Você está na página 1de 71

S.T. BOILERS & ENINEERING CONSTRUCTION CO. PVT.

Protocol For :-
PROJECT :- WHRS 1 X 16 MW on EPC basis (PH1&PH2) Date :-
COSTMER :- ULTRA TECH CIMENT, KOTPUTLI W.O No. :- 2M-0043
CLIENT :- THYSSENKRUPP INDUSTRIES INDIA PVT.
LTD. Sl No. :- TKII/UTCL/AQC/Protocol-
FQP SNO. :- Drg No. :-
Mesurement id No. :- Callibration Date :-

Star Column Verticality

+ TYP

Y
Boiler Front

-
-

Column Column Verticality of Column


Elevation Elevation
S.No. Column No. + X -- S.No.
Bottom Top X Y

1 1

2 2

3 3

4 4
NOTE :- All dimensions are in mm
Name Sign.

STBECPL

TKII (EXE) AKSHAY G. KODAG

TKII (QA/QC) LOKESH KUMAR .DANGETI

UTCL NAVNEET MISRA


TRUCTION CO. PVT. LTD

043
UTCL/AQC/Protocol-
Rev. :-
:-

Boiler Front

Water Level
Column No.
X Y
Sign. Date
S.T. BOILERS & ENINEERING CONSTRUCTION CO. PVT.
Protocol For :-
PROJECT :- WHRS 1 X 16 MW on EPC basis (PH1&PH2) Date :-
COSTMER :- ULTRA TECH CIMENT, KOTPUTLI W.O No. :- 2M-0043
CLIENT :- THYSSENKRUPP INDUSTRIES INDIA PVT.
LTD. Sl No. :- TKII/UTCL/AQC/Protocol-
FQP SNO. :- Drg No. :-
Mesurement id No. :- Callibration Date :-

6
3
5
0
0

BOTTOM PLAN
Note :-
1 All dimension in mm
2 Actual dimension in bracket
3 All dimension within limit.
4 10 % DP test conducted of welding joint and found OK.
Name Sign.

STBECPL

TKII (EXE) AKSHAY G. KODAG

TKII (QA/QC) LOKESH KUMAR .DANGETI

UTCL NAVNEET MISRA


TRUCTION CO. PVT. LTD

043
UTCL/AQC/Protocol-
Rev. :-
:-
Sign. Date
S.T. BOILERS & ENINEERING CONSTRUCTION CO. PVT.
Protocol For :-
PROJECT :- WHRS 1 X 16 MW on EPC basis (PH1&PH2) Date :-
COSTMER :- ULTRA TECH CIMENT, KOTPUTLI W.O No. :- 2M-0043
CLIENT :- THYSSENKRUPP INDUSTRIES INDIA PVT.
LTD. Sl No. :- TKII/UTCL/AQC/Protocol-
FQP SNO. :- Drg No. :-
Mesurement id No. :- Callibration Date :-

(5600)

6
3
5
0
0

(5600)

Note :-
1 All dimension in mm
2 Actual dimension in bracket
3 All dimension within limit.
4 10 % DP test conducted of welding joint and found OK.
Name Sign.

STBECPL

TKII (EXE) AKSHAY G. KODAG

TKII (QA/QC) LOKESH KUMAR .DANGETI

UTCL NAVNEET MISRA


TRUCTION CO. PVT. LTD

043
UTCL/AQC/Protocol-
Rev. :-
:-
Sign. Date
S.T. BOILERS & ENINEERING CONSTRUCTION CO. PVT.
Protocol For :-
PROJECT :- WHRS 1 X 16 MW on EPC basis (PH1&PH2) Date :-
COSTMER :- ULTRA TECH CIMENT, KOTPUTLI W.O No. :- 2M-0043
CLIENT :- THYSSENKRUPP INDUSTRIES INDIA PVT.
LTD. Sl No. :- TKII/UTCL/AQC/Protocol-
FQP SNO. :- Drg No. :-
Mesurement id No. :- Callibration Date :-

Star Column Verticality

+ TYP

Boiler Front
Y

- + X --
-

Column Column Verticality of Column


Elevation Elevation
S.No. Column No. S.No.
Bottom Top X Y
1 A1-1 21.30Mtr 40.70Mtr 1
2 A2-1 21.30Mtr 40.70Mtr 2
3 B1-1 21.30Mtr 40.70Mtr 3
4 B2-1 21.30Mtr 40.70Mtr 4

NOTE :- All dimensions are in mm


Name Sign.

STBECPL

TKII (EXE) AKSHAY G. KODAG

TKII (QA/QC) LOKESH KUMAR .DANGETI

UTCL NAVNEET MISRA


TRUCTION CO. PVT. LTD

043
UTCL/AQC/Protocol-
Rev. :-
:-

Boiler Front

Water Level
Column No.
X Y

A1-1
A2-1
B1-1
B2-1
Sign. Date
S.T. BOILERS & ENINEERING CONSTRUCTION CO. PVT.
Protocol For :-
PROJECT :- WHRS 1 X 16 MW on EPC basis (PH1&PH2) Date :-
COSTMER :- ULTRA TECH CIMENT, KOTPUTLI W.O No. :- 2M-0043
CLIENT :- THYSSENKRUPP INDUSTRIES INDIA PVT.
LTD. Sl No. :- TKII/UTCL/AQC/Protocol-
FQP SNO. :- Drg No. :-
Mesurement id No. :- Callibration Date :-

Star Column Verticality

+ TYP

Boiler Front
Y

- + X --
-

Column Column Verticality of Column


Elevation Elevation
S.No. Column No. S.No.
Bottom Top X Y

1 D1-1 21.30Mtr 40.70Mtr 1

2 D2-1 21.30Mtr 40.70Mtr 2


NOTE :- All dimensions are in mm
Name Sign.

STBECPL

TKII (EXE) AKSHAY G. KODAG

TKII (QA/QC) LOKESH KUMAR .DANGETI

UTCL NAVNEET MISRA


TRUCTION CO. PVT. LTD

043
UTCL/AQC/Protocol-
Rev. :-
:-

Boiler Front

Water Level
Column No.
X Y

D1-1

D2-1
Sign. Date
S.T. BOILERS & ENINEERING CONSTRUCTION CO. PVT.
Protocol For :-
PROJECT :- WHRS 1 X 16 MW on EPC basis (PH1&PH2) Date :-
COSTMER :- ULTRA TECH CIMENT, KOTPUTLI W.O No. :- 2M-0043
CLIENT :- THYSSENKRUPP INDUSTRIES INDIA PVT.
LTD. Sl No. :- TKII/UTCL/AQC/Protocol-
FQP SNO. :- Drg No. :-
Mesurement id No. :- Callibration Date :-

E1-1 E2-1
5600

2500 6132 6132

D1-1 D2-1
5600

1
2 13242 13242
0
0
0

B1-1 B2-1
5600

1
2
0
0 13242
0 13242

A1-1
A1-1
5600
NOTE :-

A'1-1

1 . All dimension in mm

2 . Actual dimension in bracket

3 . All dimension within limit.

