0-3356-20
Document Class. 2
Discipline: GENERAL
Document Title:
(AS BUILT)
Issue
Rev. Purpose/Description of Revision Prepared Reviewed Approved Company
Date
REVISION HISTORY
Z10 20OCT09 As Built / Incorporate Alter IH for high temperature cyclic service
Note:
A revision line in the right hand margin denotes revisions.
Reference Document :
Please see addendum developed as part of Tank Farm Expansion Project (CLSCSEF)
Doc.No. RL0-0000-WSP-23406_Z04
Page 2 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Contents
1 SCOPE................................................................................................................................................. 5
17 SAFETY ......................................................................................................................................... 20
20 GUARANTEES .............................................................................................................................. 21
Page 3 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
APPENDIX 5-1: DIMENSION OF BASIC IDENTIFICATION AND FLUID IDENTIFICATION COLOR ..... 95
APPENDIX 5-3: DIMENSION OF BASIC IDENTIFICATION AND FLUID IDENTIFICATION COLOR ..... 95
(OUTSIDE OF PLANT).............................................................................................................................. 95
(OUTSIDE OF PLANT).............................................................................................................................. 95
(OUTSIDE OF PLANT).............................................................................................................................. 95
FIGURE 2A: PIPE IDENTIFICATION (INSIDE OF PLANT) ................................................................... 96
FIGURE 2B: PIPE IDENTIFICATION (OUTSIDE OF PLANT) ............................................................... 98
FIGURE 3: TYPICAL INTERVALS AND LOCATION OF PIPING IDENTIFICATION ............................. 99
FIGURE 4: LETTER STYLE................................................................................................................. 101
FIGURE 5: LETTERING PROCEDURE FOR EQUIPMENT ................................................................ 101
FIGURE 6: TYPICAL LOCATION OF LETTERING FOR EQUIPMENT ............................................... 103
FIGURE 7: LETTERING PROCEDURE FOR TANK ............................................................................ 104
APPENDIX 6: SPLIT OF PAINTING WORKS ......................................................................................... 105
Page 4 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
1 SCOPE
This painting specification covers the minimum requirements for paint, applicable standard, surface
preparation, materials used, inspection, safety, guarantee, for the coating of structural steel, equipment,
piping, valves, fittings, electrical and instrument items, etc. on onshore for Dolphin Project
All the requirements of the following specifications have been incorporated and complied into this
specification.
If above specifications still specified as the reference in any project specifications such data sheets,
requisitions etc., those specified specifications shall be read as S-000-13A0-001.
3 DEFINITIONS
AG Galvanized Steel
The following metallic and non-metallic surfaces do not require painting unless otherwise specified;
Page 5 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
(5) Internal surfaces of process and non – process areas, which are completely sealed to atmospheric
elements, except where, specified otherwise.
(6) All AG surfaces of instrument and electrical items such as cable tray, lighting pole, conduits, etc.
(7) All AI surfaces type 316L of cable trays
(8) All insulation jacketing material
(9) All uninsulated stainless steel type 904L/254SMO and uninsulated/insulated alloy 20
(10) All AG grating, stair and associated galvanized fasteners
(11) All AF and AI steam tracer pipes. However, for AF tracer which will be used on AI traced pipe (run
pipe), 1.2 mmT glass fiber tapes shall be installed between AF tracer and AI traced pipe for isolation
purposes.
In case of impractical and / or inaccessible to apply an applicable painting system, painting shall be
applied as much as possible.
5 SURFACE PREPARATION
Oil, grease, wax, dirt and other foreign matters of metal surfaces shall be removed by cleaning and
degreasing in accordance with ISO 8502 – 1 to 4.
Before and after blasting, all welding seams shall be closely inspected for the presence of welding flux
and spatters, slivers, inclusions, burns, sharp edges, and underlying mill scales. Imperfections shall be
mechanically removed, welding porosity’s and welding pinholes will be corrected and the involved area
reblasted to standard. Sharp edges shall be rounded (r>2 mm) in accordance to ISO 12944-3.
Salt contamination of substrate shall be checked in accordance with ISO 8502-6 and 8502 – 9 and shall
be less than 30 mg/m2 and 20 mg/m2 for immersed zone.
Salt contamination for tank plate shall be less than 60 mg/m2 for both atmospheric and immersed zone.
Salt contamination for piping and structural steel shall be less than 100 mg/m2.
The whole of design requirements for paint application are contained in ISO 12944 – 3.
Where an abrasive blast cleaning is recognized as impossible or damageable for the vicinity, manual
and mechanical (power tool) cleaning could be used on a case by case basis, subject to Company
approval. All dirt, rust, loose mill scale shall be removed by powered hand tools such as powered wire
brushes or needle guns to achieve the standard ISO 8501 – 1 St 3. On completion the surface should
have a pronounced metallic sheen.
Blasting abrasives shall be dry, clean, and free from contaminants and of a type and size adequate to
give the following surface preparation quality requirement.
Conductivity of blasting abrasives shall be assessed according to ASTM D4940 and shall be less than
150 µS/cm and 30 µS/cm for immersed zone.
Compressed air shall be free of oil and water and pressure for blast cleaning operations.
For each supplier paint system, roughness is required as per ISO 8503-2 (a visco tactile roughness
determination method).
Page 6 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Roughness shall be checked with roughness meter (with adapted cut-off) or with visco-tactile (ISO 8503
– 2).
All surfaces of internal epoxy paint type pipe lining shall be prepared by abrasive blasting so as to obtain
a total roughness Rt of:
- between 30 and 50 microns where the total thickness of the lining to be applied is less than 400 microns
- between 50 and 80 microns where the total thickness of the lining to be applied is more than 400
microns.
5.1 AF Surfaces
Abrasive materials for AF surfaces shall be of industrial quality free of contaminants. Sand and copper
slag shall not be used.
Surfaces to be painted shall be of Dust level 2 as per ISO 8502-3 prior to the application of each coat.
5.2 AI Surfaces
Blasting abrasives for AI surfaces shall not contain iron particles and chlorine free to give the specified
angular profile with a Ra of 10 microns minimum.
Surfaces to be painted shall be of Dust level 2 as per ISO 8502-3 prior to the application of each coat.
Care shall be taken for handling and assembling tools used. Tools shall be in stainless steel or well
protected to avoid contamination of stainless steel and duplex stainless steel. Test shall be performed to
assess ferrous contamination as per ISO 8502-1 (direct colorimetry method using Prussian blue): no
surface pollution shall be detected.
Blasting operation shall be performed in a segregated area (blasting cabin) avoiding any iron
contamination.
The Vendor shall provide the Contractor with the following certificates to ensure that:
(a) All paint applied on stainless steel are free of contaminant i.e. metallic pigments able to alter the
substrate natural passivation, sulphur or chloride which could affect the substrate at ambient or
elevated temperatures.
All paint applied on stainless steel surfaces shall be of zinc – free material.
- Uninsulated/insulated 304, 304L, 316, 316L, 321 type of austenitic stainless steel and
insulated duplex type of stainless steel of rotary machines, packaged equipment,
compressors, and turbines
Page 7 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
- Uninsulated / insulated 304, 304L, 316, 316L, 321 type of austenitic stainless steel and
insulated duplex type of stainless steel of pipes, fittings, flanges, valves and misc. bulk
materials
- Insulated 904L and 254SMO type piping and equipment
5.3 AG Surfaces
Surfaces to be painted shall be of Dust level 2 as per ISO 8502-3 prior to the application of each coat.
6 PAINT APPLICATION
(1) Paint shall be applied in accordance with the paint manufacturer’s recommendations and
specification requirements. Particular attention shall be paid to thinning, mixing and curing times
between subsequent coats. Minimum and maximum times between coats shall be consistent with
the product data sheets and with the paint manufacturer’s recommendation.
(2) All areas such as external corners and edges, welds, bolts, nuts and interstices shall receive a
“stripe” coat prior to application of the specified succeeding coat (except with inorganic zinc silicate
primer: when the surface is to be painted with inorganic zinc silicate primer, tie coat may be used on
these areas prior to the application of the specified succeeding coat). Stripe coat of zinc rich epoxy
can be used for operating temperature up to 120 deg. C.
(3) If dismantling of an item is impossible after functional testing, inaccessible area shall be painted with
the complete painting system before assembly.
(4) Any inaccessible surfaces for proper painting application and/or inspection shall be painted prior to
final assembly. Specifically, flange and boltholes shall be coated prior to final installation.
(5) Paint application shall not be conducted under the following conditions;
(b) When the relative humidity of the air is above 85% for epoxy coatings and 90% for inorganic zinc
silicate (subjected to manufacturer’s recommendation / requirements compliance)
(c) Paint shall never be applied in rainy or foggy weather, except under shelter, and subject to
verification of the atmospheric conditions.
(d) When the minimum application temperature is less than 10 °C for epoxy.
(e) When minimum and maximum temperatures of the ambient atmosphere and support are not
within the specified product data sheet limits
(6) Prior to applying a specified succeeding coat, all coatings shall be allowed to dry for at least the
minimum time specified by the paint manufacturer’s data sheet.
(7) Prior to applying next coat, previous coat shall be referred free of dust, grease and foreign matters.
(8) The paint manufacturer shall provide technical assistance to Vendor during paint application.
(9) During zinc based coatings application, particular attention shall be given to avoid zinc spraying on
stainless steel.
Page 8 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
(10) Pressure retaining equipment shall be painted after completion of all heat treatment, pressure tests
and examination. Painting has to be done before hydrotest (e.g. Air Cooler, Plug Type Heaters,
Tubesheet back). All the welds are to be covered by straps during painting. Welds are to be painted
after successful completion of the hydrotest.
For piping, only primer shall be applied before hydrotesting.
(11) For Field Jointed areas, mechanical cleaning such as SSPC – SP2 or SP 3 shall be done prior to the
application of the specified painting system.
7 SPECIAL REQUIREMENTS
7.1.1 Bolts and Nuts (Structural Steel, Anchor Bolts, and Piping)
All carbon steel bolts and nuts shall be delivered zinc plated (electrolytic deposition or spun hot dip
galvanizing). Application of anti-seizing solvent is for carbon steel bare bolts and nuts, not applied for
zinc plated bolts and nuts, before bolting. After tightening, bolts and nuts shall be cleaned and degreased
by suitable methods such as solvent cleaning, hand tool cleaning, etc. and apply finish coat as per para.
2-10-1-1 of Appendix 2-10 based on operating temperature of the substrate.
All stainless steel bolts and nuts are supplied uncoated, but will be degrease with a suitable solvent and
then applied one coat of surface tolerant epoxy (glass flake free) at 40 microns DFT before tightening at
site. Surface tolerant epoxy and solvent for degreasing shall be suitable for stainless steel application
free from chlorides, iron particles, etc. After tightening and cleaning, finish coat as per para. 2-10-1-2 of
Appendix 2-10 shall be applied on the exposed parts. In any case, Vendor or Paint Contractor shall
submit surface tolerant epoxy and degreasing agent data sheets to Contractor for approval.
7.1.2 Equipment bolts and nuts (AFC, Pressure Vessel, Heat Exchanger), Packaged
Bolt and nuts for flange of manhole, handholes, and nozzle with blind flange shall receive flouropolymer
coating (Americote or equivalent) before bolting as per Section 8.5 of GS PVV 211 and Section 7.5 of GS
PVV 212 at Vendor shop. After tightening, only touch-up works on damaged areas will be done at site.
All other bolts and nuts shall be zinc plated (electrolytic deposition) / bichromated-treated before bolting
at Vendor shop. After tightening, shall be painted together with the equipment, etc. using specified
painting system. Only touch-up works on damaged areas will be done at site.
No treatment before bolting. After bolting it shall be painted together with the equipment, etc. using
specified painting system at Vendor shop. Only touch-up works on damaged areas will be done at site.
7.1.3 Furnace bolts and nuts (Boiler, HRSG and Fire Heater)
For pressurized parts shall receive flouropolymer coating (Americote or equivalent) before bolting as per
Section 8.5 of GS PVV 211 and Section 7.5 of GS PVV 212 at Vendor shop. After tightening, it shall be
painted together with the equipment, etc. using specified painting system. Only touch-up works on
damaged areas will be done at site.
For structural steel and fired heater shall be zinc plated (electrolytic deposition or spun hot dip
galvanizing) before bolting at Vendor shop. After tightening, shall be painted together with the equipment,
etc. using specified painting system. Only touch-up works on damaged areas will be done at site.
Page 9 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
No treatment before bolting. After bolting it shall be painted together with the equipment, etc. using
specified painting system at Vendor shop. Only touch-up works on damaged areas will be done at site.
