Você está na página 1de 4

Mohammed Hamid Khan

mhk84@outlook.com | +97470681486
8C/24, Sagar CHS, Sector - 10, Kopar Khairane,Navi Mumbai, MAHARASHTRA 400 709

• Having almost 10 years of experience in MEP Construction projects.


• Knowledge of MEP project Procurement, QA/QC Policy and construction safety (EHS).
• Knowledge of reviewing the Technical documents and MEP drawings.
• Knowledge of LV System, ELV System Design & Installation.
• Basic knowledge of HVAC, Fire Fighting, Drainage and Plumbing System.
• Knowledge of preparation of BOQ, Estimation and Proposals, RFI Documents and Submittals of MEP
system, Inspection reports, etc.
• Knowledge of MEP Codes and Standards used in MEP Construction (NFPA 70, NEC, IEC, QCS 2014, etc.).
• Knowledge of ELV products of Honeywell, Siemens, Simplex, Essar.
• Knowledge of Auto-CAD, MS-Project, Primavera, MS-Office, Revit 2016 (Basics).

Experience
Electrical Engineer Jun 2019 - Present
Trags Engineering, Qatar
• Review Tender documents (Drawings + Specification + Bill of Quantities) related to Electrical works.
• Coordinating in preparation of Shop Drawings and Technical Submittals.
• Coordinating with Main Contractor/Consultant for getting approved the documents (TDS, Drawings, etc.).
• Coordinating in resolving the Comments issued by Consultant on Shop Drawings & Technical Submittals.
• Supervising the Installation of Electrical LV and ELV Systems.
• Coordinating in Inspection with Main Contractor/Consultant.
• Coordinating with Civil & MEP Contractors at different stages of the project for smooth operation of the project.
• Attending the weekly progress meetings with Main Contractor and MEP Contractors.
• Ensured all the work done is under EHS rules and QA/QC policies.

MEP Engineer Jun 2018 - Apr 2019


Leighton India Contractors Pvt. Ltd, Mumbai (India)
• Review Tender documents (Drawings + Specification + Bill of Quantities) pertaining Electrical works.
• Review the Technical Documents submitted by Electrical Contractors for approval.
• Review the Shop drawings submitted by Electrical Contractors for the approval.
• Coordinating with Client/Consultant for getting approved the documents (TDS, Drawings, etc.)
• Performing material inspections, Site Work Inspections and generating the reports.
• Coordinating in Testing and Commissioning of Electrical Systems and generating reports.
• Coordinating with Civil & MEP Contractors at different stages of the project for smooth operation of the project.
• Attending the weekly progress meetings with Client and MEP Contractors.
• Ensured all the work done is under EHS rules and QA/QC policies.

MEP Engineer Jan 2016 - Mar 2018


Oasis Tech Contracting LLC, Dubai (United Arab Emirates)
• Receive Tender documents (Drawings + Specification + Bill of Quantities) pertaining MEP works.
• Review the tender documents and ensure that all data required for pricing are available in the documents.
• Prepare technical queries such as, details, missing documents pertaining to the tender.
• Send enquiries to the Subcontractors and suppliers for materials & equipment.
• Follow up and receive quotation from various Subcontractors and Suppliers.
• Evaluate the supplier quotations against the tender requirements such as capacity, quantity, specifications,
deviations, etc. Make comparative analysis of all quantities & use the optimum solution
• Prepare the BOQ for final submission to the Client/Main Contractor.
• Revise the costing for the post tender clarifications received.
• Negotiating with the Subcontractors and Suppliers after reviewing the MEP quotations.
• Prepare final contract BOQ based on the agreed contract value.
• Coordinate with the Consultant and Subcontractors for the smooth operation of the project.
• Coordinate with consultants, sub-contractors and involve in design/review/ implementation of all MEP functions
and discipline required for the project.
• Assure that the installations of MEP related systems are in compliance with drawings, required specifications and
standards.
• Prepared Site progress reports, Inspection reports, Snag list reports, etc.
• Attend site meetings regularly and liaise with others for details of works and coordination of requirements
amongst various parties.
• Inspecting works daily, documenting any snag items for inclusion in the Master Snag list.
• Involve in testing and commissioning of the installed systems and ensure compliance and handover.
• Coordinate in preparation of the Handover documents.
• Ensured all the work done is under EHS rules and QA/QC policies.

