Agenda
for
of
****************
Item No. 46.1. : Confirmation of Minutes of 45th Meeting of Steering Committee held on
22.11.17
Minutes of 45th Meeting of Steering Committee held on 22.11.17 were uploaded on the website
and communicated to stakeholders on 14.12.17. Minutes are annexed at Annexure-I. Since no
comments have been received from any of the members, minutes may kindly be confirmed.
******
1
Item No. 46.2 : Action Taken Report on the action points of 45th Meeting of Steering
Committee
45.4.1 to Final approval for Final approval accorded Communicated to all concerned.
45.4.8 various proposals.
*******
2
46.3 Proposals for In-Principle Approval
3
Agenda No. 46.3.1: Proposal for in-principle approval to set up Common Facility Centre
(CFC) in Printing Cluster, Tirupati, Dist, Chittor, Andhra Pradesh.
(i) Proposal was forwarded by MSME-DI, Hyderabad vide letter dated 10.06.14.
(ii) Vide letter dated 23.06.14, proposal was forwarded to Mechanical Division for
examination.
(iii) Vide U.O note dated 02.03.15, Technical Division requested to sought clarification
from SPV / IA i.e. quotations, etc..
(iv) Vide letter dated 11.03.15, SPV and State Government / IA were requested to
provide necessary information / documents..
(v) Vide letter dated 29.04.15, MSME-DI, Hyderabad forwarded point-wise
clarifications submitted by the SPV i.e. M/s. Tirupathi-Tirumala Print and Tone
Services Pvt. Ltd.
(vi) Based on the information provided, Mechanical Division vide their letter dated
03.07.15, recommended the proposal for in-principle approval.
(vii) The proposal was placed in the 38th SCM held on 28.07.15. After deliberations, the
Steering Committee rejected the proposal.
(viii) Vide letter dated 29.04.16, MSME-DI, Hyderabad forwarded the representation of
SPV for reconsideration. However, SPV could not provide the requisite documents.
(ix) Vide letter dated 26.10.17, MSME-DI, Hyderabad requested for re-consideration of
the proposal.
(x) Vide letter dated 04.11.17, Government of Andhra Pradesh recommended to
reconsider the proposal.
(xi) Vide e-mail dated 29.01.18, MSME-DI, Hyderabad has forwarded the following
documents:
Minutes of State Level Project Steering Committee (SLSC) meeting held on
02.11.17 in Commissionerate of Industries, Government of Andhra Pradesh.
Certificate of formation of SPV and Trust building.
Details of SPV bank account in Schedule A bank.
Details of the share holding pattern of SPV members.
Major Outputs / Deliverables of CFC, Projected performance of the cluster
units after proposed intervention (in terms of production, exports / domestic
sales and direct / indirect employment, etc.).
Details of Revenue generation mechanism.
Bye Laws or MA and AoA of SPV.
In view of the above, Steering Committee may like to consider the proposal for In-principle
approval.
1. DSR Details
4
2. Basic Information of Cluster
Main Problems of Cluster: The units are suffering with poor scale of economies and
inadequate resources to invest in necessary technology
upgradation to go up in value-chain.
Other Information: Cost structure of cluster firms is adverse and extents of potential
value-accrual losses (to other regions) are high.
5
of facilities with multi 4 (and more) - colour
sheet and web offset printing facilities Presence
of facilities with multi 4 (and more) - colour
sheet and web offset printing facilities resolved
by association and SPV based initiatives. Many
facilities with advanced high resolution digital
printer Canon equipment for larger dimension
printing These initiatives need be critically
supported by a CFC.
% age of units in 15 --
radius of 5km
% age of units in 30 --
radius of 10km
7
(j.) Commitment letter for Will be provided on obtaining in-principle Required.
contribution approval
(o.)
(b) Water -- --
5. Implement Arrangements
(d.) Appraisal of DPR and Present application is for in-principle approval SIDBI appraisal is
main Recommendations and technical appraisal. DPR will be submitted required.
to SIDBI for appraisal after obtaining in
principle approval
8
Technical Division proposal.
(b.) IRR, Payback period Less than 3 years and 2 months with grant-in- --
aid assistance from GoI
9
3. Plant & Machinery(including electrification) 1305.26
4. Misc. fixed assets 15.00
5. Preliminary & Pre-operative expenses, maximum 2% of project 30.00
cost
6. Contingency (2% building and 5% on plant and machinery) 66.54
7. Margin money for Working Capital 3.82
Total 1521.62
8. Proposed means of finance are as follows:
(Rs. in lakh)
9. Observations:
(i) Registered lease deed for longer period (at least 30 years) in the name of SPV.
(ii) SIDBI Appraisal Report.
(iii) NOC from Pollution Control Board.
(iv) Documents regarding registration of all the units in MSME Data Bank.
(v) Details of authorized share capital and paid up capital
(vi) Commitment letter from SPV for their contribution.
(vii) Certificate from State Government to construe GFR/ relevant guidelines issued by
Hon’ble Supreme Court / CVC have been adhered to / would be adhered to while
selecting implementing / Partner agencies and in course of forwarding / implementing
the project.
Committee may consider the proposal for In-principle Approval for setting up of CFC in Printing
Cluster, Tirupati, Dist. Chittor, Andhra Pradesh.
*******
10
Agenda No.46.3.2: Proposal for in-principle approval for up-gradation of ID centre at
Autonagar, Gajuwaka, Vishakhapatnam, Andhra Pradesh.
Background:
(i) Proposal was received from Government of Andhra Pradesh vide application ref.
No.3942 dated 06.11.15 & recommended by MSME-DI, Hyderabad.
(ii) Proposal along with Detailed project Report (DPR) was forwarded by MSME-DI,
Hyderabad vide letter dated 30.06.16.
(iii) MSME-DI, Hyderabad vide e-mail dated 29.01.18, forwarded the following documents:
(a) SIDBI Appraisal Report
(b) Minutes of State Level Steering Committee (SLSC) meeting held on 18.11.17
that recommended the proposal.
(c) Copy of proposed layout plan
1. Pre-registration Information
Particulars Description
Whether appraised DPR with approved layout Yes
plan
Total Area of industrial estate / area (acre) 1476.50
Area to be developed (acre) 1476.50
Number and sizes of plots to be developed 1065
Implementing Period 24 months
Other ID projects sanctioned in same district: year Nil
of sanction, number of plots allotted, units set up,
etc.
Performance of ID projects in State. Satisfactory
11
Description Proposed by Implementation Agency(IA) Remarks
availability of water
supply, adequate power
supply, telecom facilities,
dwelling places of
workers)
Whether land is in Yes Letter required.
possession in the name of
IA with Clear Title
Whether Zoning Yes
regulations and non-
agricultural conversion
etc complied with)
Whether State Level Yes Yes
Committee to coordinate
and monitor progress has
been Constituted
Whether confirmation Yes Confirmation letter
received form IA that it from APIIC
will meet the cost in required.
excess of approved
project cost and any
escalation in cost
Basis of elements of Standard Schedule Of Rates
project Cost
Tangible Outcomes of the Spin off Unit 2015 2018 2022 --
project Growth of Nos. 50 75 100
Firms in Park
Aggregate Rs. 150 225 300
Investments Crores
by Firms in
Park
Aggregate Nos. 600 900 1200
Employement
in park
Indirect Nos. 900 1350 1800
employment
expected to be
triggered
Justification of the The Autonagar Gajuwaka cluster is spread in --
Proposal an area of 1476.50 acres which is located
within the limits of Greater Visakhapatnam
Municipal Corporation (GVMC). Products
and services from the estate are diversified
but are focussed towards service to large
industrial units like Steel Plant, BHVM, etc
located nearby. The products that are
manufactured in the estate are fabricated
iron and steel structures, steel re rolling,
processing of iron scrap, heavy structural
engineering, industrial chemicals, apparels
and allied units.
12
4. Project Cost:
(Rs. In lakh)
S. No. Particulars Estimated by IA
1. Land filling/leveling including boundary wall and fencing: 59.85
2. Laying roads 200.00
3. Road side greenery & social forestry 10.00
4. Drainage 60.00
5. Power distribution, Street light arrangements, etc. 88.40
6. Telecom/Cyber/Documentation centre 16.50
7. Conference Hall/Exhibition centre 36.00
8. Bank/Post office 12.00
9. Raw material storage facility, Marketing outlets 36.00
10. First aid centre, Creche Canteen 12.00
11. Contingencies & Pre operative expenses : 42.46
Total 573.21
6. Observations:
(i) Land documents with clear title (signed by Competent Authority) and complying
with zoning regulations and non-agricultural conversion etc. on the name of IA.
(ii) Commitment letter from State Government (Industries Department) in respect of its
share in the project and cost escalation, if any, over and above the approved project
cost.
(iii) Undertaking from State Government that more than 50% units are Micro / SC-ST /
Women Enterprises, as the case may be.
(iv) Status of completed ID projects in the State as per format to be provided by Office of
DC (MSME).
(v) Details of industries operating in the Industrial Estate.
(vi) Certificate from State Government to construe GFR/ relevant guidelines issued by
Hon’ble Supreme Court / CVC have been adhered to / would be adhered to while
selecting implementing / Partner agencies and in course of forwarding /
implementing the project.
Committee may consider the proposal for In-principle Approval for up-gradation of ID centre at
Autonagar, Gajuwaka, Vishakhapatnam, Andhra Pradesh.
**************
13
Agenda No.46.3.3: Proposal for in-principle approval for Up-gradation of Singarayakonda,
Prakasham District, Andhra Pradesh.
Background
(i) Proposal was received from Government of Andhra Pradesh vide application ref.
No.3995 dated 23.11.15 & recommended by MSME-DI, Hyderabad.
(ii) Proposal along with Detailed Project Report (DPR) was forwarded by MSME-DI,
Hyderabad vide letter dated 15.11.16.
(iii) MSME-DI, Hyderabad vide e-mail dated 29.01.18, forwarded the following documents:
(d) SIDBI Appraisal Report
(e) Minutes of State Level Steering Committee (SLSC) meeting held on 18.11.17,
that recommended the proposal.
1. Pre-registration Information
Particulars Description
Whether appraised DPR with approved layout Yes
plan
Total Area of industrial estate/ area (acre) 136.08
Area to be developed (acre) 136.08
Number and sizes of plots to be developed 110 Plots size of 0.25 to 2.00 acres
Implementing Period 24 months
Other ID projects sanctioned in same district: Nil
year of sanction, number of plots allotted, units
set up, etc.
Performance of ID projects in State Satisfactory
14
Description Proposed by Implementation Agency(IA) Remarks
availability of water
supply, adequate power
supply, telecom facilities,
dwelling places of
workers)
Whether land is in Yes Received.
possession in the name of
IA with Clear Title
Whether Zoning Yes
regulations and non-
agricultural conversion etc
complied with)
Whether State Level Yes Yes
Committee to coordinate
and monitor progress has
been Constituted
Whether confirmation Yes Confirmation
received form IA that it letter from
will meet the cost in APIIC is
excess of approved project required.
cost and any escalation in
cost
Basis of elements of Standard Schedule Of Rates --
project Cost
Tangible Outcomes of the Spin off Unit 2015 2017 2020 --
project Growth of Nos. 110 130 190
Firms in Park
Aggregate Rs. in 250 325 475
Investments by crores
Firms in Park
Aggregate Nos. 1000 1300 1900
Employment in
park
Indirect Nos. 1500 2000 3000
employment
expected to be
triggered
Justification of the The cluster already has around 79 MSEs --
Proposal comprising automobile, engineering, cold
storage, Ice making and Engineering Lathe
works etc. The activities are highly
complementary and the firms are horizontally
well integrated. Besides providing sustainable
livelihoods directly and indirectly to more than
1500 persons round the year, the cluster also
contributes significantly to the growth of the
local economy.