All carbon steel bolts and nuts shall be zinc plated (electrolytic deposition) / bichromated – treated before
bolting. After tightening, it shall be painted together with rotating machine using specified painting
system.
No treatment for stainless steel bolts and nuts before bolting. After bolting it shall be painted together
with the equipment, etc. using specified painting system at Vendor shop. Only touch-up works on
damaged areas will be done at site.
All carbon steel bolts and nuts shall be delivered zinc plated (electrolytic deposition or spun hot dip
galvanizing) and no painting.
All bolts for valves shall be zinc plated (electrolytic deposition) / bichromated-treated as per GS PVV 142
before bolting. After bolting, shall be painted together with valves using specified painting system at
Vendor shop. Only touch-up works on damaged areas will be done at site.
All carbon steel bulk valves and bulk piping miscellaneous materials such as strainer, steam trap, etc.
shall be primed with zinc ethyl silicate primer at Vendor shop in case its operating temperature where the
items is to used is unknown.
In case the operating temperature is known, bulk valves and bulk piping miscellaneous materials shall be
fully painted as per requirement of this specification and touch up works shall be carried out after
installation.
For items with many angles, areas not easy to reach with paint gun, P01 system can be replaced by P14
system modified as follows so as to reach 5 years Ri 2 guarantee according to ISO 4628-3;
TSA, with sealer, could be considered as an alternative solution to protect carbon steel if it is
demonstrated that painting system is not suitable or not able to give sufficient expected lifetime. For
example, insulated piping, which cannot be inspected easily, or structures or equipment subject to wide
range cyclic temperature could be coated by TSA. Qualification, application, inspection of TSA will be the
subject of a specific procedure or treated in paint procedure. Finish coat (if necessary) shall be selected
in accordance with operating conditions.
Page 10 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
To enhance corrosion resistance and to ensure electrical continuity for steel structure, the following
activity shall be done on contact areas of steel structure;
At Vendor Shop:
2. Inorganic Zinc primer shall be applied on all steel structure surfaces.
3. Contact surfaces shall then be masked with tape based on sketch drawing.
4. Intermediate and finish coat shall be applied as per specification.
At Site:
1. Peel off the masking tape on all contact surfaces
2. Immediately apply one build-up coat of Organic Zinc Rich paint.
Underground piping shall be wrap with tape wrapping system based on its operating temperature
involved. Tape manufacturer’s recommendation on primer application and tape wrapping procedure
shall be followed at all times.
For Seal Leg, 350 to 500 microns of FBE (Fusion Bonded Epoxy) will apply at shop and 2 coats of
Hempadur with 300 microns per coat and 600 microns of total DFT for field joint area at field.
1. Material
(1) Primer
Type: Butyl based elastomers blended with polymeric resins
Polyken Primer #1027 or equivalent
2. Application
(1) Steel surface of pipes, fittings and welds shall be cleaned by power tool to SSPC-SP3 combined
with hand tool to SSPC-SP2. Weld spatters, projections, sharp edges or indentations, burrs shall
be ground smooth.
(2) Primer shall be applied to a uniform thickness on the surface free of floods, runs, sags, drips and
visible holidays using either brush or roller spreader in accordance with tape manufacturer’s
recommendation. The primer shall be tacky to dry at the time the tape is applied.
(3) Mastic and mastic strip shall be used for filling the gaps and molding of the irregular shapes of the
pipeline, such as parts around the bolts and nuts, on the flange connections, valves, etc. Mastic
and mastic strip shall be put between wrapped piping and supports for protection of the wrapped
piping.
(4) Wrapping with tape on a half-dried primed surfaces. Tape wrapping shall be applied spirally with a
minimum overlap of 50 percent (#980-25) and minimum overlap of 67 percent (#980-20). Prime
coated surfaces shall not be left without wrapping to the following day.
Page 11 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
1. Material
(1) Primer
Type: Butyl based elastomers blended with polymeric resins
Polyken Primer# 1627 or equivalent
2. Application
7.6.3 For operating temperature above 120 deg. C and up to 200 deg. C
1. Material
(1) Primer
Type: Silicone resin based primer
ACT 200U-P or equivalent
(4) Topcoat
Type: Silicone resin based topcoat
ACT 200U-P or equivalent
2. Application
(1) Steel surface of pipes, fittings and welds shall be cleaned by power tool to SSPC-SP3 combined
with hand tool to SSPC-SP2. Weld spatters, projections, sharp edges or indentations, burrs shall
be ground smooth.
(2) Primer shall be applied immediately after the completion of surface preparation using brush or
roller. The primer shall be applied in two coats.
Page 12 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
For structures and related equipment, the corrosivity categories shall be classified C5-M as per ISO
12944-2 and suitable for tropical service and marine corrosion proof.
For system based on zinc ethyl silicate primer, the following precaution shall be taken:
• Particular attention shall be given to respect paint film thickness as per system requirements.
• Two hours after application, zinc ethyl silicate shall be sprayed with fresh water
• Before over coating zinc ethyl silicate layer, MEK test shall be perform as per requirements of
ASTM D 4752 level 5 to ensure the curing of zinc ethyl silicate.
All paint materials shall be stored in optimal conditions for their best conservation and delivered in their
original packaging. The packaging precise the batch number, the fabrication date and expired date.
The maximum expired dates considered starting to the fabrication dates are;
For some particular products in accordance with the paint manufacturer’s recommendations and the
Contractor approval.
Uninsulated portions of insulated items shall be painted in accordance with the painting system for
uninsulated painting system of intended operating temperature conditions.
All surfaces to be protected for personnel protection shall be painted in accordance with the painting
system for uninsulated surfaces.
For cyclic condition (JT and Regeneration), the painting system shall be based on the maximum cyclic
temperature condition, not the normal operating temperature condition.
For steam-out condition, the painting system shall be based on the steam-out temperature condition, not
the normal operating temperature condition.
Sulfur purge, catalyst passivation and start – up condition shall be considered to select the painting
system.
Considering the constructivity of painting work, zinc ethyl silicate can be used as primer for the alternative
painting system for up to 400 deg. C operating temperature conditions of uninsulated / insulated AF
surfaces and alternative painting systems are as follows;
Page 13 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Vendor’s standard paint system will be applied only if the specified paint system in APPENDIX 2 is
impossible to be applied or not suited for that specific items or conditions of service and shall be
subjected to Contractor approval. Contractor to issue a waiver in that case, for Company approval.
Before application, the complete product data sheets and safety data sheets shall be supplied to the
Contractor with a painting procedure. The application shall start only after written approval of the
Contractor.
The Vendor’s standard paint systems shall also comply with the following;
(1) Vendor standard paint system shall be suitable for a marine salty environment exposed conditions. If
for any reason a Vendor’s standard paint system is delivered with a finish coat not suitable for a
marine exposure conditions and equipment is intended for outside exposure at ambient temperature,
it shall be painted with an epoxy surface tolerant paint plus polyurethane coat after checking paint
materials compatibility.
(2) To allow possible painting touch up after installation on site, all items coated with a Vendor’s
standard painting system, shall be delivered on site with a sufficient quantity of finish coat to restore
any small damage. (Refer to para. 21 of this specification)
(3) Powder paint subjected for Contractor approval. Equipment coated with powder paint, will be no less
than 200 µm thick if exposed outside. For inside exposure a lower dry film thickness may be allowed
after Contractor approval. Prior to apply a powder system, Contractor’s approval will be needed.
Process shall be provided to the Contractor with relevant products technical data sheets and
application procedures.
11 COLOR CODING
The final coat color of all equipment and piping shall be followed in accordance with APPENDIX 3 of this
specification.
(1) Pipe service fluid abbreviation shall be identified according to the fluid service carries as stipulated in
APPENDIX 4 of this specification
(2) The basic identification color shall be applied by band X mm wide around the pipe on either side of
each valve, fitting, wall penetration and any other places where identification of the fluid is necessary.
Page 14 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
(3) The fluid identification color shall be applied by band Y mm wide all around the pipe and placed in the
middle of the basic identification color as shown in FIGURE 2A.
(4) Fluid abbreviation shall be painted in black letter as shown in FIGURE 2A. The flow direction shall be
indicated by a repetition of the basic and fluid identification colors downstream at Y mm apart and Y mm
wide as shown in FIGURE 2A.
(5) The flow direction, basic identification color band and fluid identification colors for piping shall be
identified near the operating point on the loading/unloading piping lines in accordance with FIGURE 3
and piping connection point on the utility supply piping lines.
(6) Inlets and outlets pipes of equipment shall be provided with flow direction, basic identification color
band and fluid identification colors.
(7) Actual location of flow direction, basic identification color and fluid identification color as topside or
underside of horizontal position and vertical position on pipes shall be determined at site in consideration
of visibility to operator.
(8) Detail dimension of basic identification color and fluid identification color shall be in accordance with
APPENDIX 5-1.
(9) Detail dimension for lettering of fluid abbreviation shall be in accordance with APPENDIX 5-2 and
FIGURE 2A.
(10) ESDV, SDV and other major valves shall be with unique identification or color codes so that
possibility of “Accidental” operation shall be minimized.
Pipe identification for hydrocarbon liquid lines and lines outside the plant fence and located in RLIC
common area shall be as follows;
(1) Basic identification, fluid identification and flow direction arrow shall be in accordance with FIGURE
2B.
(2) Detail dimension of basic identification color and fluid identification color shall be in accordance with
APPENDIX 5-3.
(3) For hydrocarbon lines instead of marking the fluid abbreviation “L” as per APPENDIX 4, line number
shall be marked as shown in FIGURE 2B.
(4) Detail dimension for lettering of line number and flow direction arrow shall be in accordance with
APPENDIX 5-4 and APPENDIX 5-5.
(5) The lettering of line number and flow direction arrow shall be painted in black (RAL 9005) as shown in
FIGURE 2B.
Pipe identification for the three lines located in corridor area shall receive the following details;
Details of line numbering for the three lines located in corridor area shall follow item 7.1 of ES.0.07.0025
Rev. E, with an ownership code “DE” assigned for Dolphin Project. Area Code will depend on
RLGE-0-07-0002 Rev. E and insulation code “H” is used since there is no code for solar protection.
Typical example for pipe identification in corridor area shall be referred in FIGURE 2B.
Page 15 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Surface treatment by hand abrading using sand paper to remove the gloss and promote adhesion over
the existing coating for both uninsulated and pre-painted insulation jacketing material shall be done prior
to any lettering and fluid identification. Ensure that the surface to be painted is dust free prior to painting.
b. GRP Pipes
Surface treatment by solvent degreasing followed by hand adbrading using 80 to 100 grit sand paper to
ensure adhesion shall be done prior to any lettering and fluid identification on above ground GRP pipes.
Ensure that the surface to be painted is dust free prior to painting.
c. Painting Materials
Painting materials shall be a two-component polyurethane type paint to achieve the required color in
APPENDIX 4. Single coat of paint to be applied as a minimum, although more than one coat may be
required to achieve the required obliteration of the preceding paint color.
(1) The tag number of equipment shall be lettered on the surface of the equipment and the number of
lettering shall be one (1) per equipment with black (RAL 9005).
(2) Equipment lettering procedure and size of lettering for reactors, columns, drums, air fin coolers, heat
exchangers, machines, furnaces, pumps, compressors, etc. shall be as per FIGURE 5, TABLE 1,
TABLE 2, and TABLE 3 except small drums such as air holders and snubbers. Flares and analyzer
shelter are not required identification by tag numbers.
(3) Regarding the location of lettering of equipment, FIGURE 6 shall be followed but details will be
finalized at the field considering site conditions.
(4) For the lettering of air fin coolers, both induced fan type and foced fan type shall be identified tag
number on plenum chamber and no lettering for fan motors.
(5) For the concrete foundation surface for pumps and fire proofed surface of equipment and furnaces,
epoxy white paint shall be applied as a background for the lettering. Size of background shall be fixed at
site considering site conditions.
Lettering on foundation, which is applicable such as pumps and compressors, lettering size shall be as
per TABLE 2.
(6) In case of lettering to insulated equipment, the lettering shall be direct marked on the insulation
jacketing surfaces after light abrading.
Page 16 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
(8) For main process equipments in area A110/A210, A120/A220, A130/A230, A140/A240, A150/A250
and C120 (U109) shall be lettered tag number and service name as per FIGURE 6. Items of main
process equipment and abbreviation of service name for the long service name equipment shall be
finalized at site.
Small equipments such as filters, small tanks, small drums, and small pumps lettered tag numbers only.
For air holders and snubbers no lettering number and service name required.
(9) Lettering of equipment shall be marked on the pipe rack walkway side.