Name Sign.

STBECPL

TKII (EXE) AKSHAY G. KODAG

TKII (QA/QC) LOKESH KUMAR .DANGETI

UTCL NAVNEET MISRA


TRUCTION CO. PVT. LTD

043
UTCL/AQC/Protocol-
Rev. :-
:-

E2-1

2500

D2-1

1
2
0
0
0

B2-1

1
2
0
0
0

A2-1
A2-1

A'2-1

Sign. Date
S.T. BOILERS & ENINEERING CONSTRUCTION CO. PVT.
Protocol For :- Column E1-1, Column E2-1, 21.3M LEVEL to 40.70M LEVEL verticality
PROJECT :- WHRS 1 X 16 MW on EPC basis (PH1&PH2) Date :-16.11.2019
COSTMER :- ULTRA TECH CIMENT, KOTPUTLI W.O No. :- 2M-0043
CLIENT :- THYSSENKRUPP INDUSTRIES INDIA PVT.
LTD. Sl No. :- TKII/UTCL/AQC/Protocol-
FQP SNO. :- Drg No. :-D11-0WB-00216
Mesurement id No. :- Callibration Date :-

Column Verticality

+ TYP

Boiler Front
Y

- + X --
-

Column Column Verticality of Column


Elevation Elevation
S.No. Column No. S.No.
Bottom Top X Y

1 E1-1 21.30Mtr 40.70Mtr 1

2 E2-1 21.30Mtr 40.70Mtr 2

NOTE :-

1 . All dimension in mm & Levels are in Meters

2 . All dimension within limit.


Name Sign.

STBECPL

TKII (EXE) AKSHAY G. KODAG

TKII (QA/QC) LOKESH KUMAR .DANGETI

UTCL NAVNEET MISRA


TRUCTION CO. PVT. LTD
VEL verticality
9
043
UTCL/AQC/Protocol-
WB-00216 Rev. :-01
:-

Boiler Front

Water Level
Column No.
X Y

E1-1

E2-1
Sign. Date
S.T. BOILERS & ENINEERING CONSTRUCTION CO. PVT

Protocol For :- HP EVAP COIL- 4 TO 5 FITUP AND WELDING,WELD VISUAL


PROJECT :- WHRS 1 X 16 MW on EPC basis (PH1&PH2) Date :-20-12-2019
COSTMER :- ULTRA TECH CIMENT, KOTPUTLI W.O No. :- 2M-0043
CLIENT :- THYSSENKRUPP INDUSTRIES INDIA PVT. LTD. Sl No. :- TKII/UTCL/AQC/Protocol- PP
FQP SNO. :- 2M0043/FQP/01 (4.4) (4.4.1) Drg No. :-PD1-1WB-10557-01

SL.NO. JOINT NO. MATERIAL DIA X THIK FITUP DATE WELDING DATE WELDER CODE
1 HP EVAPC4+5A-1 SA 210 GR.A1 44.5 X 3.25 13-12-2019 13-12-2019 HPW-01
2 HP EVAPC4+5B-1 SA 210 GR.A1 44.5 X 3.25 13-12-2019 13-12-2019 HPW-01
3 HP EVAPC4+5C-1 SA 210 GR.A1 44.5 X 3.25 13-12-2019 13-12-2019 HPW-01
4 HP EVAPC4+5D-1 SA 210 GR.A1 44.5 X 3.25 13-12-2019 13-12-2019 HPW-01
5 HP EVAPC4+5E-1 SA 210 GR.A1 44.5 X 3.25 13-12-2019 13-12-2019 HPW-01
6 HP EVAPC4+5A-2 SA 210 GR.A1 44.5 X 3.25 14-12-2019 14-12-2019 HPW-01
7 HP EVAPC4+5B-2 SA 210 GR.A1 44.5 X 3.25 14-12-2019 14-12-2019 HPW-01
8 HP EVAPC4+5C-2 SA 210 GR.A1 44.5 X 3.25 14-12-2019 14-12-2019 HPW-01
9 HP EVAPC4+5D-2 SA 210 GR.A1 44.5 X 3.25 14-12-2019 14-12-2019 HPW-01
10 HP EVAPC4+5E-2 SA 210 GR.A1 44.5 X 3.25 14-12-2019 14-12-2019 HPW-01
11 HP EVAPC4+5A-3 SA 210 GR.A1 44.5 X 3.25 14-12-2019 14-12-2019 HPW-01
12 HP EVAPC4+5B-3 SA 210 GR.A1 44.5 X 3.25 14-12-2019 14-12-2019 HPW-01
13 HP EVAPC4+5C-3 SA 210 GR.A1 44.5 X 3.25 14-12-2019 14-12-2019 HPW-01
14 HP EVAPC4+5D-3 SA 210 GR.A1 44.5 X 3.25 14-12-2019 14-12-2019 HPW-01
15 HP EVAPC4+5E-3 SA 210 GR.A1 44.5 X 3.25 15-12-2019 15-12-2019 HPW-02
16 HP EVAPC4+5A-4 SA 210 GR.A1 44.5 X 3.25 15-12-2019 14-12-2019 HPW-01
17 HP EVAPC4+5B-4 SA 210 GR.A1 44.5 X 3.25 15-12-2019 14-12-2019 HPW-01
18 HP EVAPC4+5C-4 SA 210 GR.A1 44.5 X 3.25 15-12-2019 14-12-2019 HPW-01
19 HP EVAPC4+5D-4 SA 210 GR.A1 44.5 X 3.25 15-12-2019 14-12-2019 HPW-01
20 HP EVAPC4+5E-4 SA 210 GR.A1 44.5 X 3.25 15-12-2019 14-12-2019 HPW-01

