PEMERINTAH ACEH

DINAS BINA MARGA DAN DIPTA KARYA

: .
: -
:
:
: .
: . ss. .
:

KONTRAK AWAL KONTRAK ADD-I


HARGA SATUAN
NO. URAIAN SAT.
(Rp.) JUMLAH HARGA BOBOT JUMLAH HARGA BOBOT
VOLUME VOLUME
(Rp.) (%) (Rp.) (%)
DIVISI 1. UMUM
1.2 Mobilisasi Ls 50,100,000.00 1.00 50,100,000.00 0.689 1.00 50,100,000.00 0.689
DIVISI 2. DRAINASE 50,100,000.00 0.689 - 50,100,000.00 0.689
2.1
2.1 Gali
Galian
an Untuk
ntuk Sel
Selokan
okan Drain
rainas
ase
e da
dan Sal
Salur
uran
an Air 
Air  M³ 37,888.00 2,000.00 75,776,000.00 1.042 1,849.33 70,067,415.04 0.963
2.3.
2.3.5
5 Goro
Gorong
ng-g
-gor
oron
ong
g Pipa
Pipa Baja
Baja Berg
Bergel
elom
omba
bang
ng Ton 37,703,990.35 1.50 56,555,985.53 0.778 0.15 5,655,598.55 0.078
DIVISI 3. PEKERJAAN TANAH 132,331,985.53 1.820 - 75,723,013.59 1.041
3.1.1 Galian Biasa M³ 24,003.00 1,250.94 30,026,312.82 0.413 - - -
3.2.1 Timbunan Biasa M³ 71,022.00 2,000.00 142,044,000.00 1.953 511.46 36,324,772.13 0.499
3.2.2 Timbunan Pi
Pilihan M³ 106,227.00 1,221.83 129,791,335.41 1.785 2,900.74 308,136,907.98 4.237
3.3.1 Penyiapan Badan Jalan M² 2,922.00 27,900.00 81,523,800.00 1.121 25,840.15 75,504,918.30 1.038
DIVISI 4. PELEBARAN DAN PERKERASAN BAHU JALAN 383,385,448.23 5.272 - 419,966,598.41 5.775
4.2.2 Lapis Po
Pondasi Ag
Agregat Kl
Klas B M³ 455,605.00 1,860.00 847,425,300.00 11.652 1,289.79 587,634,772.95 8.080
DIVISI 5. PERKERASAN BERBUTIR 847,425,300.00 11.652 - 587,634,772.95 8.080
5.1.1 Lapis Po
Pondasi Ag
Agregat Kl
Klas A M³ 526,671.00 2,790.00 1,469,412,090.00 20.204 2,906.64 1,530,842,995.44 21.049
5.1.2 Lapis Po
Pondasi Ag
Agregat Kl
Klas B M³ 449,249.00 3,720.00 1,671,206,280.00 22.979 3,875.52 1,741,073,484.48 23.940
DIVISI 6. PERKERASAN ASPAL 3,140,618,370.00 43.184 - 3,271,916,479.92 44.989
6.1.
6.1.(1
(1)(
)(a)
a) Lapi
Lapis
s Resa
Resap
p Peng
Pengik
ikat
at - Aspa
Aspall Cair 
Cair  Liter 11,249.00 13,950.00 156,923,550.00 2.158 14,691.41 165,263,671.09 2.272
KONTRAK ADD FINAL
Keterangan
JUMLAH HARGA BOBOT
VOLUME
(Rp.) (%)

1.00 50,100,000.00 0.689


- 50,100,000.00 0.689
1,832.02 69,411,504.95 0.954
0.23 8,671,917.78 0.119
- 78,083,422.73 1.074
- - -
477.20 33,891,698.40 0.466
2,870.08 304,879,988.16 4.192
26,746.55 78,153,419.10 1.075
- 416,925,105.66 5.733
1,259.31 573,747,932.55 7.889
- 573,747,932.55 7.889
3,010.14 1,585,353,443.94 21.799
3,904.56 1,754,119,675.44 24.119
- 3,339,473,119.38 45.918
15,189.31 170,864,548.19 2.349
PEMERINTAH ACEH