(1) The tag number of storage tank and service name shall be lettered on all storage tanks.
(2) Lettering procedure and its dimension for lettering of storage tank tag number and service name shall
be as per FIGURE 7 and TABLE 4.
(3) Company Logo shall be marked for Condensate Storage Tank (143-0T0100-A/B/C) and Fire Water
Storage Tank (153-0T0200) above the tank tag number. Color of company logo shall be finalized at site.
(4) The lettering to storage tank shall be one (1) per each storage tank. In addition “STORAGE TANK”
will be abbreviated as “STG TK”.
(5) The detail position of lettering to storage tank shall be finalized one by one considering the site
conditions.
(6) In case of lettering of insulated storage tanks to corrugated jacket surface, lettering shall be direct
marked on the corrugated jacketing surfaces after light abrading.
12 PAINTING REPAIRS
If the defect is detected during inspection phase, this defect shall be defined as per requirements of ISO
4628 (Type, dimension and scale).
Page 17 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
For high temperature system, touch up of inorganic zinc silicate shall be done with zinc rich epoxy,
excepting substrates with operating temperature is higher than 80 deg. C, in this case a zinc silicate
primer shall be used. The surface shall be prepared and painting shall be reinstated such that the
furnished coating complies with this specification.
(5) Where an abrasive blast cleaning is recognized as impossible, mechanical or manual surface
preparation to ISO 8501-1 grade St 3 could be applied for touch-up and field jointed areas.
(6) Any repair procedure shall be submitted for approval, in writing to Contractor prior to commencement
of the work.
Extent of painting works at Vendor shop and at Construction site shall be referred to APPENDIX 6 of this
specification.
Throughout the duration of the work, the Vendor or Paint Contractor shall check the following points and
recorded in the paint daily report
• Dry film thickness of each coat and of the complete painting system as per ISO 19840
Readings shall take into account roughness since calibration is done on smooth plate. Then
thickness is given by the following formula:
• Curing test for zinc silicates as per ASTM D4752. Only level 5 is acceptable (no trace of zinc).
• Conductivity test for blasting abrasives shall be assessed according to ASTM D4940 and shall
be less than 150 µS/cm for emerged zone and 30 µS/cm for immersed zone.
• Appearance of the final coat such as Cracking, Bubbling, Pin-holes, Run, Sags, color etc. shall
be checked.
• Adherence test
Page 18 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
The adherence test shall be carried out on three steel test plate (dimensions 250 x 150 x 5mm). Surface
preparation, paint application shall be done at the same time and in the same conditions than the item to
be painted.
Test shall be carried out after full curing the painting system (21 days at 20 deg. C) or according to
manufacturer’s recommendation.
For systems with total dry film thickness of less than 200 microns, adhesion test shall be crosscut test in
accordance with ISO 2409 and acceptance result shall be No. 0 as a minimum or as per specified value
in Appendix 2.
For systems with total dry film thickness of 200 microns and above, adhesion test shall be pull-off test in
accordance with ISO 4624 and acceptance result shall be > 3 Mpa minimum for external coating and 4
Mpa for internal coating or as per specified value in Appendix 2 when tested with a mechanical
apparatus acceptance result shall be > 5 Mpa minimum or as per specified value in Appendix 2 if tested
with a pneumatic or hydraulic apparatus.
The porosity of the coating shall be checked across the entire surface using a wet sponge or an electrical
brush in accordance with painting system instruction. No arcing at the voltages specified in the painting
system data sheet shall be permitted.
The porosity of the coating shall be test in accordance with the requirement in ASTM D5162.
The Inspector shall mark the position of the defect to locate the repair to be made.
All porosity shall be repaired. Where the number of pores is more than 3 per m2, the part examined shall
be entirely re-prepared and recoated in compliance with this specification.
All result of the above mentioned tests shall be recorded in painting daily report as per APPENDIX 7.
(1) One-month minimum before work commences; all the chosen systems shall be applied (graded) on
representative elements of the structure. The paint materials used shall be taken from the same
batches as those intended for the structure.
(2) The system shall be applied in the presence of the Supplier of the paint materials and the
Contractor’s representative. Application shall be performed by the painting specialist who will be
responsible for application during work.
(3) A pre-operational technical meeting shall be organized by the Vendor in the presence of the
Contractor and the Paint Manufacturer to analyze all the details concerning performance of the work,
and the application and inspection principles.
Page 19 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Painting inspectors shall be individually certified personnel by an approved organization such as ACQPA,
FROSIO, NACE International minimum Level 3 equivalent to CIP (Coating Inspector Program) Level 2
Coating Inspector of NACE New Training Structure, etc.
The following reports and documents shall be issued by the Quality Control Department of the Vendor or
Painting Contractor to the Contractor;
The Vendor and Painting Contractor shall complete, document in APPENDIX 9 in order to help
Contractor to control if painting procedure is correct or if it shall be completed. No procedure will be
checked without this document correctly completed.
17 SAFETY
The painting manufacturer’s health and safety instructions on the use of their products provided on data
sheets and warning labels shall be fully understood and complied with before any work is undertaken.
Paint safety data sheets shall be available on the painting site.
Page 20 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Care shall be taken to avoid damage to coating systems during loading, transport, unloading and storage.
All slings, ropes and chains shall be rubber sheathed or otherwise suitably protected. Synthetic belt
slings are preferred. Adequate timber blocks shall be provided when stacking coated items, and no items
shall be stacked directly on the ground. Small pieces of equipment shall be packaged (or crated) to avoid
coating damages.
Quality controls, batch number records, meteorological conditions records, coating reports etc. shall be
issued by the Quality Control Department of the Vendor to the Contractor.
Contractual documents:
• A blasting and coating report issued by the Vendor QC Department as per APPENDIX 7shall be
added to the painting report.
• The product certificates of material used to perform the painting work.
20 GUARANTEES
The coatings shall be covered by a specific guarantee, the duration, criteria and levels of performance of
which shall be specified in each painting system.
Painting works shall be warranted in accordance with ISO 4628 – 3 Evaluation of degradation of paint
coatings. Designation of degree of rusting: Rust scale shall be maximum Ri 2 after 5 years or as per
individual painting system.
For surfaces to be fireproofed, the guarantee given by the fireproofing manufacturer shall not limit to the
fireproofing materials but shall extend to the entire painting system (painting system and fireproofing).
The paint manufacturer of the pipe lining material shall submit a written guarantee to Contractor
indicating that the pipe lining material is compatible with the effluent and will not release any volatile
component.
The Contractor, the Vendor and/or Painting Contractor and the Paint Manufacturer shall jointly
underwrite the guarantee.
Vendors will have to incorporate in crates or other packing, a sufficient quantity of different products
(paint with every coats and colors, solvents, etc.) to allow site touch up for 5% of the surface per system
only for Vendor’s standard painting system.
Page 21 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Page 22 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Page 23 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Page 24 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
APPENDIX 2: SUMMARY OF PAINTING SYSTEM FOR DOLPHIN PROJECT
APPENDIX 2-1: PAINTING SYSTEM FOR STEEL STRUCTURE
Painting System Remarks
Ope. Surface Nom.
Supplier Surface Deg. Of Mech.
Material Sys. Temp. Prep. Nom Nom Nom Nom Total Operating
Condition Sys. No. Roughness Intermediate Guarantee Rusting Pull-off
(Note 1) No. (°C) (ISO Primer DFT Tie-coat DFT DFT Finish Coat DFT DFT Temp.
(Note 9) (ISO 8503-2) Coat Years (ISO test (min)
8501-1) (µm) (µm) (µm) (µm) (µm) Resistance
4628-3) (ISO 4624)
2-1-1. Frame Element, Ladders, Cages, Safety gates, Toe plates, Handrail and Platforms
Grit – Intergard
P01I Sa3 Interzinc 22 60 30 Intergard 475HS 150 Interthane 990 50 290 5 Ri 2 3 Mpa Less than 80
Medium (G) 269
Grit – Penguard
P01J Sa3 Resist GTI 60 30 Jotamastic 87 150 Hardtop AS 50 290 5 Ri 2 3 Mpa Less than 80
Medium (G) Tiecoat 100
Sigma Sigmacover
Grit – Sigmarite Freitane 501 or
P01SF Sa3 Tornusil MC 60 40 Freitapox SR 150 50 300 5 Ri 2 3 Mpa Less than 80
Medium (G) Sealer Sigmadur Gloss
58 213
Grit – Penguard
P04J Sa3 Resist GTI 60 30 Jotamastic 87 150 - - 240 5 Ri 2 3 Mpa Less than 80
Medium (G) Tiecoat 100
Sigmacover
Grit – Sigma Tornusil Sigmarite
P04SF Sa3 60 40 Freitapox SR 140 - - 240 5 Ri 2 3 Mpa Less than 80
Medium (G) MC 58 Sealer
213
Page 25 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Grit – Penguard 90
P04J-I Sa3 Resist GTI 60 30 - - - - - - - -
Medium (G) Tiecoat 100 (Max.)
Sigma
Grit – Sigmarite 90
P04SF-I Sa3 Tornusil MC 60 40 - - - - - - - -
Medium (G) Sealer (Max.)
58
2-1-3. Floors
Sigma
Grit – Sigmarite Sigmacover TCP Less than
P02SF Sa3 Tornusil MC 60 40 200 - - 300 5 Ri 2 4 Mpa
Medium (G) Sealer Glassflake 80
58
Page 26 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Page 27 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Page 28 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Page 29 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Grit –
UH-J Sa3 Solvalitt 25 - - - - Solvalitt 25 50 - - - -
Medium (G)
Sigmatherm Sigmatherm
Grit – Super Super
UH-SF Sa3 25 - - - - 25 50 - - - -
Medium (G) Thermovit Thermovit
600 Primer 600 Finish
Page 30 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Page 31 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Grit – Carbozinc
IH-C Sa3 60 - - - - - - 60 - - - -
Medium (G) 11
Grit –
IH-I Sa3 Interzinc 22 60 - - - - - - 60 - - - -
Medium (G)
Grit –
IH-J Sa3 Resist GTI 60 - - - - - - 60 - - - -
Medium (G)
Sigma
Grit –
IH-SF Sa3 Tornusil MC 60 - - - - - - 60 - - - -
Medium (G)
58
2-2-2. Platform, Guardrail or Handrail, Ladder and Cage of Equipment, AFC, Furnace, Boiler, Duct and Process Vessels
Page 32 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Page 33 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Etched or
Ra = 10 µm. Solvalitt Solvalitt
S2J Degreased and 25 - - - - 25 50 - - - - -
Blast cleaning min (Note 3) Aluminum Aluminum
2-2-4. External of Galvanized Steel Equipment, AFC, Furnace, Boiler, Duct and Process Vessels
Gratings,
Stairs &
associated GN T< 80 - No Painting - - - - -
galvanized
fasteners
Etching - - - Epoxy 30-50 130 – 220 – Less than
P05 Epoxy Polyurethane 50 5 - Good 2 Mpa
or Paint Manufacturer’s Recommendation 150 230 80
Etching w/ Amercoat 71
- - - 30 Amercoat Less than
P05A Amercoat 59 primer Amercoat 385 150 50 230 5 - Good 2 Mpa
450S 80
or Paint Manufacturer’s Recommendation
Etching w/ Carboguard
- - - 30 Carboguard Carbothane Less than
P05C Lithoform No. 2 193 primer 150 50 230 5 - Good 2 Mpa
Ladders, 893 134 80
or Paint Manufacturer’s Recommendation
AG Cages,
Etching w/ Hempadur
Safety - - - 30 Hempadur Hempathane Less than
T< 80 P05H Lithoform No. 2 4508 150 50 230 5 - Good 2 Mpa
gates, 4588 5521 80
P05 (Note or Paint Manufacturer’s Recommendation
Toeplates,
8)
Handrail Etching w/ Intergard
and - - - 30 Intergard Less than
P05I Foscral 291 150 Interthane 990 50 230 5 - Good 2 Mpa
Platforms 475HS 80
or Paint Manufacturer’s Recommendation
Etching w/ Penguard
- - - 30 Less than
P05J Lithoform No. 2 Tiecoat 100 Jotamastic 87 140 Hardtop AS 50 220 5 - Good 2 Mpa
80
or Paint Manufacturer’s Recommendation
Etching w/ Sigmacover
- - - 50 Sigmacover Freitane 501 or
Lithoform No. 2 Primer Less than
P05SF Freitapox SR 130 Sigmadur 50 230 5 - Good 2 Mpa
80
or Paint Manufacturer’s Recommendation 213 Gloss
Page 34 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Page 35 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Etched or
SA (AI) – Ra = 10 µm. Sigmatherm Sigmatherm
Degreased and 25 - - - - 25 50 - - - - -
SF Blast cleaning min (Note 3) Silacryl 7565 Silacryl 7565
Page 36 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
AI - SN - No Painting
Page 37 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Page 38 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Page 39 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Page 40 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Page 41 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Page 42 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Page 43 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
APPENDIX 2-4: PAINTING SYSTEM FOR ROTARY MACHINE, PACKAGED EQUIPMENT, ETC.
