GOVERNMENT OF PAKISTAN
MINISTRY OF COMMUNICATIONS
NATIONAL HIGHWAY AUTHORITY

1 7 th M e e t i n g o f Tr a n s p o r t S e c t o r C o o rd i n a t i n g C o m m i tte e ( T S C C )

Road Safety Engineering Workshop Istanbul, Turkey


April, 2018
National Highway Authority www.nha.gov.pk
CENTRAL ASIA REGIONAL ECONOMIC C O O P E R AT I O N (CAREC)
In a historic moment, Gwadar Port starts commercial shipping service 7 Mar, 2018
PAKISTAN Gilgit
Khunjrab

National Highway Authority Chitral


S1
N35
Road Network N45 N95
Thakot
N15
Raikot
Skardu

Havelian S
Peshawar M1 2 S3
125 N75
Burhan Islamabad
N80
N55
M2

Sialkot

Pindi
Yarik Bhatian
DI Khan
Zhob M4 Lahore
Gojra
N50 Shorkot
Abdul Hakeem
N65 Multan
Quetta M4
Khanewal

N40 N65
Surab Shahdad
Wanguhills Kot Rato
Shikarpur
Khuzdar Dero
Basima
M8 655 105 Sukkur
N30
155
N85 225

N25 Category Motorway Expressway Highway Total


305
M8 Hoshab
Current 689 93 10,392 11,174
N10 120
M10 Hyderabad
M9
Gwadar Karachi Planned 2015-18 1,673 - 281 1,954
110
Total 2,362 93 10,673 13,128
PAKISTAN Gilgit
N35
Khunjrab

National Highway Authority Chitral

Road Pictures N45 N95


Thakot
Raikot
Skardu
N90 N15
Havelian
Peshawar N75
M1
Burhan Islamabad
N80

N55 Sialkot
M2
Pindi
Yarik Bhatian
DI Khan
Zhob Lahore
Gojra M4
Shorkot
N50 Abdul Hakeem N5

N70 Multan Khanewal


Quetta

N40 N65
Surab Shahdad
Kot Rato Shikarpur
Khuzdar Dero
Basima
M8 Sukkur

N85
N25

Hoshab 305
M8

N10
Hyderabad
Gwadar Karachi M9

110
Pakistan CAREC Route Projects February Khunjrab
Realignment of Karakoram
Status and Investment as of February 2018 Gilgit
Highway at Hunza due to Attabad
Lake Overflow, N-35
Chitral
S1
N35 Raikot
N45 N95 Skardu
Thakot E-35 (Section 1 Havelian –
Peshawar–Torkham, N-5 N15 Mansehra) 4-Lane Expressway
Havelian S S3
Peshawar M1 E35 2
N75
N-70 Muzaffargarh – DG Khan Burhan 125
Section (Upgrading of Existing Islamabad E-35 (Section 1 Hasanabdal –
N80 Havelian) 4-Lane Expressway
Road to 4-Lane Dual
Carriageway) Sialkot
M2
Pindi M-4 (Section 1 Faisalabad – Gojra
BCP Expansion and Upgrading at Yarik Bhatian
DI Khan 4-Lane Motorway)
Torkham, Wagah and Chaman
Zhob Lahore
GojraM4
N50
Shorkot M3
Abdul Hakeem M-4 (Section 2 Gojra–Shorkot
Surab – Kalat (N85 and N25) [4-Lane Motorway])
N65 Multan Khanewal
Quetta
Karachi – Hub – Dureji – Sehwan
M-7 (250 km), M-4 (Section 3-Shorkot-Khanewal
New Alignment, 6-Lane Motorway [4-Lane MW ind. bridges over
N40 N65 M5 Ravi & Sidhnai Rivers])
Surab Shahdad
Kot Rato Shikarpur
Khuzdar Dero
Hoshab – Surab (N85 and N25) Basima M-4 (Section 4 Khanewal–
N30 M8 105 Sukkur
Multan) 4-Lane Motorway
155
N85
Gwadar – Hoshab (M8)
N25 M6 Ratodero–Dera Ghazi (DG) Khan,
Hoshab 305 N-55 (Expressway, 200 km)
M8

