Você está na página 1de 22

Site Acceptance Testing for New insatllatio

Circle

New Site
Basic Information (New Site/ Swap) ✘

2G 3G
Technology
Site ID :-
Site Name
MR KAILASHPATI PODDAR S/o SHRI SHITAL PODDER VILL KURCE
Address
Site Type (ID/OD)
IP 55 cabinet Make if applicable
Parent Node Name & Id
BTS -OEM
BTS Type
RF Configuration 2+2+2
MIMO Power configuration 43 dbm
BTS SW Version
BTS IP
BTS O&M IP
TOCO (Indus/Infratel/ATC etc..)
Type (GBT/RTT/RTP/IBS)
No. of Sectors
Date of AT

Signoff :

BSS Manager:-Viswajeet Singh


Date : 29-Aug-19
Mobile Number:7667625511
or New insatllation activtiy

Swap/
Upgrades Sector
Addition
SRA
FDD TDD ✘ N

BHKUV-01
KURCELL-01
AL PODDER VILL KURCELL PO JHAUA PS KODUWA DIST KATIHAR BIHAR

OD
YES
NA
RJ45
MR-10
4T4R
43 dbm
FL18A
NA
NA
INFRATEL
GBT
3
8/29/2019

noff :

Project Manager:-Mohammed Saif


Date :29-08-2019
Mobile Number: NA
OEM to fill details
S.No
Activity
1-Rack & Cabinet
Cabinet is fixed firmly with all necessary installation accessories in correct
1.1.01 sequence
Cabinet is or order. mounted & secured on wall /pole. (When the cabinet is
properly
1.1.02 mounted on wall/pole).
1.1.03 IP 55 Cabinet Filter( whereever appicable) are in place and properly cleaned
1.1.04 IP 55 cabinet fans are working properly
1.1.05 IP 55 cabinet alarms are extended
2. Base station
2.1.01 RF Module Type- Technology wise for SRAN
2.1.02 No of RF Module- Technology wise for SRAN
2.1.03 Base band Unit Type
2.1.04 No of Baseband Units- Technology wise
2.1.05 Base Station is secured installed.
2.1.06 Base Station is perfect at vertical position ( Should not be tilted towards sky or
ground )
2.1.07 IP seals /plugs must be installed in all module.
2.1.08 RRUs are securely installed.
3-Power and grounding cable
3.1.01 Tower, DG and Shelter grounding is connected to earth pit
3.1.02 Potential between Earth to Neutral is zero
3.1.03 Circuit breaker for PDU, DCDU, BBU and RRU meets the design specifications.
3.1.04 BBU and DCDU are grounded.
3.1.05 Number of DCDUs installed
All the power cables and protection ground cables are connected firmly with
3.1.06 RRU is grounded
correct polarity. and the grounding cable of RRUs are extended downward and
3.1.07 fixed to the tower nearby.(ensure that paints are removed at touching portion of
3.1.08 clamp to tower
RRU power member
cables before in
are arranged fixing).
neat and straight way without any crossing.
3.1.09 IGB is properly grounded to earth pit
3.1.10 OGB is properly grounded to earth pit
3.1.11 Grounding of FO cable at Y joint should be downward & weather proofing done.
3.1.12 CPRI - FO Cable looped in ring at least 2-3 times
3.1.13 Any visible stretch/Cut/damage on FO Cable.
4. Media Cable
4.1.01 The E1 / Ethernet Lan cables are routed and connected securely at BBU.
4.1.02 CPRI cables of RRU are arranged in neat and straight way without any crossing.
The fixing clips of the CPRI cables of RRU are spaced evenly and secured and
4.1.03 oriented
Cables inrouted
are thesame direction.
properly inside and outside the cabinet and bound with ties
4.1.04
with uniform spacing & moderate tightness.
Correct CPRI Cable / SFP Port is there as per FDD-1000/TDD-10G Recommendation (E//
4.1.05 Only)
4.1.06 Feeder should be traced for Swap / Cyclic Swap / Proper Mapping (FDD/TDD/3G)

5. Media Details
5.1.01 Type of Media
5.1.02 BW Provisioned
5.1.03 QOS Implementation as per guideline
6. Clock
6.1.01 BTS Clock Configuration-Primary

