Today’s program
Research:
• Supply Chain Management
• Operations Management
• Production Planning and Control
TUM School of Management Technische Universität München
Mirko Beißner
Background:
Since 09/2017 Ph.D. student
Technische Universität München (TUM)
02/2014 – 06/2017 Strategy consultant in Operations & Healthcare
PwC Strategy&, Germany
10/2010 – 12/2013 Master of Industrial Biotechnology
TUM & University of Illinois
10/2007 – 09/2010 B.Sc. in Molecular Biotechnology
TUM
Research:
• Supply chain design & planning
• Mathematical modelling & optimization
• Pharmaceutical & biotechnology industry
TUM School of Management Technische Universität München
What do we expect?
• Familiarity with basic OR techniques
• Knowledge on basic production management
• Basic command of computer programming, incl. mathematical
modeling (e.g. CPLEX)
TUM School of Management Technische Universität München
Produktionsmanagement
Basics of Advanced Modeling, Optimization Sales and Operations Cases in Lean Production
Planning and Supply and Simulation Planning in the
Chain Management Automotive Industry
Literature
Main content:
– Lecture notes
Background reading:
– Journal articles
– Books, a.o.:
• Chopra, S., Meindl, P. (2016). Supply chain management: Strategy,
planning, and operation. 6th ed., Upper Saddle River, N.J., Pearson
Prentice Hall.
• Stadtler, H., Kilger, C. (eds.) (2015). Supply chain management and
advanced planning. 5th ed., Berlin: Springer.
TUM School of Management Technische Universität München
Production Management
Globalization
Operations
Research
Supply Chain Management
Engineering
Advanced Planning Systems (e.g.
SAP APO)
TUM School of Management Technische Universität München
Demand
mid-term Planning
Supply Network Planning
Production Transportation
External Planning / Planning /
short-term Order
Procurement Detailed Vehicle Fulfilment
Scheduling Scheduling and
ATP / CTP
6.
Demand
mid-term Supply Network
Demand
Planning
7. Supply NetworkPlanning
Planning
Planning
Production 10.
Transportation
External Planning
1, 2, 3 / Transportation
Planning /
short-term
Procurement Detailed planning
Vehicleand 9.Order
Order
and 8 Fulfilment
Scheduling vehicle
Scheduling fulfilment
and
scheduling & ATP
ATP / CTP
560
380
Master
production 140 160
Rüsten und Lagern
schedule
1 2 3 4
100 100 100 100
T+1
10 10 30 15
Bills of MRP Inventory 220
Rüsten
material explosion status 340
Time-phased
Time-phased
requirements for 1 2 3 4 5 Pre-bottleneck
requirements
sub-assemblies, for
sub-assemblies,
components and 1 2 3 4 5 Bottleneck
components
raw materialsand
raw materials 1 2 3 4 5 Post-bottleneck
Time
TUM School of Management Technische Universität München
Production
Produktionsplanung
Planning Order
Detailed
Feinplanung
Scheduling Processing:
Ordering
Network Retrieval
Strategische
Strategic
Planning Transport Planning Production
Planung
Planning
Distribution
Distributionsplanung
Planning Distribution
Storage
Sales and Demand Planning GlobaleGlobal Availability Check
Verfügbarbeitsprüfung
hour
day
week
month
year
Planning Periods
TUM School of Management Technische Universität München
60.0
Demand
Budapest
50.0
Genua
Exp.Sm. (0,2)
Barcelona
40.0
30.0
1 2 3 4 5 6 7 8 9 10 11 12
PPM Explosion
Production
Order 50 50 50
50 30 20 50
80 80 (+10)
Purchasing
Alternative
Order
Locations
Alternative Products
TUM School of Management Technische Universität München
Warehouse
Warehouse
Plant
i j i j
Warehouse
Warehouse
Warehouse
0 0
Plant
TUM School of Management Technische Universität München
Planning levels
Decision Level
Planning levels
Decision Level