N10
Hyderabad 120
Gwadar Karachi M9 Sehwan–Ratodero, N-55
(Expressway)
110 Key
Completed Ongoing Planned
• In last four years, Pakistan has initiated an ambitious program of US$ 13.63 Billion
• Complete North – South Motorway Link
• Strengthen East – West Connectivity i.e. Baluchistan
• Revival of Sick Mega Projects
• Largest BoT Regime under PPP Mode US$ 3.4 Billion
• Off budget financing and cost saving of US$ 4.43 Billion
• Contribution to GDP Growth i.e. 1.0% to 1.5%
Thank You
National Highway Authority

National Highway Authority www.nha.gov.pk


Trade & Transport Sector Vision
• Improve trade competitiveness
• Establish efficient / well integrated transport system
• Reduce transport costs
• Enhance road density from 0.32 to 0.64 Km / Km2
• Develop Pakistan as hub of sub regional connectivity
Reliance on Road Network
95% 90%
100
90
80

Passenger Traffic
70

Freight Traffic
60

% 50
40
30
8
20 0.5 5%
8%
0 0% 2
2%
10
0

ROAD RAIL

ROAD RAIL AIR


Road Length/Sq. km of Area

0.5
0
1
2
3

1.5
2.5
3.5

Japan
3.2

Hungary
2.12

France

UK
1.73 1.72

Spain

India
1.32 1.25

Italy
1.04

USA
Countries
0.67

China

Pakistan
0.4 0.32
Road Density Comparison

Brazile

Malaysia

Indonesia

Argentina
0.23 0.20 0.17 0.08
Existing National
Road Length of Highways Network
National Highways
Province-wise Breakup
Province Wise Length
AJK Punjab
Gilgit - Baltistan 0.78% 22.51%
5.42%

2731 kms

2204 kms Sindh


4565 kms 18.17%

Balochistan 1878 kms


37.63%

KP
Total Length - 12,131 Km 15.48%
Existing National Highways Network
Sr. Length in Kilometers
Route No. Road Description
No. Motoway Expressway Highway
1 N-5 Karachi-Lahore-Peshwar-Torkham - - 1819
2 N-10 Makran-coastal; liari-Ormara-Gwadar-Jiwani - - 653
3 N-15 Mansehra-Naran-Jalkhad - - 240
4 N-25 Karachi-Kalat-Quetta-Chaman - - 813
5 N-30 Basima – Khuzdar - - 110
6 N-35 Hassanabdal-Thakot-Khunjrab - - 806
7 N-40 Lakpass-Dalbandin-Taftan - - 610
8 N-45 Nowsehra-Dir-Chitral - - 309
9 N-50 Kuchlack-Zhob-D.I.Khan - - 531
10 N-55 Kotri-Larkana-D.G.Khan-D.I.Khan-Peshawar - - 1264
11 N-65 Sukkur-Sibi-Quetta - - 385
12 N-70 Multan-D.G.Khan-Loralai-Qali Saifullah - - 447
13 N-75 Islamabad-Satra Mile-Lower Topa-Kohala - 54
14 N-80 Tarnol-Fateh Jang-Jand-Khushal Garh-Kohat - - 146
15 N-85 Hoshab-Panjgur-Nag-Baseema-Sorab - - 487
16 N-90 Khwazakhela – Besham - - 64
17 N-95 Chakdara – Kalam - - 135
18 N-105 Larkana - Naudero – Lakhi - - 61
19 N-110 Gharo - Keti Bunder - - 90
Continue….
Existing National Highways Network
Sr. Length in Kilometers
Route No. Road Description
No. Motorway Expressway Highway
20 N-120 Hyderabad - Mirpukhas - Khokhrapar - - 220
21 N-125 Taxila - Khanpur – Hairpur - - 44
22 N-155 Larkana - Moenjo Daro Road - - 28
23 N-255 Larkana - Nasirabad via RasheedWagan - - 34
24 N-305 Sakrand - Shaheed Benazirabad - - 35
25 N-455 Larkana - Kamber – Shahdadkot - - 50
26 N-655 Ratodero - Naudero Road - - 18
27 S-1 KKH-Skardu Road (Strategic Road) - - 167
28 S-2 Kohala-Muzaffarabad - - 40
29 S-3 Muzaffarabad – Chakothi - - 55
30 M-1 Islamabad-Peshawar Motorway 155 - -
31 M-2 Lahore-Islamabad Motorway incl. 32 Km 367 - -
32 M-3 Pindi Bhattian-Faisalabad Motorway 53 - -
33 M-4 Faisalabad - Khanewal - Multan 241 115 - -
34 N-5A Khanewal – Lodhran - - 102
35 M-8 Gwadar-Hoshab-Khuzdar-Ratodero - - 436
36 M-9 Karachi-Hyderabad Motorway - - 136
37 M-10 Karachi Northern Bypass - - 57
38 - Layari Expressway - 39 -
Total (Current National Highways) 690 93 10392
Planned 2016-18
Sr. Length in Kilometers
Route No. Road Description
No. Motoway Expressway Highway
1 KLM Hyderabad – Sukkur 296 - -
2 KLM Sukkur - Multan 387 - -
3 KLM Abdul Hakeem – Lahore 230 - -
4 E-35 Burhan - Havalian 60 - -
5 CPEC Havalian - Thakot 39 - 81
6 M-4 Gojra - Khanewal 124 - -
7 SLM Lahore - Sialkot - 91 -
8 - Yakmach - Kharan - - 200
9 CPEC Islamabad – DIKhan - 210 -
10 M-9 Karachi - Hyderabad 136 - -
11 MMM Muzaffarabad – Mangla - Mirpur - 174
Total (Planned 2016-18) 1,272 475 281
LINK SLIDES
CENTRAL ASIA REGIONAL ECONOMIC C O O P E R AT I O N (CAREC)