DINAS BINA MARGA DAN CIPTA KARYA


PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI SIMEULUE

SERTIFIKAT BULANAN
MONTHLY CERTIFICATE (MC)
KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 07 (TUJUH)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : OKTOBER
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 23 OKTOBER 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 1 dari 8
NILAI KONTRAK : Rp. 8,000,000,000.00,-
NOMOR KONTRAK ADD-I : 13.1/SPPK/PBJ/DBC/APBA/VII/2012
TANGGAL KONTRAK ADD-I : 03 JULI 2012
NILAI KONTRAK ADD-I : Rp. 8,000,000,000.00,-
NOMOR KONTRAK ADD FINAL : 13.2/SPPK/PBJ/DBC/APBA/X/2012
TANGGAL KONTRAK ADD FINAL : 16 OKTOBER 2012
NILAI KONTRAK ADD FINAL : Rp. 8,000,000,000.00,-
SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA

NILAI KONTRAK  JUMLAH PEMBAYARAN


NOMOR MATA
URAIAN PEKERJAAN S/D S/D BOBOT (%) BOBOT (%)
PEMBAYARAN KONTRAK AWAL (Rp.) KONTRAK ADD-I (Rp.) KONTRAK ADD FINAL (Rp.) BULAN INI
BULAN LALU BULAN INI S/D BULAN INI ITEM PEKERJAAN
1 2 3 4 5 6 7 8 9 10
1 UMUM 50,100,000.00 50,100,000.00 50,100,000.00 35,070,000.00 15,030,000.00 50,100,000.00 0.69% 0.69%
2 DRAINASE 132,331,985.53 75,723,013.59 78,083,422.73 70,067,415.04 8,016,007.69 78,083,422.73 1.07% 1.07%
3 PEKERJAAN TANAH 383,385,448.23 419,966,598.41 416,925,105.66 415,993,619.55 931,486.11 416,925,105.66 5.73% 5.73%
4 PELEBARAN DAN PERKERASAN BAHU JALAN 847,425,300.00 587,634,772.95 573,747,932.55 - 573,747,932.55 573,747,932.55 7.89% 7.89%
5 PERKERASAN BERBUTIR 3,140,618,370.00 3,271,916,479.92 3,339,473,119.38 3,207,077,907.12 132,395,212.26 3,339,473,119.38 45.92% 45.92%
6 PERKERASAN ASPAL 2,628,526,398.70 2,768,260,475.89 2,707,510,770.40 2,527,370,130.26 180,140,640.14 2,707,510,770.40 37.23% 37.23%
7 STRUKTUR 90,339,780.00 99,125,941.69 106,886,931.74 99,125,941.69 7,760,990.05 106,886,931.74 1.47% 1.47%

A SUB TOTAL 7,272,727,282.46 7,272,727,282.46 7,272,727,282.46 6,354,705,013.66 918,022,268.80 7,272,727,282.46 S/D BULAN INI
B PPN (10%) X A 727,272,728.25 727,272,728.25 727,272,728.25 635,470,501.37 91,802,226.88 727,272,728.25 100.00% 100.00%
C JUMLAH TOTAL A + B 8,000,000,010.70 8,000,000,010.70 8,000,000,010.70 6,990,175,515.02 1,009,824,495.68 8,000,000,010.70
D DIBULATKAN C 8,000,000,000.00 8,000,000,000.00 8,000,000,000.00 6,990,175,000.00 1,009,824,000.00 8,000,000,000.00 BULAN INI
E MATERIAL ON SITE (MOS)
12.62%
F JUMLAH KOTOR SERTIFIKAT BULAN INI
G POTONGAN - POTONGAN S/D BULAN LALU
1 SERTIFIKAT S/D BULAN LALU (KOMULATIF) 5,242,631,250.00
87.38%
2 5 % JAMINAN PEMELIHARAAN ( 5% X D ) 400,000,000.00
3 20 % PENGEMBALIAN UANG MUKA 1,600,000,000.00
H JUMLAH POTONGAN ( 1 + 2 + 3 ) 7,242,631,250.00
I JUMLAH BERSIH SERTIFIKAT BULAN INI TERMASUK PPN 10% (F-H) 757,368,750.00
 J DIBULATKAN 757,368,750.00
Terbilang : tujuh ratus lima puluh tujuh juta tiga ratus enam puluh delapan ribu tujuh ratus lima puluh rupiah

DIAJUKAN OLEH : DIPERIKSA/DISETUJUI OLEH : MENYETUJUI OLEH :


PENYEDIA BARANG/JASA KONSULTAN SUPERVISI PPTK
PT. FLAMBOYANT HUMA ARTA PT. CIPTA JAYA UTAMA KONSULTAN PEMBANGUNAN JALAN DAN JEMBATAN
WILAYAH XI (SIMEULUE)

ALWIN ABDULLAH LINDUNG NAINGGOLAN Ir. ZULKARNEN, MT.