4. Project Cost:
(Rs. In lakh)
S. No. Particulars Estimated by
IA
1. Land filling/leveling including boundary wall and fencing 58.80
15
S. No. Particulars Estimated by
IA
2. Laying roads 199.23
3. Road side greenery & social forestry 10.00
4. Water supply including overhead tanks, and pump houses 342.37
5. Power distribution, Street light arrangements, etc. 143.01
6. Administrative and Other Services Complex 26.00
7. Telecom/Cyber/Documentation centre 11.00
8. Conference Hall/Exhibition centre 11.00
9. Bank/Post office 10.00
10. Raw material storage facility, Marketing outlets 12.00
11. First aid centre, Creche Canteen 10.00
12. Effluent Treatment Facilities 148.84
13. Contingencies & Pre operative expenses : 75.64
Total 1057.89
6. Observations:
(i) Commitment letter from State Government (Industries Department) in respect of its
share in the project and cost escalation, if any, over and above the approved project
cost.
(ii) Status of completed ID projects in the State as per format to be provided by Office of
DC (MSME).
(iii) Details of industries operating in the Industrial Estate.
(iv) Status of completed ID projects in the State as per format to be provided by Office of
DC (MSME).
(v) Certificate from State Government to construe GFR/ relevant guidelines issued by
Hon’ble Supreme Court / CVC have been adhered to / would be adhered to while
selecting implementing / Partner agencies and in course of forwarding / implementing
the project.
Committee may consider the proposal for In-principle Approval for up-gradation of
Singarayakonda, Prakasham District,Andhra Pradesh.
*********
16
Agenda No.46.3.4: Proposal for In-principle approval for setting up of Industrial Estate of
Peddapuram Traditional Food Park, Peddapuram, East Godavari
District, Andhra Pradesh.
Background
(i) Proposal was received from Government of Andhra Pradesh vide application ref. No.3700
dated 10.09.15 & recommended by MSME-DI, Hyderabad.
(ii) Proposal along with Detailed Project Report (DPR) was forwarded by MSME-DI,
Hyderabad vide letter dated 15.11.16.
(iii) MSME-DI, Hyderabad vide e-mail dated 29.01.18, forwarded the minutes of State Level
Steering Committee (SLSC) meeting held on 18.11.17 that recommended the proposal.
1. Pre-registration Information:
Particulars Description
Whether appraised DPR with approved Yes
layout plan
Total Area of industrial estate/ area (acre) 20.60
Area to be developed (acre) 20.60
Number and sizes of plots to be developed 29 units with plot size ranging from 0.5 to 3 acre
Implementing Period 2 years
Other ID projects sanctioned in same district: Nil
year of sanction, number of plots allotted,
units set up, etc.
Performance of ID projects in State Satisfactory
17
availability of water supply,
adequate power supply, telecom
facilities, dwelling places of
workers).
Whether land is in possession in Yes Land documents
the name of IA with Clear Title in the name of IA
is required.
4. Project Cost:
(Rs. In lakh)
S. Particulars Estimated by
No. IA
1. Land filling/leveling including boundary wall and fencing: 76.57
2. Laying roads 348.56
3. Road side greenery & social forestry 15.00
4. Water supply including overhead tanks, and pump houses 76.90
5. Drainage 292.20
6. Power distribution, Street light arrangements, etc. 184.80
7. Administrative and Other Services Complex 22.00
8. Telecom/Cyber/Documentation centre 10.00
9. Conference Hall/Exhibition centre 18.45
10. Bank/Post office 10.00
11. Raw material storage facility, Marketing outlets 10.50
12. First aid centre, Creche Canteen 10.00
13. Effluent Treatment Facilities 30.00
14. Contingencies & Pre operative expenses : 87.34
15. Others (Sanitary Conveniences etc.) 54.02
Total 1246.34
Total 1246.34
6. Observations:
Following documents are required to be submitted prior to final approval:
(i) Land documents with clear title (signed by Competent Authority) and complying with
zoning regulations and non-agricultural conversion etc. on the name of IA.
(ii) Status of completed ID projects in the State as per format to be provided by Office of
DC (MSME).
(iii) Status of completed ID projects in the State as per format to be provided by Office of
DC (MSME).
(iv) Certificate from State Government to construe GFR/ relevant guidelines issued by
Hon’ble Supreme Court / CVC have been adhered to / would be adhered to while
selecting implementing / Partner agencies and in course of forwarding / implementing
the project.
7. Proposal for Steering Committee:
Committee may consider the proposal for In-principle Approval for setting up of Industrial Estate
of Peddapuram Traditional Food Park, East Godavari District, Andhra Pradesh.
****************
19
Agenda No.46.3.5: Proposal for In-principle approval for setting up of new Industrial
Estate at Gandrajupalli, Chittoor, Andhra Pradesh.
Proposal was received from Government of Andhra Pradesh vide application Ref. No.
10821 dated 03.01.18 and recommended by MSME-DI, Hyderabad. State Level Steering
Committee (SLSC) in its meeting held on 17.12.17 and recommended the proposal.
1. Pre-registration Information:
Particulars Description
Whether appraised DPR with approved Yes.
layout plan received or not
Total Area of industrial estate/ area (acre) 514.50 acres.
Description Remarks
Implementing Agency (IA): Andhra Pradesh Industrial Infrastructure As per guidelines.
Corporation Limited (A Government of
Andhra Pradesh Undertaking).
Track Record of the IA The Corporation has so far developed -
more than 300 Industrial parks spreading
over an extent of about 1,21,655
acres(including allotted area).
Appraisal by SIDBI Yes. The present proposal
(Observations and for In-principle
recommendations). Attach SIDBI approval.
report.
Whether sufficient facilities Yes.
available at site. (Proximity to
railway stations / state highways,
availability of water supply,
adequate power supply, telecom
facilities, dwelling places of
workers)
20
Description Remarks
Whether land is in possession in Yes Document Required
the name of IA with Clear Title
Whether Zoning regulations and Yes Document Required
non-agricultural conversion etc
complied with)
Whether State Level Committee Yes Constituted.
to coordinate and monitor
progress has been Constituted
Tangible Outcomes of the project Establishment of 60 Textile and Readymade Garments Units
with all Infrastructure Facilities and Amenities providing
Employment to more than 10,000 persons at different levels in
the district
Justification of the Proposal At present there is no specific Integrated Park in the District for
Textile Industry. A more planned and systematic growth of the
cluster could therefore be sought only by relocating the cluster
firms to a dedicated Industrial Park and offering customized
infrastructure facilities. The development of the existing Jewelry
Cluster would thus confer distinct locational advantages and
enhance the collective competitiveness of cluster firms both in
domestic and export markets.
4. Proposed project cost:
(Rs. in lakh)
S. No. Particulars of Head Proposed cost by IA
1. Land &Site Development
(i) Cost of land filling, site development & compound wall 180.08
(ii) Cost of laying roads 733.88
(iii) Road side greenery & Social forestry 15.00
(iv) Water supply including overhead tanks and pump houses 155.39
(v) Drainage 562.06
(vi) Power distribution, Street light arrangements, etc. 371.80
2. Administrative and other services complex
(i) Administrative office building 31.50
(ii) Telecom/Cyber/Documentation centre 4.80
(iii) Conference Hall/Exhibition centre 11.50
(iv) Bank/Post office 4.83
(v) Raw material storage facility, Marketing outlets 19.70
(vi) First aid centre,Creche Canteen 7.88
3. Contingencies and Pre-operative charges 167.62
4. Other (Sewerage System): 109.40
Total 2375.44
*Note: IA has proposed Rs.552.53 lakh for land compensation cost, which is not admissible as
per MSE-CDP guidelines.
21
5. Proposed means of finance:
(Rs. in lakh)
S. No. Particulars Proposed by IA
1 GoI Grant under MSE-CDP 718.97*
2 Govt. of Andhra Pradesh 2209.00
Total 2927.97
*GoI assistance would be Rs.600.00 lakh (60% of Project cost, max. Rs.1000.00 lakh). In case 50% or more units are
Micro / SC-ST / Women Enterprises, certificate as mentioned at S.No. (iii) of the observations below is needed from
State Government / IA, to avail more than 60% of GoI assistance.
6. Observations:
(i) Land documents with clear title, signed by Competent Authority, complying with zoning
regulations and non-agricultural conversion etc.
(ii) Commitment letter from State Government / IA to meet the cost escalation, if any, over and
above the approved project cost.
(iii) Undertaking from State Government that more than 50% units are Micro / SC-ST / Women
Enterprises, as the case may be.
(iv) Certificate from State Government to construe GFR / relevant guidelines issued by Hon’ble
Supreme court / CVC have been adhered to / would be adhered to while selecting
implementing / Partner agencies and in course of forwarding / implementing the project.
Committee may consider the proposal for In-principle Approval for setting up of new Industrial
Estate at Gandhrajupalli, Chittoor, Andhra Pradesh.
***********
22
Agenda No. 46.3.6: Proposal for In-principle approval for setting up of Common Facility
Centre (CFC) in Green Yarn Cluster, Khanwa, Nawada, Bihar.
(i) MSME-DI, Patna forwarded online application vide ref. No. 9799 dated 14.12.17.
(ii) The proposal was recommended by State Level Steering Committee (SLSC) in its meeting
held on 15.12.17.
(iii) Proposal along with Detailed Project Report (DPR) was forwarded by MSME-DI, Patna
vide letter dated 21.12.17.
(iv) Vide U.O. Note dated 12.01.18, Technical Division recommended the proposal.
In view of the above, Steering Committee may like to consider the proposal for In-principle
approval.
1. DSR Details
DSR Conducted By : -
Validated By : -
When Started : -
When Completed : -
25
6. Financial Analysis of CFC
Description Proposed by Implementation Comments by Cluster
Agency (IA) Division
(a.) BEP 55% -
(b.) IRR, Payback period 10.91% Payback 6 Year 8 Months. -
(c.) DSCR AS per DPR -
(d.) Return on Capital employed AS per DPR ROCE data is required.
