Você está na página 1de 18

Project Name: Civil Works at Assembly & Fabrication Storage Building

Reconciliation Period: Upto 31-07-2019

Issued Qty. Consumed Qty.


SL. NO. Description of Items Unit.
Project :3704 Project :3704
1 P.C.C. M-7.5 Cum. 12.000 12.537
2 R.C.C. M-25 Cum. 76.000 74.904
3 T.M.T. Bar, Fe-500
8mm MT. 0.450 0.445
10mm MT. 5.000 4.157
12mm MT.
16mm MT.
20mm MT.
4 Moorum CFT 17310 17105
5 W.B.M. MT. 244.85 23.30
6 Stone Dust MT. 42 11.48
7 Bricks NOS 69500 67686
8 Cement BAGS 320 372
9 Sand CFT 2878.16 2255

Issued Qty. Consumed Qty.


SL. NO. Description of Items Unit.
Project :3705 Project :3705
1 P.C.C. M-7.5 Cum. 0.000 0.000
2 R.C.C. M-25 Cum. 153.500 154.765
3 T.M.T. Bar, Fe-500
8mm MT. 0.350 0.357
10mm MT. 12.234 11.322
12mm MT. 0.000 0.000
16mm MT. 0.000 0.000
20mm MT. 0.000 0.000
4 Moorum CFT 0.0 0.000
5 W.B.M. MT. 0.0 0.000
6 Stone Dust MT. 0.0 0.000
7 Bricks NOS 21700 18470
8 Cement BAGS 226 247
9 Sand CFT 1769.0 1331
brication Storage Building

Wastage
W.I.P. (+/-)
% of Wastage Remarks.

0.000 -0.537 -4.48% 1.7-2.1


0.000 1.096 1.44%

0.005 1.14%
0.800 0.043 0.85%
0.000
0.000
0.000
0 204.684 1.18%
220 1.549 0.63%
30.5 0.023 0.06%
2500 -686.272 -0.99%
-51.778 -16.18%
500 123.114 4.28%

Wastage
W.I.P. (+/-)
% of Wastage Remarks.

0.000 0.000
0.000 -1.265 -0.82%

-0.007 -1.90%
0.800 0.112 0.92%
0.000
0.000
0.000
0.000
0.000
0.000
2500 730 3.36%
0 -21.495 -9.51%
Site Tranfer
300 137.772 7.79% to Bld:1
Measurement Sheet (Assembly Storage Building)

Length Width (In Heigth (In


Item No. Description of Items Unit Nos.
(In Mtr) Mtr.) Mtr.)
1 M-7.5 (For P.C.C. work)
1.0.2 For Platform area Guard Wall base Cum 1 91.928 0.950 0.100
(-) Less for balance guard wall portion Cum -1 10.000 0.950 0.100
1.0.2 For Platform RCC Wall base (23 m width) Cum 1 30.041 0.950 0.100
1.0.4 For Platform RCC Wall base (Right Side) Cum 1 10.000 0.950 0.100
1.0.5 For Dock leveller wall (inner side) Cum 1 5.000 0.950 0.100
1.0.6 For Dock leveller toe wall (inner side) Cum 1 5.000 0.950 0.100
Floor PCC work
(i) Platform area (23.041m X 5m) Cum 1 22.791 4.800 0.100

2 M-25 (For R.C.C. work)


2.0.1 Slab RCC in B/w bottom(0.400 width) Cum 1 433.254 0.300 0.175
(-) Less for entry (4 nos.) Cum -4 6.500 0.300 0.175
(-) Less for column outside portion (1.2m) Cum -3 1.200 0.300 0.175
2.0.2 Lintel (250 x 250) Cum 32 7.692 0.250 0.250

2.0.3 Platform Area (Raft Base)


For Platform area Guard Wall base Cum 1 96.928 0.800 0.100
For Platform RCC Wall base Cum 1 30.041 0.800 0.200
For Platform RCC Wall base (Left Side) Cum 1 15.000 0.800 0.200
For Platform RCC Wall base (Right Side) Cum 1 10.000 0.800 0.200
For Dock leveller wall base (inner side) Cum 1 5.000 0.800 0.200
For Dock leveller toe wall base (inner side) Cum 1 5.000 0.800 0.200
For Platform RCC Wall Cum 1 65.041 0.200 1.384
For Ramp Wall Cum 1 10.000 0.200 1.082

3.1 TMT Bar (8mm.)


Lintel Stirrups MT 30
MT
MT
MT

3.2 TMT Bar (10mm.)


For Slab (Brickwall bottom portion) MT 33
Lintel MT 30
4 Moorum
For Platform (5 m. width) 1 23.041 5.000 0.679
For Dock Leveller platform (5m. X m.) 1 5.000 5.000 0.679
(-) Less Levveler portion -1 2.500 1.500 0.679
For Ramp Portion (10m. X 7m.) 1 10.000 7.000 0.311
For Platform area 1 40.964 23.041 0.392

