RAMP Procurement Plan

I. General
1. Project Information
Project Name: Yemen: Road Asset Management Project
Country: Yemen
Grant P125135
Project ID & Grant/Credit Numbers: :
2. Bank's approval date of Procurement Pla Original:
Revision 1: December 19, 2012
Revision 2: September 9, 2013
Revision 3:March, 2015

3. Date of General Procurement Notice 2-Mar-11

II. Goods, Work and Non-Consulting Services Thresholds

Prior Review Threshold. Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the
Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be
determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing
agency’s capacity.]

1.

1a. Procurement Category Prior Review Threshold (USD) Comments

Goods Greater than or Equal to 500,000 All contracts


Works Greater than or Equal to 5,000,0000 All contracts
Non-Consultant Services Greater than or Equal to 200,000 All contracts
Include all categories authorized by the grant agreement

Procurement Method Threshold


1b. Procurement Method (USD) Comments
ICB and LIB (Goods) Greater than or Equal to 500,000
NCB (Goods) Less than 500,000 First contract is subject to prior Review
Shopping IS(Goods) Less than 50,000
Shopping NS(Goods) Less than 50,000 First contract is subject to prior Review
ICB (Works) Greater than or Equal to 5,000,0000
NCB (Works) Less than 5,000,0000 First contract is subject to prior Review
ICB (Non-Consultant Services) Greater than or Equal to 200,000

Include all methods authorized by the grant agreement


2. Prequalification. As required
3. Proposed Procedures for CDD Components (as per paragraph 3.17 of the NA
Guidelines): Refer to the relevant CDD project implementation document approved
by the Bank

4. Reference to (if any) Project Operational/Procurement Manual:

5. Any Other Special Procurement Arrangements: Including advance procurement and retroactive financing, if applicable
NA
6. Procurement Packages with Methods and Time Schedule: See attached "Goods and Works" sheet

III. Selection of Consultants

Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines
1. Selection and Employment of Consultants:

1a. Procurement Category Prior Review Threshold (USD) Comments


Consulting Firms (Competitive) Greater than or Equal to 200,000 All contracts
Consulting Firms (National adv.) Greater than 200,000 All TOR
Consulting Firms (Sole Source) All All contracts
Individual Consultants (Competitive) Greater than or Equal to 100,000 All TOR
Individual Consultants (Sole Source) All All Contracts
Include all categories authorized by the grant agreement

Procurement Method Threshold


1b. Procurement Method (USD) Comments
QCBS Greater than or equal 300,000
QBS Less than 300,000
FCS Less than 300,000
LCS Less than 300,000
CQS Less than300,000
Consulting Firms (Competitive) Any Value
Consulting Firms (Sole Source) Less than 100,000
Individual Consultants (Competitive) Less than 100,000
Individual Consultants (Sole Source) Less than 50,000
ICB(Non-Consultant Services) Greater than or equal 200,000

Include all methods authorized by the loan agreement

2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less
than$ 300.000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of
paragraph 2.7 of the Consultant Guidelines. NA

Note: OPCPR list of ceilings can be found hehttp://go.worldbank.org/MKXO98RY40

3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable]
NA
4. Consultancy Assignments with Selection Methods and Time Schedule:

See attached "Consulting Services" sheet


IV. Implementing Agency Capacity Building Activities with Time Schedule:
See attached "Capacity Building" sheet
RAMP Procurement Plan for Works and Goods

** Applicable in case of Bank's prior review Prequalification

Bank’s No
No Objection No Objection Objection to
Bank’s No
Review from Bank for from Bank for Contract Bid
Goods/ Domestic Prequalifi Objection to Contract Value Name, City, and Expenditure
SL Package/ Reference by Bank Method of Draft Evaluation of Preparation of Bid Bid Invitation Bid Closing Bid Opening Award Evaulation Contract Signed Contract Completion of Expenditure incurred to
Description of Goods/ Works Works/ Preferenc cation Bidding commencement date +Vartion Order Expenditure Commitments Currency Contract No. Country of Contractor incurred from Remarks
No. No. (Prior/ Selection Prequalificatio Prequalificatio Document (Date) (Date) (Date) (Date) Decision Report and (Date) Contract (Date) Date
NCS e (yes/no) (yes/no) Document (US$) (incl. Zip Code if US) phase
Post) n documents n Application (Date) Contract
(Date)**
(Date)** (Date)** Award
(Date)**