Name Sign.
STBECPL(QA/QC) SOURAV METE

TKII (EXE) AKSHAY G. KODAG

TKII (QA/QC) LOKESH KUMAR .DANGETI

UTCL NAVNEET MISRA


N CO. PVT. LTD

/Protocol- PP-03
-01 Rev. :-01

WELD VISUAL DATE

13-12-2019

13-12-2019

13-12-2019

13-12-2019

13-12-2019

14-12-2019

14-12-2019

14-12-2019

14-12-2019

14-12-2019

14-12-2019

14-12-2019

14-12-2019

14-12-2019

15-12-2019

14-12-2019

15-12-2019

15-12-2019

15-12-2019

15-12-2019

Date
S.T. BOILERS & ENINEERING CONSTRUCTION CO. PVT

Protocol For :- HP EVAP COIL- 4 TO 5 FITUP AND WELDING,WELD VISUAL


PROJECT :- WHRS 1 X 16 MW on EPC basis (PH1&PH2) Date :-20-12-2019
COSTMER :- ULTRA TECH CIMENT, KOTPUTLI W.O No. :- 2M-0043
CLIENT :- THYSSENKRUPP INDUSTRIES INDIA PVT. LTD. Sl No. :- TKII/UTCL/AQC/Protocol- PP
FQP SNO. :- 2M0043/FQP/01 (4.4) (4.4.1) Drg No. :-PD1-1WB-10557-01

SL.NO. JOINT NO. MATERIAL DIA X THIK FITUP DATE WELDING DATE WELDER CODE
1 HP EVAPC4+5A-5 SA 210 GR.A1 44.5 X 3.25 14-12-2019 14-12-2019 HPW-02
2 HP EVAPC4+5B-5 SA 210 GR.A1 44.5 X 3.25 14-12-2019 14-12-2019 HPW-02
3 HP EVAPC4+5C-5 SA 210 GR.A1 44.5 X 3.25 14-12-2019 14-12-2019 HPW-02
4 HP EVAPC4+5D-5 SA 210 GR.A1 44.5 X 3.25 14-12-2019 14-12-2019 HPW-02
5 HP EVAPC4+5E-5 SA 210 GR.A1 44.5 X 3.25 14-12-2019 14-12-2019 HPW-02
6 HP EVAPC4+5A-6 SA 210 GR.A1 44.5 X 3.25 14-12-2019 14-12-2019 HPW-02
7 HP EVAPC4+5B-6 SA 210 GR.A1 44.5 X 3.25 16-12-2019 16-12-2019 HPW-02
8 HP EVAPC4+5C-6 SA 210 GR.A1 44.5 X 3.25 16-12-2019 16-12-2019 HPW-02
9 HP EVAPC4+5D-6 SA 210 GR.A1 44.5 X 3.25 16-12-2019 16-12-2019 HPW-02
10 HP EVAPC4+5E-6 SA 210 GR.A1 44.5 X 3.25 16-12-2019 16-12-2019 HPW-02
11 HP EVAPC4+5A-7 SA 210 GR.A1 44.5 X 3.25 16-12-2019 16-12-2019 HPW-02
12 HP EVAPC4+5B-7 SA 210 GR.A1 44.5 X 3.25 16-12-2019 16-12-2019 HPW-02
13 HP EVAPC4+5C-7 SA 210 GR.A1 44.5 X 3.25 16-12-2019 16-12-2019 HPW-02
14 HP EVAPC4+5D-7 SA 210 GR.A1 44.5 X 3.25 16-12-2019 16-12-2019 HPW-02
15 HP EVAPC4+5E-7 SA 210 GR.A1 44.5 X 3.25 16-12-2019 16-12-2019 HPW-02
16 HP EVAPC4+5A-8 SA 210 GR.A1 44.5 X 3.25 17-12-2019 17-12-2019 HPW-02
17 HP EVAPC4+5B-8 SA 210 GR.A1 44.5 X 3.25 17-12-2019 17-12-2019 HPW-02
18 HP EVAPC4+5C-8 SA 210 GR.A1 44.5 X 3.25 17-12-2019 17-12-2019 HPW-02
19 HP EVAPC4+5D-8 SA 210 GR.A1 44.5 X 3.25 17-12-2019 17-12-2019 HPW-02
20 HP EVAPC4+5E-8 SA 210 GR.A1 44.5 X 3.25 17-12-2019 17-12-2019 HPW-02

Name Sign.
STBECPL(QA/QC) SOURAV METE

TKII (EXE) AKSHAY G. KODAG

TKII (QA/QC) LOKESH KUMAR .DANGETI

UTCL NAVNEET MISRA


N CO. PVT. LTD

/Protocol- PP-04
-01 Rev. :-01

WELD VISUAL DATE

14-12-2019

14-12-2019

14-12-2019

14-12-2019

14-12-2019

14-12-2019

16-12-2019

16-12-2019

16-12-2019

16-12-2019

16-12-2019

16-12-2019

16-12-2019

16-12-2019

16-12-2019

17-12-2019

17-12-2019

17-12-2019

17-12-2019

17-12-2019

Date
S.T. BOILERS & ENINEERING CONSTRUCTION CO. PVT

Protocol For :- HP EVAP COIL- 4 TO 5 FITUP AND WELDING,WELD VISUAL


PROJECT :- WHRS 1 X 16 MW on EPC basis (PH1&PH2) Date :-20-12-2019
COSTMER :- ULTRA TECH CIMENT, KOTPUTLI W.O No. :- 2M-0043
CLIENT :- THYSSENKRUPP INDUSTRIES INDIA PVT. LTD. Sl No. :- TKII/UTCL/AQC/Protocol- P
FQP SNO. :- 2M0043/FQP/01 (4.4) (4.4.1) Drg No. :-PD1-1WB-10557-01