6.1.02 BTS Clock Configuration-Secondary

In case FDD installation of existing TDD site, FDD should be syncronized with GPS
6.1.03
only.
7. RF Media used
7.1.01 CPRI/Feeder Length Sec-1
7.1.02 CPRI/Feeder Length Sec-2
7.1.03 CPRI/Feeder Length Sec-3
7.1.04 CPRI/Feeder Length Sec-4
7.1.05 CPRI/Feeder Length Sec-5
7.1.06 CPRI/Feeder Length Sec-6
8. Antenna System Details
Item List- Only for new installation
8.1.01 Antenna Type
8.1.02 Antenna Type
8.1.03 Antenna Quantity
8.1.04 Antenna Height (AGL)
8.1.05 Azimuth
8.1.06 Electrical Downtilt
8.1.07 Mechanical Downtilt
8.1.08 TMA/Combiner/Duplexer/Triplexer
8.1.09 Obstructions if any ( Optimization purpose)
8.1.10 TX Power ( On Top of BTS Cabinet )
FDD/TDD Antenna should be in same direction & no Height / Azimuth /Tilt
8.1.11 missmatch
Antenna Clamp should not be blocked to allow Antenna for proper optimization
8.1.12 (+/-30 Degree)

8.1.13 Antenna Clamp should not be damaged/Up Tilted

9. Cable Return loss, Cable Loss & VSWR Measurements : (<1.5)


Sector/ Cell
9.1.01 TXRX-1
9.1.02 TXRX-1
9.1.03 TXRX-1
9.1.04 TXRX-1
9.1.05 Path Imbalance for FDD / TDD Ports
10. Weather Proofing
Sector/ Cell
10.1.01 Weather proofing on all joints
Activity
11. Active Alarm
11.1.01 Active alarm on site (Critical, Major, Minor or Warning)
11.1.02 Any fluctuating alarm in last 24 hours

11.1.03 Last 24 Hr Alarm (Sync/GPS/QA Alarm)


12. Labelling done for all BTS and TX equipments Installed (Yes/No)
12.1.01 For All BTS Cabinet
12.1.02 For all Cables & Accessories
12.1.03 For Antenna
12.1.04 Labeling of DDF modules is done according to specifications. (External alarm
number marking on Wire & index of alarms stick beside DDF Box).
12.1.05 For TMA's/ Duplexer/Combiner/Triplexer
12.1.06 For Indoor Unit
12.1.07 For Outdoor Unit
13. BTS Infra Alarm Verification (2G/SRAN/ Standalone sites) on actual basis
13.1.01 Site Electrified
13.1.02 DG Fails to Start
13.1.03 Rectifer Fail
13.1.04 Mains Fail
13.1.05 High Temperature
13.1.06 Site on DG
13.1.07 Site on Battery
14-Site clean
14.1.01 Site is cleaned properly & housekeeping is done.
14.1.02 Any project left over material lying at site
14.1.03 Site access is safe and as per OHS
14.1.04 EMF Signage Board
15. CATS Lables (Y/N)
16. AT Doc uploaded to Bulls Eye (Y/N)

*Kindly mention NA where ever planned values is not required.


Wherever NA is not applicable, Yes/No to be filled in Actual Column

Signoff :
BSS Manager:-Vishwajeet Singh
Date : 8/29/2019
Mobile Number: 7667625511
OEM to fill details
UoM Planned* Actual

Yes/No Yes Yes


Yes/No Yes Yes
Yes/No Yes Yes
Yes/No Yes Yes
Yes/No Yes Yes

Model FXJB FXJB


Number 1 1
Model FSMF FSMF
Number 1800/900 1800/900
Yes/No Yes Yes
Yes/No Yes Yes
Yes/No Yes Yes
Yes/No Yes Yes

Yes/No NO NO
Yes/No Yes Yes
Yes/No NO NO
Yes/No Yes Yes
Number NA NA
Yes/No Yes Yes
Yes/No Yes Yes
Yes/No Yes Yes
Yes/No Yes Yes
Yes/No Yes Yes
Yes/No Yes Yes
Yes/No NA NA
Yes/No NO NO