Yemen: Road Asset Management Project Grant No P 125135


Planned 16-Feb-18
01-May-12 01-Jun-12 20-Jun-12 05-Aug-12 05-Aug-12 05-Oct-12 15-Oct-12 15-Nov-12 AL-MOLAIKI
Term maintenance contract for Al- CORPORATION
Revised Civil 30-Jan-13 01-Mar-13 21-Mar-13 05-May-13 05-May-13 19-Jun-13 09-Jul-13 08-Aug-13 06-Sep-18 Suspended on
1 RAMP/CW#01 Hodeidah with Small-scale (road safety) Prior NCB No No 06-Sep-14 $5,704,529.05 1,435,555.93 US$ RAMP CW#01 FOR TRADING & 1,435,555.93
Works GENERAL 1/10/2015
Revised civil works (Group 1)-282km 30-Sep-13 30-Sep-13 20-Oct-13 04-Dec-13 04-Dec-13 18-Jan-14 07-Feb-14 09-Mar-14 CONTRACTIONS
Actual 20-Oct-13 28-Oct-13 07-Nov-13 23-Dec-13 23-Dec-13 20-Apr-14 18-Apr-14 25-Jun-14
Planned 19-Feb-54
01-May-12 01-Jun-12 20-Jun-12 05-Aug-12 05-Aug-12 05-Oct-12 15-Oct-12 15-Nov-12
RED SEA
Revised Term maintenance contract for Al- 15-Feb-13 17-Mar-13 06-Apr-13 21-May-13 21-May-13 05-Jul-13 25-Jul-13 24-Aug-13 CONTRACTING 02-Sep-18
Civil Suspended on
2 RAMP/CW#02 Hodeidah with Small-scale (road safety) Prior NCB No No 02-Sep-14 $5,549,871.32 828,499.24 US$ RAMP CW#02 AND 828,499.24
Works CONSTRUCTION 15/9/2015
Revised civil works (Group2 )249km
30-Jan-14 01-Mar-14 21-Mar-14 05-May-14 05-May-14 19-Jun-14 09-Jul-14 08-Aug-14 COMPANY

Actual
20-Oct-13 28-Oct-13 02-Dec-13 15-Jan-14 15-Jan-14 14-Apr-14 11-Apr-14 25-Jun-14
Planned 15-Sep-18
01-May-12 01-Jun-12 20-Jun-12 05-Aug-12 05-Aug-12 05-Oct-12 15-Oct-12 15-Nov-12
Revised Mukbil Mubarak &
Term maintenance contract for Taiz with Civil 30-Mar-13 29-Apr-13 19-May-13 18-Jul-13 18-Jul-13 16-Sep-13 06-Oct-13 05-Nov-13 BROS EST For 12-Oct-18 Suspended on
3 RAMP/CW#03 Prior ICB No No 12-Oct-14 $8,250,000.00 1,234,183.89 US$ RAMP CW#03 1,234,183.89
Small-scale (road safety) civil works Works Trading Agencies 19/4/2015
Revised
30-Mar-14 29-Apr-14 19-May-14 03-Jul-14 03-Jul-14 17-Aug-14 06-Sep-14 06-Oct-14 Oil Fild Services