SL.NO. JOINT NO. MATERIAL DIA X THIK FITUP DATE WELDING DATE WELDER CODE
1 HP EVAPC4+5A-9 SA 210 GR.A1 44.5 X 3.25 16-12-2019 16-12-2019 HPW-03
2 HP EVAPC4+5B-9 SA 210 GR.A1 44.5 X 3.25 16-12-2019 16-12-2019 HPW-03
3 HP EVAPC4+5C-9 SA 210 GR.A1 44.5 X 3.25 16-12-2019 16-12-2019 HPW-03
4 HP EVAPC4+5D-9 SA 210 GR.A1 44.5 X 3.25 16-12-2019 16-12-2019 HPW-03
5 HP EVAPC4+5E-9 SA 210 GR.A1 44.5 X 3.25 16-12-2019 16-12-2019 HPW-03
6 HP EVAPC4+5A-10 SA 210 GR.A1 44.5 X 3.25 16-12-2019 16-12-2019 HPW-03
7 HP EVAPC4+5B-10 SA 210 GR.A1 44.5 X 3.25 16-12-2019 16-12-2019 HPW-03
8 HP EVAPC4+5C-10 SA 210 GR.A1 44.5 X 3.25 16-12-2019 16-12-2019 HPW-03
9 HP EVAPC4+5D-10 SA 210 GR.A1 44.5 X 3.25 16-12-2019 16-12-2019 HPW-03
10 HP EVAPC4+5E-10 SA 210 GR.A1 44.5 X 3.25 16-12-2019 16-12-2019 HPW-03
11 HP EVAPC4+5A-11 SA 210 GR.A1 44.5 X 3.25 17-12-2019 17-12-2019 HPW -02
12 HP EVAPC4+5B-11 SA 210 GR.A1 44.5 X 3.25 17-12-2019 17-12-2019 HPW -02
13 HP EVAPC4+5C-11 SA 210 GR.A1 44.5 X 3.25 17-12-2019 17-12-2019 HPW -02
14 HP EVAPC4+5D-11 SA 210 GR.A1 44.5 X 3.25 17-12-2019 17-12-2019 HPW -02
15 HP EVAPC4+5E-11 SA 210 GR.A1 44.5 X 3.25 17-12-2019 17-12-2019 HPW -02
16 HP EVAPC4+5A-12 SA 210 GR.A1 44.5 X 3.25 17-12-2019 17-12-2019 HPW -02
17 HP EVAPC4+5B-12 SA 210 GR.A1 44.5 X 3.25 17-12-2019 17-12-2019 HPW -02
18 HP EVAPC4+5C-12 SA 210 GR.A1 44.5 X 3.25 17-12-2019 17-12-2019 HPW -02
19 HP EVAPC4+5D-12 SA 210 GR.A1 44.5 X 3.25 17-12-2019 17-12-2019 HPW -02
20 HP EVAPC4+5E-12 SA 210 GR.A1 44.5 X 3.25 17-12-2019 17-12-2019 HPW -02

Name Sign.
STBECPL(QA/QC) SOURAV METE

TKII (EXE) AKSHAY G. KODAG

TKII (QA/QC) LOKESH KUMAR .DANGETI

UTCL NAVNEET MISRA


CO. PVT. LTD

/Protocol- PP-05
-01 Rev. :-01

WELD VISUAL DATE

16-12-2019

16-12-2019

16-12-2019

16-12-2019

16-12-2019

16-12-2019

16-12-2019

16-12-2019

16-12-2019

16-12-2019

17-12-2019

17-12-2019

17-12-2019

17-12-2019

17-12-2019

17-12-2019

17-12-2019

17-12-2019

17-12-2019

17-12-2019

Date
S.T. BOILERS & ENINEERING CONSTRUCTION CO. PVT

Protocol For :- HP EVAP COIL- 4 TO 5 FITUP AND WELDING,WELD VISUAL


PROJECT :- WHRS 1 X 16 MW on EPC basis (PH1&PH2) Date :-20-12-2019
COSTMER :- ULTRA TECH CIMENT, KOTPUTLI W.O No. :- 2M-0043
CLIENT :- THYSSENKRUPP INDUSTRIES INDIA PVT. LTD. Sl No. :- TKII/UTCL/AQC/Protocol- P
FQP SNO. :- 2M0043/FQP/01 (4.4) (4.4.1) Drg No. :-PD1-1WB-10557-01

SL.NO. JOINT NO. MATERIAL DIA X THIK FITUP DATE WELDING DATE WELDER CODE
1 HP EVAPC4+5A-13 SA 210 GR.A1 44.5 X 3.25 17-12-2019 17-12-2019 HPW-03
2 HP EVAPC4+5B-13 SA 210 GR.A1 44.5 X 3.25 17-12-2019 17-12-2019 HPW-03
3 HP EVAPC4+5C-13 SA 210 GR.A1 44.5 X 3.25 17-12-2019 17-12-2019 HPW-03
4 HP EVAPC4+5D-13 SA 210 GR.A1 44.5 X 3.25 17-12-2019 17-12-2019 HPW-03
5 HP EVAPC4+5E-13 SA 210 GR.A1 44.5 X 3.25 17-12-2019 17-12-2019 HPW-03
6 HP EVAPC4+5A-14 SA 210 GR.A1 44.5 X 3.25 17-12-2019 17-12-2019 HPW-03
7 HP EVAPC4+5B-14 SA 210 GR.A1 44.5 X 3.25 17-12-2019 17-12-2019 HPW-03
8 HP EVAPC4+5C-14 SA 210 GR.A1 44.5 X 3.25 17-12-2019 17-12-2019 HPW-03
9 HP EVAPC4+5D-14 SA 210 GR.A1 44.5 X 3.25 17-12-2019 17-12-2019 HPW-03
10 HP EVAPC4+5E-14 SA 210 GR.A1 44.5 X 3.25 17-12-2019 17-12-2019 HPW-03
11 HP EVAPC4+5A-15 SA 210 GR.A1 44.5 X 3.25 18-12-2019 18-12-2019 HPW-02
12 HP EVAPC4+5B-15 SA 210 GR.A1 44.5 X 3.25 18-12-2019 18-12-2019 HPW-02
13 HP EVAPC4+5C-15 SA 210 GR.A1 44.5 X 3.25 18-12-2019 18-12-2019 HPW-02
14 HP EVAPC4+5D-15 SA 210 GR.A1 44.5 X 3.25 18-12-2019 18-12-2019 HPW-02
15 HP EVAPC4+5E-15 SA 210 GR.A1 44.5 X 3.25 18-12-2019 18-12-2019 HPW-02
16 HP EVAPC4+5A-16 SA 210 GR.A1 44.5 X 3.25 18-12-2019 18-12-2019 HPW-02
17 HP EVAPC4+5B-16 SA 210 GR.A1 44.5 X 3.25 18-12-2019 18-12-2019 HPW-02
18 HP EVAPC4+5C-16 SA 210 GR.A1 44.5 X 3.25 18-12-2019 18-12-2019 HPW-02
19 HP EVAPC4+5D-16 SA 210 GR.A1 44.5 X 3.25 18-12-2019 18-12-2019 HPW-02
20 HP EVAPC4+5E-16 SA 210 GR.A1 44.5 X 3.25 18-12-2019 18-12-2019 HPW-02