New
N-35 (KKH) Khunjrab – Hassanabdal (806 km)
N-35 (KKH) Khunjrab – Hassanabdal (806 km)
N-35 (KKH) Atta Abad Barrier Lake
M-1 Peshawar – Islamabad Motorway (155 Km)
M-2 Lahore – Islamabad Motorway (357 Km)
M-4 Pindi Bhattian - Faisalabad Motorways (53 Kms)
M-4 Faisalabad – Gojra Motorway (59 Kms)
N-5 (Grand Trunk Road) Karachi – Peshawar 1,819 km
N-75 (Islamabad – Murree Dual Carriage Way) 54 km
N-10 (Makran Costal) 653 km
M-8 (Gwadar – Turbat – Hoshab) 193 Km
M-9 (Hyderabad – Karachi) 136 Km
N-25 (Karachi – Kalat – Quetta – Chaman) 813 Km
N-40 Quetta – Taftan (Iran Border)
N-70 (DG Khan – Loralai)
N-85 (Sura – Basima – Hoshab)
N-45 (Nowsehra – Dir – Chitral) 309 km
N-90 (Khwazakhela – Besham) 64 km
N-95 (Chakdara – Kalam) 135 km
N-15
N-15
Link Slides
KKH Improvement / Up-gradation Project (Raikot – Khunjerab Section) 335 Km
Contractor China Road and Khunjrab
Bridge Corporation
(CRBC)
Mode of Contract Engineer, Procure,
Construct-Contract
(EPC/ Turnkey)
Total Project Cost US$ 510.42 Million
Date of Comm. August 01, 2008
Date of Completion Nov 30th, 2013
(64 Calendar Months)
Tunnel (Mined) 02-697 meter
Tunnel (Open 16 No’s
cut/Shed)
Bridges (New) 35 No’s
Culverts (New) 1,040 Nos. Gilgit

Completed
CAREC: 5b Raikot
Open Cut Tunnels FEATURES OF KKH
Slope Protection
Open Slab Tunnels 2 way Tunnels Breast Wall
Sign Boards

Drain
Anchor Rope Ribbed
Panel Wall Wide Bridges
Retaining Wall

Sign Boards

Guard Rail
Chevrons

Ruling Gradient 4%
Shoulder 0.6m wide
Shoulder 0.6m wide

Asphalt Concrete
Cement Stabilized Base
Graded Grit Subbase
Geogrid/Geotextile
Crushed Rock Subgrade (for Frozen Soils)
Atta Abad Barrier Lake

Name of Project Re-alignment of KKH at Atta Abad Barrier Lake


Name of Contractor China Road and Bridge Corporation
Scope of Work 24 Km, 5 Tunnels, 2 Bridges and 78 Culverts
Date of
Commencement
July 26th, 2012