Actual
25-Feb-14 05-Mar-14 23-Mar-14 07-May-14 07-May-14 30-Jun-14 25-Jun-14 11-Aug-14
Planned 15-Sep-18
01-Nov-12 01-Dec-12 20-Dec-12 05-Feb-13 05-Feb-13 05-Apr-13 15-Apr-13 15-May-13
Revised
Term maintenance Contract for Ibb with Civil 01-Mar-13 31-Mar-13 20-Apr-13 19-Jun-13 19-Jun-13 18-Aug-13 07-Sep-13 07-Oct-13 National Bridges 20-Dec-18 Suspended on
4 RAMP/CW#04 Prior ICB No No 20-Dec-14 $8,932,735.00 1,070,470.82 US$ RAMP CW#04 1,070,470.82
Small-scale (road safety) civil works Works & Roads Co.Ltd 26/3/2015
Revised
30-Mar-14 29-Apr-14 19-May-14 03-Jul-14 03-Jul-14 17-Aug-14 06-Sep-14 06-Oct-14
Revised
25-Feb-14 06-Mar-14 23-Mar-14 08-May-14 08-May-14 30-Jun-14 27-Jun-14 29-Sep-14
Planned 20-Sep-53
01-Nov-12 01-Dec-12 20-Dec-12 05-Feb-13 05-Feb-13 05-Apr-13 15-Apr-13 15-May-13
Revised
25-Feb-13 27-Mar-13 16-Apr-13 31-May-13 31-May-13 15-Jul-13 04-Aug-13 03-Sep-13 AL SHATEY FOR 25-Aug-18
Term maintenance contract for Lahj Civil Suspended on
5 RAMP/CW#05 Prior NCB No No 25-Aug-14 $8,363,833.83 1,018,669.48 US$ RAMP/CW#05 ENGINEERING & 1,018,669.48
with Small-scale (road safety) civil works Works 26/3/2015
Revised CONTRACTING
30-Sep-13 30-Sep-13 20-Oct-13 04-Dec-13 04-Dec-13 18-Jan-14 07-Feb-14 09-Mar-14
Actual
04-Dec-13 26-Dec-13 12-Jan-14 03-Mar-14 03-Mar-14 14-Apr-14 11-Apr-14 26-May-14
Planned 1-Mar-14
Construction of 2 permanent axle-load 01-Sep-12 01-Oct-12 20-Oct-12 05-Dec-12 05-Dec-12 05-Feb-13 15-Feb-13 15-Mar-13
AL SHATEY FOR
control stations with Supply and Civil Suspended on
Revised 6 RAMP/CW#06 Post NCB No No 16-Nov-14 $1,297,727.00 419,708.98 US$ RAMP/CW#06 ENGINEERING & 16-Jul-15 419,708.98
installation two weigh stations (A- Works 20-Jan-13 19-Feb-13 11-Mar-13 25-Apr-13 25-Apr-13 25-May-13 14-Jun-13 04-Jul-13 26/3/2015
CONTRACTING
Alam,AlAnad)
Actual 23-Apr-14 26-May-14 26-May-14 22-Jul-14
22-Mar-14 15-Apr-14 NA 22-Oct-14
Planned
Construction of 2 permanent axle-load 01-Mar-14
01-Sep-12 01-Oct-12 20-Oct-12 05-Dec-12 05-Dec-12 05-Feb-13 15-Feb-13 15-Mar-13 Tarebah for trading.
control stations with Supply and Civil
7 RAMP/CW#07 Post NCB No No $1,305,381.00 0 US$ RAMP/CW#07 General Contracting 20-Aug-15 0 don't start yet
Revised
installation two weigh stations AlRyan & Works 20-Jan-13 19-Feb-13 11-Mar-13 25-Apr-13 25-Apr-13 25-May-13 14-Jun-13 04-Jul-13 and Oil Services
Brum)
Actual 22-Mar-14 15-Apr-14 23-Apr-14 26-May-14 26-May-14 22-Jul-14 NA 23-Dec-14
Planned 01-Sep-12 01-Oct-12 20-Oct-12 05-Dec-12 05-Dec-12 05-Feb-13 15-Feb-13 15-Mar-13 31-Oct-15
Revised
20-Jan-13 19-Feb-13 11-Mar-13 25-Apr-13 25-Apr-13 25-May-13 14-Jun-13 04-Jul-13
Purchase two mobile axle-load control
8 RAMP/Goods#01 goods Post NCB No No
Revised equipment with two caravans
20-Mar-15 19-Apr-15 09-May-15 23-Jun-15 23-Jun-15 23-Jul-15 12-Aug-15 01-Sep-15
Actual

P.P for RAP / Works oods 3[Page]


Bank’s No
No Objection No Objection Objection to
Bank’s No
Review from Bank for from Bank for Contract Bid
Goods/ Domestic Prequalifi Objection to Contract Value Name, City, and Expenditure
SL Package/ Reference by Bank Method of Draft Evaluation of Preparation of Bid Bid Invitation Bid Closing Bid Opening Award Evaulation Contract Signed Contract Completion of Expenditure incurred to
Description of Goods/ Works Works/ Preferenc cation Bidding commencement date +Vartion Order Expenditure Commitments Currency Contract No. Country of Contractor incurred from Remarks
No. No. (Prior/ Selection Prequalificatio Prequalificatio Document (Date) (Date) (Date) (Date) Decision Report and (Date) Contract (Date) Date
NCS e (yes/no) (yes/no) Document (US$) (incl. Zip Code if US) phase
Post) n documents n Application (Date) Contract
(Date)**
(Date)** (Date)** Award
(Date)**