Name Sign.
STBECPL(QA/QC) SOURAV METE

TKII (EXE) AKSHAY G. KODAG

TKII (QA/QC) LOKESH KUMAR .DANGETI

UTCL NAVNEET MISRA


CO. PVT. LTD

/Protocol- PP-06
-01 Rev. :-01

WELD VISUAL DATE

17-12-2019

17-12-2019

17-12-2019

17-12-2019

17-12-2019

17-12-2019

17-12-2019

17-12-2019

17-12-2019

17-12-2019

18-12-2019

18-12-2019

18-12-2019

18-12-2019

18-12-2019

18-12-2019

18-12-2019

18-12-2019

18-12-2019

18-12-2019

Date
S.T. BOILERS & ENINEERING CONSTRUCTION CO. PVT

Protocol For :- HP EVAP COIL- 4 TO 5 FITUP AND WELDING,WELD VISUAL


PROJECT :- WHRS 1 X 16 MW on EPC basis (PH1&PH2) Date :-20-12-2019
COSTMER :- ULTRA TECH CIMENT, KOTPUTLI W.O No. :- 2M-0043
CLIENT :- THYSSENKRUPP INDUSTRIES INDIA PVT. LTD. Sl No. :- TKII/UTCL/AQC/Protocol- P
FQP SNO. :- 2M0043/FQP/01 (4.4) (4.4.1) Drg No. :-PD1-1WB-10557-01

SL.NO. JOINT NO. MATERIAL DIA X THIK FITUP DATE WELDING DATE WELDER CODE

1 HP EVAPC4+5A-17 SA 210 GR.A1 44.5 X 3.25 18-12-2019 18-12-2019 HPW-02

2 HP EVAPC4+5B-17 SA 210 GR.A1 44.5 X 3.25 18-12-2019 18-12-2019 HPW-02

3 HP EVAPC4+5C-17 SA 210 GR.A1 44.5 X 3.25 18-12-2019 18-12-2019 HPW-02

4 HP EVAPC4+5D-17 SA 210 GR.A1 44.5 X 3.25 18-12-2019 18-12-2019 HPW-02

5 HP EVAPC4+5E-17 SA 210 GR.A1 44.5 X 3.25 18-12-2019 18-12-2019 HPW-02

6 HP EVAPC4+5A-18 SA 210 GR.A1 44.5 X 3.25 19-12-2019 19-12-2019 HPW-02

7 HP EVAPC4+5B-18 SA 210 GR.A1 44.5 X 3.25 19-12-2019 19-12-2019 HPW-02

8 HP EVAPC4+5C-18 SA 210 GR.A1 44.5 X 3.25 19-12-2019 19-12-2019 HPW-02

9 HP EVAPC4+5D-18 SA 210 GR.A1 44.5 X 3.25 19-12-2019 19-12-2019 HPW-02

10 HP EVAPC4+5E-18 SA 210 GR.A1 44.5 X 3.25 19-12-2019 19-12-2019 HPW-02

11 HP EVAPC4+5A-19 SA 210 GR.A1 44.5 X 3.25 18-12-2019 18-12-2019 HPW-03

12 HP EVAPC4+5B-19 SA 210 GR.A1 44.5 X 3.25 18-12-2019 18-12-2019 HPW-03

13 HP EVAPC4+5C-19 SA 210 GR.A1 44.5 X 3.25 18-12-2019 18-12-2019 HPW-03

14 HP EVAPC4+5D-19 SA 210 GR.A1 44.5 X 3.25 18-12-2019 18-12-2019 HPW-03

15 HP EVAPC4+5E-19 SA 210 GR.A1 44.5 X 3.25 18-12-2019 18-12-2019 HPW-03

16 HP EVAPC4+5A-20 SA 210 GR.A1 44.5 X 3.25 18-12-2019 18-12-2019 HPW-03

17 HP EVAPC4+5B-20 SA 210 GR.A1 44.5 X 3.25 18-12-2019 18-12-2019 HPW-03

18 HP EVAPC4+5C-20 SA 210 GR.A1 44.5 X 3.25 18-12-2019 18-12-2019 HPW-03

19 HP EVAPC4+5D-20 SA 210 GR.A1 44.5 X 3.25 18-12-2019 18-12-2019 HPW-03

20 HP EVAPC4+5E-20 SA 210 GR.A1 44.5 X 3.25 18-12-2019 18-12-2019 HPW-03

Name Sign.
STBECPL(QA/QC) SOURAV METE

TKII (EXE) AKSHAY G. KODAG

TKII (QA/QC) LOKESH KUMAR .DANGETI

UTCL NAVNEET MISRA


CO. PVT. LTD

/Protocol- PP-07
-01 Rev. :-01

WELD VISUAL DATE

18-12-2019

18-12-2019

18-12-2019

18-12-2019

18-12-2019

19-12-2019

19-12-2019

19-12-2019

19-12-2019

19-12-2019

18-12-2019

18-12-2019

18-12-2019

18-12-2019

18-12-2019

18-12-2019

18-12-2019

18-12-2019

18-12-2019

18-12-2019

Date
S.T. BOILERS & ENINEERING CONSTRUCTION CO. PV

Protocol For :- HP EVAP COIL- 4 TO 5 FITUP AND WELDING,WELD VISUAL (PREEASSEMBLE)


PROJECT :- WHRS 1 X 16 MW on EPC basis (PH1&PH2) Date :-23-12-2019
COSTMER :- ULTRA TECH CIMENT, KOTPUTLI W.O No. :- 2M-0043
CLIENT :- THYSSENKRUPP INDUSTRIES INDIA PVT. LTD. Sl No. :- TKII/UTCL/PH/Protocol- PP
FQP SNO. :- 2M0043/FQP/01 (4.4) (4.4.1) Drg No. :-PD1-1WB-10557-01

SL.NO. JOINT NO. MATERIAL DIA X THIK FITUP DATE WELDING DATE WELDER CODE
1 HP EVAPC4+5A-21 SA 210 GR.A1 44.5 X 3.25 12/19/2019 12/19/2019 HPW-03

