14 26-May-14 26-May-14 22-Jul-14 NA 23-Dec-14
Planned 01-Sep-12 01-Oct-12 20-Oct-12 05-Dec-12 05-Dec-12 05-Feb-13 15-Feb-13 15-Mar-13 31-Oct-15
Revised
20-Jan-13 19-Feb-13 11-Mar-13 25-Apr-13 25-Apr-13 25-May-13 14-Jun-13 04-Jul-13
Purchase two mobile axle-load control
8 RAMP/Goods#01 goods Post NCB No No
Revised equipment with two caravans
20-Mar-15 19-Apr-15 09-May-15 23-Jun-15 23-Jun-15 23-Jul-15 12-Aug-15 01-Sep-15
Actual
Planned 11-Jan-16
30-Jul-15 NA 14-Aug-15 13-Sep-15 13-Sep-15 NA NA 13-Oct-15
Supply and installation of
Revised 9 RAMP/Goods#02 monitoring system for eight weigh Goods Post NCB No No
bridges
Actual
Planned 28-Jul-15
15-Aug-13 NA 30-Aug-13 29-Sep-13 29-Sep-13 NA NA 29-Oct-13
Material laboratory equipment for
Revised 10 RAMP/Goods#03 Goods Post NCB No No
quality control directorate 15-Mar-15 NA 30-Mar-15 29-Apr-15 29-Apr-15 NA NA 29-May-15
Actual
Planned 14-Mar-16
15-Aug-14 NA 30-Aug-14 29-Sep-14 29-Sep-14 NA NA 29-Oct-14
Equipment for the PIU [multiple
Revised 11 RAMP/Goods#04 Goods Post NS No No
contracts] 15-Nov-15 NA 30-Nov-15 15-Dec-15 15-Dec-15 NA NA 14-Jan-16
Actual
Planned
15-Jul-14 NA 30-Jul-14 29-Aug-14 29-Aug-14 NA NA 28-Sep-14 13-Jun-15
Revised 12 RAMP/Goods#05 Supply of traffic ccounting system Goods Post NS No No 15-Mar-15 NA 30-Mar-15 14-Apr-15 14-Apr-15 NA NA 14-May-15
Actual
Total
O
b
j
e
c
t
i
o
n
Procurement
f Plan for Consultant Services
r Yemen: Road Asset Management Project Grant No P 125135
o
mone or more of these approvals may be
In some contracts,
** Applicable in case of Bank's prior review contained in one Bank communication.
B
a
No Objection No Objection by
Review n
Type of RFP Final Draft No Objection by the Bank to the Bank
by Advertising for TOR/Shortlist to No Objection k Proposal Contract Services Expenditure
SL Consultant Method of to be forwarded from Bank for the Technical (Technical/ Contract Signed Contract Value+ Name, City, and Country of Contractor Expenses Incurred
Package/ Reference No. Description of Services Sub-description of Services Bank Short listing be Finalised from Bank for RFP Issued (Date) Submission Currency( Contract No. Completion incurred from Remarks
No. (Firm/ Selection to the Bank Final RFP Evaluation #Combined/ Draft (Date) Addendum (US$) (incl. Zip Code if US) to Date(US$)
(Prior/ (Date) (Date) TOR (Date)** f Deadline (Date) US$) (Date) phase II
Individual) (Date) (Date)** Report Contract/ Final
Post) o
(Date)** Contract) (Date)**
r
S
Planned 1-Apr-12 10-May-12 10-May-12 ###
h
10-Jun-12 20-Jun-12 30-Jul-12 20-Aug-11 20-Sep-11 20-Oct-12 23-Jul-17