Planned 11-Jan-16
30-Jul-15 NA 14-Aug-15 13-Sep-15 13-Sep-15 NA NA 13-Oct-15
Supply and installation of
Revised 9 RAMP/Goods#02 monitoring system for eight weigh Goods Post NCB No No
bridges
Actual

Planned 28-Jul-15
15-Aug-13 NA 30-Aug-13 29-Sep-13 29-Sep-13 NA NA 29-Oct-13
Material laboratory equipment for
Revised 10 RAMP/Goods#03 Goods Post NCB No No
quality control directorate 15-Mar-15 NA 30-Mar-15 29-Apr-15 29-Apr-15 NA NA 29-May-15
Actual

Planned 14-Mar-16
15-Aug-14 NA 30-Aug-14 29-Sep-14 29-Sep-14 NA NA 29-Oct-14
Equipment for the PIU [multiple
Revised 11 RAMP/Goods#04 Goods Post NS No No
contracts] 15-Nov-15 NA 30-Nov-15 15-Dec-15 15-Dec-15 NA NA 14-Jan-16
Actual

Planned
15-Jul-14 NA 30-Jul-14 29-Aug-14 29-Aug-14 NA NA 28-Sep-14 13-Jun-15
Revised 12 RAMP/Goods#05 Supply of traffic ccounting system Goods Post NS No No 15-Mar-15 NA 30-Mar-15 14-Apr-15 14-Apr-15 NA NA 14-May-15
Actual

Planned 01-Feb-15 NA 16-Feb-15 18-Mar-15 18-Mar-15 NA NA 17-Apr-15 Grand Motors 9-Apr-15


13 RAMP/Goods#06 Purchase Van for RMS Goods Post NS No No 39500 $ 39500 $ US$ RAMP/G#06 39500 $ Done
Actual 01-Feb-15 NA 12-Feb-15 26-Feb-15 26-Feb-15 08-Mar-15 NA 09-Mar-15 Company

Total

P.P for RAP / Works oods 4[Page]


N
o

O
b
j
e
c
t
i
o
n
Procurement
f Plan for Consultant Services
r Yemen: Road Asset Management Project Grant No P 125135
o
mone or more of these approvals may be
In some contracts,
** Applicable in case of Bank's prior review contained in one Bank communication.
B
a
No Objection No Objection by
Review n
Type of RFP Final Draft No Objection by the Bank to the Bank
by Advertising for TOR/Shortlist to No Objection k Proposal Contract Services Expenditure
SL Consultant Method of to be forwarded from Bank for the Technical (Technical/ Contract Signed Contract Value+ Name, City, and Country of Contractor Expenses Incurred
Package/ Reference No. Description of Services Sub-description of Services Bank Short listing be Finalised from Bank for RFP Issued (Date) Submission Currency( Contract No. Completion incurred from Remarks
No. (Firm/ Selection to the Bank Final RFP Evaluation #Combined/ Draft (Date) Addendum (US$) (incl. Zip Code if US) to Date(US$)
(Prior/ (Date) (Date) TOR (Date)** f Deadline (Date) US$) (Date) phase II
Individual) (Date) (Date)** Report Contract/ Final
Post) o
(Date)** Contract) (Date)**
r

