Você está na página 1de 3

Project : Document Number

Development Quality System BPI-SPC- -A


Discipline :
BP - INDONESIA Vol. Revision
SCM and QA/QC Group No. A
Author’s Org : Material Purchase Specification Revision Date
September 10, 2002

CHEMICAL AND LABORATORY EQUIPMENT

1. DOCUMENTATION
- Material Certificate shall be issued by manufacture. Gas bottles shall be
made of high strength carbon steel for pressure vessel (eg , SA.788 , SA-541 , SA 508 , SA
515 , SA 516 , etc) and alloyed steel (eg. Chromium Molybdenum steel, Nickel steel ,etc ,as
stipulated in BS 5045 Part 1) or section xx BP Gas Bottle Procedure number XXX.

- Guarantee Letter shall be issued by vendor.

- Inspection and testing report shall be issued by manufacture according


to section 8 BP Gas Bottle Procedure number XXX.

- Catalogue and manual shall be issued by manufacture.

- Drawing shall be issued by manufacture.

- Material Safety Data Sheet shall be issued by manufacture which should


comply with section II article 4 Indonesian regulation number Keputusan Menteri Tenaga
Kerja RI No.: KEP-187/MEN/1999).

- Marking (colour coding marking and stamping) shall be attached by


manufacture according to section 3.5 BP Gas Bottle Procedure number XXX.

- Label shall be attached by manufacture according to the information on


MSDS.

2. INSPECTION AND TESTING


- Packaging and Marking Inspection:
- Packaging shall comply with section 3b and 3c of this appendix.

- Visual inspection:
- The Inspection to make sure the condition of equipment.

Page 1 of 15
Project : Document Number
Development Quality System BPI-SPC- -A
Discipline :
BP - INDONESIA Vol. Revision
SCM and QA/QC Group No. A
Author’s Org : Material Purchase Specification Revision Date
September 10, 2002

- Identification Check
- Inspection based on Material Safety Data Sheet.

- Dimensional Check
- Inspection based on weight and composition of substances.

3. SHIPPING, PACKAGING, AND MARKING REQUIREMENT


a. Shipping Requirement
-

b. Packaging Requirement
-

c. Marking Requirement
-

4. REFERENCE
- BP Gas Bottle Procedure number XXX.
- Kepmenaker RI No. KEP-187/MEN/1999.
BP

Page 2 of 15
Project : Document Number
Development Quality System BPI-SPC- -A
Discipline :
BP - INDONESIA Vol. Revision
SCM and QA/QC Group No. A
Author’s Org : Material Purchase Specification Revision Date
September 10, 2002

Page 3 of 15

Você também pode gostar