o
Revised Supervision consultants for Term 1-Jul-12 10-Aug-12 10-Aug-12 ###
r 20-Aug-12 1-Sep-12 15-Oct-12 15-Nov-12 10-Dec-12 10-Jan-13 4-Sep-18
VisionRI Connexion Services Private Suspended
1 RAMP CS#02 maintenance contract for Hodeidah Prior Firm QCBS t 986,971.00 US$ RAMP CS#02 65200.60
10-Jan-13 19-Feb-13 19-Feb-13 ###
Limitd India on 26/3/2015
Revised Group 1&2 l 11-Mar-13 26-Mar-13 25-Apr-13 14-Jun-13 14-Jul-13 13-Aug-13
i
Actual 30-Mar-13 6-Jan-14 6-Jan-14 ###
s 6-Jan-14 12-Jan-14 13-Feb-14 18-Sep-14 25-Sep-14
t
Planned 1-Apr-12 10-May-12 10-May-12 ### 10-Jun-12 20-Jun-12 30-Jul-12 20-Aug-11 20-Sep-11 20-Oct-12 23-Jul-17
(
Revised Supervision consultants for Term 1-Jul-12 10-Aug-12 10-Aug-12 ###
D 20-Aug-12 1-Sep-12 15-Oct-12 15-Nov-12 10-Dec-12 10-Jan-13 Umar Munshi Associates and Plan- 29-Nov-18 Suspended
2 RAMP CS#03 Prior Firm QCBS a 998,824.00 US$ RAMP CS#03 0.00
Revised maintenance contract for Ibb 10-Jan-13 19-Feb-13 19-Feb-13 ### 11-Mar-13 26-Mar-13 25-Apr-13 14-Jun-13 14-Jul-13 13-Aug-13 Planners & Engineers on 16/3/2015
t
Actual 30-Mar-13 6-Jan-14 6-Jan-14 e
### 6-Jan-14 30-Mar-14 29-Apr-14 12-Dec-14 20-Dec-14
)
Planned 1-Apr-12 10-May-12 10-May-12 *
### 10-Jun-12 20-Jun-12 30-Jul-12 20-Aug-11 20-Sep-11 20-Oct-12 2-Sep-18
*
Revised 1-Jul-12 10-Aug-12 10-Aug-12 ### 20-Aug-12 1-Sep-12 15-Oct-12 15-Nov-12 10-Dec-12 10-Jan-13 30-Oct-18
Supervision consultants for Term MA'AN for Engineering & Construction in
Suspended
Revised 3 RAMP CS#04 maintenance contract for Lahj & Prior Firm QCBS 20-Jan-13 1-Mar-13 1-Mar-13 ### 21-Mar-13 5-Apr-13 5-May-13 24-Jun-13 24-Jul-13 23-Aug-13 970,652.00 US$ RAMP CS#04 Association with Jurutera Konsult Maju 53209.78
( Malaysia ) on 26/3/2015
Taiz
Revised 20-Feb-14 1-Apr-14 1-Apr-14 ### 21-Apr-14 6-May-14 5-Jun-14 25-Jul-14 24-Aug-14 23-Sep-14
Actual 6-Apr-13 13-Mar-14 30-Mar-14 29-Apr-14 24-Sep-14 20-Nov-14
Planned 1-May-12 10-Jun-12 10-Jun-12 ### 10-Aug-12 20-Aug-12 20-Sep-12 20-Oct-12 20-Nov-12 1-Dec-12
Revised 1-Oct-12 10-Nov-12 10-Nov-12 ### 10-Dec-12 20-Dec-12 20-Feb-13 20-Mar-13 10-Apr-13 1-May-13
4 RAMP CS#05 Support to the PIU and training) Prior Firm QCBS
Revised 10-Apr-14 20-May-14 20-May-14 ### 19-Jun-14 4-Jul-14 18-Aug-14 17-Oct-14 16-Nov-14 16-Dec-14
Actual
Planned 10-Apr-13 20-May-13 20-May-13 ### 19-Jun-13 4-Jul-13 18-Aug-13 17-Oct-13 16-Nov-13 16-Dec-13
Continuous training for staff of
Revised MPWH road sector, RMF, FFPIU 10-Feb-14 22-Mar-14 22-Mar-14 ### 21-Apr-14 6-May-14 20-Jun-14 19-Aug-14 18-Sep-14 18-Oct-14
