Você está na página 1de 6

(/default.

aspx)


(https://www.facebook.com/bestprojectsinindia/)

News Updates (https://twitter.com/BestProjectsInd)


1%8D%E0%B0%A8%E0%B1%8D-%E0%B0%95%E0%B1%80-%E0%B0%B5%E0%B0%BF%E0%B0%A7%E0%B0%BE%E0%B0%A8%E0%B0%82%E0%B

 Home (/Default.aspx) /  Projects (/Project.aspx) /  Sauni Yojana Project (https://plus.google.com/114270133680347838974)

Sauni Yojana Project (https://www.instagram.com/bestprojectsinindia/)
Print Media TV Coverages Videos

Saurashtra Narmada Avtaran Irrigation Yojana (https://www.youtube.com/bestprojectsinindia) Print media clips on


pattiseema project (../5/print-
(Sauni Yojana Project) 
(../5/print-
(https://www.linkedin.com/in/best-projects-india-4aa620166/)
This is one of the Best Project In India. Indian is growing faster than the before. Now  We are having larger and best media-clips-on-
infrastructure projects in india  equal to other countries.Our country is looking forward to build mega construction projects pattiseema-
soon. project.aspx)

Today we are discussing about the the best project Sauni.Its Stands for Saurashtra Narmada Avtaran Irrigation Yojana located in
the Saurashtra Region of Gujarat. Print Media Coverage on
Pattisema Li Irrigation

PROJECT  AT A GLANCE (../4/print-


media-coverage-
on-
pattisema.aspx)

Kaleshwaram Project
Electronic Media Coverage

(../3/kaleshwara
m-project-
electronic-
 media-
coverage.aspx)
(https://www.facebook.com/bestprojectsinindia/)
 About Pattisema (../2/about-
(https://twitter.com/BestProjectsInd)
pattisema-project.aspx)

(../2/about-

pattisema-
(https://plus.google.com/114270133680347838974)
project.aspx)


Sauni Yojana Project launched by Shri Narendra Modi in September 2012 with objective of filling 115 major dams by diverting
flood water of Narmada allocated to Saurashtra Region.The excess over flowing flood water of Narmada will be distributed to 115
(https://www.instagram.com/bestprojectsinindia/)
reservoirs of eleven districts of Saurashtra through total 1126 km long four link pipelines benefiting 10,22,589 acre land.

Project Background  GALLERY
(https://www.youtube.com/bestprojectsinindia)
The state of Gujarat was facing severe water scarcity and several regions remain arid and receive scarce rainfall,thus facing

frequent droughts.People of Saurashtra and Kutch regions were facing acute shortage of water for drinking and irrigation and
(https://www.linkedin.com/in/best-projects-india-4aa620166/)
were forced to migrate to other regions.Almost 70 percent of dams,reservoirs and other water bodies of this region had become
dry and  large area of the Kutch-Suarashtra region was dependent on water supply through tankers.In a bid to mitigate this
problem,the Gujarat government undertook the development of a state water supply grid,Swarnim Gujarat Saurashtra–Kutch  
Water Grid Project.

Annaram Pump House Under


Objectives of SAUNI  Kaleshwaram Project
The project acts as a ‘linking’ project where the water will be filled in irrigation dams that are already equipped with canal
network. 
115 dams in the Saurashtra region will be filled with excess water.
The pipelines from the SAUNI job are underground, so meaning no soil should be obtained. The plumbing has been
massive in diameter 3-M to 500 millimeters. 
The stations are increasingly being assembled in us government territory.
 It entails putting a 1,125-km system of pipelines at a high price of R S 12,166 crore to haul Narmada drinking water to such
dams, also irrigate 4.13 lakh hectares.
To resolve the water related problems of an area.