(ROCE)
(e.) NPV 36.17 Lakh. AS per DPR -
(f.) DER AS per DPR -
(g.) Sensitivity Analysis AS per DPR -
(h.) Status of CFCs approved in - -
the State
7. Proposed Cost is as follow:
(Rs. in Lakh)
S. No. Particulars Proposed by IA As per MSE-CDP
1. Land and its Development 0.00 0.00
2. Building and other Civil Constructions 200.00 200.00
3. Plant & Machinery(including electrification) 487.00 474.48
4. Misc. fixed assets 0.00 12.74
5. Preliminary & Pre-operative expenses, 5.00 5.00
maximum 2% of project cost
6. Contingency (2% building and 5% on plant and 13.00 13.49
machinery)
7. Margin money for Working Capital 216.00 54.00
Total Project Cost 922.00 759.71
8. Proposed Means of finance are as follows:
(Rs. in lakh)
S. No. Particulars %age Proposed by IA %age As per MSE-CDP
1. SPV contribution 31.18 287.51 37.54 285.23
2. Grant-in-aid from 51.46 474.48 62.46 474.48
Govt. of India
3. Bank Loan/others 17.36 160.00 -- --
Total 100.00 922.00 100.00 759.71
9. Plant and machinery (with Brief Specification)
(RS. in lakh)
S. No. Description Qty. Power Requirement(HP/KW) Cost
1. Speed Frame Model LF 1400A Flyer 12 X 2 13.76 59.82
6.5
2. Draw Frame Model LD2 1 13.45 19.07
3. Draw Frame Model LDF3 2 11.5 53.08
4. Card LC363/361 4 18.69 115.72
5. Fine Feed Chute LA7/6 4 18.69 28.00
6. Carding Accessories 1 0 6.77
7. Mixing Bael Opener Model LB3/2 1 8.04 9.58
8. Mixing Bael Opener Model LB3/5 1 5.04 8.34
26
S. No. Description Qty. Power Requirement(HP/KW) Cost
9. Mono Cylinder LB4/2 1 2.2 2.16
10. Flexiclean Model LB5/6 1 11.37 7.54
11. Flushing unit 1 0.05
12. Bend Metal Extractor DIA 350 1 0.66
13. Straight Metal Extractor DIA 350 1 0.66
14. Ventilator Model LA5/4 1 7.5 0.58
15. Ventilator Model LA5/6 2 4.0 1.15
16. Ventilator Model LA5/7 2 3.0 1.01
17. Exhaust and Delivery Apparatus Model 1 4.5 1.22
LA2
18. Deduster Model LA2/1 1 4.5 1.36
19. By pass unit model LA4/2A, 300 MM Dia 1 0.25
Total 474.45
10. Observations:
Following documents are required to be submitted prior to final approval:
(i) Registered lease deed for longer period (at least 30 years) in the name of SPV.
(ii) Tangible outcomes like number of units, turnover, export, employment etc.
(iii) SIDBI Appraisal Report.
(iv) Details of SPV’s Bank Account.
(v) Commitment letter from SPV members to utilise at least 60 percent of installed
capacity.
(vi) Documents regarding registration of all the units in MSME Data Bank.
(vii) Letter from Bank for providing working capital loan.
(viii) Details of Return on Capital Employed (ROCE).
(ix) Certificate from State Government to construe GFR / relevant guidelines issued by
Hon’ble Supreme court / CVC have been adhered to / would be adhered to while
selecting implementing / Partner agencies and in course of forwarding / implementing
the project.
27
Agenda No. 46.3.7: Proposal for In-principle approval for setting up of Common Facility
Centre (CFC) in Dyes, Intermediates and Chemicals Cluster, Narol,
Ahmedabad, Gujarat.
Background:
(i) Proposal received from Centre for Entrepreneurship Development (CED) on 21.06.16.
(ii) Vide letter dated 11.07.16, proposal was forwarded to Technical Division for their
comments.
(iii) Technical Division vide letter dated 20.07.16 raised certain observations and same were
forward to Centre for Entrepreneurship Development (CED), seeking their comments.
(iv) Thereafter, multiple correspondences took place between this Office and SPV. Latest
reply received from SPV on 27.02.17.
(v) As the technical issues related to proposal did not get resolved, it was decided to
deliberate the issues in Technical Committee Meeting with IA and SPV members to
discuss and resolve the same.
(vi) During the 53rd Technical Committee Meeting held on 31.07.17, the issues were
deliberated in detail. Technical Division as per their final observations advised SPV / IA
to remove the following Machinery & Equipment from the list for being not relevant to
present need of MSEs.
(vii) During the deliberations, SPV agreed to exclude machinery & equipment at S.No. 1 to 4
for the present. However, requested to include equipment for Pilot Project (at S.No.5) in
the list of machinery.
(viii) Though, the Technical Division was not convinced with their request, it was decided that
SPV would undertake Demand Survey among MSEs of Cluster for utility of above items
including equipment proposed for Pilot Plant and submit the report. Based on the
outcome, decision would be taken regarding pilot plant to include or otherwise and same
was communicated to SPV.
(ix) Thereafter, SPV informed the outcome of demand survey on 20.09.17 and same was
communicated to Technical Division on 20.09.17.
(x) Technical Division vide letter dated 27.10.17 raised certain queries, as the technical
issues related to proposal did not get resolved, it was decided to deliberate the issues
once again in Technical Committee Meeting.
(xi) During the 55th Technical Committee Meeting held on 03.11.17, the issues were
deliberated in detail, based on the feedback / documents provided by SPV, Technical
Committee agreed to include Pilot Plant in the approved Plant & Machinery of the
Project and recommend the proposal for In-Principal approval, subject to the condition
that the State Government should give an undertaking that the Pilot Plant Proposed
Should not be used for commercial production purposes.
(xii) State Government vide their letter dated 20.11.17 submitted the undertaking along with
their recommendations for consideration and issuance of In-principle approval.
28
In view of the above, Steering Committee may like to consider the proposal for In-principle
approval.
1. DSR Details:
DSR Conducted By : -
Validated By : -
When Started : -
When Completed : -
29
Whether DS Conducted : Yes. DSR submitted in June 2014.
Main findings of DSR : Following common facilities are being needed at proposed centre.
Analytical Testing Laboratory Facility
Research & Development (R&D) Centre
Pilot Plant Set-up & Technology Transfer Center
Environment Cell
Library/e-Library/Databank Facility
Conference Hall/Training Center and Convention Centre
Business Sourcing & Market Development Centre
Main Problems of Cluster : Cluster is facing problem in the area of Quality, Testing,
Productivity, Research & Development, Technology, Pollution,
Packaging etc.
Other Information : Cluster information is provided in DSR (page no 18)
30
Description Proposed by Implementation Agency (IA) Comments by
Cluster Division
iii. Valuation and its basis Valuation is not carried out -
iv. Land is sufficient Yes. Total land area of NEPL is 176000 Sq -
Mt
v. Change of land use Non Agriculture -
vi. If on lease, duration of 20 years Registered lease
lease deed on the name of
SPV required.
vii Whether lease is legally Yes -
tenable
(d.) Total Building area(sq ft) Total building area 11480 Sq ft -
(e.) Rate of construction of Pilot plant, ETP and laboratory renovation -
building work Cost Rs 100 Lacs including structure
of pilot plant, on Lump sum basis, as part of
the building already exist.
(f.) Main Facility Proposed At CERDIC, following common facilities -
are being proposed.
Analytical Testing Laboratory Facility
Research & Development (R&D)
Centre
Pilot Plant Set-up & Technology
Transfer Center
Environment Cell
Library/e-Library/Databank Facility
Conference Hall/Training Center and
Convention Centre
Business Sourcing & Market
Development Centre
(g.) Prod capacity of CFC Proposed CFC would have testing lab, R&D -
centre and Pilot plant setup, hence particular
production capacity is not defined.
(h.) Major Outputs/ Not Available Required
Deliverables of CFC,
Projected performance of the
cluster after proposed
intervention (in terms of
production, export/ domestic
sales and direct/indirect
employment, etc.)
(i.) Pollution clearance Clearance from Gujarat Pollution Control NOC from Pollution
required or not Board is awaited. Control Board.
(j.) Man Power in CFC 23 -
(k.) Revenue generation Submitted in DPR as annexure-7.( page no -
31
Description Proposed by Implementation Agency (IA) Comments by
Cluster Division
mechanism for sustainability 92-95)
of assets (service/user charges
to be levied, any other-to be
specified)
32
Description Proposed by Implementation Agency (IA) Comments by
Cluster Division
documentation
(m.) Technical Institution -- -
(n.) CFC may be utilised by NA Letter required.
SPV members as also others
in a cluster. However,
evidence should be furnished
with regard to SPV member
ability to utilise at least 60
percent of installed capacity.
(o.)
(a) Power requirement for Total power requirement of 75 HP is -
commercial/domestic estimated at the proposed CFC. The existing
purpose set up of NEPL is already having power
connection from GEB/Torrent, Ahmedabad.
Total connected load is 156 HP.
(b) Water 6000 Liter/ Day is required for proposed -
CFC. Centre has its own bore-well within
the premises. Facility of overhead tank of
30000 Lit capacities has been constructed for
the storage of water
(c) Gas/Oil/Other Utilities -- -
5. Implement Arrangements
33
Description Proposed by Implementation Agency (IA) Comments by
Cluster Division
Division
(f.) Approval of Technical -- Recommended with
Committee conditions mentioned
(g.) Working capital(In- NA -
principle sanction of loan
from a bank, if applicable
arrangement made)
34
8. Proposed Means of Finance are as follows:
(Rs. in lakh)
S. No. Particulars %age Amount
1. SPV contribution 30.00 342.80
2. Grant-in-aid from Govt. of India 70.00 799.84
Total 100.00 1142.64
36
10. Observations:
Following documents are required to be submitted prior to final approval:
Committee may consider the proposal for In-principle Approval for setting up of CFC in Dyes,
Intermediates and Chemicals Cluster, Narol, Ahmedabad, Gujarat.
**************
37
Agenda No.46.3.8: Proposal for In-principle approval for setting up New Industrial Estate
at Idukki, Kerala.
Background
1. Pre-registration Information:
Description Comments by
Cluster Division
Implementing Agency Kerala Industrial Infrastructure Development -
(IA): Corporation (KINFRA) A Statutory Body of
38
Govt of Kerala
Track Record of the IA Kerala Industrial Infrastructure Development -
Corporation (KINFRA) is a statutory body
formed by the Government of Kerala in 1993,
by an act of State Legislature for facilitating the
development of industrial infrastructure in the
State. KINFRA has played a pioneer role in
developing industrial infrastructure in the State
of Kerala.
KINFRA has a very successful track record in
setting up 22 industrial parks across Kerala for
facilitating development of the industry in the
State. KINFRA has taken the initiative of
promoting the concept of Theme Based parks
since its inception in 1993. After understating
the needs of a particular industry, KINFRA
identifies common needs and accordingly
provide common facilities to promote the
concept of shared infrastructure as a facilitating
measure to attract investors of that particular
industry.
Appraisal by SIDBI Not applicable as additional expenses are met Required prior to
(Observations and directly by Government of Kerala & KINFRA. final approval.
recommendations).
Attach SIDBI report.
Whether sufficient Yes -
facilities available at site.
(Proximity to railway
stations / state highways,
availability of water
supply, adequate power
supply, telecom facilities,
dwelling places of
workers)
Whether land is in Yes, KINFRA possess the ownership of the Document required.
possession in the name of land. Document attached.
IA with Clear Title
Whether Zoning Not applicable as it is an industrial zone. Document required.
regulations and non-
agricultural conversion
etc complied with):
Whether State Level KINFRA is the implementing agency for the Received
Committee to coordinate Industrial Infrastructure Development in Kerala
and monitor progress has and it is the statutory body of Govt. of Kerala.
been Constituted :
Whether confirmation Yes, KINFRA along with Government of Document required.
received form IA that it Kerala will meet the escalation cost if any.
will meet the cost in
excess of approved
project cost and any
escalation in cost :
Basis of elements of Common Infrastructure facilities such as -
project Cost : Compound wall & fencing, Internal roads &
drains, Rain water harvesting, Water
distribution, Power distribution, ETP etc. Along
with Administrative and other service complex
facilities.
