PRODUCT DATA SHEET

ConstructSim V8i (SELECTseries 4)


Improve Workface Planning and Control With the Leader
in Virtual Construction Simulation

ConstructSim V8i (SELECTseries 4) is a powerful virtual construction simulation system for


detailed and automated workface planning on large projects. ConstructSim V8i provides
construction management the visibility needed to rapidly and effectively respond to project
issues to increase productivity, drive down costs and reduce project cycle time, while
providing improved risk mitigation and team safety.

Robust Construction Work Package requirements. Users can also report estimated and earned
Management Improves Project Management hours and quantities for measuring progress of the Level 3
In ConstructSim, project teams can visualize and interact schedule via a model-based 5D cost analysis. Data can be
with a virtual construction model (VCM), visually organizing uploaded from subcontractors to monitor and coordinate
engineering components into construction work areas (CWAs), interdependent activities, moving to an X-D construction
construction work packages (CWPs), and installation work simulation environment.
packages (IWPs). This allows a more optimal and granular
work breakdown structure to drive engineering, procure- Materials Management Improves Procurement
ment, and fabrication based on the sequencing needs of field Improved scheduling is based upon materials currently on-site
Software offers workflow support and estimated arrival dates received from procurement in the
for all disciplines. installation. Visually defining CWAs and CWPs provides an
unprecedented level of management control over construc- materials system. Users prioritize material feasibility analysis
tion planning. Construction managers can more easily and from the detailed sequence of IWPs and eliminate cumber-
accurately plan work priorities and installation sequences. some data entry through automated material reservation
requests. Integration with RFID and bar coding systems adds
Quantity Tracking and Earned Value to the ability to optimize on-site material management.
Reporting Saves Time
ConstructSim represents the future of model-based quantity
Look-ahead Planning for Proactive Management
tracking and earned value reporting. Templates can be used ConstructSim improves the acquisition of information from the
to assign milestones with labor estimates onto construction field before finalizing plans. It provides a visual representation
quantities and then generate a database of Level 5 work steps of available work and materials, then manages the resource
for planning and measuring progress. Publishing of progress constraints against each work package. ConstructSim’s
scorecards, material lists, reports, and other documentation dynamic ability to track, update, and edit work packages
ConstructSim provides extended based on constraints helps ensure packages are released to
i-model support for CAD conversion. into IWPs for the crews can be automated.
the field only when management knows the IWPs can be com-
Visualize Component States With pleted, reducing rework and minimizing out-of-sequence work.
Construction Status Tracking
Users can mark and track individual model component or Virtual Model Enhances Systems Completions
groups to see a color-coded 3D image representing construc- The VCM allows users to walk-down turnover systems in the
tion status. This allows progress to be tracked in near virtual model prior to installation and interactively define test
real-time, providing a clear overview of complex projects. packages. Users can monitor installation progress to expedite
incomplete work based on system turnover priorities.
Construction Schedule Animation Improves
Safety and Timing
Automatic linking of components and user-defined groups
with the schedule provides flexible 4D schedule visualization.
Users can enhance reporting
capabilities leveraging the SQL With a clear understanding of the construction path,
Server Reporting Service. supervisors can maximize safety while meeting schedule
System Requirements ConstructSim V8i At-A-Glance
Operating System
Windows 7 (64-bit), Windows Vista Expanded Support for • Incorporate visualizations of cranes, • Used by: Workface Planner, Field
(64-bit), Windows XP Pro (64-bit) Additional Disciplines scaffolding, and other construction Engineer, Foreman / Supervisor,
• Workflow support for all construction site content Construction Manager, Project Man-
Processor • Provides support for loading CAD ager, Turnover Coordinator, Material
disciplines including civil engineer-
Intel or AMD processor 3.0 GHz or data from third-party engineering
ing, electrical and instrumentation, Coordinator, Project Controls, QA /
higher software vendors
piping structural, and equipment QC Personnel
Memory • Standard data transfer interfaces
8 GB or more
Dynamic Review Publishing Work Package Bookmarks
for input of engineering lists such Service
Hard Disk as mechanical equipment list, • Generate work package bookmarks
• Publish i-models (containers for open automatically
20 GB free disk space or more instrument index, electrical cable information exchange) suitable for
schedule, raceways, HVAC, and more • Access bookmarks to generate
Video large-scale dynamic review with
• Non-graphical work package func- Bentley Navigator markups
Graphics card supported by DirectX
9.0. See graphics card manufacturer tionality to track detailed quantities • Create interactive 3D PDFs to • Support for labeling inside
for latest information on DirectX where components are not modeled provide models for review to a of bookmarks
drivers. At least 512 MB of video in 3D CAD wide audience
RAM is recommended. For optimal
Steel Hanglists
• Work packages development on • Enhance collaboration between
performance, graphics display color • Create list of steel members
early engineering models prior to engineering and construction
depth should be set to 24-bit or higher. release of construction documents • Order and animate lists
• Review construction status and
When using a color depth setting of • Publish lists in reverse order to aid
priorities in engineering
16-bit, some inconsistencies will Systems Turnover truck loading
• Leverage shared mark-ups, notes,
be noted. Enhancements • Create erection sequences based
and annotations in the 3D model
• Visually develop turnover systems on published lists
and test packages in a virtual model Comprehensive Work-Sharing
Find out about Bentley • Represent engineering components Environment Support
at: www.bentley.com simultaneously by installation area, • Comprehensive work-sharing • Addresses fundamental needs of
work package, test package and environment for simultaneous use change management
Contact Bentley system extent by construction management firms, • Incorporates key concepts and work
1-800-BENTLEY (1-800-236-8539) direct-hire contractors and owner-
• Prioritize and expedite incomplete process methodologies for agile
Outside the US +1 610-458-5000 operators
installation work based on turnover construction, work-face planning and
Global Office Listings schedule needs • Easy-to-use game-like environment related construction industry best
www.bentley.com/contact • Provides suite of “out-of-the-box” for field users practices
system completion reports and • Templated, open interfaces to all • Includes support by a team of senior
expediting reports popular 3D modeling packages and
industry consultants with decades of
materials management systems
MicroStation® Visualization field experience
including SmartPlant Materials
Engine • Robust data processing environment • Includes well developed, standard-
• Provides powerful graphics for the data administration using ized project templates to sim-
visualization for smooth navigation a federated information workflow plify deployment, and jump-start
of complex CAD data from global architecture a company towards realizing the
megaprojects • Use cases relevant to early con- targeted benefits of virtual construc-
• Leverages the drawing production, struction planning, field execution, tion simulation
publishing, documentation, model, handover, commissioning, and • Supports ROI and quality initiatives
and output capability of MicroStation shutdown-turnarounds with owner and constructor partners

© 2012 Bentley Systems, Incorporated. Bentley, the “B” Bentley logo, and MicroStation are either registered or unregistered trademarks or service marks of Bentley
Systems, Incorporated or one of its direct or indirect wholly owned subsidiaries. Other brands and product names are trademarks of their respective owners. CS8944