WATER PROOFING:-
2. INTRODUCTION:-
Being passage of water in building elements is the biggest problem in
construction field; it is necessary to make the building totally resistant to the
passage of water. This system or product that effectively prevents liquid water
from passing through is called Waterproofing. Waterproofing is an important
activity, which is to be executed with utmost care and supervision.
Waterproofing shall be designed to prevent the water from percolating
through a surface under pressure due to high water table or under gravity due to
seepage.
3. In this chapter each water proofing method is explained as follows:-
• Area where waterproofing is required
• Execution methodology
• Tools required
• Material required
5.
Swimming Pool/Water 1.Under tile waterproofing system
3 bodies (Internal) 2.Cementitious Waterproofing
3.Crystalline Water proofing system
4 Swimming Pool/Water 1.Bituminous Emulsion system
2.Cementitious
bodieswaterproofing
(External) system
RCC Walls in low water 1.Bitumen sheet application system
table areas 2.Bituminous emulsion system
3.Cementitious waterproofing system
5 4.Crystalline waterproofing system
5.WaterImpermeable RCC System (White
Tanking)
6 SSM Walls – in Low water 1.Bitumen Sheet application system
table areas 2.Bituminous Emulsion System
• All concealed pipe line work and its packing should be completed.
• Plastering done on walls to plumb, right angle and true alignment.
• SBR (NS) admixed screed completed to specified slope and in true
alignment.
• Wall tiling finished up to-skirting portion.
• Surface cleaned, primed and dry.
When any PVC pipes are passing through the concrete which is exposed to
water like toilets, bathroom, balconies, tanks etc. water will pass through that
joint as it is weak due to poor bonding between the concrete and the PVC. So,
some special treatment is required to make the joint impermeable. This
treatment is called Bore Packing. The bore packing is done immediately after
the internal plastering and plumbing work so that the area can be tested for
leakage by ponding.
14. The inner sides of the cutouts in the RCC elements should be hacked and
should be free from dust and debris
15. The epoxy bonding agent of approved make shall be mixed thoroughly. .
16. Applied over the hacked surface and to the inner side of the bore hole.
17. The approved non shrinkable compound is mixed with water as per the
manufacturer’s specification
18. Picture only
19. The down take pipes are positioned in the bore hole and packed with non
shrinkable compound
20. Pictures only
21. Pictures only
22. Pictures only
23. Pictures only
24. Pictures only
25. Methodology for Under Tile Water proofing:
Under Tile Waterproofing should start just before floor tiling.
26. Liquid sealing primer is applied on the clean and dry surface and allowed
for drying as per the manufacturer’s instruction.
27. Sealing compound is applied in the corners to fix caulking strip
28. A view of equal division of caulking strip to be placed in the wall & floor
junction
29. Placing of Caulking strip b/n wall & floor junction
30. Placing of Caulking strip in the skirting area beneath the vertical caulking
strip in the corner
31. A view of caulking strip from 3 directions meeting at a junction
32. Application of Sealing coat before fixing the vertical caulking strip over the
2 horizontal strips
33. Fixing the vertical caulking strip over the 2 horizontal strips
34. Fine tuning of vertical caulking strip at the junction without air gaps
35. Application of sealing coat in the hunching portion b/n dry & wet area
36. Placing of caulking strip in the hunching portion b/n dry & wet area
37. Fine tuning of caulking strip at the haunching portion without air gaps
38. Application of sealing coat above the caulking strip
39. Placing of Caulking strip peripherally around the flange
40. Application of Liquid sealing coat to overlap the 2 parallel caulking strip
41. Placing of caulking strip overlapping the other 2 strips
42. Sealing Compound application:-
a) First coat application
1) Application of first coat in the skirting area
43. 2) Removal of masking tape from the EWC
44. 3) Application of sealing coat for getting 0.5mm thickness
45. 4) Application of first coat in the junction of wet & dry area
46. Second coat application
1) Second coat application of Liquid sealing coat on the floor to
get 1mm thickness
47. SECTION VIEW OF UNDER TILE WATERPROOFING
a) Primer coat.
b) First coat of 0.5mm thick.
c) Second coat of 0.5+0.5= 1mm thickness.
48. WATERPROOFING FOR EWC
After waterproofing on the floor, EWC pipe to be properly
filled peripherally with silicon, in order to avoid leakage in that area.
AREAS OF USAGE:
Toilets / Bathrooms / Showers (Non Sunken).
Balconies and utilities (Non Sunken).
Swimming pools / Water bodies- Internal.
55. BITUMEN SHEET APPLICATION SYSTEM:-
2 Layers of HDPE sheets can be fixed and backfilled with stone free
soil by layers is adopted as protective measures for this type of
waterproofing.