2 HP EVAPC4+5B-21 SA 210 GR.A1 44.5 X 3.25 12/19/2019 12/19/2019 HPW-03

3 HP EVAPC4+5C-21 SA 210 GR.A1 44.5 X 3.25 12/19/2019 12/19/2019 HPW-03

4 HP EVAPC4+5D-21 SA 210 GR.A1 44.5 X 3.25 12/19/2019 12/19/2019 HPW-03

5 HP EVAPC4+5E-21 SA 210 GR.A1 44.5 X 3.25 12/19/2019 12/19/2019 HPW-03

6 HP EVAPC4+5A-22 SA 210 GR.A1 44.5 X 3.25 12/19/2019 12/19/2019 HPW-03

7 HP EVAPC4+5B-22 SA 210 GR.A1 44.5 X 3.25 12/19/2019 12/19/2019 HPW-03

8 HP EVAPC4+5C-22 SA 210 GR.A1 44.5 X 3.25 12/19/2019 12/19/2019 HPW-03

9 HP EVAPC4+5D-22 SA 210 GR.A1 44.5 X 3.25 12/19/2019 12/19/2019 HPW-03

10 HP EVAPC4+5E-22 SA 210 GR.A1 44.5 X 3.25 12/19/2019 12/19/2019 HPW-03

11 HP EVAPC4+5A-23 SA 210 GR.A1 44.5 X 3.25 12/20/2019 12/20/2019 HPW-02

12 HP EVAPC4+5B-23 SA 210 GR.A1 44.5 X 3.25 12/20/2019 12/20/2019 HPW-02

13 HP EVAPC4+5C-23 SA 210 GR.A1 44.5 X 3.25 12/20/2019 12/20/2019 HPW-02

14 HP EVAPC4+5D-23 SA 210 GR.A1 44.5 X 3.25 12/20/2019 12/20/2019 HPW-02

15 HP EVAPC4+5E-23 SA 210 GR.A1 44.5 X 3.25 12/20/2019 12/20/2019 HPW-02

16 HP EVAPC4+5A-24 SA 210 GR.A1 44.5 X 3.25 12/20/2019 12/20/2019 HPW-02

17 HP EVAPC4+5B-24 SA 210 GR.A1 44.5 X 3.25 12/20/2019 12/20/2019 HPW-02

18 HP EVAPC4+5C-24 SA 210 GR.A1 44.5 X 3.25 12/20/2019 12/20/2019 HPW-02

19 HP EVAPC4+5D-24 SA 210 GR.A1 44.5 X 3.25 12/20/2019 12/20/2019 HPW-02

20 HP EVAPC4+5E-24 SA 210 GR.A1 44.5 X 3.25 12/20/2019 12/20/2019 HPW-02

Name Sign.

STBECPL(QA/QC) SOURAV METE


STBECPL(QA/QC) SOURAV METE

TKII (EXE) AKSHAY G. KODAG

TKII (QA/QC) LOKESH KUMAR .DANGETI

UTCL NAVNEET MISRA


N CO. PVT. LTD

MBLE)

Protocol- PP-08
-01 Rev. :-01

WELD VISUAL DATE


12/19/2019

12/19/2019

12/19/2019

12/19/2019

12/19/2019

12/19/2019

12/19/2019

12/19/2019

12/19/2019

12/19/2019

12/20/2019

12/20/2019

12/20/2019

12/20/2019

12/20/2019

12/20/2019

12/20/2019

12/20/2019

12/20/2019

12/20/2019

Date
S.T. BOILERS & ENINEERING CONSTRUCTION CO. PVT. L

Protocol For :- HP EVAP COIL- 4 TO 5 FITUP AND WELDING,WELD VISUAL (PREEASSEMBLE)


PROJECT :- WHRS 1 X 16 MW on EPC basis (PH1&PH2) Date :-23-12-2019
COSTMER :- ULTRA TECH CIMENT, KOTPUTLI W.O No. :- 2M-0043
CLIENT :- THYSSENKRUPP INDUSTRIES INDIA PVT. LTD. Sl No. :- TKII/UTCL/PH/Protocol- PP-09
FQP SNO. :- 2M0043/FQP/01 (4.4) (4.4.1) Drg No. :-PD1-1WB-10557-01

SL.NO. JOINT NO. MATERIAL DIA X THIK FITUP DATE WELDING DATE WELDER CODE
1 HP EVAPC4+5A-25 SA 210 GR.A1 44.5 X 3.25 12/20/2019 12/20/2019 HPW-02

2 HP EVAPC4+5B-25 SA 210 GR.A1 44.5 X 3.25 12/20/2019 12/20/2019 HPW-02

3 HP EVAPC4+5C-25 SA 210 GR.A1 44.5 X 3.25 12/20/2019 12/20/2019 HPW-02

4 HP EVAPC4+5D-25 SA 210 GR.A1 44.5 X 3.25 12/20/2019 12/20/2019 HPW-02

5 HP EVAPC4+5E-25 SA 210 GR.A1 44.5 X 3.25 12/20/2019 12/20/2019 HPW-02

6 HP EVAPC4+5A-26 SA 210 GR.A1 44.5 X 3.25 12/21/2019 12/21/2019 HPW-02

7 HP EVAPC4+5B-26 SA 210 GR.A1 44.5 X 3.25 12/21/2019 12/21/2019 HPW-02

8 HP EVAPC4+5C-26 SA 210 GR.A1 44.5 X 3.25 12/21/2019 12/21/2019 HPW-02

9 HP EVAPC4+5D-26 SA 210 GR.A1 44.5 X 3.25 12/21/2019 12/21/2019 HPW-02

10 HP EVAPC4+5E-26 SA 210 GR.A1 44.5 X 3.25 12/21/2019 12/21/2019 HPW-02

11 HP EVAPC4+5A-27 SA 210 GR.A1 44.5 X 3.25 12/21/2019 12/21/2019 HPW-02

12 HP EVAPC4+5B-27 SA 210 GR.A1 44.5 X 3.25 12/21/2019 12/21/2019 HPW-02

13 HP EVAPC4+5C-27 SA 210 GR.A1 44.5 X 3.25 12/21/2019 12/21/2019 HPW-02

14 HP EVAPC4+5D-27 SA 210 GR.A1 44.5 X 3.25 12/21/2019 12/21/2019 HPW-02

15 HP EVAPC4+5E-27 SA 210 GR.A1 44.5 X 3.25 12/21/2019 12/21/2019 HPW-02

16 HP EVAPC4+5A-28 SA 210 GR.A1 44.5 X 3.25 12/21/2019 12/21/2019 HPW-03

17 HP EVAPC4+5B-28 SA 210 GR.A1 44.5 X 3.25 12/21/2019 12/21/2019 HPW-03

18 HP EVAPC4+5C-28 SA 210 GR.A1 44.5 X 3.25 12/21/2019 12/21/2019 HPW-03

19 HP EVAPC4+5D-28 SA 210 GR.A1 44.5 X 3.25 12/21/2019 12/21/2019 HPW-03

20 HP EVAPC4+5E-28 SA 210 GR.A1 44.5 X 3.25 12/21/2019 12/21/2019 HPW-03

Name Sign.

