SAUDI ARAMCO ID/PID FORM REV 1 - 010109 Rev 8 COS0 6/30/2014

SATIP No. APPROVED DATE DISCIPLINE:


SAUDI ARAMCO TYPICAL INSPECTION PLAN
On-Land and Near-Shore Pipelines SATIP-L- 450- 01 31-Dec-14 CIVIL
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE & QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. ACTIVITY CODE PROCEDURE RECORD Construc LSTK Others
tion QC QA/QC PID (TBD)
1.0 DOCUMENT REVIEW

1.1 Not Applicable


RECEIVING
2.0
INSPECTION

FBE Rebar, Embedments & Portland See SATIP-Q-001-02 if concreting is part of the Scope
2.1
Cement Concrete Receiving Inspection of Work.

3.0 INSTALLATION

Contractor QC - Witness first two occurences and one


Pipeline Right of Way (ROW) SAIC-L-
3.1
Inspection
SAIC-L-1001
1001
W W W per 5 occurences thereafter. S. ARAMCO - Witness
first occurrence and one in 5 occurrences thereafter.

Trench Excavation and Preparation SAIC-L- S. ARAMCO - Witness first 2 occurences and one per
3.2
Inspection
SAIC-L-1002
1002 H W W 3 occurrences thereafter.

Contractor QC - Witness first two days, and one per 5


SAIC-L-
3.3 Pipe Lowering Inspection SAIC-L-1003
1003 H W S occurrences thereafter. S. ARAMCO - Surveillance on
first day and 1 in every 5 occurrences thereafter.

Contractor QC - Witness first 2 days and one per 5


Backfilling and Berm Construction SAIC-L-
3.4
Inspection
SAIC-L-1004
1004 H W W occurrences thereafter. S. ARAMCO - Surveillance on
first day and 1 in every 5 occurrences thereafter.

See SATIP-Q-006-02 if paved road reconstruction is


3.5 Road Crossing Construction Inspection
part of the Scope of Work.

Portland cement concrete placement See SATIP-Q-001-02 if concreting is part of the Scope
3.6
and curing of Work.

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PID FORM REV 1 - 010109 Rev 8 COS0 6/30/2014
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
On-Land and Near-Shore Pipelines SATIP-L- 450- 01 31-Dec-14 CIVIL
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE & QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. ACTIVITY CODE PROCEDURE RECORD Construc LSTK Others
tion QC QA/QC PID (TBD)
4.0 PRE-COMMISSIONING

4.1 Not Applicable

GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may
1 adjust the levels of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization
3 representative is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in
4 attendance.
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.

LEGEND
H 100% Hold Point for QC Inspection or Test. R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents
S Surveillance I 100% Contractor Inspection