This document contains solutions to a test on standards and quality practices. It discusses topics like objectives of quality management systems like TQM and 5S, calculation of Overall Equipment Effectiveness (OEE), benchmarking, quality audits, customer satisfaction measures like SERVQUAL, and factors affecting organizational productivity. The test aims to evaluate understanding of quality practices in production, construction, maintenance and service sectors.
This document contains solutions to a test on standards and quality practices. It discusses topics like objectives of quality management systems like TQM and 5S, calculation of Overall Equipment Effectiveness (OEE), benchmarking, quality audits, customer satisfaction measures like SERVQUAL, and factors affecting organizational productivity. The test aims to evaluate understanding of quality practices in production, construction, maintenance and service sectors.
This document contains solutions to a test on standards and quality practices. It discusses topics like objectives of quality management systems like TQM and 5S, calculation of Overall Equipment Effectiveness (OEE), benchmarking, quality audits, customer satisfaction measures like SERVQUAL, and factors affecting organizational productivity. The test aims to evaluate understanding of quality practices in production, construction, maintenance and service sectors.
GENERAL STUDIES AND ENGINEERING APTITUDE SUBJECT: STANDARDS AND QUALITY PRACTICES IN PRODUCTION, CONSTRUCTION, MAINTENANCE AND SERVICES SOLUTIONS
01. Ans: (c) All the 3 parameters decide OEE i.e.,
Sol: AGMARK is the governing body for capacity of system. agricultural and dairy products to be sold in India. 08. Ans: (b) Sol: Safety is not part of 5s. 02. Ans: (b) Sol: Indian Standards Institute will cover codes 09. Ans: (a) for fire extinguisher ness. Sol: Minimizing searching and identification of capacity losses are part of 5s. Safety is not 03. Ans: (a) related to 5s. Sol: ISI will take care of any type of meat to be sold in India. 10. Ans: (a) Sol: Breakdowns and changeover are availability 04. Ans: (d) losses whereas defects are yield losses. Sol: The examples lead to minor or small stops in process. Therefore, all are performance 11. Ans: (a) losses. Sol: TQM is based on top down approach i.e., management is mainly responsible for 05. Ans: (b) quality. Sol: Reduced speed is performance loss. 12. Ans: (d) 06. Ans: (b) Sol: Management is mainly responsible for Sol: Defects are yield losses. Idling & Speed quality i.e., top down approach is the losses are performance losses. principle of TQM.
07. Ans: (d) 13. Ans: (d)
Sol: Availability is the fraction of time machine Sol: Only through active participation in the is in working condition. audit can top management acquire the Performance is the ratio of actual speed and necessary insight into the problems of firm. theoretical speed. Yield is the fraction of Remaining two statements are correct from output which is defect free. common sense point of view. ACE Engineering Academy Hyderabad|Delhi|Bhopal|Pune|Bhubaneswar|Lucknow|Patna|Bengaluru|Chennai|Vijayawada|Vizag|Tirupati|Kukatpally|Kolkata|Ahmedabad | Kothapet :2: General Studies & Engineering Aptitude
ACE Engineering Academy Hyderabad|Delhi|Bhopal|Pune|Bhubaneswar|Lucknow|Patna|Bengaluru|Chennai|Vijayawada|Vizag|Tirupati|Kukatpally|Kolkata|Ahmedabad | Kothapet
:3: ESE - 2020 (Prelims) Offline Test Series
14. Ans: (d) 8 60 min
Sol: It is Europe’s most prestigious award for Actual cycle time = x units organisational excellence which is given Theoretical cycle time = 6 min/unit annually by EFQM. 6 6x Performance = = 60 8 60 15. Ans: (c) 8 Sol: If top management is involved in quality x audit as part of TQM, they will ask 57 Yield = questions of (a), (b) and (d). (c) is not x relavent question in audit. 6x 57 OEE = 0.9 = 64% 8 60 x 16. Ans: (c) Sol: Company needs to improve in order to 22. Ans: (c) survive in stiff competition. Sol: It is developed by Japanese Union of Therefore, need for improvement is Scientists and Engineers (JUSE). something no one will question. 23. Ans: (d) 17. Ans: (d) Sol: It is given by NIST. ASQ assist in Sol: Principle of benchmarking is to match with administering it. The award is given in all competitor or to perform/beat competitor but six categories. not to bring down. 24. Ans: (b) 18. Ans: (d) Sol: According to construction quality Sol: Internal benchmarking is comparing assessment system (CONQUAS) highest yourself with departments and divisions in weightage is given to architecture (around the same organisation. 50%) in case of commercial buildings. Functional benchmarking is based on the functions which the firm concerned is 25. Ans: (d) especially noted for. Sol: All the factors indicate directional failure of management. They ultimately result in low 19. Ans: (d) productivity of the firm. Sol: 1 is internal customer while 2 and 3 are external customers. 26. Ans: (b) 20. Ans: (b) Sol: Shortage of tools and materials is poor Sol: Team involved in QFD is cross functional. planning (pre work preparation) of That is members are from different supervisor. It is not a factor which department. demotivates employees.