DIREKTUR UTAMA SITE ENGINEER Nip. 19640516 199703 1 001

MENGETAHUI OLEH :
KUASA PENGGUNA ANGGARAN / KUASA PENGGUNA BARANG
KEGIATAN PEMBANGUNAN JALAN DAN JEMBATAN
DINAS BINA MARGA DAN CIPTA KARYA ACEH

Ir. FAJRI, MT
PEMBINA
NIP. 19640831 199203 1 005
PEMERINTAH ACEH

DINAS BINA MARGA DAN CIPTA KARYA


PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI SIMEULUE

SERTIFIKAT BULANAN

KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 07 (TUJUH)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : OKTOBER
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 23 OKTOBER 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 2 dari 8
NILAI KONTRAK : Rp. 8,000,000,000.00,-
NOMOR KONTRAK ADD-I : 13.1/SPPK/PBJ/DBC/APBA/VII/2012
TANGGAL KONTRAK ADD-I : 03 JULI 2012
NILAI KONTRAK ADD-I : Rp. 8,000,000,000.00,-
NOMOR KONTRAK ADD FINAL : 13.2/SPPK/PBJ/DBC/APBA/X/2012
TANGGAL KONTRAK ADD FINAL : 16 OKTOBER 2012
NILAI KONTRAK ADD FINAL : Rp. 8,000,000,000.00,-
SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA

DIVISI 1. UMUM JUMLAH KONTRAK ADD FINAL Rp 50,100,000.00

NOMOR KUANTITAS JUMLAH HARGA S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN
MATA URAIAN PEKERJAAN SAT. ADD FINAL
KONTRAK KONTRAK KONTRAK (Rp.) JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
PEMB. (Rp.) KUANTITAS KUANTITAS KUANTITAS
AWAL ADD-I ADD FINAL (Rp.) (Rp.) (Rp.)
1 2  3 4 5 6 7 8=6x7 9 10 = 7 x 9 11 12 = 7 x 11 13 = 9 + 11 14 = 10 + 12  

1.2 Mobilisasi Ls 1.00 1.00 1.00 50,100,000.00 50,100,000.00 0.70 35,070,000.00 0.30 15,030,000.00 1.00 50,100,000.00

TOTAL HARGA  50,100,000.00 - - -

DIVISI 1. UMUM  TOTAL PEMBAYARAN - 35,070,000.00 15,030,000.00 50,100,000.00

PERSENTASE 100.00% 70.00% 30.00% 100.00%

DISETUJUI OLEH : DIPERIKSA OLEH : DIBUAT OLEH :


PEMBANTU PPTK KONSULTAN SUPERVISI PENYEDIA BARANG/JASA
PEMBANGUNAN JALAN DAN JEMBATAN PT. CIPTA JAYA UTAMA KONSULTAN PT. FLAMBOYANT HUMA ARTA
WILAYAH XI (SIMEULUE)

RUSVAN VERIZAL, ST EDWARD NOUR, ST SYAHRIZAL, ST.


Nip. 19830706 201001 1029 CHIEF INSPECTOR GENERAL SUPERINTENDENT
PEMERINTAH ACEH

DINAS BINA MARGA DAN CIPTA KARYA


PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI SIMEULUE

SERTIFIKAT BULANAN

KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 07 (TUJUH)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : OKTOBER
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 23 OKTOBER 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 3 dari 8
NILAI KONTRAK : Rp. 8,000,000,000.00,-
NOMOR KONTRAK ADD-I : 13.1/SPPK/PBJ/DBC/APBA/VII/2012
TANGGAL KONTRAK ADD-I : 03 JULI 2012
NILAI KONTRAK ADD-I : Rp. 8,000,000,000.00,-
NOMOR KONTRAK ADD FINAL : 13.2/SPPK/PBJ/DBC/APBA/X/2012
TANG GAL KO NTRAK ADD FINAL : 16 OKTO BER 2012
NILAI KONTRAK ADD FINAL : Rp. 8,000,000,000.00,-
SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA

