Validate Print Help Item Rate BoQ

Tender Inviting Authority: DG(WS)

Name of Work: SUPPLY, DELIVERY,POURING AND RENOVATION OF FILTER BED NO- 12 &13 WITH ALLIED WORKS AT TP-I,GRWW.

Contract No: KMC/EE/O&M-III/6OF2019-20

Name of the PATHAK ENGINEERING CORPORATION


Bidder/
Bidding Firm /
Company :

PRICE SCHEDULE
(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is lia
are allowed to enter the Bidder Name and Values only )

NUMBER # TEXT # NUMBER # TEXT # NUMBER #


Sl. Item Description Quantity Units BASIC RATE In Figures
No. To be entered by the
Bidder in
Rs. P
1 REMOVING THE SAND MEDIA VERY CAUTIOUSLY 143.760 CU.M 511.00
UP TO THE TOP LAYER OF THE GRAVEL FROM
R.G FILTER BED INCLUDING COLLECTING,
LIFTING, CARRYING AND LIFTING PROPERLY
OUTSIDE OF R.G FILTER PLANT WITH IN -----
(AVERAGE) FROM THE BED BY HEAD LOAD AND
REMOVING THE SAME FROM BY LORRY AT ANY
PLACE WITHIN 20 KM OF WTP OR NEAREST
SAND WASHING MACHINE AS PER DIRECTION
OF EIC INCLUDING LOADING AND UNLOADING
THE SAME BY HEAD LOAD WITH IN A LEAD OF 30
M AND COMPLETE IN ALL RESPECT AS PER
DIRECTION OF EIC.

2 TAKING OUT VERY CAREFULLY OF ALL THE FIVE 131.260 CU.M 560.00
DIFFERENT SIZES OF GRAVELS ,GIRTS UP TO
THE RAPID GRAVITY FILTER BED INVERT I.E.
THE BELOW THE LATERALS , SO THE UNDER
DRAINAGE SYSTEM ARE NOT DAMAGED,
COLLECTING AND CARRYING THE SAME BY
HEAD LOAD AND DUMPING IN THE HEAPS AT
OUTSIDE OF R.G FILTER PLANT WITH IN A
DISTANCE OF 300M AND LOADING INTO THE
LORRY FOR CARRYING THE SAME TO THE
NEAREST SAND WASHING MACHINE WITH IN A
DISTANCE OF 1.5 KM FROM THE LOADING POINT
AND UNLOADING THE SAME WITHIN IN 30M AND
COMPLETE IN ALL RESPECT AS PER DIRECTION
OF EIC.
3 CLEANING AND WASHING THE UNDER 2.000 EACH 2580.00
DRAINAGE SYSTEM FILTER BED INVERT
FLOOR ,WALLS AND ALL INDIVIDUALS LATERALS
AND ORIFICE OF AC PIPE AND CHECKING
PROPERLY WITH BACK WASH WATER AND
COMPLETE IN ALL RESPECT AS PER DIRECTION
OF EIC.

