Você está na página 1de 2

QF-DGN-01

TITLE: DOCUMENT/DRAWING APPROVAL/COMMENT TRANSMITAL

Project : Supply, Installation, Testing & Commissioning of Bakerganj-Barguna 132kV


Transmission Line on Turnkey Basis.
Contract Number : PGCB/132kV/BKG-BGN/TL, Date: 21.01.2018
Document Submittal Ref : HGPT/PGCB/132kV/BBTL/2018/057; Date:08.07.2018
HGPT/PGCB/132kV/BBTL/2018/072; Date:15.07.2018

Subject : Pile Schedule-03 & 04.

Copy to
To
Managing Director, PGCB
Project Director
Bakerganj-Barguna Transmission Line Project √ Executive Director (P & D), PGCB
Power Grid Company of Bangladesh Limited (PGCB)
H-6 (Level-3), R-23/A, Gulshan-1 √ Chief Engineer (P & D/Project), PGCB
Dhaka-1212.
√ HG POWER Transmission SDN. BHD.
Kind Attn :

Dear Sir √ Executive Engr. (Civil Design), PGCB


We are pleased to enclose the following documents for the purpose
√ Master File
indicated below:

In case of any modification other than those desired are carried out, the Issued by:
same shall be highlighted clearly in the Drawing/Document with full
justification thereof and resubmitted for approval.
(Engr. Md. Delowar Hossain)
Approval/Comments/Information conveyed herein neither relieves the Superintending Engineer
contractor of his contractual obligation and his responsibilities for Civil Design, P&D.
correctness of dimensions, material of constructions, weight, quantities, Our Ref: 27.21.0000.412.49.001.18.452
design details, assemble fits, performance particulars and conformity of
the supplies with the Statutory Laws of Bangladesh as may be applicable, Date: 19 August, 2018
nor does it limit the Employer’s right under the contract.

Item Description of Tower No. Number of Revision Status Enclosed


No Drawing/ Documents Tower

01. Pile Schedule-03 T-1/5, T-1/6, T-1/7, T-1/8, 18 0 Approved (A)


Yes
T-1/9, T-1/10, T-1/11, T-1/12, Approved with
T-2/1, T-2/2, T- T-2/3, T-2/4, Comment /
T-3/1, T-3/2, T-3/3, T-3/4, Correction (C)
T-3/5 & T-3/6
Request for re- No
Submission (RR)

01. Pile Schedule-04 T-10/2, T-10/3, T-10/4, 16 0 For information


T-10/5, T-10/6, T-10/7, (FI)
T-10/8, T-11/1, T-12/3,
T-13/1, T-13/2, T-13/3,
T-16/3, T-17/1, T-18/1
& T-18/2

Please acknowledge receipt of documents:


Received by Date