Date of Completion September 25th, 2015


Length of Project 24 Km
Progress 100%
Atta Abad Barrier Lake (KKH)
Atta Abad Barrier Lake (KKH)
Khunjrab
MOTORWAY NETWORK
Havelian – Thakot SectionGilgit
(CPEC) Havelian – Thakot

CPEC
Ongoing
118 km
Partial Completion: Oct-18 (39 km)

Length 118 km
Thakot N35
Raikot S1 Hazara Motorway
CAREC:(E-35)
5b
57 km
Thakot Tunnel N45 N95 Completion:May-18
PC-I Cost 136.659 B 615 m Thakot N15
Hakla-DI Khan
EPC Cost 133.98 B Peshawar Havelian S2 S3
290 km
Completion: May-19
Scope Construction of 39 km 06 Lane Access
M1
Burhan 125
Islamabad
N75

Lahore - Islamabad (M-2)


controlled MW, 79 km Class-II N80 357 km
N55 Completed
Highway
Contractor M/s China Communications Pindigheb
Battal Tunnel
M2
Sialkot Lahore – Sialkot
Mianwali 91 km
Construction company Ltd E35 2,906 m Pindi Bhatian Completion: Dec-18
Yarik
Commencement September, 2016 DI Khan Lahore
Zhob M4
Lahore – Multan (M-3)
Completion March, 2020 (42 Months) Gojra 230 km
Shorkot Karmong Tunnel Completion: Aug-18
Havelian-Mansehra section (39 km) N50
M3
442 m
by October 2018 Multan Abdul Hakeem Faisalabad-Gojra (M-4)
N70
N65 58 km
Quetta Khanewal
Progress 45% Mansehra Tunnel
Completed

2528 m Gojra – Shorkot (M-4)


62 km
Completion: Jul-18
N40 N65
Mansehra M5
Interchange
Surab Wanguhills
Interchange
Mansehra Shorkot – Khanewal (M-4)
65 km Tunnel
Shahdad Rato Shikarpur
Khuzdar Kot
Dero Completion: Aug-18
Basima
N30
M8
655
105
Sukkur KWL – MLN (M-4 Ext.)
155 56 km
225
N85
Qalandarabad Completed
Interchange
N35 Sukkur-Multan (M-5)

CPEC
N25 M6
Hoshab 305
392 km
M8 Abbottabad Tunnel -2 Partial Completion: Apr-18 (254 km)
Hyderabad 390 m
Gwadar N10
120
Hyderabad – Sukkur (M-6)
Muslim Abad
Karachi 299 km
M9
Interchange Abbottabad Tunnel -1
1720 m Karachi – Hyderabad (M-9)
Completion in 110
136 km
2017 2018 2019 Havelian
Completion: Feb-18
Or Earlier Or After
Salient Features
Length 118 Km
Contractor M/s China Communications construction company Ltd
Type of Road Expressway/ Access Controlled Highway (Class-II)
PC-I cost (Works) PKR 136.65 Billion
PC-I cost (Land)
Original 7.267 Billion
Under Revision 13.178 Billion
Contract Cost PKR 133.98 Billion
Start Point Havelian
End Point Thakot
a. Havelian – Abbottabad 60 M
b. Abbottabad – Mansehra 60 M
ROW
c. Mansehra – Battagram 40 M
d. Battagram –Thakot Section 40 M
TECHINCAL FEATURES OF THE PROJECT
Sr.
Item Unit Technical Standards and Sections
No.
Expressway (Havelian Expressway (Abbottabad – Class II Highway
1 Highway classification - – Abbottabad) Mansehra) (Mansehra – Battagram)
(27.601 KM) (11.910 KM) (79.170 KM)

2 No of Lanes Nos. 06 06 02

3 Design speed KM/h 100 80 60

Minimum radius of
4 m 437 252 125
horizontal curve
Maximum longitudinal
5 % 4~6 4~6 6
slope

6 Pavement structure - Flexible pavement Flexible pavement Flexible pavement


Detail of Structures
Sr.
Structure Description Total Numbers
No.
06 No’s (02x in Section-I&II having length of 2,110 meters
1. Tunnels
and 04x in Section-III with length of 6,491 meters)