Painting System Remarks
Surface Surface Nom.
Ope. Supplier Deg. Of Mech.
Material Sys. Prep. Roughness Nom Nom Nom Nom Total Operating
Condition Temp. Sys. No. Intermediate Guarantee Rusting Pull-off
(Note 1) No. (ISO (ISO Primer DFT Tie-coat DFT DFT Finish Coat DFT DFT Temp.
(°C) (Note 9) Coat Years (ISO test (min)
8501-1) 8503-2) (µm) (µm) (µm) (µm) (µm) Resistance
4628-3) (ISO 4624)
2-4-1. Machines such as Rotary Machine
Grit – 50 – 250 – Less than
P14 Sa3 Zinc Rich Epoxy - - Epoxy 150 Polyurethane 50 5 Ri 2 3 Mpa
Medium (G) 60 260 80
Grit – Amercoat Less than
P14A Sa3 Amercoat 68 50 - - Amercoat 385 150 50 250 5 Ri 2 3 Mpa
Medium (G) 450S 80
Grit – Carboguard Carbothane Less than
P14C Sa3 Carboline 658 P 50 - - 150 50 250 5 Ri 2 3 Mpa
Medium (G) 893 134 80
Grit – Hempadur Zinc Hempadur Hempathane Less than
P14 P14H Sa3 50 - - 150 50 250 5 Ri 2 3 Mpa
T < 80 Medium (G) 1536 4588 MIO 5521 80
(Note 8) Grit – Intergard Less than
P14I Sa3 Interzinc 72 50 - - 150 Interthane 990 50 250 5 Ri 2 3 Mpa
Medium (G) 475HS 80
Grit – Less than
P14J Sa3 Barrier 50 - - Primastic 150 Hardtop AS 50 250 5 Ri 2 3 Mpa
Medium (G) 80
Sigmacover Freitane 501
Grit – Sigmarite Vigor Less than
P14SF Sa3 60 - - Freitapox SR 150 or Sigmadur 50 260 5 Ri 2 3 Mpa
Medium (G) ZN 302 SR 80
213 Gloss
Or VS - Vendor Standard Painting System subject for Contractor’s approval
Grit – Epoxy or Epoxy or Less than
P10 Sa3 120 - - 120 - - 240 3 Ri 2 3 Mpa
Medium (G) Phenolic Epoxy Phenolic Epoxy 120
Grit – Less than
P10A Sa3 Amerlock 400 120 - - Amerlock 400 120 - - 240 3 Ri 2 3 Mpa
Medium (G) 120
Grit – Thermaline 400 Thermaline 400 Less than
P10C Sa3 120 - - 120 - - 240 3 Ri 2 3 Mpa
Medium (G) Primer Finish 200
Grit – Hempadur Less than
Uninsulated P10H Sa3 Hempadur 4514 120 - - 120 - - 240 3 Ri 2 3 Mpa
AF P10 Medium (G) 4514 120
/ Insulated Grit – Less than
P10I Sa3 Intertherm 228 120 - - Intertherm 228 120 - - 240 3 Ri 2 3 Mpa
Medium (G) 150
Grit – Tankguard Tankguard Less than
P10J Sa3 120 - - 120 - - 240 3 Ri 2 3 Mpa
Medium (G) Storage Storage 120
Sigmacover Sigmacover
Grit – Less than
P10SF Sa3 Vigor EP 235 120 - - Vigor EP 235 120 - - 240 3 Ri 2 3 Mpa
Medium (G) 150
Aluminum Aluminum
80 <T
Grit – Zinc Ethyl Epoxy or Less than
<120 Alter P10 Sa3 60 - - 120 Polyurethane 50 230 3 Ri 2 3 Mpa
Medium (G) Silicate Phenolic Epoxy 120
Dimetcote 19 or
Alter Grit – 6 or equivalent Amercoat Less than
Sa3 60 - - Amerlock 400 120 50 230 3 Ri 2 3 Mpa
P10A Medium (G) as per Paint 450S 120
Mfg. Recom.
Alter Grit – Thermaline 400 Carbothane Less than
Or Sa3 Carbozinc 11 60 - - 120 50 230 3 Ri 2 3 Mpa
P10C Medium (G) Finish 134 200
Alter
Alter Grit – Hempadur Hempathane Less than
P10 Sa3 Galvosil 1570 60 - - 120 50 230 3 Ri 2 3 Mpa
P10H Medium (G) 4514 5521 120
Alter Grit – Less than
Sa3 Interzinc 22 60 - - Intertherm 228 120 Interthane 990 50 230 3 Ri 2 3 Mpa
P10I Medium (G) 150
Alter Grit – Tankguard Less than
Sa3 Resist GTI 60 - - 120 Hardtop AS 50 230 3 Ri 2 3 Mpa
P10J Medium (G) Storage 120
Sigmacover Freitane 501
Alter Grit – Sigma Tornusil Less than
Sa3 60 - - Vigor EP 235 120 or Sigmadur 50 230 3 Ri 2 3 Mpa
P10SF Medium (G) MC 58 150
Aluminum Gloss
Page 44 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
APPENDIX 2-4: PAINTING SYSTEM FOR ROTARY MACHINE, PACKAGED EQUIPMENT, ETC.
Painting System Remarks
Surface Nom. Mech.
Ope. Supplier Surface Deg. Of
Material Sys. Roughness Nom Nom Nom Nom Total Pull-off Operating
Condition Temp. Sys. No. Prep. (ISO Intermediate Guarantee Rusting
(Note 1) No. (ISO Primer DFT Tie-coat DFT DFT Finish Coat DFT DFT test (min) Temp.
(°C) (Note 9) 8501-1) Coat Years (ISO
8503-2) (µm) (µm) (µm) (µm) (µm) (ISO Resistance
4628-3)
4624)
2-4-1. Machines such as Rotary Machine
Grit – Zinc Ethyl 20 – 20 – 100 –
P11 Sa3 60 Silicone Silicone - - 1 - Ri 2 -
Medium (G) Silicate 30 30 185
Dimetcote 19
or 6 or
Grit –
P11A Sa3 equivalent as 60 - - Amercoat 741 125 - - 185 1 - Ri 2 -
Medium (G)
per Paint Mfg.
Recom.
Grit – Carboline
120 < P11C Sa3 Carbozinc 11 60 - - 20 Carboline 4631 20 100 1 - Ri 2 -
Medium (G) 4631
P11 T<
Grit – Silicone ALU Silicone ALU
400 P11H Sa3 Galvosil 1570 60 - - 25 25 110 1 - Ri 2 -
Medium (G) 5691 5691
Grit –
P11I Sa3 Interzinc 22 60 Intertherm 50 20 Intertherm 50 20 - - 100 1 - Ri 2 -
Medium (G)
Grit –
P11J Sa3 Resist GTI 60 Solvalitt 25 Solvalitt 25 - - 110 1 - Ri 2 -
Medium (G)
Sigmatherm Sigmatherm
Grit – Sigma Tornusil
Uninsulated / P11SF Sa3 60 Super 30 Super 30 - - 120 1 - Ri 2 -
AF Medium (G) MC 58
Insulated Thermovit 600 Thermovit 600
Grit –
UH Sa3 Silicone 25 - - - - Silicone 25 50 - - - -
Medium (G)
Grit –
UH-A Sa3 Amercoat 878 25 - - - - Amercoat 878 25 50 - - - -
Medium (G)
Grit – Carboline
UH-C Sa3 25 - - - - Carboline 4631 25 50 - - - -
Medium (G) 4631
Grit – Silicone ALU Silicone ALU
T> UH-H Sa3 25 - - - - 25 50 - - - -
Medium (G) 5691 5691
UH 400
Grit –
UH-I Sa3 Intertherm 50 25 - - - - Intertherm 50 25 50 - - - -
Medium (G)
Grit –
UH-J Sa3 Solvalitt 25 - - - - Solvalitt 25 50 - - - -
Medium (G)
Sigmatherm Sigmatherm
Grit – Super Super
UH-SF Sa3 25 - - - - 25 50 - - - -
Medium (G) Thermovit 600 Thermovit 600
Primer Finish
Page 45 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
APPENDIX 2-4: PAINTING SYSTEM FOR ROTARY MACHINE, PACKAGED EQUIPMENT, ETC.
Painting System Remarks
Surface Nom. Mech.
Ope. Supplier Surface Deg. Of
Material Sys. Roughness Nom Nom Nom Nom Total Pull-off Operating
Condition Temp. Sys. No. Prep. (ISO Intermediate Guarantee Rusting
(Note 1) No. (ISO Primer DFT Tie-coat DFT DFT Finish Coat DFT DFT test (min) Temp.
(°C) (Note 9) 8501-1) Coat Years (ISO
8503-2) (µm) (µm) (µm) (µm) (µm) (ISO Resistance
4628-3)
4624)
2-4-1. Machines such as Rotary Machine
Etched or
Ra = 10 µm.
S1 Degreased and Vinyl Ester 500 - - - - Vinyl Ester 500 1000 - - - -
Blast cleaning min (Note 3)
Etched or Carboglas Carboglas
Ra = 10 µm.
S1C Degreased and 1601SG or 500 - - - - 1601SG or 500 1000 - - - -
Blast cleaning min (Note 3)
Plasite 4007 Plasite 4007
Hempel Hempel
S1 Etched or
Ra = 10 µm. Polyester GF Polyester GF
S1H Degreased and 500 - - - - 500 1000 - - - -
Blast cleaning min (Note 3) 35920 or Vinyl 35920 or Vinyl
Ester 359QA Ester 359QA
Etched or
Ra = 10 µm.
S1I Degreased and Interline 955 500 - - - - Interline 955 500 1000 - - - -
Blast cleaning min (Note 3)
Etched or
Ra = 10 µm. Chemflake Chemflake
S1J Degreased and 500 - - - - 500 1000 - - - -
Blast cleaning min (Note 3) Special Special
Etched or 200
T< Ra = 10 µm. 40 - 270 -
Alter S1 Degreased and Epoxy 30 - - Epoxy HB (1 or 2 Polyurethane - - - -
120 Blast cleaning min (Note 3) 50 280
coats)
Etched or 200
Ra = 10 µm. Carboline 193 Carboline Carboline 134
Alter S1C Degreased and 30 - - (1 or 2 40 270 - - - -
AI Blast cleaning min (Note 3) Primer 190HB Finish
coats)
(Austenitic Etched or Hempadur 200
Stainless Uninsulated / Ra = 10 µm. Hempadur Hempathane
Alter S1H Degreased and 30 - - 4515 or (1 or 2 50 280 - - - -
Steel type Insulated Or Blast cleaning min (Note 3) Primer 15550 5521
45880 / 45881 coats)
304, 304L, Alter
Etched or 200
316, 316L S1 Ra = 10 µm. Intergard 475
Alter S1I Degreased and Intergard 251 30 - - (1 or 2 Interthane 990 50 280 - - - -
and 321) Blast cleaning min (Note 3) HS
coats)
Etched or 200
Ra = 10 µm. Penguard
Alter S1J Degreased and 30 - - Primastic (1 or 2 Hardtop AS 40 270 - - - -
Blast cleaning min (Note 3) Primer
coats)
Etched or 200
Alter Ra = 10 µm. Freitapox SR
Degreased and Centrepox PZ 30 - - (1 or 2 Vigor PU 239 50 280 - - - -
S1SF Blast cleaning min (Note 3) 213
coats)
Etched or Heat Resistant Heat Resistant
Ra = 10 µm.
S2 Degreased and Silicone 25 - - - - Silicone 25 50 - - - -
Blast cleaning min (Note 3)
Aluminum Aluminum
Etched or
Ra = 10 µm. Thermaline Thermaline
S2C Degreased and 25 - - - - 25 50 - - - -
Blast cleaning min (Note 3) 4631 4631
T> Etched or
S2 Ra = 10 µm. Silicone ALU Silicone ALU
120 S2H Degreased and 25 - - - - 25 50 - - - -
Blast cleaning min (Note 3) 5691 5691
Etched or
Ra = 10 µm.