Tangible Outcomes of The project intends to open up world class --
the project opportunities to the upcoming entrepreneurs. It
also augments export potential of the country
39
and effectively utilizes the employment
potential and raw material sources. The project
is expected to be completed within a period of
21 months, financed by way of assistance from
the Government of India under the Cluster
Development Infrastructure development
scheme and KINFRA/State Government.
Considering the nature of the project, the
financial parameters and its socio economic
significance, the project can be considered
viable and if implemented will have profound
impact on the food processing industry as a
whole and spices processing in particular. The
project will add employment to the state by
more than 300 in terms of direct and more than
500 indirect openings. The units will generate
export as well as domestic turnover, yielding tax
revenues to the exchequer.
Justification of the The proposed Spices Park, located at --
Proposal Thodupuzha in Idukki District is intended to be
a path breaking unique facility for the spices
growers and processors in Kerala. This will
offer a common platform for small and marginal
growers to have their produce processed in
accordance with international standards in the
most hygiene conditions assuring best value
addition.
The proposed Spices Park is a well-conceived
approach to have an integrated operation for
cultivation, post harvesting, processing for
value addition, packaging, storage and exports
of spices and spice products by meeting the
quality specifications of the consuming
countries.
Currently the raw products are exported from
Kerala in bulk. But if the products are properly
processed according to the international
standards it will give more value addition,
which has got a large scale demand all over the
world. This will lead to the socio economic
development of the district as well as state.
4. Proposed project cost:
(Rs. in lakh)
Particulars Proposed by IA
Land filling/leveling including boundary wall and fencing: 102.16
Laying roads 133.79
Water supply including overhead tanks, and pump houses 93.36
Water harvesting 50.00
Drainage 78.43
Power distribution, Street light arrangements, etc. 250.00
Administrative and Other Services Complex 298.72
Effluent Treatment Facilities 150.00
Contingencies & Pre operative expenses : 83.54
Other (Sanitary Convenience): 10.00
Total 1250.00
40
5. Proposed means of finance:
Particulars Proposed by IA
GoI Grant under MSE-CDP: 600.00
State Government 650.00
Total 1250.00
6. Observations:
Committee may consider the proposal for In-Principle Approval for setting up New Industrial
Estate at Idukki, Kerala.
************
41
Agenda No. 46.3.9: Proposal for in-principle approval for up-gradation of Industrial Estate
at Balotra (Phase-III), Barmer, Rajasthan.
Background:
(i) Government of Rajasthan forwarded the Detailed Project Report (DPR) vide letter dated
20.12.17.
(ii) Rajasthan State Industrial Development and Investment Corporation Ltd. forwarded
online application vide ref. No. 10825 dated 11.01.18. The proposal was recommended
by State Level Steering Committee (SLSC) in its meeting held on 27.11.17.
(iii) Vide letter dated 15.01.18, MSME-DI, Jaipur has submitted its recommendation for the
project.
1. Pre-registration Information:
4. Project Cost:
(Rs. in lakh)
S. No. Particulars Estimated by IA
1. Land filling/levelling including boundary wall and fencing: 40.77
2. Laying roads 224.97
3. Drainage 73.55
4. Power distribution, Street light arrangements, etc. 189.91
Total 529.20
5. Proposed means of finance:
6. Observations:
Following documents are required to be submitted prior to final approval.
(i) SIDBI Appraisal Report.
(ii) Approved Layout Plan signed by Competent Authority.
(iii) Land document in the name of Implementing Agency.
(iv) Commitment letter from IA to meet the cost escalation, if any, over and above the
approved project cost.
(v) Undertaking from State Government that more than 50% units in the Industrial Estate
are (a) Micro (b) SC/ST& (c) Women owned, as the case may be.
43
(vi) Details of industries operating in the Industrial Estate.
(vii) Status of completed ID projects in the State as per format to be provided by Office of
DC (MSME).
(viii) Certificate from State Government to construe GFR / relevant guidelines issued by
Hon’ble Supreme court / CVC have been adhered to / would be adhered to while
selecting implementing / Partner agencies and in course of forwarding / implementing
the project.
********
44
46.4 Proposals for Final Approval
45
Agenda No. 46.4.1: Proposal for Final Approval for setting up of Common Facility Centre
(CFC) in Plastic Packaging Cluster, Karnal, Haryana.
(i) In-principle approval was accorded for the proposal during 44th SCM held on 05.09.17,
subject to submission of documents as mentioned in table at point (ii) below.
(ii) Vide letter dated 17.11.17; Government of Haryana submitted the following requisite
documents and requested to consider the proposal for Final Approval.
In view of the above, Steering Committee may be requested to consider the proposal for Final
approval.
Details of the proposal are as under:
1. DSR Details
DSR Conducted By : --
Validated By : --
When Started : --
When Completed : --
2. Basic Information of Cluster
46
No. of Enterprises including break Micro 47
up (Micro, Small, Medium): Small 13
Total 60
Turnover(Rs in Crore) for the last S. No. Year Amount
five years: 1. 2011-12 225
2. 2012-13 232
3. 2013-14 240
4. 2014-15 250
5. 2015-16 250
Exports(Rs in Crore) for the last five Nil
years:
Employment in Cluster: 1300 Direct & 500 Indirect
Technology Details: Injection Moulding, Blow Moulding for Manufacturing
of Bottles, Covers, Canisters and Drums
Extrusion Machine for Manufacturing of Sacs and
Plastic Bags
Colour Printing Machine for Printing of Covers, Labels
and Packets
Whether DS Conducted: Yes
Main findings of DSR: To adopt new technology
Main Problems of Cluster: Obsolete level of technologies and limited access to
advanced technologies
Production inefficiencies
Lack of standardization of processes & products
Limited access to markets
Absence of cluster portal for e-commerce and
dissemination of information
Other Information: To bring latest technology to improve the products
3. Information about Proposed CFC
Description Proposed by Implementation Agency Comments by
(IA) Cluster Division
(a.) Justification for CFC Lack of modern machineries, common --
production centre & raw material bank
(b.) Location of CFC Village Mugal Majra, Karnal --
Percentage of units in radius of 10 --
5km
Percentage of units in radius of 90 --
10km
(c.) Land for CFC
i. Whether land acquired In progress Land documents with
ii. Title is in name of Karnal Plastpack CFC Pvt. Ltd clear title in the name
of SPV received.
iii. Valuation and its basis The SPV is purchasing a plot of 3100
47
Description Proposed by Implementation Agency Comments by
(IA) Cluster Division
sq yards at the rate of Rs. 6500 per
square yard.
iv. Land is sufficient Yes
v. Change of land use No
vi. If on lease, duration of No
lease
vii Whether lease is legally No
tenable
(d.) Total Building area(sq ft) 41137 --
(e.) Rate of construction of Rs. 800 per square feet --
building
(f.) Main Facility Proposed Injection Moulding facility --
Blow Moulding facility
Multi-layer extrusion facility
Coating and lamination facility
Value added printing facility
(g.) Prod capacity of CFC Different facilities have different --
capacity of production
(h.) Major Outputs/ Deliverables Area Pre- After --
intervention intervention
of CFC, Projected performance of
Units About 60 About 80
the cluster after proposed MSEs MSEs
intervention (in terms of Employment About 1300 About 2000
direct direct
production, export/domestic sales employment employment
and direct/indirect employment Exports Nil 25% of units
etc.) shall explore
international
markets and
start
exporting
Turnover About 250 Increase of
crore 10% each
year and
expected to
double
within 7
years.
48
Description Proposed by Implementation Agency Comments by
(IA) Cluster Division
levied, any other-to be specified) DPR.
49
Description Proposed by Implementation Agency Comments by
(IA) Cluster Division
(o.)
(a) Power requirement for Total connected load 800 kW Monthly --
commercial/domestic purpose consumption 87204 units
(b) Water 7 KL per day --
(c) Gas/Oil/Other Utilities Consumables as per requirement --
5. Implement Arrangements
(Rs. in lakh)
S. No. Description No. Cost
1. PET Preform Manufacturing Machine: a. PET SERIES - 970/510 1 135.70
Injection Moulding machine b. Auxilliaries (Dehumidifier, Water
cooled chiller, Granulator) c. Moulds (750 ml, 180 ml, 375 ml, 200 ml
bottles)
2. Automatic Blow Moulding Machine: JMV - 60 - Production of 60 Ltr - 1 118.00
70 Ltr Single Layer Automatic Blow Moulding Machine with B&R
Multipoint Parison, Energy meter, Air Compressor, Water cooled
chiller, Grinder, Cooling Tower, Hopper Loader, Mould 60 Ltr
3. 8 Color Rotogravure printing machine: Rotogravure Printing Machine 1 177.00
including Automatic Registration Control, Web video, Hot air
generator, Ink circulation pump
4. Solvent less Lamination Machine 1 82.60
5. Dry Lamination Machine 1 70.80
6. Slitting machine (1 for BOPP + 1 for WPP products) 2 75.52
7. Extrusion blow moulding machine (1lt. Double station) with auto 1 24.19
deflasher
8. Testing equipment (Tensile Tester, Opacity Tester, Static & Kinetic 14.75
Friction Tester, Hot Air oven, Heat Sealer, Dart Impact Tester)
9. Genset 1 48.38
10. Computer & Printers 5 5.58
11. Camera 50 4.22
12. Air compressor with filter and air dryer (fully loaded, Rand or 2 5.90
equivalent make ingersol)
13. Compact air cooled water chiller (2 No. – 10 TR + 20TR) 2 14.16
14. Lifts 2 9.44
51
S. No. Description No. Cost
15. Transformers (1000 kva) 1 8.99
16. Air conditioners 2 11.80
17. Web guiding system digital opto electronic 1 1.91
18. Metal electrode controller with mounting and control panel 1 11.68
19. Cooling tower (50TR) 1 0.76
20. Cooling tower (100TR) 1 1.33
21. Moulds - 9.45
22. One time connection charges @4300*687.50 KVA - 29.57
Total 861.73
10. Observations:
Following documents are required to be submitted prior to issuance of final approval letter:
(i) Commitment letter from State Government and SPV regarding contribution of their
respective share.
(ii) Certificate /NOC from Pollution Control Board.
(iii) State Government / IA should give an undertaking that manufacturing activities of CFC
will not hamper existing units and SPV will not be allowed to sell the items produced in
CFC in open market.
(iv) Certificate from State Government to construe GFR / relevant guidelines issued by
Hon’ble Supreme court / CVC have been adhered to / would be adhered to while selecting
implementing / Partner agencies and in course of forwarding / implementing the project.
52
Agenda No.46.4.2: Proposal for Final approval to set up Common Facility Centre (CFC) in
Global Puffed Rice Cluster, Chitradurga, Karnataka.
The proposal was accorded In-principle approval during 39th SCM held on 08.01.16.
SIDBI Appraisal Report received vide KCTU letter dated 08.03.17.
The desired documents / information received from KCTU vide letter dated 13.11.17.
There were a total of 68 micro units in the Global Puffed Rice Cluster, Chitradurga at the
time of seeking In-principle approval as informed by KCTU / MSME-DI.
Vide letter dated 13.11.17, KCTU informed that at present 31 units have been relocated to
Mandakari Pura from Nehrunagar. However, remaining 37 micro units are still operating
from Nehrunagar.
