Project : Bandar Utama Job No : NA

Desc : LEVEL 13 (L13-H14) Date : 9-Dec-2019

Code of Beam size, conc/steel grade and concrete cover


Practice
Beam width = 300 mm fcu = 40 N/mm2
BS8110 : Beam depth = 600 mm fy = 460 N/mm2
Pt 1 : 1990 Concrete cover = 35 mm fyv = 460 N/mm2
Effective depth of
i. Tension reinf, d = 517.50 mm
ii. Comp. Reinf, d' = 70.00 mm

Design of flexural reinforcement

Cl 3.4.4.4 Max. moment = 902 kNm


K= 0.281 ~Doubly Reinforced
d'/x = 0.2333 < 0.43, ok
z= 402.04 mm
As' req = 2237.24 mm2 ~Compression reinforcement required
As req = 5353.12 mm2 ~Tension reinforcement

As min (tension reinf) = 234.00 mm2


As prov (tension reinf) = 5399.61 mm2 ~ OK
Table 3.27 Percentage of rebar = 3.00 % Ac >0.13% and <4.0%, ok
Tension reinf provided : 4T25 + 4T25 + 3T25

As' min (comp. reinf) = 360.00 mm2


As' prov (comp. reinf) = 2767.74 mm2 ~ OK
Table 3.27 Percentage of rebar = 1.54 % Ac >0.2% and <4.0%, ok
Comp reinf provided : 4T25 + 4T16

Design of shear link

Cl 3.4.5.2 Max. shear force, Vs = 625 kN v, max = 5.0596 N/mm2


Shear stress, vs = 4.0258 N/mm2 < v, max, ok

Shear stress at distance d from the support :


Shear force, Vd = 625 kN
Shear stress, vd = 4.0258 N/mm2

100As/bd = 3.478
400/d = 1.000
Design concrete shear
Table 3.9 stess, vc = 1.120 N/mm2
Table 3.8 Asv/Sv = 2.178

Bar size used = 10 mm


No. of legs = 4
Sv max = 388.125 mm
Link spacing = 145 mm ~ Provide 2T10-300

sw Liong
Project : Bandar Utama Job No : NA
Desc : LEVEL 13 (L13-H14) Date : 9-Dec-2019

Deflection check

Cl 3.4.6 Span length, L = 11000 mm


Support condition = 3 ( 1=cantilever, 2=simply supported, 3=continuous)
Table 3.10 Basic L/d = 26

Table 3.11 M/bd^2 = 11.23


fs = 285.02 N/mm2
Modification factor for 0.682
tension reinforcement =

Table 3.12 100As'prov/bd = 1.78


Modification factor for 1.37
compression reinforcement =

Allowable L/d = 24.34


Actual L/d = 21.26 ~Deflection passed

sw Liong
Project : Bandar Utama Job No : NA
Desc : LEVEL 13 (L13-H14) Date : 9-Dec-2019

Design for Torsion

Ultimate torsional moment,T = 2.00 KNm


x1 = 230 mm
y1 = 530 mm
Cl 2.4.4, eq 2 Torsional shear stress, vt = 0.0889 N/mm^2 ~Torsional reinf. is not required

Cl 2.4.6 Minimum torsional shear stress,


Table 2.3 vt, min = 0.4237 N/mm^2
Maximum combined shear stress (shear + torsion),
vtu = 5.0596 N/mm^2

10
2

sw Liong
Provided tension reinf
Layer rebar dia nos. of rebar
1 25 4 4T25
2 25 4 4T25
3 25 3 3T25

Provided compression reinf


Layer rebar dia nos. of rebar
1 25 4 4T25
2 16 4 4T16
3

ADOPT LINK SPACING : 300

sw Liong
sw Liong
ADOPT LINK SPACING : 150

Provided tension reinf


Layer rebar dia nos. of rebar
1 16 2 2T16
2 16 2 2T16
3 10 2 2T10

Provided compression reinf


Layer rebar dia nos. of rebar
1 20 2 2T20
2 10 2 2T10
3 10 2 2T10

sw Liong