S2I Degreased and Intertherm 50 25 - - - - Intertherm 50 25 50 - - - -
Blast cleaning min (Note 3)
Etched or
Ra = 10 µm. Solvalitt Solvalitt
S2J Degreased and 25 - - - - 25 50 - - - -
Blast cleaning min (Note 3) Aluminum Aluminum
Page 46 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
APPENDIX 2-4: PAINTING SYSTEM FOR ROTARY MACHINE, PACKAGED EQUIPMENT, ETC.
Painting System Remarks
Nom.
Ope. Supplier Surface Surface Deg. Of Mech.
Material Sys. Nom Nom Nom Nom Total Operating
Condition Temp. Sys. No. Prep. (ISO Roughness Intermediate Guarantee Rusting Pull-off
(Note 1) No. Primer DFT Tie-coat DFT DFT Finish Coat DFT DFT Temp.
(°C) (Note 9) 8501-1) (ISO 8503-2) Coat Years (ISO test (min)
(µm) (µm) (µm) (µm) (µm) Resistance
4628-3) (ISO 4624)
2-4-1. Machines such as Rotary Machine
Uninsulated SN - - No Painting
Etched or
Ra = 10 µm.
S1 Degreased and Vinyl Ester 500 - - - - Vinyl Ester 500 1000 - - - -
Blast cleaning min (Note 3)
Etched or Carboglas Carboglas
Ra = 10 µm.
S1C Degreased and 1601SG or 500 - - - - 1601 SG or 500 1000 - - - -
Blast cleaning min (Note 3)
Plasite 4007 Plasite 4007
Hempel Hempel
Etched or Polyester GF Polyester GF
S1 Ra = 10 µm.
S1H Degreased and 35920 or 500 - - - - 35920 or 500 1000 - - - -
Blast cleaning min (Note 3)
Vinyl Ester Vinyl Ester
359QA 359QA
Etched or
Ra = 10 µm.
S1I Degreased and Interline 955 500 - - - - Interline 955 500 1000 - - - -
Blast cleaning min (Note 3)
Etched or
Ra = 10 µm. Chemflake Chemflake
S1J Degreased and 500 - - - - 500 1000 - - - -
Blast cleaning min (Note 3) Special Special
Etched or 200
Ra = 10 µm. 40 - 270 -
T < 120 Alter S1 Degreased and Epoxy 30 - - Epoxy HB (1 or 2 Polyurethane - - - -
Blast cleaning min (Note 3) 50 280
coats)
Etched or 200
Alter Ra = 10 µm. Carboline Carboline Carboline 134
Degreased and 30 - - (1 or 2 40 270 - - - -
S1C Blast cleaning min (Note 3) 193 Primer 190HB Finish
coats)
AI (Duplex Hempadur
Stainless Etched or Hempadur 200
Alter Ra = 10 µm. 4515 or Hempathane
Steel, Degreased and Primer 30 - - (1 or 2 50 280 - - - -
Or S1H Blast cleaning min (Note 3) 45880 / 5521
904L and Insulated 15550 coats)
Alter 45881
254SMO) S1 Etched or 200
Ra = 10 µm. Intergard Intergard Interthane
Alter S1I Degreased and - - (1 or 2 50 280 - - - -
Blast cleaning min (Note 3) 251 30 475HS 990
coats)
Etched or 200
Ra = 10 µm. Penguard
Alter S1J Degreased and 30 - - Primastic (1 or 2 Hardtop AS 40 270 - - - -
Blast cleaning min (Note 3) Primer
coats)
Etched or 200
Alter Ra = 10 µm. Centrepox Freitapox SR
Degreased and 30 - - (1 or 2 Vigor PU 239 50 280 - - - -
S1SF Blast cleaning min (Note 3) PZ 213
coats)
Heat Heat
Etched or
Ra = 10 µm. Resistant Resistant
S2 Degreased and 25 - - - - 25 50 - - - -
Blast cleaning min (Note 3) Silicone Silicone
Aluminum Aluminum
Etched or
Ra = 10 µm. Thermaline Thermaline
S2C Degreased and 25 - - - - 25 50 - - - -
Blast cleaning min (Note 3) 4631 4631
Etched or
S2 T > 120 Ra = 10 µm. Silicone ALU Silicone ALU
S2H Degreased and 25 - - - - 25 50 - - - -
Blast cleaning min (Note 3) 5691 5691
Etched or
Ra = 10 µm. Intertherm
S2I Degreased and 25 - - - - Intertherm 50 25 50 - - - -
Blast cleaning min (Note 3) 50
Etched or
Ra = 10 µm. Solvalitt Solvalitt
S2J Degreased and 25 - - - - 25 50 - - - -
Blast cleaning min (Note 3) Aluminum Aluminum
Page 47 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
APPENDIX 2-4: PAINTING SYSTEM FOR ROTARY MACHINE, PACKAGED EQUIPMENT, ETC.
Page 48 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
APPENDIX 2-4: PAINTING SYSTEM FOR ROTARY MACHINE, PACKAGED EQUIPMENT, ETC.
Page 49 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
APPENDIX 2-4: PAINTING SYSTEM FOR ROTARY MACHINE, PACKAGED EQUIPMENT, ETC.
Page 50 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
APPENDIX 2-4: PAINTING SYSTEM FOR ROTARY MACHINE, PACKAGED EQUIPMENT, ETC.
Painting System Remarks
Surface Nom.
Ope. Supplier Surface Deg. Of Mech.
Material Sys. Roughness Nom Nom Nom Nom Total Operating
Condition Temp. Sys. No. Prep. (ISO Intermediate Guarantee Rusting Pull-off
(Note 1) No. (ISO Primer DFT Tie-coat DFT DFT Finish Coat DFT DFT Temp.
(°C) (Note 9) 8501-1) Coat Years (ISO test (min)
8503-2) (µm) (µm) (µm) (µm) (µm) Resistance
4628-3) (ISO 4624)
2-4-2. Packaged Equipment
Etched or
Ra = 10 µm.
S1 Degreased and Vinyl Ester 500 - - - - Vinyl Ester 500 1000 - - - -
Blast cleaning min (Note 3)
Etched or Carboglas Carboglas
Ra = 10 µm.
S1C Degreased and 1601SG or 500 - - - - 1601SG or 500 1000 - - - -
Blast cleaning min (Note 3)
Plasite 4007 Plasite 4007
Hempel
Hempel
Etched or Polyester GF
S1 Ra = 10 µm. Polyester GF
S1H Degreased and 35920 or 500 - - - - 500 1000 - - - -
Blast cleaning min (Note 3) 35920 or Vinyl
Vinyl Ester
Ester 359QA
359QA
Etched or
Ra = 10 µm.
S1I Degreased and Interline 955 500 - - - - Interline 955 500 1000 - - - -
Blast cleaning min (Note 3)
Etched or
Ra = 10 µm. Chemflake Chemflake
S1J Degreased and 500 - - - - 500 1000 - - - -
Blast cleaning min (Note 3) Special Special
Page 51 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
APPENDIX 2-4: PAINTING SYSTEM FOR ROTARY MACHINE, PACKAGED EQUIPMENT, ETC.
Painting System Remarks
Surface Nom.
Ope. Supplier Surface Deg. Of Mech.
Material Sys. Roughness Nom Nom Nom Nom Total Operating
Condition Temp. Sys. No. Prep. (ISO Intermediate Guarantee Rusting Pull-off
(Note 1) No. (ISO Primer DFT Tie-coat DFT DFT Finish Coat DFT DFT Temp.
(°C) (Note 9) 8501-1) Coat Years (ISO test (min)
8503-2) (µm) (µm) (µm) (µm) (µm) Resistance
4628-3) (ISO 4624)
2-4-2. Packaged Equipment
Uninsulated SN - - No Painting
Etched or
Ra = 10 µm.
S1 Degreased and Vinyl Ester 500 - - - - Vinyl Ester 500 1000 - - - -
Blast cleaning min (Note 3)
Etched or Carboglas Carboglas
Ra = 10 µm.
S1C Degreased and 1601SG or 500 - - - - 1601SG or 500 1000 - - - -
Blast cleaning min (Note 3)
Plasite 4007 Plasite 4007
Hempel
Hempel
Etched or Polyester GF
S1 Ra = 10 µm. Polyester GF
S1H Degreased and 35920 or 500 - - - - 500 1000 - - - -
Blast cleaning min (Note 3) 35920 or Vinyl
Vinyl Ester
Ester 359QA
359QA
Etched or
Ra = 10 µm.
S1I Degreased and Interline 955 500 - - - - Interline 955 500 1000 - - - -
Blast cleaning min (Note 3)
Etched or
Ra = 10 µm. Chemflake Chemflake
S1J Degreased and 500 - - - - 500 1000 - - - -
Blast cleaning min (Note 3) Special Special
Etched or
Ra = 10 µm. Solvalitt Solvalitt
S2J Degreased and 25 - - - - 25 50 - - - -
Blast cleaning min (Note 3) Aluminum Aluminum
Page 52 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
APPENDIX 2-4: PAINTING SYSTEM FOR ROTARY MACHINE, PACKAGED EQUIPMENT, ETC.
Page 53 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
APPENDIX 2-4: PAINTING SYSTEM FOR ROTARY MACHINE, PACKAGED EQUIPMENT, ETC.
Page 54 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
APPENDIX 2-4: PAINTING SYSTEM FOR ROTARY MACHINE, PACKAGED EQUIPMENT, ETC.
Page 55 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
APPENDIX 2-4: PAINTING SYSTEM FOR ROTARY MACHINE, PACKAGED EQUIPMENT, ETC.
Painting System Remarks
Surface Nom.
Ope. Supplier Surface Deg. Of Mech.
Material Sys. Roughness Nom Nom Nom Nom Total Operating
Condition Temp. Sys. No. Prep. (ISO Intermediate Guarantee Rusting Pull-off
(Note 1) No. (ISO Primer DFT Tie-coat DFT DFT Finish Coat DFT DFT Temp.
(°C) (Note 9) 8501-1) Coat Years (ISO test (min)
8503-2) (µm) (µm) (µm) (µm) (µm) Resistance
4628-3) (ISO 4624)
2-4-3.1 Compressor
Grit – Zinc Ethyl
IH Sa3 60 - - - - - - 60 - - - -
Medium (G) Silicate
Dimetcote 19 or
Grit – 6 or equivalent
IH-A Sa3 60 - - - - - - 60 - - - -
Medium (G) as per Paint
Mfg. Recom.
Grit –
IH-C Sa3 Carbozinc 11 60 - - - - - - 60 - - - -
Medium (G)
AF Insulated IH T>200 Grit –
IH-H Sa3 Galvosil 1570 60 - - - - - - 60 - - - -
Medium (G)
Grit –
IH-I Sa3 Interzinc 22 60 - - - - - - 60 - - - -
Medium (G)
Grit –
IH-J Sa3 Resist GTI 60 - - - - - - 60 - - - -
Medium (G)
Grit – Sigma Tornusil
IH-SF Sa3 60 - - - - - - 60 - - - -
Medium (G) MC 58
Etched or
Ra = 10 µm.
S1 Degreased and Vinyl Ester 500 - - - - Vinyl Ester 500 1000 - - - -
Blast cleaning min (Note 3)
Etched or Carboglas Carboglas
Ra = 10 µm.
S1C Degreased and 1601SG or 500 - - - - 1601SG or 500 1000 - - - -
Blast cleaning min (Note 3)
Plasite 4007 Plasite 4007
Hempel Hempel
S1 Etched or
Ra = 10 µm. Polyester GF Polyester GF
S1H Degreased and 500 - - - - 500 1000 - - - -
Blast cleaning min (Note 3) 35920 or Vinyl 35920 or Vinyl
Ester 359QA Ester 359QA
Etched or
Ra = 10 µm.