5 W.B.M. (63-40mm grading)


For Platform (23.041 x 5 m. width) Cum 1 23.041 5.000 0.150

Add 15% for compaction

4 Masonary Work in C.M.(1:6)


4.0.1 Floor top to 2400 level.
(i) Long wall Side cum 2 201.036 0.250 2.400
(ii) Short Wall Side cum 2 15.541 0.250 2.400
(-) Less for Main Entry Gate cum -4 6.500 0.250 2.400
(-) Less for Man-Door ( 2.4mX 1.2m) cum -6 2.400 0.250 1.200
(-) Less for Window ( 2.4m. X 1.5m.) cum -98 2.400 0.250 1.500

cum -2 8.000 0.250 2.400


(-) Less for incomp. Span(2nos.)
(-) Less for certain incomp. Part cum -1 15.000 0.250 2.400
4.0.2 Lintel Top Area (20 span) cum 15 7.692 0.250 0.300
4.0.3 Platform Area Guard Wall
For Ramp area Guard Wall Base (375 mm. thk.)- Cum 1 47.464 0.375 0.500
Left side
For Ramp area Guard Wall Base (375 mm. thk.)- Cum 1 44.464 0.375 0.500
Right side
For Ramp Guard Wall Base (250 mm. thk.)-Left Cum 1 47.464 0.250 0.650
side
For Ramp Guard Wall Base (250 mm. thk.)-Right Cum 1 44.464 0.250 0.650
Side

Bricks
Cement
Sand
4 Inside plaster Work
(i) Long wall Side (Span Wise) SqM. 15 7.692 - 3.000
(-) Less for Window ( 2.4m. X 1.5m.) SqM. -30 2.400 - 1.500
Cement
Sand
Building)
Upto 31.07.2019

Unit Qty. Total Qty. Remarks

8.733 8.733
0.950 -0.950 10 m. not done
2.854 2.854
0.950 0.950
0.475 0.475
0.475 0.475

10.940 10.940
Total= 12.537 cum RCC
76
22.746 22.746 B/w bot 20.5
0.341 -1.365 Lintel 14.5
0.063 -0.189 Platform 41 38.328 -2.672
0.481 15.384

7.754 7.754
4.807 4.807
2.400 2.400
1.600 1.600
0.800 0.800
0.800 0.800
18.003 18.003
2.164 2.164

Total= 74.9 76

0.015 0.445 30 span

Lintel for 12 mtr


10 dia 6 12.5 46.30 kg
Total= 0.445 0.45 8 dia 61 0.96 23.13 kg

0.099 3.267
0.030 0.890 30 span
Total= 4.157 5

78.224 78.224
16.975 16.975
2.546 -2.546
21.735 21.735
369.990 369.990 15m. Undone 55.964 23.041
Total= 484.378 cum
Vol. in CFT= 17105 17310

17.281 17.281
Total= 17.281 cum
Add 15% for compaction 19.87 cum
WBM (75%) 23.30 MT
Dust(25%) 11.48 MT

120.622 241.243
9.325 18.649
3.900 -15.600
0.720 -4.320
0.900 -88.200

4.800 -9.600
Present entry area
9.000 -9.000
0.577 8.654

8.900 8.900
7.0 m not done
8.337 8.337
5.0 m not done
7.713 7.713
7.0 m not done
7.225 7.225
5.0 m not done
Total= 174.001 cum
Co-eff.
389 67686 Nos.
1.9 331 Bags.
11.8 2053 Cft.

23.076 346.140
3.600 -108.000
Total= 238.140 Sqm
Co-eff.
0.173 41 Bags.
0.848 202 Cft.
Measurement Sheet (Fabrication Storage Building)
Upto 03.07.2019

Length Width (In Heigth (In


Item No. Description of Items Unit Nos. Unit Qty.
(In Mtr) Mtr.) Mtr.)
1 M-7.5 (For P.C.C. work)

Total=
2 M-25 (For R.C.C. work)
2.0.1 For Fdn Mark : F-1 Cum. 4 3.500 3.500 0.600 7.350
2.0.2 For Fdn Mark : F-2 Cum. 6 4.500 3.650 0.700 11.498
2.0.3 For Fdn Mark : F-3 Cum. 6 4.100 3.650 0.700 10.476
2.0.4 For Fdn Mark : F-4 Cum. 3 4.400 3.700 0.700 11.396
2.0.5 For Fdn Mark : F-5 Cum. 3 4.200 3.600 0.700 10.584
2.0.6 For Fdn Mark : F-6 Cum. 4 2.750 2.500 0.400 2.750
For Pedestal: P1 on F1 Cum 4 1 0.5 2.6 1.300

For Pedestal: P1 on F2,3,4,5 Cum 18 1 0.5 2.5 1.250

For Pedestal Mark : P2 Cum 4 0.65 0.5 2.8 0.910


For Plinth Beam, PB : 1 Cum 2 75.982 0.3 0.75 17.096
For Plinth Beam, PB : 2 Cum 2 20.658 0.3 0.75 4.648
Deduction for Pedestal-
Column Junction Cum -22 0.5 0.255 0.75 0.096