2. Interchanges 03 No’s
3. Bridges 101 No’s (Total Length= 12.769 KM)
4. Culverts 440 No’s
5. Underpasses/Cattle creeps 29 No’s
6. Toll Plazas 07 No’s
7. Weigh Stations 07 No’s
8. Service Areas 02 No’s
Tunnels Progress
Total
Entrance Excavation % completed
Exit Excavation Length completed Total length
S# TUNNEL NAME Description Length length
(Meters) length (Meters)
(Meters) (Meters)
(Meters)
K73+260-K75+025 450.7 645.3 1096 1765 62.10%
Abbotabad 1 #
1
Tunnel
ZK73+316-ZK75+040 305.1 655.1 960.2 1724 55.70%

K78+260-K78+660 24.6 375.4 400 400 100.00%


Abbotabad 2 #
2
Tunnel
ZK78+253-ZK78+625 29 343 372 372 100.00%

3 Mansehra Tunnel K100+922-K103+450 413 580 993 2528 39.28%

4 Karmang Tunnel K13+227-K136+669 0 0 0 442 0.00%

5 Battal Tunnel K144+874-K147+780 750 704 1454 2906 50.03%

6 Thakot Tunnel K176+125-K176+640 565.5 0 565.5 615 91.95%


Khunjrab
MOTORWAY NETWORK
ADB Funded Burhan to Havelian (HazaraGilgitMotorway) 6 Lanes
Havelian – Thakot

CPEC
118 km
Partial Completion: Oct-18 (39 km)

Hazara Motorway (E-35)


Package-1 Package-2 N45 N95
N35
Raikot S1
Package-3 57 km
Completion:May-18
Burhan – Jarikas Jarikas – Sarai Saleh Thakot N15 Sarai Saleh – Havelian
Hakla-DI Khan
M/s CGGC - GRC (JV) M/s CGGC - AM Asso. (JV)Havelian
Peshawar S3
M/s Limak-ZKB (JV) 290 km
S2 Completion: May-19
20.3 km / Rs. 10.2 B M1
19.2 km / Rs. 9.311 B Burhan 125
Islamabad
N75
17.1 km / Rs. 13.10 B
Lahore - Islamabad (M-2)
N55
N80
Havelian
357 km
Completed
Pindigheb Lahore – Sialkot
Sialkot
Mianwali M2
91 km
Pindi Bhatian Completion: Dec-18
Yarik
DI Khan Lahore
Zhob M4
Lahore – Multan (M-3)
Gojra 230 km
Shorkot M3
Completion: Aug-18
N50

Abdul Hakeem S. MaqsoodFaisalabad-Gojra (M-4)


N70
N65
Multan Interchange 58 km
Quetta
Hattar
Khanewal
42+496 Completed
Completed

Interchange Sarai Gojra – Shorkot (M-4)


Jarikas 24+160 CAREC: 5b
62 km
Completion: Jul-18
Interchange
N40 N65
Saleh
17+860 M5
Surab Wanguhills Shorkot – Khanewal (M-4)
Rato Shikarpur
Shahdad Dero
Chechian 65 km
Burhan Basima
Khuzdar Kot Interchange Length / Cost 57 Km / Rs.Completion: Aug-18
30.27 Billion
Interchange 29+200
N30
Jarikas
M8
655
105
Sukkur Scope KWL –ofMLN
Construction (M-4Access
06 Lane Ext.)
0+00 155 56 km
N85
225
Controlled Motorway
Completed
Commencement March, 2015
Sukkur-Multan (M-5)

CPEC
N25 M6
Hoshab 305 Completion Packages I and II:392Completed
km
M8 Partial Completion: Apr-18 (254 km)
December, 2017.
Burhan Hyderabad Package-III: 27th May, 2018(M-6)
Interchange Gwadar N10
120
Hyderabad – Sukkur
Karachi M9 Package-I Package-II 299 km Package-III
Hassan Abdal
Completion in 110
Substantially Completed 81%
Karachi – Hyderabad (M-9)
136 km
2017 2018 2019 Completion: Feb-18
Or Earlier Or After
Faisalabad – Gojra (M-4)
SALIENT FEATURES
Completed Project Cost Rs. 10,305 M
Final Project Cost Rs. 9,630 M (Saving: Rs. 675 M)
CAREC: 5abc, 6c Funding ADB / GOP
Type of Road Four (04) Lane Fenced Motorway
Structures (for 6 Lane Motorway Ext.)
Design Speed 120 kph
Interchanges Three (03)
Bridges & Culverts 11 and 246 Nos. Respectively
Underpasses 55 Nos
Status Completed (March 2015)
Khunjrab
MOTORWAY NETWORK
ADB Funded Gojra – Shorkot Section (62 Km) Havelian – Thakot