S1I Degreased and Interline 955 500 - - - - Interline 955 500 1000 - - - -
Blast cleaning min (Note 3)
Etched or
Ra = 10 µm. Chemflake Chemflake
AI S1J Degreased and 500 - - - - 500 1000 - - - -
Blast cleaning min (Note 3) Special Special
(Austenitic
Stainless Etched or 200
Insulated / Ra = 10 µm. 40 - 270 -
Steel type T < 120 Alter S1 Degreased and Epoxy 30 - - Epoxy HB (1 or 2 Polyurethane - - - -
Uninsulated Blast cleaning min (Note 3) 50 280
304, 304L, coats)
316, 316L Etched or 200
Alter Ra = 10 µm. Carboline 193 Carboline Carboline 134
and 321) Degreased and 30 - - (1 or 2 40 270 - - - -
S1C Blast cleaning min (Note 3) Primer 190HB Finish
coats)
Etched or Hempadur 200
Alter Ra = 10 µm. Hempadur Hempathane
Degreased and 30 - - 4515 or (1 or 2 50 280 - - - -
or S1H Blast cleaning min (Note 3) Primer 15550 5521
45880 / 45881 coats)
Alter
Etched or 200
S1 Ra = 10 µm. Intergard 475
Alter S1I Degreased and Intergard 251 30 - - (1 or 2 Interthane 990 50 280 - - - -
Blast cleaning min (Note 3) HS
coats)
Etched or 200
Ra = 10 µm. Penguard
Alter S1J Degreased and 30 - - Primastic (1 or 2 Hardtop AS 40 270 - - - -
Blast cleaning min (Note 3) Primer
coats)
Etched or 200
Alter Ra = 10 µm. Freitapox SR
Degreased and Centrepox PZ 30 - - (1 or 2 Vigor PU 239 50 280 - - - -
S1SF Blast cleaning min (Note 3) 213
coats)
Page 56 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
APPENDIX 2-4: PAINTING SYSTEM FOR ROTARY MACHINE, PACKAGED EQUIPMENT, ETC.
Painting System Remarks
Surface Nom.
Ope. Supplier Surface Deg. Of Mech.
Material Sys. Roughness Nom Nom Nom Nom Total Operating
Condition Temp. Sys. No. Prep. (ISO Intermediate Guarantee Rusting Pull-off
(Note 1) No. (ISO Primer DFT Tie-coat DFT DFT Finish Coat DFT DFT Temp.
(°C) (Note 9) 8501-1) Coat Years (ISO test (min)
8503-2) (µm) (µm) (µm) (µm) (µm) Resistance
4628-3) (ISO 4624)
2-4-3.1 Compressor
Etched or Heat Resistant Heat Resistant
Ra = 10 µm.
S2 Degreased and Silicone 25 - - - - Silicone 25 50 - - - -
Blast cleaning min (Note 3)
Aluminum Aluminum
AI Etched or
Ra = 10 µm. Thermaline Thermaline
(Austenitic S2C Degreased and 25 - - - - 25 50 - - - -
Blast cleaning min (Note 3) 4631 4631
Stainless Etched or
Uninsulated Ra = 10 µm. Silicone ALU Silicone ALU
Steel type S2 T > 120 S2H Degreased and 25 - - - - 25 50 - - - -
/ Insulated min (Note 3) 5691 5691
304, 304L, Blast cleaning
316, 316L Etched or
Ra = 10 µm.
and 321) S2I Degreased and Intertherm 50 25 - - - - Intertherm 50 25 50 - - - -
Blast cleaning min (Note 3)
Etched or
Ra = 10 µm. Solvalitt Solvalitt
S2J Degreased and 25 - - - - 25 50 - - - -
Blast cleaning min (Note 3) Aluminum Aluminum
Uninsulated SN - - No Painting
Etched or
Ra = 10 µm.
S1 Degreased and Vinyl Ester 500 - - - - Vinyl Ester 500 1000 - - - -
Blast cleaning min (Note 3)
Etched or Carboglas Carboglas
Ra = 10 µm.
S1C Degreased and 1601SG or 500 - - - - 1601SG or 500 1000 - - - -
Blast cleaning min (Note 3)
Plasite 4007 Plasite 4007
Hempel Hempel
S1 Etched or
Ra = 10 µm. Polyester GF Polyester GF
S1H Degreased and 500 - - - - 500 1000 - - - -
Blast cleaning min (Note 3) 35920 or Vinyl 35920 or Vinyl
Ester 359QA Ester 359QA
Etched or
Ra = 10 µm.
S1I Degreased and Interline 955 500 - - - - Interline 955 500 1000 - - - -
Blast cleaning min (Note 3)
Etched or
Ra = 10 µm. Chemflake Chemflake
S1J Degreased and 500 - - - - 500 1000 - - - -
Blast cleaning min (Note 3) Special Special
Etched or
T < 120 Ra = 10 µm. 200 (1 or 40 - 270 -
Alter S1 Degreased and Epoxy 30 - - Epoxy HB Polyurethane - - - -
Blast cleaning min (Note 3) 2 coats) 50 280
Etched or
Alter Ra = 10 µm. Carboline 193 Carboline 200 (1 or Carboline 134
Degreased and 30 - - 40 270 - - - -
S1C Blast cleaning min (Note 3) Primer 190HB 2 coats) Finish
AI (Duplex
Stainless Hempadur
Etched or
Steel, Alter Ra = 10 µm. Hempadur 4515 or 200 (1 or Hempathane
or Degreased and 30 - - 50 280 - - - -
904L and Insulated S1H Blast cleaning min (Note 3) Primer 15550 45880 / 2 coats) 5521
Alter 45881
254SMO) S1 Etched or
Ra = 10 µm. Intergard 200 (1 or
Alter S1I Degreased and Intergard 251 30 - - Interthane 990 50 280 - - - -
Blast cleaning min (Note 3) 475HS 2 coats)
Etched or
Ra = 10 µm. Penguard 200 (1 or
Alter S1J Degreased and 30 - - Primastic Hardtop AS 40 270 - - - -
Blast cleaning min (Note 3) Primer 2 coats)
Etched or
Alter Ra = 10 µm. Freitapox SR 200 (1 or
Degreased and Centrepox PZ 30 - - Vigor PU 239 50 280 - - - -
S1SF Blast cleaning min (Note 3) 213 2 coats)
Etched or Heat Resistant Heat Resistant
Ra = 10 µm.
S2 Degreased and Silicone 25 - - - - Silicone 25 50 - - - -
Blast cleaning min (Note 3)
Aluminum Aluminum
Etched or
Ra = 10 µm. Thermaline Thermaline
S2C Degreased and 25 - - - - 25 50 - - - -
Blast cleaning min (Note 3) 4631 4631
Etched or
S2 T > 120 Ra = 10 µm. Silicone ALU Silicone ALU
S2H Degreased and 25 - - - - 25 50 - - - -
Blast cleaning min (Note 3) 5691 5691
Etched or
Ra = 10 µm.
S2I Degreased and Intertherm 50 25 - - - - Intertherm 50 25 50 - - - -
Blast cleaning min (Note 3)
Etched or
Ra = 10 µm. Solvalitt Solvalitt
S2J Degreased and 25 - - - - 25 50 - - - -
Blast cleaning min (Note 3) Aluminum Aluminum
Page 57 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
APPENDIX 2-4: PAINTING SYSTEM FOR ROTARY MACHINE, PACKAGED EQUIPMENT, ETC.
Page 58 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
APPENDIX 2-4: PAINTING SYSTEM FOR ROTARY MACHINE, PACKAGED EQUIPMENT, ETC.
Page 59 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
APPENDIX 2-4: PAINTING SYSTEM FOR ROTARY MACHINE, PACKAGED EQUIPMENT, ETC.
Grit –
UH-J Sa3 Solvalitt 25 - - - - Solvalitt 25 50 - - - -
Medium (G)
Sigmatherm Sigmatherm
Grit –
UH-SF Sa3 Super Thermovit 25 - - - - Super Thermovit 25 50 - - - -
Medium (G)
600 Primer 600 Finish
Grit – Amercoat
P12A Sa3 - - 150 Amercoat 385 150 - - 300 3 Ri 2 4 Mpa Less than 90
Medium (G) 385P
Sigmacover Sigmacover
Grit – Less than
P12SF Sa3 - - Vigor EP 235 150 Vigor EP 235 150 - - 300 3 Ri 2 4 Mpa
Medium (G) 150
Aluminum Aluminum
Page 60 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
APPENDIX 2-4: PAINTING SYSTEM FOR ROTARY MACHINE, PACKAGED EQUIPMENT, ETC.
IH T>200 Grit –
IH-H Sa3 Galvosil 1570 60 - - - - - - 60 - - - -
Medium (G)
Grit –
IH-I Sa3 Interzinc 22 60 - - - - - - 60 - - - -
Medium (G)
Grit –
IH-J Sa3 Resist GTI 60 - - - - - - 60 - - - -
Medium (G)
Page 61 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
APPENDIX 2-4: PAINTING SYSTEM FOR ROTARY MACHINE, PACKAGED EQUIPMENT, ETC.
Painting System Remarks
Surface Nom.
Ope. Supplier Surface Deg. Of Mech.
Material Sys. Roughnes Nom Nom Nom Nom Total Operating
Condition Temp. Sys. No. Prep. (ISO Intermediate Guarantee Rusting Pull-off
(Note 1) No. s (ISO Primer DFT Tie-coat DFT DFT Finish Coat DFT DFT Temp.
(°C) (Note 9) 8501-1) Coat Years (ISO test (min)
8503-2) (µm) (µm) (µm) (µm) (µm) Resistance
4628-3) (ISO 4624)
2-4-3.2. Turbines
Etched or
Ra = 10 µm.
S1 Degreased and Vinyl Ester 500 - - - - Vinyl Ester 500 1000 - - - -
Blast cleaning min (Note 3)
Etched or Carboglas Carboglas
Ra = 10 µm.
S1C Degreased and 1601SG or 500 - - - - 1601SG or 500 1000 - - - -
Blast cleaning min (Note 3)
Plasite 4007 Plasite 4007
Hempel Hempel
Etched or
S1 Ra = 10 µm. Polyester GF Polyester GF
S1H Degreased and 500 - - - - 500 1000 - - - -
Blast cleaning min (Note 3) 35920 or Vinyl 35920 or Vinyl
Ester 359QA Ester 359QA
Etched or
Ra = 10 µm.
S1I Degreased and Interline 955 500 - - - - Interline 955 500 1000 - - - -
Blast cleaning min (Note 3)
Etched or
Ra = 10 µm. Chemflake Chemflake
S1J Degreased and 500 - - - - 500 1000 - - - -
Blast cleaning min (Note 3) Special Special
Etched or 200
Ra = 10 µm. 40 - 270 -
T < 120 Alter S1 Degreased and Epoxy 30 - - Epoxy HB (1 or 2 Polyurethane - - - -
Blast cleaning min (Note 3) 50 280
coats)
Etched or 200
Alter Ra = 10 µm. Carboline 193 Carboline Carboline 134
Degreased and 30 - - (1 or 2 40 270 - - - -
S1C Blast cleaning min (Note 3) Primer 190HB Finish
AI coats)
(Austenitic Hempadur
Etched or 200
Stainless Insulated / Alter Ra = 10 µm. Hempadur 4515 or Hempathane
Degreased and 30 - - (1 or 2 50 280 - - - -
Steel type Uninsulated Or S1H Blast cleaning min (Note 3) Primer 15550 45880 / 5521
coats)
304, 304L, Alter 45881
316, 316L S1 Etched or 200
Ra = 10 µm. Intergard 475
and 321) Alter S1I Degreased and Intergard 251 30 - - (1 or 2 Interthane 990 50 280 - - - -
Blast cleaning min (Note 3) HS
coats)
Etched or 200
Ra = 10 µm. Penguard
Alter S1J Degreased and 30 - - Primastic (1 or 2 Hardtop AS 40 270 - - - -
Blast cleaning min (Note 3) Primer
coats)
Etched or 200
Alter Ra = 10 µm. Freitapox SR
Degreased and Centrepox PZ 30 - - (1 or 2 Vigor PU 239 50 280 - - - -
S1SF Blast cleaning min (Note 3) 213
coats)
Etched or Heat Resistant Heat Resistant
Ra = 10 µm.
S2 Degreased and Silicone 25 - - - - Silicone 25 50 - - - -
Blast cleaning min (Note 3)
Aluminum Aluminum
Etched or
Ra = 10 µm. Thermaline Thermaline
S2C Degreased and 25 - - - - 25 50 - - - -
Blast cleaning min (Note 3) 4631 4631
Etched or
Ra = 10 µm. Silicone ALU Silicone ALU
S2 T > 120 S2H Degreased and 25 - - - - 25 50 - - - -
Blast cleaning min (Note 3) 5691 5691
Etched or
Ra = 10 µm.
S2I Degreased and Intertherm 50 25 - - - - Intertherm 50 25 50 - - - -
Blast cleaning min (Note 3)
Etched or
Ra = 10 µm. Solvalitt Solvalitt
S2J Degreased and 25 - - - - 25 50 - - - -
Blast cleaning min (Note 3) Aluminum Aluminum
Page 62 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
APPENDIX 2-4: PAINTING SYSTEM FOR ROTARY MACHINE, PACKAGED EQUIPMENT, ETC.
Painting System Remarks
Surface Nom.
Ope. Supplier Surface Deg. Of Mech.