63. BITUMINOUS EMULSION SYSTEM
TOOLS REQUIRED:
• Coir brush and steel wire brush
• Hammer
• Chisel
• 4” brush
SURFACE PREPARATION:
• Admixed slope concrete should get completed to carry out
the emulsion.
• Corners and edges are rounded (4cm to 8cm dia.).
• All flange pipes should be fixed.
• Surface primed and dry.
• Application surface must be cleaned, dry and free from
grease and loose particles. Surface may be damp but not
saturated.
65. PROTECTIVE MEASURES:
• Cementitious compound
• TOOLS REQUIRED:
• Mechanical stirrer
• Vessel for mixing
• Coir brush and steel wire brush
• Hammer
• Chisel
• 4” brush
68. SURFACE PREPARATION:
SBR Added plastering can be done for rest of the walls or PCC
can be done in case of floors.
AREAS OF USAGE :
SUGGESTED BRANDS:
AREAS OF USAGE :
SUGGESTED BRANDS:
• Koester NB Grey, Chowglue
• Master Seal 501/502, Degussa
• Cera crystalline crete, CCP
TOOLS REQUIRED:
SURFACE PREPARATION:
• Surfaces must be clean and sound.
• Remove all oil, dirt, laitance and other contaminants
by water blasting.
83. METHODOLOGY :
Mix the component in the ratio of 1:1 with water until a
homogeneous blend is obtained.
Wet the surface before the mix is applied to dry concrete.
Care must be taken to fill voids and pin holing.
A minimum of 2 coats is recommended.
When finishing, it is necessary to lay the materials into the
surface to achieve required dry film thickness per coat.
Allow to cure for 24 hrs.
Care is ensured that the waterproofing membrane coating is not
damaged.
At least 3 days cure is necessary before applying final coat.
84. SUGGESTED BRANDS:
AREAS OF USAGE:
OHT, UG sump-internal
85. MORTAR ADMIXTURE SYSTEM
87. METHODOLOGY:
AREAS OF USAGE:
Car wash drain
Chejjas
External Plaster / Shaft Plaster
SUGGESTED BRANDS:
• Ceralatex SBR, CCP
• Rheomix, Degussa
89. WATER IMPERMEABLE RCC SYSTEM
(WHITE TANKING METHOD)
maintained.
by pressure grouting.
95. Concrete shall be carried out as per the methodology instructed in the
Technology Manual and care should be taken as follows:
• The maximum distance between the construction joints should be twice the
height of the retaining wall (For construction with controlled separation cracks).
96. PROTECTIVE MEASURES:
AREAS OF USAGE:
98. The Black tanking can be defined as sealing the entire surface by means of
a skin like protection over the entire surface as defined in DIN 18195 part 6.
TOOLS REQUIRED:
• Torch and LPG cylinder
• Coir brush and steel wire brush
• Hammer
• Chisel
• 4” brush
SURFACE PREPARATION:
• Corners and edges are rounded
• Structural surface sound, clean and even.
• Surface primed and dry.
100. METHODOLOGY
103. PCC with power float to get smooth finish for application of primer.
Surface cleaning – Before application of primer over PCC, this will
ensure the proper bonding to the primer with PCC.
104. At the end portions – Block work, plastering and smooth haunching
ensured at the end portions to avoid sharp edge between horizontal and vertical
area.
105. Primer application – Primer to be applied over the cleaned, dried pcc
surface, this primer will ensure the proper bonding with bituminous sheet, while
torching.
106. Bitumen sheet application
Laying of bituminous sheet, first layer – First layer bituminous sheet should be
laid with minimum lap length of 10 cm.
107. Laying of bituminous sheet, second layer – Second layer laid over first
layer.
Protective screed for the floor area – To protect the water proofing
membrane from the external heat or pedestrian movement…..
110. …….SBR admixed screeding is done on nominal reinforcement
111. Protective screed for walls –Bitu board is placed over the bitumen sheet
113. Backfilling soil
Backfilling soil started with layer by layer with correct compaction (Max.30
cm)
114. SUGGESTED BRANDS:
• The immediate upper floor cutout holes to be closed properly to avoid falling of
materials, water, etc.
• In the immediate lower floor toilet, doors opening to be barricaded to avoid the entry of
any person.
• Proper firm platform to be provided like stool/table etc, inside the toilet while bore
packing is happening.
• While packing outside or inside the duct, the person should have a firm platform
made using M.S jelly laid over the cup lock or H-frame staging.
• Personnel should wear safety belt and get it hooked to a firm support like props or
building elements.