Yes/No Yes Yes


Yes/No Yes Yes
Yes/No Yes Yes
Yes/No Yes Yes
Yes/No Yes Yes
Yes/No Yes Yes

ATM/IP/Media IP IP
Mbps/Gbps Mbps Mbps
Yes/No Yes Yes
2G 3G FD TD SRAN
GPS/IP/Top/TDM/NTP GPS GPS

GPS/IP/Top/TDM/NTP GPS GPS

Yes/No Yes Yes


2G 3G FD/L900 TD SRAN
Mtr NA 50M
Mtr NA 50M
Mtr NA 50M
Mtr NA
Mtr NA
Mtr NA

Sector 1 Sector 2 Sector 3


Planned Actual Planned Actual Planned
Model 10 PORT 10 PORT 10 PORT 10 PORT 10 PORT
Part Code Andrew Andrew Andrew Andrew Andrew
Number 1 1 1 1 1
Mtr 40 40 42 42 40
Degree 90 90 180 180 300
Degree 2 2 2 2 2
Degree 2 2 2 2 2
Number NA NA NA NA NA
Yes/No NO NO NO NO NO
dB NA NA NA NA NA

Yes/No NA NA NA NA NA

Yes/No NA NA NA NA NA

Yes/No NA NA NA NA NA

Sector 1 Sector 2 Sector 3 Sector 4 Sector 5


Actual Actual Actual Actual Actual
Value NA NA NA NA NA
Value NA NA NA NA NA
Value NA NA NA NA NA
Value NA NA NA NA NA
<=2 dB NA NA NA NA NA

Sector 1 Sector 2 Sector 3 Sector 4 Sector 5


Yes/No Yes Yes Yes
Planned* Actual

Yes/No Yes Yes


Yes/No Yes Yes

Yes Yes

Yes/No Yes Yes


Yes/No Yes Yes
Yes/No Yes Yes
Yes/No Yes Yes
Yes/No NA NA
Yes/No No No
Yes/No Yes Yes

Yes/No Yes Yes


Yes/No Yes Yes
Yes/No Yes Yes
Yes/No Yes Yes
Yes/No Yes Yes
Yes/No Yes Yes
Yes/No Yes Yes

Yes/No Yes Yes


Yes/No Yes Yes
Yes/No Yes Yes

Yes/No Yes Yes


Yes/No Yes Yes
Project Manager:-Mohammed Saif
Date :29-08-2019
Mobile Number:na
MS Remarks ( Ok/ Punch Point Details)
MS Remarks ( Ok/ Punch Point Details)

MS Remarks ( Ok/ Punch Point Details)

Sector 3 Sector 4 Sector 5 Sector 6


Actual Planned Actual Planned Actual Planned Actual
10 PORT
Andrew
1
40
300
2
2
NA
NO
NA

NA

NA

NA

Sector 6 MS Remarks ( Ok/ Punch Point Details)


Actual
NA
NA
NA
NA
NA

Sector 6 MS Remarks ( Ok/ Punch Point Details)

MS Remarks ( Ok/ Punch Point Details)


Installation Snap
2. BBU Installation Showing Labeling, Proper
1. OD BTS SHOWING SITE ID Routing & Grounding

4. DCDB LABELING 5. OVP INSTALLATION

NA

7. FSMF END LABELING 8. FSMF GROUNDING


10.FODA INSTALATION 11. FODA CONNECTIVITY

NA NA

13. TDD 4th RF Module End Labeling 14. 2nd RF Module End Labeling

NA NA

16. 3G(2100) RF End AirScale Labeling 17. 2G RF End AirScale Labeling


NA NA

19. GSM Ant 1st 20. GSM Ant 2nd

22. L900 RHH 1st 23.L900 RHH 2nd

NA NA

25. DDF 26.MW Ant


NA NA

28. IDU Power 29.MW Ant

NA NA
ap
3. DUDC LABELING

6. GLAND INSTALLATION

9. FSMF PLINTH GROUNDING


NA

12. FODA END CPRI LABELING

NA

15. 1st RF Module End Labeling

NA

18. SITE IS CLEAN


21. GSM Ant 3rd

24. L900 RHH 3rd

NA

27.IDU Inc
NA

GPS

NA