Material Sys. Roughness Nom Nom Nom Nom Total Operating
Condition Temp. Sys. No. Prep. (ISO Intermediate Guarantee Rusting Pull-off
(Note 1) No. (ISO Primer DFT Tie-coat DFT DFT Finish Coat DFT DFT Temp.
(°C) (Note 9) 8501-1) Coat Years (ISO test (min)
8503-2) (µm) (µm) (µm) (µm) (µm) Resistance
4628-3) (ISO 4624)
2-4-3.2 Turbines
SN - - No Painting
Uninsulated
Etched or
Ra = 10 µm.
S1 Degreased and Vinyl Ester 500 - - - - Vinyl Ester 500 1000 - - - -
Blast cleaning min (Note 3)
Etched or Carboglas Carboglas
Ra = 10 µm.
S1C Degreased and 1601SG or 500 - - - - 1601SG or 500 1000 - - - -
Blast cleaning min (Note 3)
Plasite 4007 Plasite 4007
Hempel
Hempel
Etched or Polyester GF
S1 Ra = 10 µm. Polyester GF
S1H Degreased and 500 - - - - 35920 or 500 1000 - - - -
Blast cleaning min (Note 3) 35920 or Vinyl
Vinyl Ester
Ester 359QA
359QA
Etched or
Ra = 10 µm.
S1I Degreased and Interline 955 500 - - - - Interline 955 500 1000 - - - -
Blast cleaning min (Note 3)
Etched or
Ra = 10 µm. Chemflake Chemflake
S1J Degreased and 500 - - - - 500 1000 - - - -
Blast cleaning min (Note 3) Special Special
Etched or 200
T < 120 Ra = 10 µm. 40 - 270 -
Alter S1 Degreased and Epoxy 30 - - Epoxy HB (1 or 2 Polyurethane - - - -
Blast cleaning min (Note 3) 50 280
coats)
Etched or 200
Alter Ra = 10 µm. Carboline 193 Carboline Carboline
Degreased and 30 - - (1 or 2 40 270 - - - -
S1C Blast cleaning min (Note 3) Primer 190HB 134 Finish
coats)
AI (Duplex
Stainless Hempadur
Etched or 200
Steel, Alter Ra = 10 µm. Hempadur 4515 or Hempathane
Degreased and 30 - - (1 or 2 50 280 - - - -
904L and Or S1H Blast cleaning min (Note 3) Primer 15550 45880 / 5521
Insulated coats)
254SMO) Alter 45881
S1 Etched or 200
Ra = 10 µm. Intergard 475 Interthane
Alter S1I Degreased and Intergard 251 30 - - (1 or 2 50 280 - - - -
Blast cleaning min (Note 3) HS 990
coats)
Etched or 200
Ra = 10 µm. Penguard
Alter S1J Degreased and 30 - - Primastic (1 or 2 Hardtop AS 40 270 - - - -
Blast cleaning min (Note 3) Primer
coats)
Etched or 200
Alter Ra = 10 µm. Freitapox SR
Degreased and Centrepox PZ 30 - - (1 or 2 Vigor PU 239 50 280 - - - -
S1SF Blast cleaning min (Note 3) 213
coats)
Heat Heat
Etched or
Ra = 10 µm. Resistant Resistant
S2 Degreased and 25 - - - - 25 50 - - - -
Blast cleaning min (Note 3) Silicone Silicone
Aluminum Aluminum
Etched or
Ra = 10 µm. Thermaline Thermaline
S2C Degreased and 25 - - - - 25 50 - - - -
Blast cleaning min (Note 3) 4631 4631
Etched or
Ra = 10 µm. Silicone ALU Silicone ALU
S2 T > 120 S2H Degreased and 25 - - - - 25 50 - - - -
Blast cleaning min (Note 3) 5691 5691
Etched or
Ra = 10 µm.
S2I Degreased and Intertherm 50 25 - - - - Intertherm 50 25 50 - - - -
Blast cleaning min (Note 3)
Etched or
Ra = 10 µm. Solvalitt Solvalitt
S2J Degreased and 25 - - - - 25 50 - - - -
Blast cleaning min (Note 3) Aluminum Aluminum
Page 63 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Page 64 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
P11 120 < T < 400 Grit – Galvosil Silicone ALU Silicone ALU Less than
P11H Sa3 60 - - 25 25 110 1 Ri 2 -
Medium (G) 1570 5691 5691 450
Grit –
UH-J Sa3 Solvalitt 25 - - - - Solvalitt 25 50 - - - -
Medium (G)
Sigmatherm Sigmatherm
Grit – Super Super
UH-SF Sa3 25 - - - - 25 50 - - - -
Medium (G) Thermovit Thermovit 600
600 Primer Finish
Page 65 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Page 66 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Grit – Penguard
P01J Sa3 Resist GTI 60 30 Jotamastic 87 150 Hardtop AS 50 290 5 Ri 2 3 Mpa Less than 80
Medium (G) Tiecoat 100
Sigma Sigmacover Freitane 501
Grit – Sigmarite
P01SF Sa3 Tornusil MC 60 40 Freitapox SR 150 or Sigmadur 50 300 5 Ri 2 3 Mpa Less than 80
Medium (G) Sealer
58 213 Gloss
Page 67 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
P01 As per Zinc Ethyl Epoxy 30 Epoxy 150 Polyurethane 50 290 5 Ri 2 3 Mpa Less than 80
P01, Silicate
Unknown Alter Alter P10 Grit – (Refer to 60 Epoxy or
T < 400 Sa 3 - - 120 Polyurethane 50 230 - - - -
temp. P10 or P11 in Medium (G) P01 primer Phenolic Epoxy
para. material) - - Silicone 25 Silicone 25 110 Less than
P11 2-5-1 1 Ri 2 -
At Shop At Field depending on the operating temperature. 400
T < 80
Zinc Ethyl
Unins P01 (Note 60 Epoxy 30 Epoxy 150 Polyurethane 50 290 5 Ri 2 3 Mpa Less than 80
AF Silicate
/ Ins 8) As per
P01, Epoxy or Epoxy or
Less than
P10 P10, Epoxy 120 - - - - Epoxy 120 240 3 Ri 2 3 Mpa
80 < T 120
Known Alter P10 Grit – Phenolic Phenolic
< 120 Sa 3
temp. Alter or P11 in Medium (G) Zinc Ethyl Epoxy or
para. 60 - - 120 Polyurethane 50 230 - - - -
P10 Silicate Phenolic Epoxy
2-5-1
Zinc Ethyl
120 < T 60 - - Silicone 25 Silicone 25 110 Less than
P11 Silicate 1 Ri 2 -
< 400 400
At Shop
Page 68 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Page 69 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Page 70 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Uninsulated SN - - No Painting - - - -
Etched or
Ra = 10 µm.
S1 Degreased and Vinyl Ester 500 - - - - Vinyl Ester 500 1000 - - - -
Blast cleaning min (Note 3)
Etched or Carboglas Carboglas
Ra = 10 µm.
S1C Degreased and 1601SG or 500 - - - - 1601SG or 500 1000 - - - -
Blast cleaning min (Note 3)
Plasite 4007 Plasite 4007
Hempel
Hempel
Etched or Polyester GF
S1 Ra = 10 µm. Polyester GF
S1H Degreased and 500 - - - - 35920 or 500 1000 - - - -
Blast cleaning min (Note 3) 35920 or Vinyl
Vinyl Ester
Ester 359QA
359QA
Etched or
Ra = 10 µm.
S1I Degreased and Interline 955 500 - - - - Interline 955 500 1000 - - - -
Blast cleaning min (Note 3)
Etched or
Ra = 10 µm. Chemflake Chemflake
S1J Degreased and 500 - - - - 500 1000 - - - -
Blast cleaning min (Note 3) Special Special
T< Etched or 200
120 Ra = 10 µm. 40 - 270 -
Alter S1 Degreased and Epoxy 30 - - Epoxy HB (1 or 2 Polyurethane - - - -
Blast cleaning min (Note 3) 50 280
coats)
Etched or 200
Ra = 10 µm. Carboline 193 Carboline Carboline 134
Alter S1C Degreased and 30 - - (1 or 2 40 270 - - - -
AI (Duplex Blast cleaning min (Note 3) Primer 190HB Finish
coats)
Stainless Hempadur 200
Etched or
Steel, 904L Ra = 10 µm. Hempadur Hempathane
Alter S1H Degreased and 30 - - 4515 or 45880 (1 or 2 50 280 - - - -
and Insulated Or Blast cleaning min (Note 3) Primer 15550 5521
/ 45881 coats)
254SMO) Alter
Etched or 200
S1 Ra = 10 µm. Intergard 475 Interthane
Alter S1I Degreased and Intergard 251 30 - - (1 or 2 50 280 - - - -
Blast cleaning min (Note 3) HS 990
coats)
Etched or 200
Ra = 10 µm. Penguard
Alter S1J Degreased and 30 - - Primastic (1 or 2 Hardtop AS 40 270 - - - -
Blast cleaning min (Note 3) Primer
coats)
Etched or 200
Alter Ra = 10 µm. Freitapox SR
Degreased and Centrepox PZ 30 - - (1 or 2 Vigor PU 239 50 280 - - - -
S1SF Blast cleaning min (Note 3) 213
coats)
Heat
Etched or Heat Resistant
Ra = 10 µm. Resistant
S2 Degreased and Silicone 25 - - - - 25 50 - - - -
Blast cleaning min (Note 3) Silicone
Aluminum
Aluminum
Etched or
Ra = 10 µm. Thermaline
S2C Degreased and Thermaline 4631 25 - - - - 25 50 - - - -
Blast cleaning min (Note 3) 4631
T> Etched or
S2 Ra = 10 µm. Silicone ALU Silicone ALU
120 S2H Degreased and 25 - - - - 25 50 - - - -
Blast cleaning min (Note 3) 5691 5691
Etched or
Ra = 10 µm.
S2I Degreased and Intertherm 50 25 - - - - Intertherm 50 25 50 - - - -
Blast cleaning min (Note 3)
Etched or
Ra = 10 µm. Solvalitt Solvalitt
S2J Degreased and 25 - - - - 25 50 - - - -
Blast cleaning min (Note 3) Aluminum Aluminum
Page 71 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Page 72 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Page 73 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Page 74 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Etched or
Ra = 10 µm. Solvalitt Solvalitt
S2J Degreased and 25 - - - - 25 50 - - - -
Blast cleaning min (Note 3) Aluminum Aluminum
AI (Type
904L - SN -- No Painting
Tube)
2-7-3. Cable Trays, Ladders, Bolts, Nuts and Screws
Indoor GN - No Painting
AG
Outdoor GN - No Painting
Page 75 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Page 76 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Etching or
P10 T < 80 Ra = 10 µm. Hempadur Less than
AI P10H Degreased and 120 - - Hempadur 4514 120 - - 240 3 Ri 2 3 Mpa
(Note 8) Blast Cleaning min (Note 3) 4514 120
Etching or
Ra = 10 µm. Intertherm Less than
P10I Degreased and 120 - - Intertherm 228 120 - - 240 3 Ri 2 3 Mpa
Blast Cleaning min (Note 3) 228 150
Etching or
Ra = 10 µm. Tankguard Tankguard Less than
P10J Degreased and 120 - - 120 - - 240 3 Ri 2 3 Mpa
Blast Cleaning min (Note 3) Storage Storage 120
Sigmacover
Etching or Sigmacover
Ra = 10 µm. Vigor EP Less than
P10SF Degreased and 120 - - Vigor EP 235 120 - - 240 3 Ri 2 3 Mpa
Blast Cleaning min (Note 3) 235 150
Aluminum
Aluminum
2-8-1. Cable Trays, Ladders, Bolts, Nuts and Screws
Indoor GN - No Painting
AG
Outdoor GN - No Painting
AI (type Storage Area /
SN - No Painting
316L) Jetty
2-8-2. Bolts, Nuts and Screws
Indoor /
AG GN - No Painting
Outdoor
Indoor /
AI SN - No Painting
Outdoor
Page 77 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Page 78 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Page 79 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Hempadur Hempathane
Uninsulated / T < 80 P06H Degreasing - - - 30 Hempadur 4588 150 50 230 5 Good - Less than 80
AB P06 4508 5521
Insulated (Note 8)
Intergard Intergard Interthane
P06I Degreasing - - - 30 150 50 230 5 Good - Less than 80
291 475HS 990
Penguard
P06J Degreasing - - - 30 Jotamastic 87 140 Hardtop AS 50 220 5 Good - Less than 80
Tie coat 100
Sigmacover Freitane 501
Sigmacover
P06SF Degreasing - - - 50 Freitapox SR 130 or Sigmadur 50 230 5 Good - Less than 80
Primer
213 gloss
Page 80 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Sigmatherm
Super
P11SF-B Degreasing - - - - - - - 30 30 - - - -
Thermovit
600
Page 81 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Page 82 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Page 83 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Page 84 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Page 85 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Page 86 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Page 87 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Page 88 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Page 89 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Note 1: Zebra color, angle and dimension shall be referred to below Fig. 1. For escape route handrail refer to
MOM-01190.