4 "CLEANING THE DIRT/JUNGLES ETC& WASHING 71.880 CU.M 170.00


OF COARSE SAND/MEDIUM COARSE SAND
THROUGH WATER JET TYPE SAND WASHING
MACHINE AND STACKING IN HEAPS /STACKS
INCLUDING CUTTING AND CARRYING THE SAND
FROM ALL WORKS SITES OF RGSFB AREA WTP,
TO THE IDENTIFIED SAND WASHING MACHINE .
AFTER WASHING OF SAND THE TURBIDITY OF
THE WASH SAND MUST BE WITH IN 7000PPM.
(PAYMENT SHOULD BE MADE ON THE BASIS OF
STACK MEASUREMENT OF UNWASHED SAND).
5 THOROUGHLY WASHING ALL FILTER BEDS 65.640 CU.M 657.00
GRAVELS, GIRTS BY WATER JETTING AFTER
IMMERSING IN ------/ HYDROCHLORIC ACID
SOLUTION FOR A TIME AS PER DIRECTION OF
EIC AND REWASHING THE SAME BY JETTING OF
WATER DRAW FROM SAND WASHING MACHINE
OR WASHING VAT AND DO NEEDFUL FOR
SCREENING BY SHEAVING OR REVERSE
SHEAVING TO DIFFERENTIATE ALL THE
DIFFERENT SIZES OF GRAVELS AS PER
DIRECTION OF EIC AND MAKE STACK OF
DIFFERENT SIZES OF GRAVELS ON THE
GROUND NEAR R.G FILTER PLANT BY LORRY
AND HEAD LOAD IN SIZE INCLUDING LOADING
AND UNLOADING AS PER DIRECTION OF EIC
COMPLETE IN ALL RESPECT . AFTERCLEANING
NO DIRT /MUD COATING SHOULD BE FOUND
AROUND THE SURFACE OF DIFFERENTIATE
GRAVELS.

6 SUPPLY, DELIVERY AND UNLOADING OF THE 169.520 CU.M 6360.00


COARESE SAND (EFFECTIVE SIZE 0.45 TO 0.7
UNIFORMITY CO-EFFICIENT 1.5 TO 2.0 ) FOR THE
USE IN THE RAPID GRAVITY SAND FILTER BEDS
OF 60 MGD WTP(CONSIDERED SP. GRAVITY OF
SAND -2650KG/CUM.)

7 SUPPLY ,DELIVERY AND UNLOADING OF THE 157.960 CU.M 7526.00


GRAVELS (EFFECTIVE SIZE 3.0MM TO 6.0MM ,IS
-8419,PART-1-1977 FOR THE USE IN THE RAPID
GRAVITY SAND FILTER BEDS OF 60 MGD WTP.
(CONSIDERED SPECIFIC GRAVITY OF GRAVELS
2650KG/CUM.)
8 PACKING OF BEDS OF RG FILTERS WITH 159.720 CU.M 623.00
DIFFERENTIATE GRAVELS AND GIRTS
CARRYING FROM A DISTANCE WITHIN 150M AVG.
FROM THE RG FILTER BEDS VERY CAREFULLY
I,E. THAT IS REARRANGING THE CLEANED
DIFFERENTIATE GRAVELS IN SIZE WISE LAYER
INCLUDING HAND PACKING THE GRAVELS
AROUND LATERALS AS PER DIRECTION OF EIC.
SO THAT TOTAL GRAVELS ? TO BE NOT LESS
THAN 500MM INCLUDING LEVELLING THE TOP
SURFACE AND COMPLETE IN ALL RESPECT AS
DIRECTION OF EIC.

9 FILLING OF THE RG FILTER BEDS BY NEW /OLD 168.280 CU.M 829.00


WASH SAND INCLUDING LOADING INTO LORRY
FROM STACK WARD WITHIN 1KM INSIDE WTP-
1AND UNLOADING THE SAME IN THE OUTSIDE
RG FILTER PLANTS PREMISES AND CARRYING
BY HEAD LOAD UPTO 500M (AVG.) DISTANCE TO
UNLOADING POINT INCLUDING
SCREENING,LEVELLING AND DRESSING THE
TPO SURFACE AS PER DIRECTION OF EIC. SO
THAT DEPTH OF SAND NOT TO BE LESS THAN
600MM FROM THE TOP OF THE GRAVELS AND
COMPLETE IN ALL RESPECT AS PER DIRECTION
OF EIC.