S
Planned 1-Apr-12 10-May-12 10-May-12 ###
h
10-Jun-12 20-Jun-12 30-Jul-12 20-Aug-11 20-Sep-11 20-Oct-12 23-Jul-17
o
Revised Supervision consultants for Term 1-Jul-12 10-Aug-12 10-Aug-12 ###
r 20-Aug-12 1-Sep-12 15-Oct-12 15-Nov-12 10-Dec-12 10-Jan-13 4-Sep-18
VisionRI Connexion Services Private Suspended
1 RAMP CS#02 maintenance contract for Hodeidah Prior Firm QCBS t 986,971.00 US$ RAMP CS#02 65200.60
10-Jan-13 19-Feb-13 19-Feb-13 ###
Limitd India on 26/3/2015
Revised Group 1&2 l 11-Mar-13 26-Mar-13 25-Apr-13 14-Jun-13 14-Jul-13 13-Aug-13
i
Actual 30-Mar-13 6-Jan-14 6-Jan-14 ###
s 6-Jan-14 12-Jan-14 13-Feb-14 18-Sep-14 25-Sep-14
t
Planned 1-Apr-12 10-May-12 10-May-12 ### 10-Jun-12 20-Jun-12 30-Jul-12 20-Aug-11 20-Sep-11 20-Oct-12 23-Jul-17
(
Revised Supervision consultants for Term 1-Jul-12 10-Aug-12 10-Aug-12 ###
D 20-Aug-12 1-Sep-12 15-Oct-12 15-Nov-12 10-Dec-12 10-Jan-13 Umar Munshi Associates and Plan- 29-Nov-18 Suspended
2 RAMP CS#03 Prior Firm QCBS a 998,824.00 US$ RAMP CS#03 0.00
Revised maintenance contract for Ibb 10-Jan-13 19-Feb-13 19-Feb-13 ### 11-Mar-13 26-Mar-13 25-Apr-13 14-Jun-13 14-Jul-13 13-Aug-13 Planners & Engineers on 16/3/2015
t
Actual 30-Mar-13 6-Jan-14 6-Jan-14 e
### 6-Jan-14 30-Mar-14 29-Apr-14 12-Dec-14 20-Dec-14
)
Planned 1-Apr-12 10-May-12 10-May-12 *
### 10-Jun-12 20-Jun-12 30-Jul-12 20-Aug-11 20-Sep-11 20-Oct-12 2-Sep-18
*
Revised 1-Jul-12 10-Aug-12 10-Aug-12 ### 20-Aug-12 1-Sep-12 15-Oct-12 15-Nov-12 10-Dec-12 10-Jan-13 30-Oct-18
Supervision consultants for Term MA'AN for Engineering & Construction in
Suspended
Revised 3 RAMP CS#04 maintenance contract for Lahj & Prior Firm QCBS 20-Jan-13 1-Mar-13 1-Mar-13 ### 21-Mar-13 5-Apr-13 5-May-13 24-Jun-13 24-Jul-13 23-Aug-13 970,652.00 US$ RAMP CS#04 Association with Jurutera Konsult Maju 53209.78
( Malaysia ) on 26/3/2015
Taiz
Revised 20-Feb-14 1-Apr-14 1-Apr-14 ### 21-Apr-14 6-May-14 5-Jun-14 25-Jul-14 24-Aug-14 23-Sep-14
Actual 6-Apr-13 13-Mar-14 30-Mar-14 29-Apr-14 24-Sep-14 20-Nov-14
Planned 1-May-12 10-Jun-12 10-Jun-12 ### 10-Aug-12 20-Aug-12 20-Sep-12 20-Oct-12 20-Nov-12 1-Dec-12
Revised 1-Oct-12 10-Nov-12 10-Nov-12 ### 10-Dec-12 20-Dec-12 20-Feb-13 20-Mar-13 10-Apr-13 1-May-13
4 RAMP CS#05 Support to the PIU and training) Prior Firm QCBS
Revised 10-Apr-14 20-May-14 20-May-14 ### 19-Jun-14 4-Jul-14 18-Aug-14 17-Oct-14 16-Nov-14 16-Dec-14
Actual

Planned 10-Apr-13 20-May-13 20-May-13 ### 19-Jun-13 4-Jul-13 18-Aug-13 17-Oct-13 16-Nov-13 16-Dec-13
Continuous training for staff of
Revised MPWH road sector, RMF, FFPIU 10-Feb-14 22-Mar-14 22-Mar-14 ### 21-Apr-14 6-May-14 20-Jun-14 19-Aug-14 18-Sep-14 18-Oct-14
5 RAMP CS#06 Prior Firm QCBS
Revised in traffic safety audits of new
road projects
Actual

Planned 1-Mar-13 1-Apr-13 20-Jun-13 1-Sep-13


Revised 1-Mar-15 1-Apr-15 20-Jun-15 1-Sep-15
6 RAMP CS#07 International Technical audit Post Firm CQS
Revised 1-Mar-15 20-Mar-15 20-Apr-15 10-May-15