Vide letter dated 21.11.17, this Office raised the issue of impact on viability of CFC in case
of non-relocation of remaining 37 units to the current cluster premises.
As per Government of Karnataka letter dated 29.11.18, 31 SPV member units and 37 non
member units will make use of the CFC facilities, thus, the Project would be viable.
Out of 31 units, 22 units have registered in MSME data bank.
In view of the above, Steering Committee may deliberate and accord Final Approval for the
Project.
1. DSR Details:
DSR Conducted By : Idea Coe Tech Pvt. Ltd
Validated By : SPV members, DIC Chitradurga, KCTU, MSME-DI, Bangalore.
When Started : 30/12/2013
When Completed : 28/02/2014
53
Cluster.
Main findings of DSR : Puffed rice is a type of puffed grain made from paddy; usually
made by heating rice kernels under high pressure in the presence of
steam, though the method of manufacture varies widely. Puffed
grains are popular as breakfast cereals and in the form of rice cakes.
Raw material is Paddy, procured from nearby villages,
approximately 300 kg Paddy/day/unit.
Main Problems of Cluster : Main problems are:-
Using old method of manufacturing.
Lack of machineries because of that prolonged production
process.
No warehouse.
Improper inventory management.
No marketing outlet.
No quality Certification.
Lack of testing center.
Poor packaging.
Other Information : The production processes adopted by the cluster members are
traditional. None of the entrepreneurs have modern equipment for
the process of Rice products. Production time approximate 10 to 11
hours. The cluster units are unable to make export quality products,
unable to maintain proper quality. None of the cluster units have
quality standard and product branding.
5. Implement Arrangements
Description Data provided by Implementing Agency Remarks
(a.) Implementing Agency Karnataka Council for Technological As per guidelines of
upgardation (KCTU), Bangalore Govt of MSE-CDP
Karnataka
(b.) Fund receiving Agency Karnataka Council for Technological
upgardation (KCTU), Bangalore Govt of
Karnataka
(c.) Implementation Period Construction Plan Approval 1 month, As per guidelines of
Electricity Installation and Water Facility MSE –CDP, the CFC
2month.Construction of CFC building from should be
3month to 9 month, Machinery tendering 2 operationslized within
and 3 month, Arrival of machine 7 month two years from the
to 10 month, Commissiong 10 month to 12 date of final approval.
month, Training on machineries 10 to 12
month, Commercial use 12 to 15 month.
56
Description Data provided by Implementing Agency Remarks
(d.) Appraisal of DPR and As per SIDBI appraisal report, the project is technically feasible and
main Recommendations financially viable. The proposed performance indicators and
financial position are satisfactory.
(e.) Comments of Technical Technical division has recommended the proposal.
Division
(f.) Approval of Technical Technical Committee recommended the proposal for Final approval
Committee of Steering Committee.
(g.) Working capital(In- NA --
principle sanction of loan
from a bank, if applicable
arrangement made)
9. Observations:
Following documents are required to be submitted prior to issue of final approval letter:
(i) SPV has registered only 22 units in MSME data bank. Details of MSME data bank
registration in respect of remaining member units are required.
(ii) SPV shall obtain ‘Consent to Establish’ from KSPCB before disbursement of GoI grant.
(iii) SPV shall also obtain consent to operate from KSPCB within 6 months of
commencement of commercial operation.
Committee may consider the proposal for Final Approval for setting of Common Facility Centre
(CFC) in Global Puffed Rice Cluster, Chitradurga, Karnataka at a total project cost of Rs.697.40
lakh with GoI assistance of Rs.554.00 lakh, State Government contribution of Rs.71.70 lakh and
SPV contribution of Rs.71.70 lakh.
**********
59
Agenda No. 46.4.3: Proposal for final approval for setting up of CFC in Mono Filament
Yarn Cluster (Lalitamba Textile), Kanpur, Uttar Pradesh.
(i) In-principle approval was accorded for the proposal during the 43rd SCM held on
09.03.17, subject to submission of documents as mentioned in table at point (ii) below.
(ii) Vide letter dated 01.11.17 & 28.11.17, State Government has forwarded the following
documents for consideration of proposal for final approval:
S. No. Documents required Status
1. Details of registration of all SPV member units in MSME Provided
databank.
2. Modified Lease deed document in the name of M/s. Lalitamba Provided
Textiles Cluster Pvt. Ltd. (due to name change)
3. SIDBI Appraisal Report. Provided
4. NOC from Pollution Control Board. Provided
5. Undertaking from State Government that ‘more than 50% Provided
units in the cluster are Micro Enterprises’ for availing more
than 70% grant.
6. Commitment letter from SPV for their contribution Provided
In view of the above, Steering Committee may be requested to consider the proposal for Final
approval.
1. DSR Details:
61
3. Information about Proposed CFC:
(f) Main Facility (i) Production of Nylon yarn. As per DPR & SIDBI
Proposed (ii) Dope Dyed yarn. Processing of
(iii) Testing lab. Nylon Monofilament
(iv) R & D Centre. Yarn manufacturing.
Processing of
Nylon Multifilament
Yarn manufacturing.
Training for
manufacturing process,
product requirement,
applications, product
specification and
Quality control.
Testing facilities.
(g) Prod capacity of CFC 4000 kg -
(h)Major Outputs / -
Deliverables of CFC, Particulars Before After
Projected performance of interventio intervention
the cluster after proposed n
intervention (in terms of Turnover Rs. 25,506 Rs. 35,000
production, lakh lakh
export/domestic sales and Export Rs. 650.00 Rs. 900.00
direct/indirect lakh lakh
employment, etc.) Employm 1700 nos. 2500 nos.
ent
(i) Pollution clearance -- Received.
required or not
(j) Man Power in CFC 23
(k) Revenue generation By way of Job work, amounting to -
mechanism for Rs.3,25,000/-per day
sustainability of
assets(service/user
charges to be levied, any
other-to be specified)
5. Implementation Arrangements
Description Proposed by Implementation Remarks
Agency (IA)
(a) Implementing Agency Uttar Pradesh Trade Promotion As per guidelines.
Authority, Kanpur. (UPTPA)
(b) Fund receiving Uttar Pradesh Trade Promotion -do-
Agency Authority, Kanpur. (UPTPA)
10. Observations:
(i) Certificate from State government to construe GFR / relevant guidelines issued by
Hon’ble Supreme court / CVC have been adhered to / would be adhered to while
selecting implementing / Partner agencies and in course of forwarding / implementing
the project.
Committee may consider the proposal for Final Approval for setting up of Common Facility
Centre (CFC) in Mono Filament Yarn Cluster (Lalitamba Textile), Kanpur, Uttar Pradesh at a total
project cost of Rs. 1676.07 lakh with GoI assistance of Rs. 1350.00 lakh & SPV contribution of Rs.
326.07 lakh.
******
66
Agenda No.46.4.4: Proposal for Final approval for setting up of new Industrial Estate at
Beliaghata, Kolkata, West Bengal.
Background
(i) Proposal was received from Department of MSME, Govt. of West Bengal vide application
Ref. No. 8610 dated 04.09.17 and recommended by MSME-DI, Kolkata.
(ii) State Level Steering Committee (SLSC) in its 2nd meeting held on 10.03.17 recommended
the proposal.
(iii) Proposal was discussed in the 45th SCM held on 22.11.17 and Committee accorded In-
principle approval subject to submission of following documents prior to Final approval.
The status is as given below:
1. Pre-registration Information:
Particulars Description
Whether appraised DPR with approved Yes.
layout plan received or not
Total Area of industrial estate/ area (acre) 1.20 acres.
Description Remarks
Implementing Agency (IA): The West Bengal Small Industries As per guidelines.
Development Corporation. Ltd.
(WBSIDC), Kolkata
67
Description Remarks
Track Record of the IA WBSIDC has set up 647 nos. of WBSIDC has developed 4
Sheds, 2021 nos. of plots, 1182 nos. ID centres in Udyan,
of stalls and 70 nos. of building Santoshpur Industrial
spaces in total 40 nos. of Industrial Estate, South 24 Pargana,
Estate and 12 nos. of commercial Beharampur Industrial
estates in different district of West Estate, Murshidabad and
Bengal. Tangra Industrial Estate,
Kolkata.
Appraisal by SIDBI Yes SIDBI appraisal report
(Observations and received.
recommendations). Attach
SIDBI report.
Whether sufficient facilities Yes The necessary
available at site. (Proximity to infrastructure facilities are
railway stations / state available at industrial site.
highways, availability of water Further, considering the
supply, adequate power location of project in the
supply, telecom facilities, heart of the city, getting
dwelling places of workers) necessary power supply
and other facilities would
not be constraint / problem
for IA once the site is
operational. An amount of
Rs.2 lakh has been
envisaged for
telecommunication
facilities in the Industrial
Estate.
Whether land is in possession Yes Document Received.
in the name of IA with Clear
Title
Whether Zoning regulations Yes -
and non-agricultural
conversion etc complied with)
Whether State Level Yes Constituted.
Committee to coordinate and
monitor progress has been
Constituted
Whether confirmation - Document Received.
received form IA that it will
meet the cost in excess of
approved project cost and any
escalation in cost
Basis of elements of project 1. Land & Site Development:
Cost Cost of land filling, site development & compound wall, Cost of
laying internal roads, Road side greenery & Social forestry, Water
supply including overhead tanks, Drainage, Power & Electricals.
2. Administrative and other services complex:
Administrative office building, Télécommunication/
Documentation centre, Contingencies and Pre-operative charges.
Tangible Outcomes of the The Industrial Estate Beliaghata is expected to be established
project within one year from the sanction of Grant under MSE-CDP
Scheme. The industrial estate is expected to have 12 no. of
industrial plots of different sizes. WBSIDC is hopeful that the
industrial estate on completion will generate direct employment
to around 60 persons and in-direct to around 300 persons at the
start up phase, which will further increase to a level of direct
employment to around 120 persons and indirect employment is
also expected through various business functions like sales and
68
Description Remarks
servicing, transportation and storage to be done through outside
vendors.
4. Project cost:
(Rs. in lakh)
S. Particulars of Head As per Recommended As per MSE-
No. IA by SIDBI CDP
1. Land &Site Development
(i) Cost of land filling, site development & 49.65 49.65 49.65
compound wall
(ii) Cost of laying internal roads 31.96 31.96 31.96
(iii) Road side greenery & Social forestry 2.02 2.02 2.02
(iv) Water supply including overhead tanks 38.71 38.71 38.71
(v) Drainage 17.95 17.95 17.95
Power & Electricals 238.08 238.08 238.08
Sub total 378.37 378.37 378.37
2. Administrative and other services 0.00 0.00 0.00
complex
(i) Administrative office building 13.10 13.10 13.10
(ii) Télécommunication/ Documentation centre 2.00 2.00 2.00
3. Contingencies and Pre-operative charges 52.34 11.80 11.80
Total 445.80 405.27 405.27
5. Means of finance:
(Rs. in lakh)
S. No. Particulars Proposed by Recommended As per
IA by SIDBI MSE-CDP
1 GoI Grant under MSE-CDP 263.15 243.16 243.16
2 Govt. of West Bengal 163.55 143.01 143.01
3 Contribution from IA (equity) 19.10 19.10 19.10
Total 445.80 405.27 405.27
6. Observation:
(i) Certificate from State Government to construe GFR / relevant guidelines issued by Hon’ble
Supreme court / CVC have been adhered to / would be adhered to while selecting
implementing / Partner agencies and in course of forwarding / implementing the project.
