Você está na página 1de 5

OWNER:

IPP: KIMANIS POWER SDN BHD (842208-H)


(A joint venture company between PETRONAS Gas Berhad and NRG Consortium (Sabah) Sdn Bhd)

PROJECT
MANAGEMENT
CONSULTANT:

KIMANIS POWER PROJECT ENGINEERING, PROCUREMENT, CONSTRUCTION AND


COMMISSIONING (EPCC) FOR 300MW COMBINED CYCLE POWER PLANT
CONTRACTOR: CTCI Corporation, CTCI Overseas Corporation Limited,
CTCI Malaysia Sdn Bhd, Synerlitz (Malaysia) Sdn Bhd,
SCHB Engineering Services Sdn Bhd CONSORTIUM
VEN. DOCUMENT NO: KECSB/ABB-KIMANIS/MOS/0213/04 REV. B
TITLE:

275/132KV KIMANIS SWITCHYARD


ITP FOR STEEL STRUCTURE
ERECTION

DOCUMENT NO: KPP-000-XK91C-009-0060 REV. B

B CHANGES IN ATTACHMENT 6/3/2013 ABB

A ISSUE FOR APPROVAL 20/02/2013 ABB

Rev. Description Date By Chk. App.

Page No. 1 of 5
THIS DOCUMENT CONTAINS CTCI CORPORATION CONFIDENTIAL INFORMATION OF A PROPRIETARY NATURE. THIS INFORMATION MUST NOT BE COPIED OR DISCLOSED IN
WHOLE OR IN PART TO OUTSIDE PARTIES NOR USED FOR OTHER THAN THE PURPOSE FOR WHICH PROVIDED WITHOUT PERMISSION OF MANAGEMENT.
本文件所述及資料及文件皆為中鼎工程股份有限公司(中鼎)版權所有,未徵得中鼎同意不得將其中全部或部份翻印或轉授與第三者。
CONTENT PAGE

1.0 PROPOSE 3

2.0 SCOPE 3

3.0 PROJECT DESCRIPTION 3

4.0 ACTIVITIES 4

5.0 ATTACHMENTS 5

275/132KV KIMANIS SUBSTATION KPP-000-XK91C-009-0060


DATE
METHOD OF STATEMENT 6/3/2013
2 OF 5
STRUCTURE ERECTION REV.
B
1.0 PURPOSE

The purpose of this Procedure is to define the items that


must be inspected and tested during the construction and to
set the Hold Points or Witness Points for certain inspection
items including required examination and test, so as to
ensure that the entire construction quality complies with
the requirements of the contract and project specifications.

2.0 SCOPE

The examination and testing items must comply with the


requirements of relevant drawings, specifications and
statutory codes. This inspection and test items listed in
the appendixes are the most basic requirements.

3.0 PROJECT DESCRIPTION

Project:

Kimanis 275/33kV Consumer Main Intake

Main Contractor:

ABB Malaysia Sdn. Bhd.

Sub Contractor:

KARISMA Energy & Construction Sdn. Bhd./SKT Semarak Sdn. Bhd.

275/132KV KIMANIS SUBSTATION KPP-000-XK91C-009-0060


DATE
METHOD OF STATEMENT 6/3/2013
3 OF 5
STRUCTURE ERECTION REV.
B
4.0 ACTIVITIES

4.1 Before starting the work, the Project Manager shall assign
the Supervisor to compile the relevant document and shall
submit to the Client for review, if required.

4.2 The Contractor shall prepare the inspection and test plan,
using specific forms to set all hold points/witness points
according to the contractual requirements, project
specifications and statutory codes.

4.3 QC manager and the Site Supervisor shall review the proposed
inspection and test plans and compile the relevant
inspection and test items to form a complete set of
Inspection and Test Plan. It should be submitted for
approval.

4.4 The approved Inspection and Test Plan shall be handed over
to the responsible appointed QC Manager.

5.0 ATTACHMENTS

ATTACHMENT 1: INSPECTION AND TESTING PLAN FLOWCHART


ATTACHMENT 2: STEEL STRUCTURE ERECTION CHECK LIST
ATTACHMENT 3: ELEVATION OF COLUMN FOUNDATION
ATTACHMENT 4: STRUCTURE STEEL ERECTION CHECK LIST
ATTACHMENT 5: GROUT/POUR CARD
ATTACHMENT 6: PUNCH LIST
ATTACHMENT 7: QUALITY MANAGEMENT STANDARD

275/132KV KIMANIS SUBSTATION KPP-000-XK91C-009-0060


DATE
METHOD OF STATEMENT 6/3/2013
4 OF 5
STRUCTURE ERECTION REV.
B
ATTACHMENT 1
INSPECTION AND TESTING PLAN FLOWCHART

275/132KV KIMANIS SUBSTATION KPP-000-XK91C-009-0060


DATE
METHOD OF STATEMENT 6/3/2013
5 OF 5
STRUCTURE ERECTION REV.
B