CPEC
118 km
Gilgit Partial Completion: Oct-18 (39 km)

Raikot S1 Hazara Motorway (E-35)


Gojra – Shorkot Section (62 Km) JhangDetails
Project
N45 N95
N35 To Faisalabad
57 km
Completion:May-18
Section/Package Section-2A Gojra-Jamani Section-2B Jamani-Shorkot Thakot N15

Length 31 km 31 km Hakla-DI Khan


Peshawar M4 290 km
Havelian
Contract Cost 8.35 Billion 8.83 Billion M1
S2 S3

Islamabad
N75
Completion: May-19
Burhan
Construction of 04 Lane Access Controlled Motorway 125
Lahore - Islamabad (M-2)
Scope With 06 Lane Structures. N55
N80 357 km
Completed
Contractor M/s Xinjiang Beixin M/s China Railways 1ST Group Pindigheb
Gojra
Sialkot Lahore – Sialkot
Commencement March, 2016 Mianwali M2
91 km
Pindi Bhatian Completion: Dec-18
Completion 2018 2018 Yarik
DI Khan Lahore
Lahore – Multan (M-3)
Progress 62% 50% Zhob
Gojra
M4
Gojra 230 km
N50
Shorkot M3 InterchangeCompletion: Aug-18
Multan Abdul Hakeem Faisalabad-Gojra (M-4)
Ongoing Quetta
N70
N65
Khanewal
58 km
Completed
T.T. Singh
Gojra – Shorkot (M-4)
CAREC: 5abc, 6c Interchange 62 km
Completion: Jul-18
N40 Jamani N65
M5
Surab Shorkot – Khanewal (M-4)
Wanguhills
Rato Shikarpur
Shahdad Dero
Toba Tek Singh To Lahore
65 km
Khuzdar Completion: Aug-18
Qaim Basima Kot

Bharwana N30
M8
655
105
Sukkur KWL – MLN (M-4 Ext.)
155
Waryamwala 56 km
N85
225
Interchange Completed

Sukkur-Multan (M-5)

CPEC
N25 M6
Hoshab 305
392 km
M8 Partial Completion: Apr-18 (254 km)
Hyderabad M3
Gwadar N10
120
Hyderabad – Sukkur (M-6)
Karachi
ShorkotM9 299 km
Shorkot Interchange
Rajana
Completion in 110
Karachi – Hyderabad (M-9)
136 km
2017 2018 2019 Completion: Feb-18
Or Earlier Or After
To Khanewal To Abdul Hakim
Khunjrab
MOTORWAY NETWORK
ADB Funded Shorkot – KhanewalGilgit(M-4) 65 Km Havelian – Thakot

CPEC
118 km
Partial Completion: Oct-18 (39 km)

Shorkot – Khanewal (M-4) 65 Km Project Details Shorkot To Gojra


N35
Raikot
Shorkot
S1 To(E-35)
Hazara Motorway Lahore
57 km
Completion:May-18
Section / Package
Section-3A Section-3B N45
Thakot
N95
Interchange M3
Shorkot-Dinpur Dinpur-Khanewal N15
Hakla-DI Khan
290 km
Length 31 km 34 km Peshawar
Shorkot Islamabad
M1
Havelian S2 S3
N75
Completion: May-19
Contract Cost 11.22 Billion 10.82 Billion Cantt
Burhan 125
Pir Mahal Lahore - Islamabad (M-2)
Construction of 04 Lane Access Controlled M-4 N80 357 km
Scope Motorway With 06 Lane Structures.
N55 Completed
Pindigheb Lahore – Sialkot
M/s China M2
Sialkot
Contractor Gezhouba -GRC JV
M/s Xinjiang Beixin Mianwali
Pindi Bhatian
91 km
Completion: Dec-18
Yarik
Lahore
Commencement December, 2016 Zhob
DI Khan
M4
Lahore – Multan (M-3)
Gojra 230 km
Completion September, 2018
Shorkot M3
Completion: Aug-18
N50
Progress 39% 32% Multan Abdul Hakeem Faisalabad-Gojra (M-4)
N70
N65 58 km
Quetta Khanewal Completed
Dinpur
Ongoing Interchange Gojra – Shorkot (M-4)
62 km
Completion: Jul-18
N40 N65 Abdul Hakim
CAREC: 5abc, 6c Surab Wanguhills
M5
Shorkot – Khanewal (M-4)
Rato Shikarpur
Shahdad Dero
65 km
Khuzdar Kot Completion: Sep-18
Basima
N30
M8
655
105
Sukkur KWL – MLN (M-4 Ext.)
155 56 km
N85
225
Mukhhdumpur Completed
Interchange
Mian Sukkur-Multan (M-5)