Committee may consider the proposal for Final Approval at a total project cost of Rs.405.27 lakh with
GoI assistance of Rs.243.16 lakh, State Government contribution of Rs. 143.01 lakh and Implementing
Agency’s contribution of Rs.19.10 lakh for setting up of new Industrial Estate at Beliaghata, Kolkata,
West Bengal.
*********
69
Agenda No.46.4.5: Proposal for Final approval for Up-gradation of ID Centre at Dabgram,
Distt. Jalpaiguri, West Bengal.
Background
(i) Proposal was received from Department of MSME, Govt. of West Bengal vide application
Ref. No. 8618 dated 04.09.17 and recommended by MSME-DI, Kolkata.
(ii) State Level Steering Committee (SLSC) in its 2nd meeting held on 10.03.17 recommended
the proposal.
(iii) Proposal was discussed in the 45th SCM held on 22.11.17 and Committee accorded In-
principle approval subject to submission of following documents prior to Final approval:
1. Pre-registration Information:
Name of Organization : The West Bengal Small Industries Development Corporation. Ltd.
(WBSIDC), Kolkata
State : West Bengal
District : Jalpaiguri
Industrial Estate : Dabgram – I
Description Remarks
Implementing Agency (IA): The West Bengal Small Industries As per guidelines.
Development Corporation. Ltd.
(WBSIDC), Kolkata
70
Description Remarks
Track Record of the IA WBSIDC has set up 647 nos. of WBSIDC has developed 4
Sheds, 2021 nos. of plots, 1182 nos. ID Centres in Udyan,
of stalls and 70 nos. of building Santoshpur Industrial
spaces in total 40 nos. of Industrial Estate, South 24 Pargana,
Estate and 12 nos. of commercial Beharampur Industrial
estates in different district of West Estate, Murshidabad and
Bengal. Tangra Industrial Estate,
Kolkata.
Appraisal by SIDBI Yes SIDBI appraisal report
(Observations and received.
recommendations). Attach
SIDBI report.
Whether sufficient facilities Yes The industrial estate is
available at site. (Proximity located at Dabgram, beside
to railway stations / state NH-6 at Mouza Dabgram,
highways, availability of Jalpaiguri District, around 5
water supply, adequate kms from New Jalpaiguri
power supply, telecom Railway station. Both basic
facilities, dwelling places of and mobile telephone and
workers) internet facilities are
available.
Whether land is in Yes Originally belonged to
possession in the name of IA Housing Department
with Clear Title GoWB, General
Manager,DIC, Jalpaiguri
Whether Zoning regulations Yes after taken over the
and non-agricultural possession of land
conversion etc complied transferred the possession to
with) Sub Asstt. Engineer,
WBSIDC Ltd. in 1986.
Whether State Level Yes Constituted.
Committee to coordinate and
monitor progress has been
Constituted
Whether confirmation - Received.
received form IA that it will
meet the cost in excess of
approved project cost and
any escalation in cost
Basis of elements of project 1. Land &Site Development:
Cost Cost of land filling, site development & compound wall, Cost of
laying internal roads, Road side greenery & Social forestry, Water
supply including overhead tanks, Drainage, Power & Electricals.
2. Administrative and other Services Complex:
Administrative office building, Télécommunication/ Documentation
centre, Contingencies, Conference Hall/Exhibition Centre, raw
material storage facility marketing outlets, First Aid Centre, Creche
and Canteen Facilities and Contingency & Pre-operative charges.
Tangible Outcomes of the The Industrial Estate is having 124 industrial plots, which are
project occupied by 102 small units. The estate is providing direct
employment opportunities to approximately 700 persons and
indirect employment to around 1800 to 2000 persons.
4. Project cost:
(Rs. in lakh)
S. No Particulars of Head Proposed Recomme As per
by IA nded by MSE-CDP
SIDBI
71
1. Land Development and other overhead
Infrastructure
(i) Cost of land filling, site development & 130.21 130.21 130.21
compound wall
(ii) Cost of laying roads (repairing/relaying of road) 144.42 144.42 144.42
(iii) Water supply including overhead tanks (cap100 106.31 106.31 106.31
Kilo litres) and pump houses
(iv) Drainage, Longitudinal Drain 500x600 mm=672 153.04 153.04 153.04
meter
Longitudinal Drain 500x1200 mm=646 meter
(v) Power & Electricals, High mast lighting 127.02 127.02 127.02
arrangement, Submersible Pump- motor set,
glow sign board, electric work for the
Administrative Building etc
Sub total 661.00 661.00 661.00
2. Administrative and other services complex
(i) Administrative office building 34.84 34.84 34.84
(ii) Télécommunication/ Documentation centre 5.01 5.01 5.01
(iii) Conférence Hall / Exhibition Centre 28.31 28.31 28.31
(iv) Raw material storage facility, Marketing outlets 7.89 7.89 7.89
(v) First Aid Centre, Crèche and Canteen facilities 27.30 27.30 27.30
3. Contingencies and Pre-operative charges@3%. 30.57 22.93 22.93
Total 794.92 787.28 787.28
5. Means of finance:
(Rs. in lakh)
S. No. Particulars Proposed by Recommended by As per MSE-
IA SIDBI CDP
1 GoI Grant under MSE-CDP 476.95 472.36 472.36
2 Govt. of West Bengal 317.97 314.92 314.92
Total 794.92 787.28 787.28
6. Observation:
Committee may consider the proposal for Final Approval at a total project cost of Rs.787.28 lakh
with GoI assistance of Rs.472.36 lakh and State Government contribution of Rs. 314.92 lakh for
Up-gradation of ID Centre at Dabgram, Distt. Jalpaiguri, West Bengal.
*********
72
Agenda No.46.4.6: Proposal for Final approval for Up-gradation of ID Centre at
Shaktigarh, Distt. Burdwan, West Bengal.
Background
(i) Proposal was received from Department of MSME, Govt. of West Bengal vide
application Ref. No. 8619 dated 04.09.17 and recommended by MSME-DI, Kolkata.
(ii) State Level Steering Committee (SLSC) in its 2nd meeting held on 10.03.17
recommended the proposal.
(iii) Proposal was discussed in the 45th SCM held on 22.11.17 and Committee accorded In-
principle approval subject to submission of following documents prior to Final approval:
1. Pre-registration Information:
Name of Organization : The West Bengal Small Industries Development Corpn. Ltd.
(WBSIDC), Kolkata
State : West Bengal
District : Burdwan
Industrial Estate : Shaktigarh – I
Particulars Description
Whether appraised DPR with approved layout Yes.
plan received or not
Total Area of industrial estate/ area (acre) 3.00 acres
Area to be developed (acre) 3.00 acres
Number and sizes of plots to be developed 24 industrial plots existing and the size of each
plot is in the range of 173.49 sq. mtr. to 937.75
sq. mt.
Implementing Period 2 Years
Other ID projects sanctioned in same district: The present proposal is for Up-gradation of
year of sanction, number of plots allotted, existing industrial estate.
units set up, etc.
Performance of ID projects in state. Satisfactory
Description Remarks
Implementing Agency (IA): The West Bengal Small As per guidelines.
Industries Development
73
Description Remarks
Corporation. Ltd. (WBSIDC),
Kolkata
Track Record of the IA WBSIDC has set up 647 nos. of WBSIDC has developed 4 ID
Sheds, 2021 nos. of plots, 1182 centres in Udyan, Santoshpur
nos. of stalls and 70 nos. of Industrial estate, South 24
building spaces in total 40 nos. of Pargana, Beharampur
Industrial Estate and 12 nos. of Industrial Estate, Murshidabad
commercial estates in different and Tangra Industrial Estate,
district of West Bengal. Kolkata.
Appraisal by SIDBI Yes SIDBI appraisal report
(Observations and received.
recommendations). Attach
SIDBI report.
Whether sufficient facilities Yes The industrial estate is having
available at site. (Proximity adequate power supply, with a
to railway stations / state 11 KV sub-station located near
highways, availability of the boundary of the estate. All
water supply, adequate the necessary telecom facilities
power supply, telecom and infrastructure facilities are
facilities, dwelling places of available in the estates.
workers)
Whether land is in Yes The land was originally belong
possession in the name of IA to Cottage & Small Scale
with Clear Title Industries Department GoWB
and subsequently transferred to
Whether Zoning regulations Yes WBSIDC Ltd. in 1995.
and non-agricultural
conversion etc complied
with)
Whether State Level Yes Constituted.
Committee to coordinate and
monitor progress has been
Constituted
Whether confirmation - Received
received form IA that it will
meet the cost in excess of
approved project cost and
any escalation in cost
Basis of elements of project 1. Land &Site Development:-
Cost Cost of land filling, site development & compound wall, Cost of
laying internal roads, Road side greenery & Social forestry, Water
supply including overhead tanks, Drainage, Power (Electrical work
including street lights).
2. Administrative and other services complex:-
Administrative office building, Télécommunication/
Documentation centre, Contingencies, Conference Hall/Exhibition
Centre, raw material storage facility marketing outlets, First Aid
Centre, Creche and Canteen Facilities and Contingency.
Tangible Outcomes of the The industrial estate is having 24 industrial plots. The estate
project has provided employment opportunities to approximately 250
persons. There are about 21 units operating in the Estate,
occupying 21 industrial plots out of the total 24 industrial plots.
The existing units are engaged in manufacturing of recycled
plastic products, hose pipes, drugs and pharmaceuticals, iron
nails, repair and overhauling of transformers etc.
The present project is aimed for improving the overall
infrastructure of the estate like Up-gradation of road network,
water supply system, storm water system, street lights and
other repairing and renovation works. Thus, the Up-gradation
of project is envisaging provisions of better infrastructure,
74
Description Remarks
improved viability of the MSME units located in the
industrial estate by allowing them to upgrade their production
facilities thereby reducing overhead costs, improve their
profitability and encourage them to take up expansion, besides
offering additional employment opportunists.
4. Project cost:
(Rs. in lakh)
S. No Particulars of Head Proposed Recommended As per
by IA by SIDBI MSE-
CDP
1. Land & Site Development
(i) Cost of land filling, site development & - - -
compound wall
(ii) Cost of repairing of internal roads 92.06 92.06 92.06
(iii) Water supply system including overhead 77.34 77.34 77.34
tanks
(iv) Drainage 55.51 55.51 55.51
(v) Power (Electrical work including Street light) 63.74 63.74 63.74
Sub total 288.65 288.65 288.65
2. Administrative and other services complex
(i) Repairing and Renovation of existing 11.59 11.59 11.59
structure
3. Labour Cess @ 1% 3.00 0.00 0.00
4. Contingencies @3% 9.00 9.00 9.00
Total 312.24 309.24 309.24
5. Means of finance:
(Rs. in lakh)
S. No. Particulars Proposed by Recommended As per MSE-
IA by SIDBI CDP
1 GoI Grant under MSE-CDP 187.34 185.54 185.54
2 Contribution from Govt. of West 124.90 123.70 123.70
Bengal
Total 312.24 309.24 309.24
6. Observation:
Committee may consider the proposal for Final Approval at a total project cost of Rs.309.24 lakh
with GoI assistance of Rs.185.54 lakh and State Government contribution of Rs. 123.70 lakh for
Up-gradation of ID Centre at Shaktigarh, Distt. Burdwan, West Bengal.