Culvert for Site Entrance Cum 1 9.5 1 0.225 2.138


For Pedestal Mark : P2 Cum 4 0.65 0.5 2.8 0.910

Lintel (250 X 250) Cum 1 192.240 0.250 0.250 12.015


(-) Less for Main entrance
Cum -2 6.500 0.250 0.250 0.406
(2nos)
(-) Less for some balance
Cum -1 7.000 0.250 0.250 0.438
portion
V.D.F. Slab Cum 1 720.000 0.200 144.000

Total=
3.0.1 TMT Bar (8mm.)
Lintel
Total=
3.0.2 TMT Bar (10mm.)
For Slab (B/w Botom) MT 6 0.099
Lintel MT 1 0.695
VDF Slab MT 1 10.033
Total=
3.0.3 TMT Bar (12mm.)
Total=
3.0.4 TMT Bar (16mm.)
Total=
3.0.5 TMT Bar (20mm.)
Total=
4 Moorum
For Building inside area Cum 0 0 0 0 0.000
Total=
Vol. in CFT=
5 W.B.M. (63-40mm grading)
For Building inside area Cum 0 0 0 0 0.000
Total=
Add 15% for compaction
WBM (75%)
Dust(25%)

4 Masonary Work in C.M.(1:6)


4.0.4 B/w upto +900mm lvl. CuM. 15 7.000 0.250 0.900 1.575
4.0.5 B/w upto Lintel lvl. CuM. 6 2.300 0.250 1.550 0.891
Floor top to Purlin level
(i) Long wall Side cum 2 75.982 0.250 3.000 56.987
(ii) Short Wall Side cum 2 20.158 0.250 3.000 15.119
(-) Less for Main Entry Gate cum -2 6.500 0.250 3.000 4.875
(-) Less for Man-Door ( 2.4mX cum -5 2.400 0.250 1.200 0.720
(-) Less for Window ( 2.4m. X 1 cum -38 2.400 0.250 1.500 0.900
(-) Less for Lintel cum -1 179.280 0.250 0.250 11.205
(-)Less Previous qty cum
(-) Less for Some Incomp. Area cum -1 15.000 0.250 2.400 9.000

Total=
Co-eff.
Bricks 389
Cement 1.9
Sand 11.8

5.1 Inside Plastering work


(i) Long wall Side SqM. 2 75.982 - 3.000 227.946
(ii) Short Wall Side SqM. 2 20.158 - 3.000 60.474
(-) Less for Main Entry Gate SqM. -2 6.500 - 3.000 19.500

(-) Less for Man-Door ( 2.4mX SqM. -5 2.400 - 1.200 2.880

(-) Less for Window ( 2.4m. X 1 SqM. -38 2.400 - 1.200 2.880
Total=

5.2 -
Outside Plastering work
(i) Long wall Side SqM. 2 75.982 - 3.000 227.946
(ii) Short Wall Side SqM. 2 20.158 - 3.000 60.474
(-) Less for Main Entry Gate SqM. -2 6.500 - 3.000 19.500

(-) Less for Man-Door ( 2.4mX SqM. -5 2.400 - 1.200 2.880

(-) Less for Window ( 2.4m. X 1 SqM. -38 2.400 - 1.200 2.880

Add window cobla SqM. 38 7.800 - 0.250 1.950

Add door cobla SqM. 5 6.000 - 0.250 1.500


Total=
Total=
Co-eff.
Cement 0.173
Sand 0.848
e Building)
Upto 03.07.2019

Total
Remarks
Qty.

0.000 CuM.

29.400
68.985
62.853
34.188
31.752
11.000
5.200

22.500

3.640
34.192
9.296

-2.104

2.138
3.640

12.015

-0.813
Slab Curtail bar for per span
-0.438
36 1.1 39.6
144.000 36 1.7 61.2
6 7 42
7 2.500 17.5
160.3
154.765 CuM. Bar-10mm 0.617
Total= 99
0.357
0.357 MT

0.594
0.695 Lintel for 12 mtr
10.033 700 sqm 10 dia 6 12.5
11.322 MT. 10 dia 61 0.96

0.000 MT.

0.000 MT.

0.000 MT.

0.000
0.000 cum
0

0.000
0.000 cum
0.00
0.00 MT
0.00 MT

23.625 2 span due


5.348 Upto 6-Span

113.973
30.237
-9.750
-3.600
-34.200
-11.205
-28.973
-9.000

47.482 cum

18470 Nos. 21700


90 Bags.
560 Cft.

455.892
120.948
-39.000
-14.400
-109.440
414.000 Sqm

455.892
120.948
-39.000
-14.400
-109.440
74.100
7.500
495.600 Sqm
909.600 Sqm

157 Bags.
771 Cft.
mtr
kg/m
kgs

or 12 mtr
46.30 kg
23.13 kg

Você também pode gostar