Actual

Planned 1-May-12 10-Jun-12 20-Sep-12 1-Dec-12

Revised Strenghtening of Planning and 1-Oct-12 10-Nov-12 20-Feb-13 20-Mar-13


7 RAMP CS#08 Programming units staff of Post Firm CQS
Revised MPWH staff 1-Mar-14 31-Mar-14 30-Apr-14 30-May-14
Actual

Planned 1-Apr-12 10-Jun-12 10-Aug-12 29-Aug-14


Strenghtening of RMFIU unit
Revised 31-May-13 30-Jun-13 30-Jul-13 29-Aug-13 22-Jan-16 Suspended
9 RAMP CS#10 with two senior (Highway and Prior indvdual IC 48,000.00 US$ CS#10 Eng.Salah Mohsen Al-Jaradi 25074.10
on 1/6/2015
Material Engineers
Actual 23-Dec-13 23-Dec-13 2-Mar-14 15-Jan-15 22-Jan-15

P.P for RAP/ Consultans 5


N
o

O
b
j
e
c
t
i
o
n
Procurement
f Plan for Consultant Services
r Yemen: Road Asset Management Project Grant No P 125135
o
mone or more of these approvals may be
In some contracts,
** Applicable in case of Bank's prior review contained in one Bank communication.
B
a
No Objection No Objection by
Review n
Type of RFP Final Draft No Objection by the Bank to the Bank
by Advertising for TOR/Shortlist to No Objection k Proposal Contract Services Expenditure
SL Consultant Method of to be forwarded from Bank for the Technical (Technical/ Contract Signed Contract Value+ Name, City, and Country of Contractor Expenses Incurred
Package/ Reference No. Description of Services Sub-description of Services Bank Short listing be Finalised from Bank for RFP Issued (Date) Submission Currency( Contract No. Completion incurred from Remarks
No. (Firm/ Selection to the Bank Final RFP Evaluation #Combined/ Draft (Date) Addendum (US$) (incl. Zip Code if US) to Date(US$)
(Prior/ (Date) (Date) TOR (Date)** f Deadline (Date) US$) (Date) phase II
Individual) (Date) (Date)** Report Contract/ Final
Post) o
(Date)** Contract) (Date)**
r

S
Planned h
Supervision consultants for o
Revised monitoring and installation of 1-Mar-13 31-Mar-13 r 30-Apr-13 30-May-13
10 RAMP CS#11 Post indvdual IC t
four weigh stations
Revised 30-Jan-15 11-Mar-15 11-Mar-15 ###
l 31-Mar-15 15-Apr-15 15-May-15 4-Jul-15 3-Aug-15 2-Sep-15
(Electromechanical Eng) i
Actual s
t
Planned Post 9-Jan-14 20-Jan-14 30-Jan-14 30-Jan-14
(
Revised 11 RAMP CS#12 Procurement Adviser for RMFIU indvdual IC 30-Jun-14 30-Jul-14 D 29-Aug-14 28-Sep-14
a
Actual t
e
Planned 11-Mar-13 20-Mar-13 ) 30-Apr-13 15-May-13
Environment and Social Studies *
Revised 13 RAMP CS#14 Post indvdual IC 31-Aug-13 30-Sep-13 * 30-Oct-13 29-Nov-13 19,584.00 US$ RAMP CS#14 Dr. Adnan Al-Senwi 19,584.00 Done
for Ibb Sub-project
Actual 25-Jan-14 25-Jan-14 24-Feb-14 28-Jan-14

Planned Post Per year

Revised 16 RAMP CS#17 Auditing Services Firm SSS RAMP CS#17 Hasbein Company

Actual 1-Jan-14 31-Dec-18


Planned Post
Revised Environmental and Social
17 RAMP CS#18 individual 5750.00 US$ RAMP CS#18 Dr. Mohammed Hizam AL-Mashriki 5750.00 Done
Consultant (short tearm)
Actual 6-Apr-14

Planned Post
Procurement Assisstance
Revised 18 RAMP CS#19 individual IC 13,300.00 US$ RAMP CS#19 Eng. Yahya Al-Ashwal 13,300.00 Done
Consultant
Actual 22-Jan-14 12-Feb-14 5-Mar-14 4-May-14

Planned Post

Revised 19 RAMP CS#20 Ecological Expert individual 5080.00 US$ RAMP CS#20 Dr.Abdulsalam Al-Kowri 5080.00 Done