*********
75
Agenda No.46.4.7: Proposal for Final approval for Up-gradation of ID Centre at Bolpur
(Phase-I), Birbhum, West Bengal.
Background
(i) Proposal was received from Department of MSME, Govt. of West Bengal vide application
Ref. No. 8621 dated 04.09.17 and recommended by MSME-DI, Kolkata.
(ii) State Level Steering Committee (SLSC) in its 2nd meeting held on 10.03.17 recommended
the proposal.
(iii) Proposal was discussed in the 45th SCM held on 22.11.17 and Committee accorded In-
principle approval subject to submission of following documents prior to Final approval:
4. Project cost:
(Rs. in lakh)
S. No Particulars of Head Proposed Recommended As per
by IA by SIDBI MSE-CDP
1. Land Development and other overhead Infrastructure
(i) Cost of repairing of internal road 194.88 194.88 194.88
(ii) Water supply System 115.67 110.15 110.15
(iii) Drainage 99.00 94.29 94.29
(iv) Power (Electrical work including street 140.09 140.09 140.09
lights)
Sub total 549.64 539.41 539.41
2. Administrative and other services complex
(i) Repairing and renovation works for 66.85 64.00 64.00
existing structure
(ii) Contingencies @3%. 18.49 18.10 18.10
(iii) Labour cess@1% 6.17 0.00 0.00
Total 641.15 621.51 621.51
5. Means of finance:
(Rs. in lakh)
S. No. Particulars Proposed by Recommended As per MSE-
IA by SIDBI CDP
1 GoI Grant under MSE-CDP 384.69 372.91 372.91
2 Contribution from Govt. of West 256.46 248.60 248.60
Bengal
Total 641.15 621.51 621.51
6. Observation:
Committee may consider the proposal for Final Approval at a total project cost of Rs.621.51 lakh
with GoI assistance of Rs.372.91 lakh and State Government contribution of Rs. 248.60 lakh for
Up-gradation of ID Centre at Bolpur (Phase-I), Birbhum, West Bengal.
*********
78
45.5 Proposals for Time Extension
79
Agenda No.46.5.1: Proposal for Time Extension for setting up CFC in Gold Jewellery
Cluster, Vijayawada, Andhra Pradesh.
S. Description Status
No.
1. Name of the proposal Setting up of Common Facility Centre (CFC in Gold
and Location Ornaments Cluster, Vijayawada, Krishna District,
Andhra Pradesh.
2. Approval accorded 35th SCM held on 15.01.14.
3. Final approval order 07.03.14.
issued on
4. Name of the IA Andhra Pradesh Trade Promotion Corporation
(APTPC) Ltd., Hyderabad.
5. Means of Finance (Rs. in lakh)
SPV contribution 34.52
Grant-in-aid from Govt. of India 225.16
Total 259.68
6. Project Cost and (Rs. in lakh)
component-wise (i) Land and its Development : 0.00
details (ii) Building and other Civil : 5.58
Constructions
(iii) Plant & Machinery (including : 217.37
electrification)
(iv) Misc. fixed assets 5.86
(v) Preliminary & Pre-operative : 5.19
expenses, maximum 2% of project
cost.
(vi) Contingency (2% building and 5% : 11.28
on plant and machinery).
(vii) Margin money for working : 5.40
capital
Total : 250.68
7. Total GoI grant Installment & Date (Rs. in lakh)
released 1st on 21.06.16 (UC received) : 90.00
2nd on 22.12.16 (UC received) : 67.54
3rd on 12.06.17 : 45.104
Total : 202.644
8. Project validity 31.05.17
9. Time Extension 31.03.18
sought up to
10. Reason for Delay Completion report received, final instalment of
10% to be released.
11. Proposal for Steering Steering Committee may kindly accord time
Committee extension upto 31.03.18.
**********
80
Agenda item No. 46.5.2: Proposal for Time Extension for setting up of new Industrial Estate
at Salemthar, Chandel, Manipur.
S. Description Status
No.
1. Name of the Setting up of new Industrial Estate at Salemthar, Chandel, Manipur.
proposal and
Location
2. Approval 38th SCM held on 28.07.2015
accorded
3. Final approval 11.12.2015
order issued on
4. Name of the IA Directorate of Commerce & Industries, Department of Commerce &
Industries, Govt. of Manipur.
5. Means of (Rs. in lakh)
Finance Govt. of India Grant : 725.24
Govt. of Manipur Grant : 181.31
Total : 906.55
6. Project Cost and (Rs. in lakh)
component-wise Particulars Approved Cost
details Land filling/leveling including boundary wall 100.00
Laying roads 197.00
Road side greenery & social forestry 10.00
Water supply including overhead tanks, and pump 108.05
houses
Water harvesting 10.00
Drainage 59.00
Power distribution, Street light arrangements, etc. 250.00
Public Convenience 10.00
Administrative office building 132.00
Telecom/Cyber/Documentation centre
Conference Hall/Exhibition centre
Bank/Post office
Raw material storage facility, Marketing outlets
First aid centre, Creche Canteen
Effluent Treatment Facilities 20.00
Contingencies 10.50
Total 906.55
7. Total GoI grant Installment & Date (Rs. in lakh)
released 1st installment on 28.04.16 : 200.00
2nd installment on 25.04.17 : 300.00
Total : 500.00
8. Project validity 11.12.17
9. Time Extension 31.03.18
sought up to
10. Reason for Long economic blockade ( 135 days)
Delay Heavy rains during 2016 and first part of 2017.
11. Proposal for Steering Committee may accord time extension upto 31.03.18.
Steering
Committee
**********
81
Agenda No.46.5.3: Proposal for Time Extension for setting up CFC in Gold Jewellery
Cluster, Madurai, Tamil Nadu.
Total : 357.83
**********
82
Agenda No.46.5.4: Proposal for Time Extension for setting up of new Industrial Estate at
Madikonda Village, Warangal District, Telangana.
******
83
Agenda No.46.5.5: Proposal for Time Extension for setting up of CFC in Metal Casting
(Foundry) Cluster, Howrah, West Bengal.
**********
84
Agenda No.46.5.6: Proposal for Time Extension for setting up of CFC in Roofing Tiles
Cluster, Bankura, West Bengal.
*****
85
Agenda No.46.5.7: Proposal for Time Extension for setting up of Common Facility Centre
(CFC) in Plastic Products Cluster, Rajganj, Jalpaiguri, West Bengal.
86
Agenda No.46.5.8: Proposal for Time Extension for Setting up of Common Facility Centre
(CFC) in Re-rolling Mills Cluster, Howrah, West Bengal.
S. Description Status
No.
1 Name of the proposal Setting up of Common Facility Centre (CFC) in Re-
and location rolling Mills Cluster, Howrah
******
87
Agenda No.46.5.9: Proposal for Time Extension for setting up of CFC in Silver Filigree
Cluster, Magrahat, Dist. South 24 – Parganas, West Bengal.
S. Description Status
No.
1. Name of the proposal Setting up of Common Facility Centre (CFC) in Silver Filigree
and Location Cluster, Magrahat, Dist. South 24 – Parganas, West Bengal.
2. Approval accorded 27th SCM held on 31.05.11.
3. Final approval order 29.07.11
issued on
4. Name of the IA West Bengal State Export Promotion Society (WBSEPS),
Kolkata.
5. Means of Finance (Rs. in lakh)
SPV contribution 14.96
Grant-in-aid from Govt. of India 119.47
Grant-in-aid from Govt. of West Bengal 15.12
Total 149.55
6. Project Cost and (Rs. in lakh)
component-wise details (i) Land and its Development : 4.80
(ii) Building and other Civil Constructions : 12.00
(iii) Plant & Machinery : 96.11
(iv) Support equipments and misc. fixed : 27.45
Assets
(v) Preliminary & Pre-operative expenses : 8.02
(vi) Margin money for working capital : 1.17
Total : 149.55
7. Total GoI grant Installment & Date (Rs. in lakh)
released 1st on 25.03.14 (UC received) : 50.00
Total : 50.00
8. Project validity 30.11.17
9. Time Extension sought 31.05.18
up to
10. Reason for Delay Specification of machinery as per DPR was not matched
with the market.
Required machinery was identified in terms of higher
version by SPV in consultation with empanelled PMC of
this Directorate, Govt. of West Bengal.
11. Proposal for Steering Steering Committee may accord time extension upto
Committee 31.05.18.
**********
88
Agenda No.46.5.10: Proposal for Time Extension for setting up of CFC in Lead Acid Battery
Cluster, Siliguri West Bengal.
8 Proposal for Steering Steering Committee may accord time extension upto
Committee 30.06.18.
***********
89
Agenda No.45.5.11: Proposal for Time Extension for new ID Centre at Durgapur (Ph-II) in
Burdwan District, West Bengal.
90
7. Total GoI grant Installment & (Rs. in
released date lakh)
1st on 17.07.12 : 60.00
2nd on 07.07.2014 : 101.80
3rd on 23.03.16 168.56
4th on 12.06.17 100.00
Total : 430.36
8. Project validity 30.09.17
9. Time Extension 31.03.18
sought up to
10. Reasons for Delay WBSIDC, Kolkata vide letter dated 31.01.18, informed that
construction of boundary wall is about to complete.
11. Proposal for Steering Steering Committee may kindly accord Time Extension up to
Committee 31.03.18.
************
91
46.6 Ratification of Decisions
92
Agenda No.46.6.1: Ratification of Time Extension granted for setting up of CFC in Pump and
Foundry Cluster, Rajkot, Gujarat.
S. Description Status
No.
1. Name of the proposal Setting up of CFC in Pump and Foundry Cluster, Rajkot,
and Location Gujarat
2. Approval accorded 35th SCM held on 15.01.14
3. Final approval order 13.03.14
issued on
4. Name of the Centre for Entrepreneurship Development (CED), Gandhinagar
Implementing Agency
5. Means of Finance (Rs. in lakh)
Govt. of India grant : 382.48
Total : 702.00
Total : 181.6034
********
93
Agenda No.46.6.2: Ratification of Time Extension granted for setting up of CFC in Wood
Furniture Cluster, Taliparamba, Kannur, Kerala.
S. Description Status
No.
1. Name of the proposal Setting up of CFC in Wood Furniture Cluster, Taliparamba,
and Location Kannur, Kerala
2. Approval accorded 29th SCM held on 22.02.2012.
3. Final approval order 28.08.12
issued on
4. Name of the Kerala Bureau of Industrial Promotion (KBIP),
Implementing Agency Thiruvananthapuram.
5. Means of Finance (Rs. in lakh)
Particulars Amount
SPV contribution 117.69
Grant-in-aid from Govt. of India under MSE- 811.67
CDP
Grant-in-aid from Govt. of Kerala 235.38
Total 1164.74
6. Project Cost and (Rs. in lakh)
component-wise S. No. Particulars Total Cost
details 1 Land and its development 16.00
2 Building & Other Civil Constructions 260.12
3 Plant & Machinery(including electrification) 620.90
4 Misc. fixed assets 202.33
5 Preliminary & Pre-operative expenses, 22.84
maximum 2% of project cost.
