Formworks
A.FOOTING
TOTAL AREA:
TOTAL AREA:
TOTAL AREA:
TOTAL AREA:
TOTAL AREA:
TOTAL AREA:
TOTAL AREA:
TOTAL AREA:
TOTAL AREA:
B.COLUMN
TOTAL AREA:
FOR C-3 (RIGHT) ENTER COLUMN HEIGHT:
ENTER LENGTH:
TOTAL SIDES
NUMBER OF COLUMNS:
TOTAL AREA:
TOTAL AREA:
TOTAL AREA:
TOTAL AREA:
TOTAL AREA:
TOTAL AREA:
C.SLAB
TOTAL AREA:
TOTAL AREA:
D.SHEAR WALL
TOTAL AREA:
TOTAL AREA:
TOTAL AREA:
TOTAL AREA:
E. STAIRS
ENTER LENGTH:
ENTER HEIGHT:
ENTER SIDES:
NUMBER OF STEPS:
TOTAL AREA:
CONCRETE
A. FOOTING
TOTAL VOLUME:
TOTAL VOLUME:
TOTAL VOLUME:
TOTAL VOLUME:
TOTAL AREA:
B.COLUMN
FOR C-1
FOR C-3(LEFT)
FOR C-2
FOR C-4
C.SLAB
D.SHEAR WALL
FOR SW-1
FOR SW-2
E. STAIRS
A. FOOTING
FOR F-1
FOR F-2(LEFT)
FOR F-4
FOR FTB-1
FOR F-5
bays pavement & platforms)
230.4 sq. m
50.04 sq. m
57.24 sq. m
102 sq. m
130.56 sq. m
232.56 sq. m
UMBER OF FTB-1 18.00 units
3.50 m
0.60 m
2 sides
75.6 sq.m
50.4 sq.m
3.6 sq. m
6.084 sq. m
9.684 sq. m
ENTER LENGTH: 96 m
ENTER HEIGHT: 0.3 m
NUMBER OF LINE: 3 units
ENTER LENGTH: 15 m
ENTER HEIGHT: 0.3 m
NUMBER OF LINE: 1 units
ENTER LENGTH: 96 m
ENTER HEIGHT: 0.3 m
ENTER WIDTH: 28.675 m
FOR F-1
FOR F-2(RIGHT)
FOR F-2(LEFT)
FOR F-3
FOR F-4
FOR FTB-1
FOR F-5
B. GRAVEL FILL
C.Backfill and Compaction (95% FDT)
ENTER LENGTH: 96 m
ENTER WIDTH: 28.68 m
ENTER LENGTH 96 m
ENTER WIDTH 28.675 m
TOTAL AREA 2752.8 m^2
CONCRETING WORKS (footings, ftb, col. pedestals, slab, ramp, loading/unloading bays pavement & platforms)
Formworks
ent & platforms)