STBECPL(QA/QC) SOURAV METE


TKII (EXE) AKSHAY G. KODAG

TKII (QA/QC) LOKESH KUMAR .DANGETI

UTCL NAVNEET MISRA


O. PVT. LTD

LE)

ocol- PP-09
Rev. :-01

WELD VISUAL DATE


12/20/2019

12/20/2019

12/20/2019

12/20/2019

12/20/2019

12/21/2019

12/21/2019

12/21/2019

12/21/2019

12/21/2019

12/21/2019

12/21/2019

12/21/2019

12/21/2019

12/21/2019

12/21/2019

12/21/2019

12/21/2019

12/21/2019

12/21/2019

Date
S.T. BOILERS & ENINEERING CONSTRUCTION CO. PV

Protocol For :- HP EVAP COIL- 4 TO 5 FITUP AND WELDING,WELD VISUAL (PREEASSEMBLE)


PROJECT :- WHRS 1 X 16 MW on EPC basis (PH1&PH2) Date :-23-12-2019
COSTMER :- ULTRA TECH CIMENT, KOTPUTLI W.O No. :- 2M-0043
CLIENT :- THYSSENKRUPP INDUSTRIES INDIA PVT. LTD. Sl No. :- TKII/UTCL/PH/Protocol- PP
FQP SNO. :- 2M0043/FQP/01 (4.4) (4.4.1) Drg No. :-PD1-1WB-10557-01

SL.NO. JOINT NO. MATERIAL DIA X THIK FITUP DATE WELDING DATE WELDER CODE
1 HP EVAPC4+5A-29 SA 210 GR.A1 44.5 X 3.25 12/21/2019 12/21/2019 HPW-03

2 HP EVAPC4+5B-29 SA 210 GR.A1 44.5 X 3.25 12/21/2019 12/21/2019 HPW-03

3 HP EVAPC4+5C-29 SA 210 GR.A1 44.5 X 3.25 12/21/2019 12/21/2019 HPW-03

4 HP EVAPC4+5D-29 SA 210 GR.A1 44.5 X 3.25 12/21/2019 12/21/2019 HPW-03

5 HP EVAPC4+5E-29 SA 210 GR.A1 44.5 X 3.25 12/21/2019 12/21/2019 HPW-03

6 HP EVAPC4+5A-30 SA 210 GR.A1 44.5 X 3.25 12/23/2019 12/23/2019 HPW-02

7 HP EVAPC4+5B-30 SA 210 GR.A1 44.5 X 3.25 12/23/2019 12/23/2019 HPW-02

8 HP EVAPC4+5C-30 SA 210 GR.A1 44.5 X 3.25 12/23/2019 12/23/2019 HPW-02

9 HP EVAPC4+5D-30 SA 210 GR.A1 44.5 X 3.25 12/23/2019 12/23/2019 HPW-02

10 HP EVAPC4+5E-30 SA 210 GR.A1 44.5 X 3.25 12/23/2019 12/23/2019 HPW-02

11 HP EVAPC4+5A-31 SA 210 GR.A1 44.5 X 3.25 12/23/2019 12/23/2019 HPW-02

12 HP EVAPC4+5B-31 SA 210 GR.A1 44.5 X 3.25 12/23/2019 12/23/2019 HPW-02

13 HP EVAPC4+5C-31 SA 210 GR.A1 44.5 X 3.25 12/23/2019 12/23/2019 HPW-02

14 HP EVAPC4+5D-31 SA 210 GR.A1 44.5 X 3.25 12/23/2019 12/23/2019 HPW-02

15 HP EVAPC4+5E-31 SA 210 GR.A1 44.5 X 3.25 12/23/2019 12/23/2019 HPW-02

16 HP EVAPC4+5A-32 SA 210 GR.A1 44.5 X 3.25 12/23/2019 12/23/2019 HPW-02

17 HP EVAPC4+5B-32 SA 210 GR.A1 44.5 X 3.25 12/23/2019 12/23/2019 HPW-02

18 HP EVAPC4+5C-32 SA 210 GR.A1 44.5 X 3.25 12/23/2019 12/23/2019 HPW-02

19 HP EVAPC4+5D-32 SA 210 GR.A1 44.5 X 3.25 12/23/2019 12/23/2019 HPW-02

20 HP EVAPC4+5E-32 SA 210 GR.A1 44.5 X 3.25 12/23/2019 12/23/2019 HPW-02

Name Sign.
STBECPL(QA/QC) SOURAV METE

TKII (EXE) AKSHAY G. KODAG

TKII (QA/QC) LOKESH KUMAR .DANGETI

UTCL NAVNEET MISRA


N CO. PVT. LTD

MBLE)

Protocol- PP-10
-01 Rev. :-01

WELD VISUAL DATE


12/21/2019

12/21/2019

12/21/2019

12/21/2019

12/21/2019

12/23/2019

12/23/2019

12/23/2019

12/23/2019

12/23/2019

12/23/2019

12/23/2019

12/23/2019

12/23/2019

12/23/2019

12/23/2019

12/23/2019

12/23/2019

12/23/2019

12/23/2019

Date
S.T. BOILERS & ENINEERING CONSTRUCTION CO. PVT

Protocol For :- HP EVAP COIL- 4 BALL SPONGE PASSING TEST IN COILS (CLEANING)
PROJECT :- WHRS 1 X 16 MW on EPC basis (PH1&PH2) Date :-20-12-2019
COSTMER :- ULTRA TECH CIMENT, KOTPUTLI W.O No. :- 2M-0043
CLIENT :- THYSSENKRUPP INDUSTRIES INDIA PVT. LTD. Sl No. :- TKII/UTCL/AQC/Protocol-
FQP SNO. :- 2M0043/FQP/01 (4.3) Drg No. :-PD1-1WB-10557-01

SL.NO DISCRIPTION COIL NO. DATE OF TEST SL.NO. DISCRIPTION COIL NO.