6 Contingency (2% building and 5% on 36.25
plant and machinery)
7 Margin money for Working Capital 6.30
Total Project Cost 1164.74
7. Total GoI grant Installment & Date (Rs. in lakh)
released 1st on 29.04.16 : 324.668
2nd on 30.08.17 : 243.501
Total : 568.169
8. Proposal for Steering Secretary, MSME as chairman of the Steering Committee
Committee of MSE-CDP granted time extension up to 30.06.18 on
file.
Steering Committee may kindly ratify.
*******
94
Agenda No.46.6.3: Ratification of Time Extension granted for setting up of CFC in Terry
Towel Cluster, Solapur, Maharashtra
S. Description Status
No.
1. Name of the proposal Setting up of CFC in Terry Towel Cluster, Solapur, Maharashtra
and Location
2. Approval accorded 38th SCM held on 28.07.15
3. Final approval order 28.10.15
issued on
4. Name of the Maharashtra Industrial Development Corporation (MIDC),
Implementing Agency Mumbai
5. Means of Finance (Rs. in lakh)
Govt. of India grant : 1291.38
Total : 1791.48
Total :
********
95
Agenda No.46.6.4: Ratification of Time Extension granted for setting up of CFC in
Powerloom Cluster, Shirpur, District - Dhule, Maharashtra
S. Description Status
No.
1. Name of the proposal Setting up of CFC in Powerloom Cluster, Shirpur, District -
and Location Dhule, Maharashtra
2. Approval accorded 27th SCM held on 31.05.11
3. Final approval order 07.03.12
issued on
4. Name of the Maharashtra Industrial Development Corporation (MIDC),
Implementing Agency Mumbai
5. Means of Finance (Rs. in lakh)
Govt. of India grant : 996.17
Total : 1423.10
Total : 947.318
********
96
Agenda No.46.6.5: Ratification of Time Extension granted for setting up of CFC in Textile
Cluster, Navapur, Nandurbar, Maharashtra
S. Description Status
No.
1. Name of the proposal Setting up of CFC in Textile Cluster, Navapur, Nandurbar,
and Location Maharashtra
2. Approval accorded 38th SCM held on 28.07.15
3. Final approval order 28.10.15
issued on
4. Name of the Maharashtra Industrial Development Corporation (MIDC),
Implementing Agency Mumbai
5. Means of Finance (Rs. in lakh)
Govt. of India grant : 1050.00
Government of : 150.00
Maharashtra
Total : 1593.00
********
97
Agenda No.46.6.6: Ratification of Time Extension granted for setting up of new Industrial
Estate at Khopuibung, Churachandpur, Manipur.
S. Description Status
No.
1. Name of the proposal Setting up of new Industrial Estate at Khopuibung,
and Location Churachandpur, Manipur.
******
98
Agenda No.46.6.7: Ratification of Time Extension granted for setting up of new Industrial
Estate at TM Kasom, Ukhrul District, Manipur.
S. Description Status
No.
1. Name of the proposal Setting up of new Industrial Estate at TM Kasom, Ukhrul
and Location District, Manipur.
2. Approval accorded 38th SCM held on 28.07.15.
3. Final approval order 30.09.15.
issued on
4. Name of the Directorate of Commerce & Industries, Department of
Implementing Agency Commerce & Industries, Govt. of Manipur.
5. Means of Finance (Rs. in lakh)
Govt. of India grant : 759.35
Govt. of Manipur : 189.84
Total : 949.19
6. Project Cost and (Rs. in lakh)
component-wise Particulars Approved
details Cost
Land filling, site development & compound wall 100.00
Laying of internal roads 200.00
Road side greenery & social forestry 10.00
Water supply including overhead tanks, and pump 110.00
houses
Water harvesting 10.00
Drainage 60.00
Power distribution, Street light arrangements, etc. 250.00
Sanitary Convenience 10.00
Administrative office building 20.00
Telecom/ Documentation centre 19.35
Conference Hall/Exhibition centre 28.15
Bank/Post office 20.00
Raw material storage facility, Marketing outlets 40.00
First aid centre, Creche Canteen 20.00
Effluent Treatment Facilities 41.69
Contingencies 10.00
Total 949.19
7. Total GoI grant Installment & Date (Rs. in lakh)
released 1st on 31.12.15 : 200.00
2nd on 18.04.17 : 300.00
Total : 500.00
8. Proposal for Steering Secretary, MSME as chairman of the Steering Committee of
Committee MSE-CDP granted time extension up to 31.03.18 on file.
Steering Committee may kindly ratify.
*******
99
Agenda No.46.6.8: Ratification of Time Extension granted for setting up of CFC in
Pharmaceutical Cluster, Cuttack, Odisha.
S. Description Status
No.
1. Name of the proposal Setting up of CFC in Pharmaceutical Cluster, Cuttack,
and Location Odisha
2. Approval accorded 40th SCM held on 23.06.16 & 02.07.16
**********
100
Agenda No.46.6.9: Ratification of Time Extension granted for setting up of CFC in Cashew
Cluster, Neelachakra, Brahmagiri, Puri, Odisha.
Description Status
S. No.
1. Name of the Setting up of CFC in Cashew Cluster, Neelachakra,
proposal and Brahmagiri, Puri, Odisha
Location
2. Approval accorded 38th SCM held on 28.07.15
********
101
Agenda No.46.6.10 : Ratification of Time Extension granted for setting up of CFC in Gota
Zari Lace Cluster, Ajmer, Rajasthan.
S. Description Status
No.
1. Name of the proposal Setting up of CFC in Gota Zari Lace Cluster, Ajmer,
and Location Rajasthan
2. Approval accorded 38th SCM held on 28.07.15
Total : 241.38
*********
102
Agenda No.46.6.11: Ratification of Time Extension granted for setting up of CFC in Coir
Product Cluster, Erode, Tamil Nadu.
S. Description Status
No.
1. Name of the proposal Setting up of CFC in Coir Product Cluster, Erode, Tamil Nadu
and Location
2. Approval accorded 37th SCM held on 03.09.14
3. Final approval order 23.12.14
issued on
4. Name of the Tamilnadu Small Industries Development Corporation Limited,
Implementing Agency Chennai
5. Means of Finance (Rs. in lakh)
Govt. of India grant : 404.44
Total : 592.51
Total : 283.102
********
103
Agenda No.46.6.12: Ratification of Time Extension granted for setting up of CFC in
Engineering Cluster, Ranipet, Vellore District, Tamil Nadu.
S. Description Status
No.
1. Name of the proposal Setting up of CFC in Engineering Cluster, Ranipet, Vellore
and Location District, Tamil Nadu
2. Approval accorded 24th SCM held on 24.12.10
3. Final approval order 04.03.11
issued on
4. Name of the Tamilnadu Small Industries Development Corporation Limited,
Implementing Agency Chennai
5. Means of Finance (Rs. in lakh)
Govt. of India grant : 616.39
Total : 927.08
Total : 554.75
********
104
Agenda No.46.6.13: Ratification of Time Extension granted for setting up of CFC in Rice
Mill Cluster, Thanjavur, Tamil Nadu.
S. Description Status
No.
1. Name of the proposal Setting up of CFC in Rice Mill Cluster, Thanjavur, Tamil Nadu
and Location
2. Approval accorded 33rd SCM held on 14.06.13
3. Final approval order 10.09.13
issued on
4. Name of the Tamilnadu Small Industries Development Corporation Limited,
Implementing Agency Chennai
5. Means of Finance (Rs. in lakh)
Govt. of India grant : 100.23
Total : 212.06
Total : 70.069
********
105
Agenda No.46.6.14: Ratification of Time Extension granted for setting up of CFC in S.S.
Utensils Cluster, Kumbakonam, Thanjavur, Tamil Nadu.
S. Description Status
No.
1. Name of the proposal Setting up of CFC in S.S. Utensils Cluster, Kumbakonam,
and Location Thanjavur, Tamil Nadu
2. Approval accorded 36th SCM held on 18.02.14
3. Final approval order 31.03.14
issued on
4. Name of the Tamilnadu Small Industries Development Corporation Limited,
Implementing Agency Chennai
5. Means of Finance (Rs. in lakh)
Govt. of India grant : 98.83
Total : 126.30
Total : 39.53
********
106
Agenda No.46.6.15: Ratification of Time Extension granted for setting up of CFC in Safety
Matches, O. Mettupatti, Sattur, District - Virudhunagar, Tamil Nadu
S. Description Status
No.
1. Name of the proposal Setting up of CFC in Safety Matches, O. Mettupatti, Sattur,
and Location District - Virudhunagar, Tamil Nadu
2. Approval accorded 35th SCM held on 15.01.14
3. Final approval order 28.03.14
issued on
4. Name of the Tamilnadu Small Industries Development Corporation Limited,
Implementing Agency Chennai
5. Means of Finance (Rs. in lakh)
Govt. of India grant : 204.64
Total : 346.89
Total : 81.856
********
107
Agenda No.46.6.16: Ratification of Time Extension granted for setting up of CFC in
Powerloom Cluster, Salem, Tamil Nadu
S. Description Status
No.
1. Name of the proposal Setting up of CFC in Powerloom Cluster, Salem, Tamil Nadu
and Location
2. Approval accorded 35th SCM held on 15.01.14
3. Final approval order 14.03.14
issued on
4. Name of the Tamilnadu Small Industries Development Corporation Limited,
Implementing Agency Chennai
5. Means of Finance (Rs. in lakh)
Govt. of India grant : 886.45
Total : 1333.96
Total : 354.58
********
108
Agenda No.46.6.17: Ratification of Time Extension granted for setting up of CFC in
Engineering Cluster, Ambattur, Tamil Nadu
S. Description Status
No.
1. Name of the proposal Setting up of CFC in Engineering Cluster, Ambattur, Tamil
and Location Nadu
2. Approval accorded 38th SCM held on 28.07.15
3. Final approval order 27.10.15
issued on
4. Name of the Tamilnadu Small Industries Development Corporation Limited,
Implementing Agency Chennai
5. Means of Finance (Rs. in lakh)
Govt. of India grant : 805.33
Total : 1124.42
Total : 354.58
********
109
Agenda No.46.6.18: Ratification of Time Extension granted for setting up of CFC in Gate
and Grill Cluster, Thirumullaivoyal, Thiruvallur, Tamil Nadu
S. Description Status
No.
1. Name of the proposal Setting up of CFC in Gate and Grill Cluster, Thirumullaivoyal,
and Location Thiruvallur, Tamil Nadu
2. Approval accorded 35th SCM held on 15.01.14
3. Final approval order 10.09.13
issued on
4. Name of the Tamilnadu Small Industries Development Corporation Limited,
Implementing Agency Chennai
5. Means of Finance (Rs. in lakh)
Govt. of India grant : 197.93
Total : 284.87
Total : 138.55
********
110
Agenda No.46.6.19: Ratification of Time Extension granted for setting up of CFC in Steel
Product Fabrication Cluster, Salem, Tamil Nadu
S. Description Status
No.
1. Name of the proposal Setting up of CFC in Steel Product Fabrication Cluster, Salem,
and Location Tamil Nadu
2. Approval accorded 32nd SCM held on 20.03.13
3. Final approval order 03.05.13
issued on
4. Name of the Tamilnadu Small Industries Development Corporation Limited,
Implementing Agency Chennai
5. Means of Finance (Rs. in lakh)
Govt. of India grant : 1277.71
Total : 1532.74
Total : 1149.932
********
111
46.7 Any Other Points