Actual 1-Jun-14

Planned Post 11-Mar-13 20-Mar-13 30-Apr-13 15-May-13

Maintenance contract for FM 3500 US$ per


Revised RAMP CS#21 indvdual IC 31-Aug-13 30-Sep-13 30-Oct-13 29-Nov-13 computer & Engineering World 3500.00 Per Year
system during 4 years year
Actual 31-Mar-14 30-Apr-14 30-May-14 29-Jun-14

MPWH Component
Planned

Revised
Technical assistance to the
Revised
20 MPWH [multiple contracts, see
note below]

Actual

P.P for RAP/ Consultans 6


N
o

O
b
j
e
c
t
i
o
n
Procurement
f Plan for Consultant Services
r Yemen: Road Asset Management Project Grant No P 125135
o
mone or more of these approvals may be
In some contracts,
** Applicable in case of Bank's prior review contained in one Bank communication.
B
a
No Objection No Objection by
Review n
Type of RFP Final Draft No Objection by the Bank to the Bank
by Advertising for TOR/Shortlist to No Objection k Proposal Contract Services Expenditure
SL Consultant Method of to be forwarded from Bank for the Technical (Technical/ Contract Signed Contract Value+ Name, City, and Country of Contractor Expenses Incurred
Package/ Reference No. Description of Services Sub-description of Services Bank Short listing be Finalised from Bank for RFP Issued (Date) Submission Currency( Contract No. Completion incurred from Remarks
No. (Firm/ Selection to the Bank Final RFP Evaluation #Combined/ Draft (Date) Addendum (US$) (incl. Zip Code if US) to Date(US$)
(Prior/ (Date) (Date) TOR (Date)** f Deadline (Date) US$) (Date) phase II
Individual) (Date) (Date)** Report Contract/ Final
Post) o
(Date)** Contract) (Date)**
r

S
Planned h
o 237,913 $
Revised Consulting Services for Environmental and 19-May-13 28-Jun-13 28-Jun-13
r
### 18-Jul-13 2-Aug-13 1-Sep-13 21-Oct-13 20-Nov-13 20-Dec-13
t VOYANTS SOLUTIONS PRIVATE
Social Safeguard Studies related to the
l LIMITED WITH
21 RAMP CS#01 Yemen International Corridor Highway Prior Firm QCBS RAMP CS#01 396,920.38 Done
Revised i YEMEN ADVANCE
Project, section between Taiz City and the s
city of Aden (140 Km length) t
Actual 19-May-13 2-Jun-13 2-Jun-13 5-Jun-13 ###
( 14-Jul-13 2-Aug-13 1-Sep-13 11-Nov-13 20-Nov-13 26-Nov-13 34,166,112 YR
D
a
Planned Post t
10-May-14
Procurement Assistance to SAYICH PIU in e
Revised the Evaluation of Prequalification )
13-Jul-15 Suspended
22 RAMP CS#15 MPWH indvdual IC 33,640.00 US$ Momirka Inic 19209.83
Revised
Submissions and of Bids for Works 9-Jan-14 20-Jan-14 * 30-Jan-14 30-Jan-14 on 26/3/2015
*
Actual 5-Jan-14 16-Jan-14 10-Jan-14

Planned Post 19-Jan-14 29-Jan-14 10-Feb-14 20-Feb-14

Revised
23 RAMP CS#16 MPWH HD Video Production Aden-Taiz road indvdual IC 16,250.00 US$ 5th Dimension for Trading 4062.00 Done
Revised

Actual 13-Aug-14

Planned

Revised This component would finance feasibility and


preliminary engineering and operations and
maintenance studies to assess potentials of public,
Transport Sector Studies
Revised 24 RAMP CS#17 private and/or public private partnership
[multiple contracts, ] investments in the transport sector in Yemen,
including public transport and operation of Sana’a
and Aden airports and of Al-Hodeidah seaport.
Actual

Total

P.P for RAP/ Consultans 7


Capacity Building Activities Grant P 125135

SL Expected Outcome/ Activity Description Estimated Cost in US$ Estimated Duration Start Date Completion Date Comments
No.

Yemen Road Maintenance Fund

Training for the Foreign Funded Projects Implementing Unit 6 months 1-Aug-14 31-Dec-14
1

Training for the MPWH and RMF 12 months 1-Jan-14 31-Dec-14


2

Total
-
200
300
150
76
120
480
48
1374
150,000
250,000
150,000
30000
50,000
20,000

650,000