21. Ans: (c) 27. Ans: (a)
Sol: Availability = 90% or 0.9 Sol: According to customer point of view is what (∵ downtime is 10%) SERVQUAL is based on. Therefore, Total output = x (say) customer can’t be found fault with.
ACE Engineering Academy Hyderabad|Delhi|Bhopal|Pune|Bhubaneswar|Lucknow|Patna|Bengaluru|Chennai|Vijayawada|Vizag|Tirupati|Kukatpally|Kolkata|Ahmedabad | Kothapet
:4: General Studies & Engineering Aptitude
ACE Engineering Academy Hyderabad|Delhi|Bhopal|Pune|Bhubaneswar|Lucknow|Patna|Bengaluru|Chennai|Vijayawada|Vizag|Tirupati|Kukatpally|Kolkata|Ahmedabad | Kothapet
:5: ESE - 2020 (Prelims) Offline Test Series
28. Ans: (c) It ignores other areas. Therefore, it is not
Sol: For emerging technologies cost of non- comprehensive. There is no 4th party audit. conformance (bad quality) will be very high for low level of quality i.e., it will be very 36. Ans: (c) steep. Therefore, optimum level of quality is Sol: Prediction and detection are both aspects of at 100%. POKA-YOKE.
29. Ans: (a) 37. Ans: (d)
Sol: Reliability in series is less than minimum Sol: POKA-YOKE reduces defects and therefore reliability of its equipment. reduced buffer stock. Increased quality will increase reputation of the firm. R1 0.7 R2 38. Ans: (c) Rseries < 0.7 Sol: Training minimizes failure. Reinspection is done because the product failed in the first 30. Ans: (d) inspection. Sol: In case of perishable items, FIFO is implemented. It aims in zero searching. 39. Ans: (b) When things are properly arranged it saves Sol: Instituting leadership is one of the 14 points floor space. for company's transformation.
31. Ans: (c) 40. Ans: (a)
Sol: Inspection is an appraisal cost, but Sol: By cleaning well arranging the workplace, reinspection is done because the product it gives opportunity to identify (potential) must have failed in the first inspection. It is losses. Proper arranging the workplace will obviously internal failure. also eliminate searching.
32. Ans: (b) 41. Ans: (c)
Sol: The producer wants inhous inspection just to Sol: Part of 5s i.e., seiso deals with make sure the probability for failing at housekeeping, but 5s is much more than external customer is low. that. It minimizes searching. It is an aiding tool inorder to improve OEE of a machine. 33. Ans: (c) Sol: The objective of prevention is to reduce any 42. Ans: (a) type of failure. Sol: Since, operator is not sure about alignment, an unit is made to cross check. If setting is 34. Ans: (c) not done accurately the unit will be Sol: If the internal audit is successful confidence defective. of the management will be high. Impact of a department on other departments 43. Ans: (a) can also be known. Sol: Only through active participation in the quality audit can top management acquired 35. Ans: (b) necessary insight into problems the firm has Sol: The main emphasis in second party audit is had in realising the quality plan. normally on areas of the auditee's business. ACE Engineering Academy Hyderabad|Delhi|Bhopal|Pune|Bhubaneswar|Lucknow|Patna|Bengaluru|Chennai|Vijayawada|Vizag|Tirupati|Kukatpally|Kolkata|Ahmedabad | Kothapet :6: General Studies & Engineering Aptitude
ACE Engineering Academy Hyderabad|Delhi|Bhopal|Pune|Bhubaneswar|Lucknow|Patna|Bengaluru|Chennai|Vijayawada|Vizag|Tirupati|Kukatpally|Kolkata|Ahmedabad | Kothapet
:7: ESE - 2020 (Prelims) Offline Test Series
44. Ans: (a) 47. Ans: (a)
Sol: Quality process starts with measurements. Sol: Cost Improvement is a change. Before, you start Total cost to change anything, find out where you are Cost of of quality now and it has to be based on facts. One of bad quality the fact is customer experience.
45. Ans: (a)
Sol: Service gaps will reduce result when Cost of compared to customer expectations good quality Level of ∵ Value = Result – Expectation quality 0% 100% Reduced result will make the customer value negative. 48. Ans: (a) Sol: OEE losses once identified, they can be 46. Ans: (a) removed by using KAIZEN & POKA- Sol: Communication (language) is common YOKE. Also 5s aims to minimize searching. parameter to both assurance and empathy. If the communication is very good, more 49. Ans: (a) score is given to both else less score is given Sol: loss = kd2 to both. where, d = deviation from target value. Though deviation is technical its impact on monetory loss makes it easy to understand.
50. Ans: (d)
Sol: Zero Defect Theory conditions worker to take interest in everything he/she does. It is quest for perfection. It doesn't mean that if zero defects is not achieved then the process is inefficient.