Note 2: The disposition of color bands shall be comply with local regulation. According to Chapter 6 of ICAO,
bandwidth is 1/7 of the structure height not exceeding 210 m height. The top and bottom bands shall be in aviation
orange.
Note 3: Color Schedule for UCP.
Note 4: Final Color for Jacketing material of items to be insulated shall be referred to Project Specification for
Insulation (RL0-0000-WSP-01026 / S-000-1390-001).
Note 5: Excluding Finish Coat Color Schedule for Firefighting Equipment, Fire Pump Enclosure and Coupling
Guards, which shall be referred separately.
Page 90 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
BASIC FLUID
SERVICE FLUID IDENTIFICATION IDENTIFICATION
No. PRODUCT REMARKS
CODE ABBREVIATION
COLOR RAL COLOR RAL
1 Air Instrument Air IA Light Blue 5015 ---- ---
2 Air Process Air PA Light Blue 5015 ---- ---
3 Air Utility Air UA Light Blue 5015 ---- ---
Unit 101 Amine
4 Closed Drain DA1 Black 9005 ---- ----
Drain
Unit 108/112
5 Closed Drain DA2 Black 9005 ---- ----
Amine Drain
Unit 116 Amine
6 Closed Drain DA3 Black 9005 ---- ----
Drain
Unit 114/115
7 Closed Drain DA4 Black 9005 ---- ----
Amine Drain
8 Closed Drain Caustic Drain DC Black 9005 ---- ----
9 Closed Drain Disulfide Oil Drain DD Black 9005 ---- ----
10 Closed Drain Cold HC Drain DP Black 9005 ---- ----
11 Closed Drain Hydrocarbon Drain DR Black 9005 ---- ----
12 Closed Drain Sour Water Drain DS Black 9005 ---- ----
13 Closed Drain Methanol Drain MT Black 9005 ---- ----
Process Water Unit
14 Closed Drain PD Black 9005 ---- ----
117 Drain
15 Closed Drain Solvent 117 Drain SD Black 9005 ---- ----
16 Closed Drain Glycol Drain (TEG) TD Black 9005 ---- ----
17 Chemicals Anti Foam AF Orange 2000 --- ---
18 Chemicals Volatile Amine AV Orange 2000 --- ---
19 Chemicals Biocide BI Orange 2000 --- ---
20 Chemicals Coagulant CG Orange 2000 --- ---
21 Chemicals Corrosion Inhibitor CK Orange 2000 --- ---
22 Chemicals Calcium Chloride CM Orange 2000 --- ---
23 Chemicals Demulsifier DE Orange 2000 --- ---
24 Chemicals De-odorizer DOD Orange 2000 --- ---
25 Chemicals Flocculant FF Orange 2000 --- ---
Sodium
26 Chemicals HY Orange 2000 --- ---
Hypochlorite
Dark
27 Chemicals Methanol ME Orange 2000 8003
Brown
28 Chemicals Phosphate PH Orange 2000 --- ---
29 Chemicals Sulfuric Acid SA Orange 2000 --- ---
Sodium
30 Chemicals SB Orange 2000 --- ---
Bicarbonate
31 Chemicals Sulphite SU Orange 2000 --- ---
32 Chemicals Urea UR Orange 2000 --- ---
33 Chemicals Weak Acid WAC Orange 2000 --- ---
Steam Cold Steam Crimson
34 CC Green 6001 3003
Condensates Condensate Red
Steam L.P. Steam Crimson
35 CL Green 6001 3003
Condensates Condensate Red
Steam LLP Steam Crimson
36 CLL Green 6001 3003
Condensates Condensate Red
Steam HP Steam Crimson
37 CH Green 6001 3003
Condensates Condensate Red
Steam Polluted Steam Crimson
38 CP Green 6001 3003
Condensates Condensate Red
Page 91 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
BASIC FLUID
SERVICE FLUID IDENTIFICATION IDENTIFICATION
No. PRODUCT REMARKS
CODE ABBREVIATION
COLOR RAL COLOR RAL
HP Wet Flare Yellow
39 Flare FA Black 9005 1006
Header Ochre
HP Cold Flare Yellow
40 Flare FC Black 9005 1006
Header Ochre
MP Sour Flare Yellow
41 Flare FS Black 9005 1006
Header Ochre
MP Dry Flare Yellow
42 Flare FT Black 9005 1006
Header Ochre
Yellow
43 Flare LP Flare Header FB Black 9005 1006
Ochre
44 Fuel Diesel Oil DO Dark Brown 8003 --- ---
45 Fuel LP Fuel Gas FG Dark Brown 8003 --- ---
46 Fuel HP Fuel Gas HFG Dark Brown 8003 --- ---
47 Fuel LLP Fuel Gas LFG Dark Brown 8003 --- ---
Yellow
48 Inert Gas Nitrogen N 1006 Light Blue 5015
Ochre
Yellow
49 Inert Gas LP Nitrogen NL 1006 Light Blue 5015
Ochre
Atmospheric Yellow
50 Miscellaneous ATM Black 9005 1006
Vent Ochre
Crimson
51 Miscellaneous Boiler Blowdown BB 3003 --- ---
Red
52 Miscellaneous Catalyst CA Orange 2000 --- ---
Yellow
53 Miscellaneous Carbon Dioxide CO2 1006 --- ---
Ochre
54 Miscellaneous Hydraulic Fluid HO Dark Brown 8003 --- ---
55 Miscellaneous Lube Oil LO Dark Brown 8003 --- ---
56 Miscellaneous Flue Gas FLG Dark Brown 8003 --- ---
Dark
57 Miscellaneous Effluent EF Green 6001 8003
Brown
58 Process Amine AM Violet 4005 --- ---
59 Process Fresh Caustic CF Violet 4005 --- ---
Disulfide Oil
60 Process DF Dark Brown 8003 --- ---
(DSO)
Hydrocarbon Yellow
61 Process G 1006 --- ---
Gas Ochre
Acid Gas (H2S +
62 Process GA Violet 4005 --- ---
CO2)
63 Process Rich Gas GA2 Violet 4005 --- ---
64 Process Glycol (TEG) GT Violet 4005 --- ---
Hydrocarbon
65 Process (Liquid and/or HC Dark Brown 8003 --- ---
Gas)
Hydrocarbon For inside
L Dark Brown 8003 --- --- plant area
Liquid
66 Process Hydro
Condensate GC Dark Brown 8011 Yellow 1003 For corridor in
carbon Propane PR Ochre 1001 Light Blue 5015 RLIC common
Liquid
Butane BU Ochre 1001 Orange 2000 area
67 Process Lean Caustic LC Violet 4005 --- ---
Propane
68 Process PR Dark Brown 8003 --- ---
Refrigerant
Page 92 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
BASIC FLUID
SERVICE FLUID IDENTIFICATION IDENTIFICATION
No. PRODUCT REMARKS
CODE ABBREVIATION
COLOR RAL COLOR RAL
69 Process Rich Caustic RC Violet 4005 --- ---
70 Process Spent Caustic SC Violet 4005 --- ---
71 Process Sulfur (Liquid) LS Violet 4005 --- ---
Dark
72 Process Lean Solvent LSO 8003 --- ---
Brown
Yellow
73 Process Process Gas PG 1006 --- ---
Ochre
Dark
74 Process Rich Solvent RS 8003 --- ---
Brown
75 Process SO2 Rich Gas SO2 Violet 4005 --- ---
Accidentally
76 Sewer HW Black 9005 --- ---
Contaminated Water
77 Sewer Chemical Sewer CS Black 9005 --- ---
Non-contaminated
78 Sewer NW Black 9005 --- ---
Sewer
Oily Water Sewer
79 Sewer OD Black 9005 --- ---
(Open Drain)
80 Sewer Domestic Sewer WD Black 9005 --- ---
HP Superheated Crimson
81 Steam SSH 3003 Black 9005
Steam Red
Crimson
82 Steam HP Saturated Steam SH 3003 Black 9005
Red
Crimson
83 Steam LP Saturated Steam SL 3003 Dark Blue 5003
Red
LLP Saturated Crimson
84 Steam SLL 3003 Dark Blue 5003
Steam Red
Foam Solution for Signal
85 Water WA Red 3001 1003
Fire Fighting Yellow
Crimson
86 Water Boiler Feed Water BW Green 6001 3003
Red
87 Water Cooling Water CW Green 6001 Light Blue 5015
88 Water Drinking Water DW Green 6001 Light Blue 5015
For above
Red 3001 --- --- ground GRP
line
89 Water Fire Water (Note 1) FW For above
Not Applicable ground Cu-Ni
line
Process Water (Oily
90 Water PW Green 6001 --- ---
Water)
91 Water Desalinated Water RW Green 6001 Light Blue 5015
92 Water Sea Water SW Green 6001 Light Blue 5015
Tempered Cooling
93 Water TCW Green 6001 Light Blue 5015
Water
Demineralized
94 Water TW Green 6001 Light Blue 5015
Water
95 Water Utility Water UW Green 6001 Light Blue 5015
96 Water Sour Water WS Green 6001 --- ---
97 Water Stripped Water WT Green 6001 --- ---
Spent or Waste
98 Water WW Green 6001 Dark Brown 8003
Water
99 Water Chilled Water CHW Green 6001 Light Blue 5015
Page 93 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
BASIC FLUID
SERVICE FLUID IDENTIFICATION IDENTIFICATION
No. PRODUCT REMARKS
CODE ABBREVIATION
COLOR RAL COLOR RAL
100 Water Refluxed Water RFW Green 6001 --- ---
Kinetic Hydrate
101 Water KHI Orange 2000 --- ---
Inhibitor
Note 1:
(1) For aboveground GRP firewater line, no painting shall be applied on the external surface and only line
identification in Red (RAL 3001) and fluid abbreviation with black letter shall be applied.
(2) For aboveground Cu-Ni line, external surfaces shall be painted with Red (RAL 3001) and line identification and
fluid abbreviation shall not be applied.
Page 94 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Page 95 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Note
Y mm Y mm
Note
Y mm Y/2 Y/2
X mm Y mm Y mm
FIG. 2A-2 Basic Identification, Fluid Identification Color and Flow Direction Indication
Page 96 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
18”A.C.GC1400DEB01H25
Note: A.C. (Area Code) depends on location as per RLGE-0-07-0002 REV. E
FIG. 2B-1 Basic Identification, Fluid Identification Color and Flow Direction Arrow
For Condensate Line
10”A.C.PR1401DED21H25
Note: A.C. (Area Code) depends on location as per RLGE-0-07-0002 REV. E
FIG. 2B-2 Basic Identification, Fluid Identification Color and Flow Direction Arrow
For Propane Line
Page 97 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
10”A.C.BU1402DED01H25
Note: A.C. (Area Code) depends on location as per RLGE-0-07-0002 REV. E
FIG. 2B-3 Basic Identification, Fluid Identification Color and Flow Direction Arrow
For Propane Line
Page 98 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
Pipe Rack
B. Sub-Pipe Rack
Page 99 of 111
File Name: RL0-0000-WSP-02005_Z11_0010
DOLPHIN PROJECT Company Doc. No.: RL0-0000-WSP-02005
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
(Doc.Title SPECIFICATION FOR PAINTING) Contractor Doc. No.: S-000-13A0-001 <Z11>
1.5 m ∼ 2.0 m
Operating Floor
1.5 m ∼ 2.0 m
Operating Floor
ABCDEFGHIJKLMN
OPQRSTUVWXYZ
1234567890
FIGURE 4: LETTER STYLE
T
114-1R2010-A
L
T
108-1R0630 *
TGT REACTOR t
Lettering
Lettering
Lettering
Lettering
Lettering
Lettering
Lettering
Lettering
1 GENERAL INFORMATIONS
a). Equipment:
Type (Valve, Pipe etc. length, Ǿ… For skid: volume or weight etc.)
b). Quantity:
Cast Iron
Other (define)
Inside
Outside
Under a shelter
Immersed
Other (define)
2 PAINT MATERIAL
Trademark:
3 PAINTING SYSTEMS
Chloride content:
Ambient Temperature
Operator Name:
Date of inspection: Relative Humidity
Time of inspection:
Dew Point
Substrate Temperature