DIVISI 2. DRAINASE JUMLAH KONTRAK ADD FINAL Rp 78,083,422.73

NOMOR KUANTITAS JUMLAH HARGA S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN
MATA URAIAN PEKERJAAN SAT. ADD FINAL
KONTRAK KONTRAK KONTRAK (Rp.) JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
PEMB. (Rp.) KUANTITAS KUANTITAS KUANTITAS
AWAL ADD-I ADD FINAL (Rp.) (Rp.) (Rp.)
1 2  3 4 5 6 7 8=6x7 9 10 = 7 x 9 11 12 = 7 x 11 13 = 9 + 11 14 = 10 + 12  

2.1 Galian Untuk Selokan Drainase dan Saluran Air  M³ 2,000.00 1,849.33 1,832.02 37,888.00 69,411,504.95 1,849.33 70,067,415.04 (17.31) (655,910.09) 1,832.02 69,411,504.95

2.3.5 Gorong-Gorong Pipa Baja Bergelombang Ton 1.50 0.15 0.23 37,703,990.35 8,671,917.78 - - 0.23 8,671,917.78 0.23 8,671,917.78

TOTAL HARGA  78,083,422.73 - - -

DIVISI 2. DRAINASE  TOTAL PEMBAYARAN - 70,067,415.04 8,016,007.69 78,083,422.73

PERSENTASE 100.00% 89.73% 10.27% 100.00%

DISETUJUI OLEH : DIPERIKSA OLEH : DIBUAT OLEH :


PEMBANTU PPTK KONSULTAN SUPERVISI PENYEDIA BARANG/JASA
PEMBANGUNAN JALAN DAN JEMBATAN PT. CIPTA JAYA UTAMA KONSULTAN PT. FLAMBOYANT HUMA ARTA
WILAYAH XI (SIMEULUE)

RUSVAN VERIZAL, ST EDWARD NOUR, ST SYAHRIZAL, ST.


Nip. 19830706 201001 1029 CHIEF INSPECTOR GENERAL SUPERINTENDENT
PEMERINTAH ACEH

DINAS BINA MARGA DAN CIPTA KARYA


PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI SIMEULUE

SERTIFIKAT BULANAN

KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 07 (TUJUH)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : OKTOBER
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 23 OKTOBER 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 4 dari 8
NILAI KONTRAK : Rp. 8,000,000,000.00,-
NOMOR KONTRAK ADD-I : 13.1/SPPK/PBJ/DBC/APBA/VII/2012
TANGGAL KONTRAK ADD-I : 03 JULI 2012
NILAI KONTRAK ADD-I : Rp. 8,000,000,000.00,-
NO MOR KONTRAK ADD FI NAL : 13. 2/ SPPK/ PBJ /DBC/ APBA/ X/ 201 2
TANG GAL KO NTRAK ADD F INAL : 1 6 O KTO BER 2 01 2
NILAI KONTRAK ADD FINAL : Rp. 8,000,000,000.00,-
SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA

DIVISI 3. PEKERJAAN TANAH JUMLAH KONTRAK ADD FINAL Rp 416,925,105.66

NOMOR KUANTITAS JUMLAH HARGA S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN
MATA URAIAN PEKERJAAN SAT. ADD FINAL
KONTRAK KONTRAK KONTRAK (Rp.) JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
PEMB. (Rp.) KUANTITAS KUANTITAS KUANTITAS
AWAL ADD-I ADD FINAL (Rp.) (Rp.) (Rp.)
1 2  3 4 5 6 7 8=6x7 9 10 = 7 x 9 11 12 = 7 x 11 13 = 9 + 11 14 = 10 + 12  

3.1.1 Galian Biasa M³ 1,250.94 - - 24,003.00 - - - - - - -

3.2.1 Timbunan Biasa M³ 2,000.00 511.46 477.20 71,022.00 33,891,698.40 505.13 35,875,342.86 (27.93) (1,983,644.46) 477.20 33,891,698.40

3.2.2 Timbunan Pilihan M³ 1,221.83 2,900.74 2,870.08 106,227.00 304,879,988.16 2,867.57 304,613,358.39 2.51 266,629.77 2,870.08 304,879,988.16

3.3 Penyiapan Badan jalan M² 27,900.00 25,840.15 26,746.55 2,922.00 78,153,419.10 25,840.15 75,504,918.30 906.40 2,648,500.80 26,746.55 78,153,419.10