CPEC
Kabirwala
Hoshab
N25 M6
392 km
M8
Kabirwala 305
Channu Partial Completion: Apr-18 (254 km)
Interchange
Hyderabad
Gwadar N10
120
Hyderabad – Sukkur (M-6)
Karachi Khanwel
M9
299 km

Interchange Karachi – Hyderabad (M-9)


Completion in 110
M-4 Ext. 136 km
2017
Or Earlier
2018 2019
Or After
To Multan
Khanewal Completion: Feb-18
Khanewal – Multan (M-4 Ext.) 55.6 Kms
Completed
CAREC: 5abc, 6c
Khanewal

Multan
M4
Multan – Muzaffargarh – DG Khan (N-70)

Multan

Dera Ghazi Khan


N70
Muzaffargarh

Scope of Work
• Dualization of Muzaffargarh – DG Khan portion of N-70
• Construction of New 2-Lane Bridge on River Indus at Ghazi Ghat
• Maintenance of Multan – Muzaffargarh – DG Khan Section (N-70)
Length / Cost 80 Km / 9.35 Billion
Concession Period 25 Years
Construction Period 24 Months
Commencement Sep, 2016
Exp. Completion Sep, 2018
Work in progress
Ratodero - Dera Ghazi Khan (N-55) (Expressway - 200 Km)
Ongoing Dera Ghazi Khan

CAREC: 5abc, 6c

N55

M5

Ratodero
Sehwan - Ratodero (N-55) (Expressway -199 Km) – (JBIC & GOP)
Ratodero
Completed
CAREC: 5abc, 6c

N55

Sehwan
Peshawar - Torkham N-5 (47 km) USAID
Torkham Completed
CAREC: 5ac, 6c

Peshawar
Gwadar – Hoshab Motorway (M-8) GoP
Completed
CAREC: 5c, 6abd M-8
Hoshab
Turbat

Gwadar-Turbat Gwadar-Turbat Turbat-


Description Sec-I, Pakage-IIA Sec-I, Pakage-IIB Hoshab
(Nalient-Dasht) (Dasht-Turbat) Section-IIA
Length 53.60 km 63.45km 76.25 Km
Contractor M/s FWO
Consultant M/s LRA Group
Cost 5.43 Billion 6.571 Billion 6.910 Billion
Commencement June, 2014
Completion 3rd February, 2016

N-10

Gawdar
Surab – Hoshab (N-85)
Surab
Surab-Hoshab (N-85)
Length 449 km
Cost Rs 17.969 Billion
Commencement September, 2007
Completion December, 2016 Basima
Status Completed

Nag

N85
Panjgur Completed
CAREC: 5c, 6abd

Wadh

Hoshab
Chaman
Jungle-PirAlizai -Chaman Khuzdar-Kalat-Quetta– Chaman Section (N-25)
existing 2 lane carriageway
56 km

Existing Carriageway
Balance work of Kalat – Quetta - Chaman (N-25) 226 km Quetta
Length / Cost 116 (Pckg. II & IV) / 90 MUSD
Contractor M/s FWO(EPC)
Commencement June, 2014
Completion June, 2016
Additional works of 4xbridges, toll plazas, Wiegh bridges and
Kuchlack Bypass are underway and shall be completed 2018

N25

Kalat

Surab

Completed Additional Carriageway (Khuzdar – Chaman)


CAREC: 5c, 6abd Length 431 km
Khuzdar
• FS completed/ Detailed Design underway