5 RAMP CS#06 Prior Firm QCBS
Revised in traffic safety audits of new
road projects
Actual
Actual
O
b
j
e
c
t
i
o
n
Procurement
f Plan for Consultant Services
r Yemen: Road Asset Management Project Grant No P 125135
o
mone or more of these approvals may be
In some contracts,
** Applicable in case of Bank's prior review contained in one Bank communication.
B
a
No Objection No Objection by
Review n
Type of RFP Final Draft No Objection by the Bank to the Bank
by Advertising for TOR/Shortlist to No Objection k Proposal Contract Services Expenditure
SL Consultant Method of to be forwarded from Bank for the Technical (Technical/ Contract Signed Contract Value+ Name, City, and Country of Contractor Expenses Incurred
Package/ Reference No. Description of Services Sub-description of Services Bank Short listing be Finalised from Bank for RFP Issued (Date) Submission Currency( Contract No. Completion incurred from Remarks
No. (Firm/ Selection to the Bank Final RFP Evaluation #Combined/ Draft (Date) Addendum (US$) (incl. Zip Code if US) to Date(US$)
(Prior/ (Date) (Date) TOR (Date)** f Deadline (Date) US$) (Date) phase II
Individual) (Date) (Date)** Report Contract/ Final
Post) o
(Date)** Contract) (Date)**
r
S
Planned h
Supervision consultants for o
Revised monitoring and installation of 1-Mar-13 31-Mar-13 r 30-Apr-13 30-May-13
10 RAMP CS#11 Post indvdual IC t
four weigh stations
Revised 30-Jan-15 11-Mar-15 11-Mar-15 ###
l 31-Mar-15 15-Apr-15 15-May-15 4-Jul-15 3-Aug-15 2-Sep-15
(Electromechanical Eng) i
Actual s
t
Planned Post 9-Jan-14 20-Jan-14 30-Jan-14 30-Jan-14
(
Revised 11 RAMP CS#12 Procurement Adviser for RMFIU indvdual IC 30-Jun-14 30-Jul-14 D 29-Aug-14 28-Sep-14
a
Actual t
e
Planned 11-Mar-13 20-Mar-13 ) 30-Apr-13 15-May-13
Environment and Social Studies *
Revised 13 RAMP CS#14 Post indvdual IC 31-Aug-13 30-Sep-13 * 30-Oct-13 29-Nov-13 19,584.00 US$ RAMP CS#14 Dr. Adnan Al-Senwi 19,584.00 Done
for Ibb Sub-project
Actual 25-Jan-14 25-Jan-14 24-Feb-14 28-Jan-14
Revised 16 RAMP CS#17 Auditing Services Firm SSS RAMP CS#17 Hasbein Company
Planned Post
Procurement Assisstance
Revised 18 RAMP CS#19 individual IC 13,300.00 US$ RAMP CS#19 Eng. Yahya Al-Ashwal 13,300.00 Done
Consultant
Actual 22-Jan-14 12-Feb-14 5-Mar-14 4-May-14
Planned Post
Revised 19 RAMP CS#20 Ecological Expert individual 5080.00 US$ RAMP CS#20 Dr.Abdulsalam Al-Kowri 5080.00 Done
Actual 1-Jun-14
MPWH Component
Planned
Revised
Technical assistance to the
Revised
20 MPWH [multiple contracts, see
note below]
Actual
O
b
j
e
c
t
i
o
n
Procurement
f Plan for Consultant Services
r Yemen: Road Asset Management Project Grant No P 125135
o
mone or more of these approvals may be
In some contracts,
** Applicable in case of Bank's prior review contained in one Bank communication.
B
a
No Objection No Objection by
Review n
Type of RFP Final Draft No Objection by the Bank to the Bank
by Advertising for TOR/Shortlist to No Objection k Proposal Contract Services Expenditure
SL Consultant Method of to be forwarded from Bank for the Technical (Technical/ Contract Signed Contract Value+ Name, City, and Country of Contractor Expenses Incurred
Package/ Reference No. Description of Services Sub-description of Services Bank Short listing be Finalised from Bank for RFP Issued (Date) Submission Currency( Contract No. Completion incurred from Remarks
No. (Firm/ Selection to the Bank Final RFP Evaluation #Combined/ Draft (Date) Addendum (US$) (incl. Zip Code if US) to Date(US$)
(Prior/ (Date) (Date) TOR (Date)** f Deadline (Date) US$) (Date) phase II
Individual) (Date) (Date)** Report Contract/ Final
Post) o
(Date)** Contract) (Date)**
r
S
Planned h
o 237,913 $
Revised Consulting Services for Environmental and 19-May-13 28-Jun-13 28-Jun-13
r
### 18-Jul-13 2-Aug-13 1-Sep-13 21-Oct-13 20-Nov-13 20-Dec-13
t VOYANTS SOLUTIONS PRIVATE
Social Safeguard Studies related to the
l LIMITED WITH
21 RAMP CS#01 Yemen International Corridor Highway Prior Firm QCBS RAMP CS#01 396,920.38 Done
Revised i YEMEN ADVANCE
Project, section between Taiz City and the s
city of Aden (140 Km length) t
Actual 19-May-13 2-Jun-13 2-Jun-13 5-Jun-13 ###
( 14-Jul-13 2-Aug-13 1-Sep-13 11-Nov-13 20-Nov-13 26-Nov-13 34,166,112 YR
D
a
Planned Post t
10-May-14
Procurement Assistance to SAYICH PIU in e
Revised the Evaluation of Prequalification )
13-Jul-15 Suspended
22 RAMP CS#15 MPWH indvdual IC 33,640.00 US$ Momirka Inic 19209.83
Revised
Submissions and of Bids for Works 9-Jan-14 20-Jan-14 * 30-Jan-14 30-Jan-14 on 26/3/2015
*
Actual 5-Jan-14 16-Jan-14 10-Jan-14
Revised
23 RAMP CS#16 MPWH HD Video Production Aden-Taiz road indvdual IC 16,250.00 US$ 5th Dimension for Trading 4062.00 Done
Revised
Actual 13-Aug-14
Planned
Total
SL Expected Outcome/ Activity Description Estimated Cost in US$ Estimated Duration Start Date Completion Date Comments
No.
Training for the Foreign Funded Projects Implementing Unit 6 months 1-Aug-14 31-Dec-14
1
Total
-
200
300
150
76
120
480
48
1374
150,000
250,000
150,000
30000
50,000
20,000
650,000