TOTAL HARGA  416,925,105.66 - - -

DIVISI 3. PEKERJAAN TANAH  TOTAL PEMBAYARAN - 415,993,619.55 931,486.11 416,925,105.66

PERSENTASE 100.00% 99.78% 0.22% 100.00%

DISETUJUI OLEH : DIPERIKSA OLEH : DIBUAT OLEH :


PEMBANTU PPTK KONSULTAN SUPERVISI PENYEDIA BARANG/JASA
PEMBANGUNAN JALAN DAN JEMBATAN PT. CIPTA JAYA UTAMA KONSULTAN PT. FLAMBOYANT HUMA ARTA
WILAYAH XI (SIMEULUE)

RUSVAN VERIZAL, ST EDWARD NOUR, ST SYAHRIZAL, ST.


Nip. 19830706 201001 1029 CHIEF INSPECTOR GENERAL SUPERINTENDENT
PEMERINTAH ACEH

DINAS BINA MARGA DAN CIPTA KARYA


PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI SIMEULUE

SERTIFIKAT BULANAN

KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 07 (TUJUH)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : OKTOBER
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 23 OKTOBER 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 5 dari 8
NILAI KONTRAK : Rp. 8,000,000,000.00,-
NOMOR KONTRAK ADD-I : 13.1/SPPK/PBJ/DBC/APBA/VII/2012
TANGGAL KONTRAK ADD-I : 03 JULI 2012
NILAI KONTRAK ADD-I : Rp. 8,000,000,000.00,-
NOMOR KONTRAK ADD FINAL : 13.2/SPPK/PBJ/DBC/APBA/X/2012
TANG GAL KO NTRAK ADD FINAL : 16 O KTO BER 2012
NILAI KONTRAK ADD FINAL : Rp. 8,000,000,000.00,-
SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA

DIVISI 4. PELEBARAN DAN PERKERASAN BAHU JALAN JUMLAH KONTRAK ADD FINAL Rp 573,747,932.55

NOMOR KUANTITAS JUMLAH HARGA S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN
MATA URAIAN PEKERJAAN SAT. ADD FINAL
KONTRAK KONTRAK KONTRAK (Rp.) JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
PEMB. (Rp.) KUANTITAS KUANTITAS KUANTITAS
AWAL ADD-I ADD FINAL (Rp.) (Rp.) (Rp.)
1 2  3 4 5 6 7 8=6x7 9 10 = 7 x 9 11 12 = 7 x 11 13 = 9 + 11 14 = 10 + 12  

4.2.2 Lapis Pondasi Aggregat Klas B M³ 1,860.00 1,289.79 1,259.31 455,605.00 573,747,932.55 - - 1,259.31 573,747,932.55 1,259.31 573,747,932.55

TOTAL HARGA  573,747,932.55 - - -

DIVISI 4. PELEBARAN DAN PERKERASAN BAHU JALAN  TOTAL PEMBAYARAN - - 573,747,932.55 573,747,932.55

PERSENTASE 100.00% 0.00% 100.00% 100.00%

DISETUJUI OLEH : DIPERIKSA OLEH : DIBUAT OLEH :


PEMBANTU PPTK KONSULTAN SUPERVISI PENYEDIA BARANG/JASA
PEMBANGUNAN JALAN DAN JEMBATAN PT. CIPTA JAYA UTAMA KONSULTAN PT. FLAMBOYANT HUMA ARTA
WILAYAH XI (SIMEULUE)

RUSVAN VERIZAL, ST EDWARD NOUR, ST SYAHRIZAL, ST.


Nip. 19830706 201001 1029 CHIEF INSPECTOR GENERAL SUPERINTENDENT
PEMERINTAH ACEH

DINAS BINA MARGA DAN CIPTA KARYA


PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI SIMEULUE

SERTIFIKAT BULANAN

KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 07 (TUJUH)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : OKTOBER
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 23 OKTOBER 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 6 dari 8
NILAI KONTRAK : Rp. 8,000,000,000.00,-
NOMOR KONTRAK ADD-I : 13.1/SPPK/PBJ/DBC/APBA/VII/2012
TANGGAL KONTRAK ADD-I : 03 JULI 2012
NILAI KONTRAK ADD-I : Rp. 8,000,000,000.00,-
NOMOR KONTRAK ADD FINAL : 13.2/SPPK/PBJ/DBC/APBA/X/2012
TANGG AL KO NTRAK ADD FINAL : 16 OKTO BER 2012
NILAI KONTRAK ADD FINAL : Rp. 8,000,000,000.00,-
SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA

DIVISI 5. PERKERASAN BERBUTIR JUMLAH KONTRAK ADD FINAL Rp 3,339,473,119.38

NOMOR KUANTITAS JUMLAH HARGA S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN
MATA URAIAN PEKERJAAN SAT. ADD FINAL
KONTRAK KONTRAK KONTRAK (Rp.) JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
PEMB. (Rp.) KUANTITAS KUANTITAS KUANTITAS
AWAL ADD-I ADD FINAL (Rp.) (Rp.) (Rp.)
1 2  3 4 5 6 7 8=6x7 9 10 = 7 x 9 11 12 = 7 x 11 13 = 9 + 11 14 = 10 + 12  

5.1.1 Lapis Pondasi Agregat Klas A M³ 2,790.00 2,906.64 3,010.14 526,671.00 1,585,353,443.94 2,849.04 1,500,506,745.84 161.10 84,846,698.10 3,010.14 1,585,353,443.94

5.1.2 Lapis Pondasi Agregat Klas B M³ 3,720.00 3,875.52 3,904.56 449,249.00 1,754,119,675.44 3,798.72 1,706,571,161.28 105.84 47,548,514.16 3,904.56 1,754,119,675.44

TOTAL HARGA  3,339,473,119.38 - - -

DIVISI 5. PERKERASAN BERBUTIR  TOTAL PEMBAYARAN - 3,207,077,907.12 132,395,212.26 3,339,473,119.38

PERSENTASE 100.00% 96.04% 3.96% 100.00%

DISETUJUI OLEH : DIPERIKSA OLEH : DIBUAT OLEH :


PEMBANTU PPTK KONSULTAN SUPERVISI PENYEDIA BARANG/JASA
PEMBANGUNAN JALAN DAN JEMBATAN PT. CIPTA JAYA UTAMA KONSULTAN PT. FLAMBOYANT HUMA ARTA
WILAYAH XI (SIMEULUE)

RUSVAN VERIZAL, ST EDWARD NOUR, ST SYAHRIZAL, ST.


Nip. 19830706 201001 1029 CHIEF INSPECTOR GENERAL SUPERINTENDENT
PEMERINTAH ACEH

DINAS BINA MARGA DAN CIPTA KARYA


PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI SIMEULUE

SERTIFIKAT BULANAN

KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 07 (TUJUH)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : OKTOBER
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 23 OKTOBER 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 7 dari 8
NILAI KONTRAK : Rp. 8,000,000,000.00,-
NOMOR KONTRAK ADD-I : 13.1/SPPK/PBJ/DBC/APBA/VII/2012
TANGGAL KONTRAK ADD-I : 03 JULI 2012
NILAI KONTRAK ADD-I : Rp. 8,000,000,000.00,-
NOMO R KO NTRAK ADD FI NAL : 1 3. 2/ SPPK/ PBJ /DBC/ APBA/ X/ 201 2
TANGG AL KO NT RAK ADD FI NAL : 16 OKT OBER 2 01 2
NILAI KONTRAK ADD FINAL : Rp. 8,000,000,000.00,-
SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA

DIVISI 6. PERKERASAN ASPAL JUMLAH KONTRAK ADD FINAL Rp 2,707,510,770.40

NOMOR KUANTITAS JUMLAH HARGA S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN
MATA URAIAN PEKERJAAN SAT. ADD FINAL
KONTRAK KONTRAK KONTRAK (Rp.) JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
PEMB. (Rp.) KUANTITAS KUANTITAS KUANTITAS
AWAL ADD-I ADD FINAL (Rp.) (Rp.) (Rp.)
1 2  3 4 5 6 7 8=6x7 9 10 = 7 x 9 11 12 = 7 x 11 13 = 9 + 11 14 = 10 + 12  

6.1.(1)(a) Lapis Resap Pengikat - Aspal Cair Liter 13,950.00 14,691.41 15,189.31 11,249.00 170,864,548.19 14,178.41 159,492,934.09 1,010.90 11,371,614.10 15,189.31 170,864,548.19