(https://www.facebook.com/bestprojectsinindia/)

(https://twitter.com/BestProjectsInd)

(https://plus.google.com/114270133680347838974)

(https://www.instagram.com/bestprojectsinindia/)

(https://www.youtube.com/bestprojectsinindia)

(https://www.linkedin.com/in/best-projects-india-4aa620166/)
Scope Of Work:
Pumping Stations:

Two set of Pumps with 13,475 M/hr with 30 meters head


Vertical Turbine 10 Pumps (8 working + 2 standby)
Motor with 1500 KW horsepower at 594 RPM speed
1 set of HT Panel
Pipeline:

Length: 40.95 km MS Pipeline of 3000 mm diameter with 17.5 mm thickness


Coating: Outside 3 LPE minimum 3.7 mm coating confirming to DIN 30670, Inside 406 micron thick solvent free food grade
epoxy coating and heat  shrink sleeve at welding joints    
Pipe welding: 32,61,824 cm
No of bends : 26 Nos.    
No of valves: 24 Nos.

Electrical System:    

66 Kv Switch Yard
10 MVA Transformer with 6.6 Kv Voltage (https://www.facebook.com/bestprojectsinindia/)

Civil Work:     

Pumping Station: 70.45 M x 13 M x 14.5 M (L,W,H)     (https://twitter.com/BestProjectsInd)


Sump: 60 M x 50 M x 7.5 M Depth    

MCC Building: 34 M x 23 M x 6.5 M (L,W,H)
Switch Yard : 65 M x 35 M   (https://plus.google.com/114270133680347838974)

(https://www.instagram.com/bestprojectsinindia/)

(https://www.youtube.com/bestprojectsinindia)

(https://www.linkedin.com/in/best-projects-india-4aa620166/)

(https://www.facebook.com/bestprojectsinindia/)

(https://twitter.com/BestProjectsInd)

(https://plus.google.com/114270133680347838974)

(https://www.instagram.com/bestprojectsinindia/)

The project has four trunk pipelines – namely Link 1, 2, 3 and 4. These will take water to the 115 dams in Saurashtra’s 11
districts.

MEIL is assigned works relating to the execution of two packages of Link-1 of the project. (https://www.youtube.com/bestprojectsinindia)

Link: 1  From Machhu-II dam of Morbi district to Sani Dam of Jamanagar District : which is 180 km long will start from the
Machhu
II dam in Morbi district. It will cut across Jamnagar, Morbi and Devbhoomi Dwarka districts, and will take water to 30 dams.
(https://www.linkedin.com/in/best-projects-india-4aa620166/)
Link: 2 Limbdi Bhogavo-II Dam of Surendranagar District to Raidi Dam of Amreli District  : (253 km)- o takes from Limdi Bhogavo
II dam in Surendrangar, and lands in Raydi dam in Khambha taluka of Amreli district. It will supply water to 17 dams.

Link: 3 From Dholidhaja Dam of Surendranagar District to Venu-I Dam of Rajkot District : (245 km)- starts from Dholi Dhaja dam in
Surendranagar and ends at Venu I dam in Upleta taluka of Rajkot district. It will fill 28 dams along its length.

Link: 4 From Limbdi Bhogavo-II Dam of Surendranagar District to Hiran-II Irrigation scheme of Junagadh : will start from Limdi
Bhogavo II dam and end at Hiran II dam in Talala taluka of Gir Somnath district.
5 2

Sundilla Pump House Forms a Crucial Part of శం అరు న ఎ తల పథకం.. ండ గు


Kaleshwaram LIS (../149/sundilla-pump-house-forms-a- (../151/kondaveeti-vagu-project.aspx)

(https://www.facebook.com/bestprojectsinindia/)

(https://twitter.com/BestProjectsInd)
© 2018 bestprojectsinindia.com (/default.aspx). All Rights Reserved.

(https://plus.google.com/114270133680347838974)
 (https://www.facebook.com/bestprojectsinindia/)  (https://twitter.com/BestProjectsInd)    (https://www.youtube.com/channel/UC_7RZwCREaaFpHiioHxDAsg)

(https://www.instagram.com/bestprojectsinindia/)

Home (/default.aspx) Contact Us (/contact-us.aspx) About Us (/about-us.aspx)
(https://www.youtube.com/bestprojectsinindia)

(https://www.linkedin.com/in/best-projects-india-4aa620166/)

Você também pode gostar