1 HP EVAP COIL-4 1 9/12/2019 24


HP EVAP COIL-4 24
2 HP EVAP COIL-4 2 9/12/2019 25
HP EVAP COIL-4 25
3 HP EVAP COIL-4 3 9/12/2019 26
HP EVAP COIL-4 26
4 HP EVAP COIL-4 4 9/12/2019 27
HP EVAP COIL-4 27
5 HP EVAP COIL-4 5 9/12/2019 28
HP EVAP COIL-4 28
6 HP EVAP COIL-4 6 9/12/2019 29
HP EVAP COIL-4 29
7 HP EVAP COIL-4 7 9/12/2019 30
HP EVAP COIL-4 30
8 HP EVAP COIL-4 8 9/12/2019 31
HP EVAP COIL-4 31
9 HP EVAP COIL-4 9 9/12/2019 32
HP EVAP COIL-4 32
10 HP EVAP COIL-4 10 9/12/2019 33
HP EVAP COIL-4 33
11 HP EVAP COIL-4 11 9/12/2019 34
HP EVAP COIL-4 34
12 HP EVAP COIL-4 12 9/12/2019 35
HP EVAP COIL-4 35
13 HP EVAP COIL-4 13 9/12/2019 36
HP EVAP COIL-4 36
14 HP EVAP COIL-4 14 9/12/2019 37
HP EVAP COIL-4 37
15 HP EVAP COIL-4 15 9/12/2019 38
HP EVAP COIL-4 38
16 HP EVAP COIL-4 16 9/12/2019 39
HP EVAP COIL-4 39
17 HP EVAP COIL-4 17 9/12/2019 40
HP EVAP COIL-4 40
18 HP EVAP COIL-4 18 9/12/2019 41
HP EVAP COIL-4 41
19 HP EVAP COIL-4 19 9/12/2019 42
HP EVAP COIL-4 42
20 HP EVAP COIL-4 20 9/12/2019 43
HP EVAP COIL-4 43
21 HP EVAP COIL-4 21 9/12/2019

22 HP EVAP COIL-4 22 9/12/2019

23 HP EVAP COIL-4 23 19-12-2019

Name Sign.
STBECPL SOURAV METE

TKII (EXE) AKSHAY G. KODAG

TKII (QA/QC) LOKESH KUMAR .DANGETI

UTCL NAVNEET MISRA


ON CO. PVT. LTD

NG)

/AQC/Protocol- PP-01
0557-01 Rev. :-01

NO. DATE OF TEST

24 19-12-2019

25 19-12-2019

26 19-12-2019

27 19-12-2019

28 19-12-2019

29 19-12-2019

30 19-12-2019

31 19-12-2019

32 19-12-2019

33 19-12-2019

34 19-12-2019

35 19-12-2019

36 19-12-2019

37 19-12-2019

38 19-12-2019

39 19-12-2019

40 19-12-2019

41 19-12-2019

42 19-12-2019

43 19-12-2019
. Date
S.T. BOILERS & ENINEERING CONSTRUCTION CO. PV

Protocol For :- HP EVAP COIL- 5 & 6 BALL SPONGE PASSING TEST IN COILS (CLEANING)
PROJECT :- WHRS 1 X 16 MW on EPC basis (PH1&PH2) Date :- 20-12-2019
COSTMER :- ULTRA TECH CIMENT, KOTPUTLI W.O No. :- 2M-0043
CLIENT :- THYSSENKRUPP INDUSTRIES INDIA PVT. LTD. Sl No. :- TKII/UTCL/AQC/Protoco
FQP SNO. :- 2M0043/FQP/01 (4.3) Drg No. :-PD1-1WB-10557-01

SL.NO DISCRIPTION COIL NO. DATE OF TEST SL.NO. DISCRIPTION COIL NO.

1 HP EVAP COIL-5&6 1 9/12/2019 24 HP EVAP COIL-5&6 24


2 HP EVAP COIL-5&6 2 9/12/2019 25 HP EVAP COIL-5&6 25
3 HP EVAP COIL-5&6 3 9/12/2019 26 HP EVAP COIL-5&6 26
4 HP EVAP COIL-5&6 4 9/12/2019 27 HP EVAP COIL-5&6 27
5 HP EVAP COIL-5&6 5 9/12/2019 28 HP EVAP COIL-5&6 28
6 HP EVAP COIL-5&6 6 9/12/2019 29 HP EVAP COIL-5&6 29
7 HP EVAP COIL-5&6 7 9/12/2019 30 HP EVAP COIL-5&6 30
8 HP EVAP COIL-5&6 8 9/12/2019 31 HP EVAP COIL-5&6 31
9 HP EVAP COIL-5&6 9 9/12/2019 32 HP EVAP COIL-5&6 32
10 HP EVAP COIL-5&6 10 9/12/2019 33 HP EVAP COIL-5&6 33
11 HP EVAP COIL-5&6 11 9/12/2019 34 HP EVAP COIL-5&6 34
12 HP EVAP COIL-5&6 12 9/12/2019 35 HP EVAP COIL-5&6 35
13 HP EVAP COIL-5&6 13 9/12/2019 36 HP EVAP COIL-5&6 36
14 HP EVAP COIL-5&6 14 9/12/2019 37 HP EVAP COIL-5&6 37
15 HP EVAP COIL-5&6 15 19-12-2019 38 HP EVAP COIL-5&6 38
16 HP EVAP COIL-5&6 16 19-12-2019 39 HP EVAP COIL-5&6 39
17 HP EVAP COIL-5&6 17 19-12-2019 40 HP EVAP COIL-5&6 40
18 HP EVAP COIL-5&6 18 19-12-2019 41 HP EVAP COIL-5&6 41
19 HP EVAP COIL-5&6 19 19-12-2019 42 HP EVAP COIL-5&6 42
20 HP EVAP COIL-5&6 20 19-12-2019 43 HP EVAP COIL-5&6 43
21 HP EVAP COIL-5&6 21 19-12-2019
22 HP EVAP COIL-5&6 22 19-12-2019

23 HP EVAP COIL-5&6 23 19-12-2019

Name Sign.

STBECPL(QA/QC) SOURAV METE

TKII (EXE) AKSHAY G. KODAG

TKII (QA/QC) LOKESH KUMAR .DANGETI

UTCL NAVNEET MISRA


N CO. PVT. LTD

G)

QC/Protocol- PP-2
57-01 Rev. :-01

L NO. DATE OF TEST

24 19-12-2019

25 19-12-2019

26 19-12-2019

27 19-12-2019

28 19-12-2019

29 19-12-2019

30 19-12-2019

31 19-12-2019

32 19-12-2019

33 19-12-2019

34 19-12-2019

35 19-12-2019

36 19-12-2019

37 19-12-2019

38 19-12-2019

39 19-12-2019

40 19-12-2019

41 19-12-2019 `
42 19-12-2019

43 19-12-2019
Date
PH-1 & PH-2
PRESSURE PARTS
PROTOCOLS

PH-1 & PH-2


NON PRESSURE PARTS
PROTOCOLS

Você também pode gostar