6.3.(6a) Laston Lapis Antara (AC-BC) (gradasi halus/kasar) Ton 2,027.22 2,134.97 2,203.27 521,662.00 1,149,362,234.74 2,056.64 1,072,871,053.78 146.63 76,491,180.96 2,203.27 1,149,362,234.74

6.3.8.a Aspal Ton 126.20 132.91 123.32 10,809,425.00 1,333,018,291.00 115.12 1,244,352,036.74 8.20 88,666,254.26 123.32 1,333,018,291.00

6.3.10 Bahan Pengisi (Filler) Tambahan Kg 41,371.98 43,570.79 44,964.74 1,206.85 54,265,696.47 41,972.16 50,654,105.64 2,992.58 3,611,590.83 44,964.74 54,265,696.47

TOTAL HARGA  2,707,510,770.40 - - -

DIVISI 6. PERKERASAN ASPAL  TOTAL PEMBAYARAN - 2,527,370,130.26 180,140,640.14 2,707,510,770.40

PERSENTASE 100.00% 93.35% 6.65% 100.00%

DISETUJUI OLEH : DIPERIKSA OLEH : DIBUAT OLEH :


PEMBANTU PPTK KONSULTAN SUPERVISI PENYEDIA BARANG/JASA
PEMBANGUNAN JALAN DAN JEMBATAN PT. CIPTA JAYA UTAMA KONSULTAN PT. FLAMBOYANT HUMA ARTA
WILAYAH XI (SIMEULUE)

RUSVAN VERIZAL, ST EDWARD NOUR, ST SYAHRIZAL, ST.


Nip. 19830706 201001 1029 CHIEF INSPECTOR GENERAL SUPERINTENDENT
PEMERINTAH ACEH

DINAS BINA MARGA DAN CIPTA KARYA


PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI SIMEULUE

SERTIFIKAT BULANAN

KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 07 (TUJUH)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : OKTOBER
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 23 OKTOBER 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 8 dari 8
NILAI KONTRAK : Rp. 8,000,000,000.00,-
NOMOR KONTRAK ADD-I : 13.1/SPPK/PBJ/DBC/APBA/VII/2012
TANGGAL KONTRAK ADD-I : 03 JULI 2012
NILAI KONTRAK ADD-I : Rp. 8,000,000,000.00,-
NOMOR KONTRAK ADD FINAL : 13.2/SPPK/PBJ/DBC/APBA/X/2012
TANGG AL KONTRAK ADD FI NAL : 16 OKTOBER 2012
NILAI KONTRAK ADD FINAL : Rp. 8,000,000,000.00,-
SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA

DIVISI 7. STRUKTUR JUMLAH KONTRAK ADD FINAL Rp 106,886,931.74

NOMOR KUANTITAS JUMLAH HARGA S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN
MATA URAIAN PEKERJAAN SAT. ADD FINAL
KONTRAK KONTRAK KONTRAK (Rp.) JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
PEMB. (Rp.) KUANTITAS KUANTITAS KUANTITAS
AWAL ADD-I ADD FINAL (Rp.) (Rp.) (Rp.)
1 2  3 4 5 6 7 8=6x7 9 10 = 7 x 9 11 12 = 7 x 11 13 = 9 + 11 14 = 10 + 12  

7.9 Pasangan Batu M³ 80.00 161.57 174.22 613,517.00 106,886,931.74 161.57 99,125,941.69 12.65 7,760,990.05 174.22 106,886,931.74

7.10 (3) Bronjong M³ 70.00 - - 589,406.00 - - - - - - -

TOTAL HARGA  106,886,931.74 - - -

DIVISI 7. STRUKTUR  TOTAL PEMBAYARAN - 99,125,941.69 7,760,990.05 106,886,931.74

PERSENTASE 100.00% 92.74% 7.26% 100.00%

DISETUJUI OLEH : DIPERIKSA OLEH : DIBUAT OLEH :


PEMBANTU PPTK KONSULTAN SUPERVISI PENYEDIA BARANG/JASA
PEMBANGUNAN JALAN DAN JEMBATAN PT. CIPTA JAYA UTAMA KONSULTAN PT. FLAMBOYANT HUMA ARTA
WILAYAH XI (SIMEULUE)

RUSVAN VERIZAL, ST EDWARD NOUR, ST SYAHRIZAL, ST.


Nip. 19830706 201001 1029 CHIEF INSPECTOR GENERAL SUPERINTENDENT