10 Dismantling R.C. floor, roof, beams etc including 3.094 CU.M 182.00
cutting rods and removing rubbish as directed within
a lead of 75 m. including stacking of steel bars.(a) In
ground floor including roof.
11 Hire and labour charges for shuttering with centering 47.800 SQ.M 291.00
and necessary staging upto 4 m using approved stout
props and thick hard wood planks of approved
thickness with required bracing for concrete slabs,
beams and columns, lintels curved or straight
including fitting, fixing and striking out after
completion of works (upto roof of ground floor).(When
the height of a particular floor is more than 4 m the
equivalent floor height shall be taken as 4 m and
extra for works beyond the initial 4 m ht. shall be
allowed under 12 (e) for every 4 m or part thereof).(a)
25 mm to 30 mm thick wooden shuttering as per
decision & direction of Engineer-In-Charge.Notes:-
For shuttering in shell roof, grid roof with vertical
faces folded plate, arched roof the rate in 36 (a), 36
(b) & 37 (c ) of subhead B above to be increased by
100 % . For grid roof with splayed faces, rate is to be
increased by 150%.

12 Cleaning the concrete surface by removing dirt and 93.500 SQ.M 80.00
debris, marking defective locations and removing
loose concrete by careful stripping untill hard surface
is exposed, cutting the concrete to regular shape,
wire brushing the exposed surface and removing
debris from site complete as per direction of the
Engineer - in - Charge.

13 Applying epoxy based reactive joining agent for 93.500 SQ.M 293.00
joining the old concrete with fresh concrete to be
applied within manufacturer's specified time as per
manufacturers specification. (0.4 Kg / m? of concrete
surface).Note: Applicable only when the full diameter
of reinforcement steel is exposed.
14 Ordinary Cement concrete (mix 1:2:4) with graded 7.480 CU.M 5034.00
stone chips (6mm nominal size) excluding shuttering
and reinforcement,if any, in gound floor as per
relevant IS codes. Pakur variety?

15 ORDINARY CEMENT CONCRETE ( MIX 1:1.5:3 ) 3.094 CU.M 5770.00


WITH GRADED STONE CHIPS ( 20 MM NOMINAL
SIZE) EXCLUDING SHUTTERING AND
REINFORCEMENT, IF ANY, IN GROUND FLOOR AS
PER RELEVANT IS CODES

16 Stripping off worn out plaster and raking out joints of 328.560 SQ.M 15.00
walls, celings etc. upto any height and in any floor
including removing rubbish within a lead of 75m as
directed.
17 Plaster (to wall, floor, ceiling etc.) with sand and 480.860 SQ.M 177.00
cement mortar including rounding off or chamfering
corners as directed and raking out joints including
throating, nosing and drip course, scaffolding/staging
where necessary (Ground floor).[Excluding cost of
chipping over concrete surface](ii) With 1:4 cement
mortar (a) 20 mm thick plaster

18 Neat cement punning about 1.5mm thick in wall, 69.280 SQ.M 29.00
dado, window sill, floor etc. NOTE:Cement 0.152
cu.m per100 sq.m.
19 Making one set of scaffolding only for replacing glass 22.000 EACH 223.00
panels, painting, uprooting plant and another
repairing works of building and S&P works for
external works only with 10 cm. dia bamboo as main
posts at the rate of 1 metre centre to centre and 7.5
cm. dia bamboo ties @ 0.75 metre apart fitting and
fixing with necessary coir, nails etc. as per direction
of the Engineer-incharge. (This item should be
executed only after prior approval of the Engineer-
incharge). Firstly, one number to be paid and then
labour rate for shifting up to further nineteenth (19)
times @ 10% each time to be considered. If
necessary further after twenty times of total use,
another one number new and labour rate for shifting
to be considered accordingly a) 3.90 metre height

20 Applying decorative cement based paint of approved 531.040 SQ.M 45.00


quality after preparing the surface including scraping
the same thoroughly (plastered or concrete surface)
as per manufacturer's specification. In Ground floor:
iii) Two coats.

21 Reinforcement for reinforced concrete work in all 0.365 M.T 53473.00


sorts of structures including distribution bars, stirrups,
binders etc initial straightening and removal of loose
rust (if necessary), cutting to requisite length, hooking
and bending to correct shape, placing in proper
position and binding with 16 gauge black annealed
wire at every intersection, complete as per drawing
and direction.(a) For works in foundation and upto
roof of ground floor/upto 4 m.(i) Tor steel/Mild Steel.I.
SAIL/ TATA/RINL.

