Pre Welding Inspection Check List ISSUE DATE 06-05-2017
TPEB-AKH-116
Pre welding Inspection of Structural (AWS D1.1/D1.1M:2015) TPEB- IC – 3.2 09-03-17
BUILDING NO.
BUILDING DESCRIPTION Scheduled Inspection DATE Inspection Level
#2 4 MAN - STAIRS
HOLD
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A REMARKS
No.
A General Requirements
AWS
All prequalified WPSs to be used shall be prepared by
D1.1/D1.1M:2015
A1 the manufacturer, fabricator, or Contractor as written
SECTION 3.6
prequalified WPSs. WPS SHALL BE AVAILABLE ON SITE
Approved Drawings are available for the work and provide General
A3 detailed instruction for the weld joint & weld dimensions. Requirements
B Pre-Welding Inspection
GEN-E-0003
B2 The Spacing Between The Main Beams Shall Not Exceed 2400 mm
DIVISION-13-2.3A
Excessive rust or scale can
Negatively affect weld quality. The code permits welding
AWS
on surfaces that contain thin mill scale, provided:
B3 (1) the mill scale remains intact after wire brushing,
D1.1/D1.1M:2015SE
CTION C-5.14.3
and
(2) the resultant weld quality is not adversely affected
Control of Distortion and Shrinkage
When making splices between sections,
AWS
whether in the shop or field, the welding sequence
B4 should be reasonably balanced between the web and
D1.1/D1.1M:2015SE
CTION 5.20
flange welds as well as about the major and minor axes
of the member
Butt Joint Alignment. Parts to be joined at butt
Joints shall be carefully aligned. Where the parts are effectively
AWS
restrained against bending due to eccentricity in
B5 alignment, the offset from the theoretical alignment shall
D1.1/D1.1M:2015SE
CTION 5.21.3
not exceed 10% of the thickness of the thinner part
joined, or 1/8 in [3 mm], whichever is smaller
PAGE 2 OF 2
TAMIMI Pre-Engineered Buildings DOC. # TPEB-QHSE-F-09
ISSUE# 01
Pre Welding Inspection Check List ISSUE DATE 06-05-2017
PAGE 2 OF 2