22 Welding in M.S. structural work with gas or electric: 480.000 POINT 8.00
(a) Tack weld
23 Supplying, fitting and fixing G.I. pipes of TATA make 37.000 METER 163.00
with all necessary accessories, specials viz. socket,
bend, tee, union, cross, elbo, nipple, longscrew,
reducing socket, reducing tee, short piece etc. fitted
with holder bats clamps, including cutting pipes,
making threads, fitting, fixing etc. complete in all
respect including cost of all necessary fittings as
required,jointing materials and two coats of painting
with approved paint in any position above ground.
(Payment will be made on the centre line
measurements of total pipe line including all specials.
No separate payment will be made for accesories,
specials. Payment for painting will be made
seperately) For Exposed Work
(i) 15 mm dia. medium quality

24 Supplying, fitting and fixing G.I. pipes of TATA make 144.700 METER 336.00
with all necessary accessories, specials viz. socket,
bend, tee, union, cross, elbo, nipple, longscrew,
reducing socket, reducing tee, short piece etc. fitted
with holder bats clamps, including cutting pipes,
making threads, fitting, fixing etc. complete in all
respect including cost of all necessary fittings as
required,jointing materials and two coats of painting
with approved paint in any position above ground.
(Payment will be made on the centre line
measurements of total pipe line including all specials.
No separate payment will be made for accesories,
specials. Payment for painting will be made
seperately) For Exposed Work
(i) 32 mm dia. medium quality
25 Supplying, fitting and fixing G.I. pipes of TATA make 104.800 METER 388.00
with all necessary accessories, specials viz. socket,
bend, tee, union, cross, elbo, nipple, longscrew,
reducing socket, reducing tee, short piece etc. fitted
with holder bats clamps, including cutting pipes,
making threads, fitting, fixing etc. complete in all
respect including cost of all necessary fittings as
required,jointing materials and two coats of painting
with approved paint in any position above ground.
(Payment will be made on the centre line
measurements of total pipe line including all specials.
No separate payment will be made for accesories,
specials. Payment for painting will be made
seperately) For Exposed Work
(i) 40 mm dia. medium quality

26 Application of two coats of Epoxy primer as per BS 392.000 SQ.M 377.00


5493 by brush on the cleaned dry concrete surface
with epoxy resin primer with reactive suitable
hardener mixture as per specification and direction of
EIC all complete. [This item will be operated on prior
permission from the concerned SE/Dy Chief
Engineer]

Total in Figures

Quoted Rate in Words #VALUE!


RKS AT TP-I,GRWW.

he relevent columns, else the bidder is liable to be rejected for this tender. Bidders
Values only )

NUMBER # TEXT #
TOTAL AMOUNT Without TOTAL AMOUNT
Taxes In Words
in
Rs. P
#VALUE! #VALUE!

#VALUE! #VALUE!
#VALUE! #VALUE!

#VALUE! #VALUE!
#VALUE! #VALUE!

#VALUE! #VALUE!

#VALUE! #VALUE!
#VALUE! #VALUE!

#VALUE! #VALUE!

#VALUE! #VALUE!
#VALUE! #VALUE!

#VALUE! #VALUE!

#VALUE! #VALUE!
#VALUE! #VALUE!

#VALUE! #VALUE!

#VALUE! #VALUE!

#VALUE! #VALUE!

#VALUE! #VALUE!
#VALUE! #VALUE!

#VALUE! #VALUE!

#VALUE! #VALUE!

#VALUE! #VALUE!
#VALUE! #VALUE!

#VALUE! #VALUE!
#VALUE! #VALUE!

#VALUE! #VALUE!

#VALUE! #VALUE!

#VALUE!