Electrical Engineer Nov 2014 - Nov 2015


Cegelec Qatar WLL, Qatar
• Coordinated in Installation, Testing and Commissioning of ELV System such as BMS, CCTV, Fire Alarm System,
Public Address System, Parking Management System, CO Detector, Access Control Systems.
• Coordinated in Installation of Containments (Conduit, Cable Tray, etc.) for all MEP system.
• Coordinated in Integrating ELV and Other MEP System of Sheraton Hotel.
• Ensured all correctness is complying with scope of works, design drawings and signed contract agreement.
• Reviewed SLD drawings, electrical drawings (LV and ELV), contracts technical specifications, as-built drawings.
• Coordinated in the site activities like material receiving, getting material approved by QA/QC department,
comparing delivered material with BOQ items.
• Coordinated in approval of the Tools and accessories used by the Technicians and get fitness tag for each from
the HSE Team.
• Coordinated in getting approved the installed items by QA/QC department.
• Chair meetings with design team, design manager, erection team, consultant and customer team to ensure all the
work is complying with tender documents, and standards.
• Reports and review all alternative solutions in concept design/ design stages changes by writing technical
recommendation to Senior Managers.
• Review and make reports all the change requests / variations orders submitted by the contractors and
consultants.
• Ensured all the work done is under EHS rules and regulation.

Electrical Engineer Jan 2013 - Sep 2014


Safari Company Limited, Jeddah (Saudi Arabia)
• Coordinated in Installation, Testing and Commissioning of Electrical System such as LV Panels, DG Sets, Light
Fittings, Distribution Boards (MDB, SMDB and DB), Sockets, Switches, etc.
• Coordinated in Integration of ELV and Other MEP System of Facility Buildings and Airport Terminals.
• Ensured all correctness is complying with scope of works, design drawings and signed contract agreement.
• Coordinate in Corrective and Preventive Maintenance of the Electrical systems.
• Coordinated in the site activities like material receiving, getting material approved by QA/QC department, testing
of cables, comparing delivered material with BOQ items.
• Coordinated in approval of the Tools and accessories used by the Technicians and get fitness tag for each from
the HSE Team.
• Coordinated in getting approved the installed items by QA/QC department.
• Issued RFI to eliminate the need for costly corrective measures.
• Attended the onsite progress meeting with Management Team, Consultant and Client.
• Prepared log schedule of received materials and drawings, Approved materials and drawings, rejected materials
and drawings.
• Ensure all correctness is complying with the scope of works, design drawings, and signed contract agreement.
• Report all technical components/ during stages (current and previous comments) to the Project Manager.
• Reports and review all alternative solutions in concept design/ design stages changes by writing a technical
recommendation to Senior Managers.
• Prepared change of requests/variations orders and submit to the Senior Project Manager for approval.
• Ensured all the work done is under EHS rules and regulation.

Site Engineer Sep 2009 - Dec 2012


Micro Systems, Mumbai (India)
• Coordinated in Installation, Testing and Commissioning of ELV systems such as CCTV, FAS, PAGA, Access
Door Control, Intrusion Alarm System, BMS, Home Automation, etc.
• Coordinated in integration of ELV System with other MEP System.
• Ensured all correctness is complying with scope of works, design drawings and signed contract agreement.
• Reviewed SLD drawings, electrical drawings (LV and ELV), contracts technical specifications, as-built drawings.
• Prepare internal reports, work progress and submit the same to the Project Manager.
• Coordinated in the site activities like material receiving, getting material approved by QA/QC department, testing
of cables, comparing delivered material with BOQ items.
• Coordinated in approval of the Tools and accessories used by the Technicians and get fitness tag for each from
the HSE Team.
• Coordinated in getting approved the installed items by QA/QC department.
• Issued RFI to eliminate the need for costly corrective measures.
• Verifying the bill submitted by the subcontractors by inspecting the onsite quantity and quality of the installed
items.
• Prepared all reports as per client's requests and attend all the related weekly meetings.
• Verifying the bill submitted by the subcontractors by inspecting the onsite quantity and quality of the installed
items.

Site Engineer Jul 2005 - Sep 2006


Unicorn Controls Pvt. Ltd, Mumbai (India)
• Supervised Installation, Testing and Commissioning of ELV Systems such as Fire Alarm and Fire Protection
System, Gate Barrier Systems, CCTV, Public Address System, Access Control System, Intrusion Alarm System,
BMS and other Electronic Security Systems.
• Coordinated in Integrating ELV and Other MEP System.
• Coordinated in preparation of As-Built and Handover documents.
• Attended internal progress meetings and client meetings.
• Prepared log sheet of completed and ongoing tasks.
• Maintained measurement and quantity of the materials installed.
• Maintained log sheet of materials received.
• Prepared Material Request and submitted to the Project Manager.

Skills & Specialization


Design, Electrical Systems, ELV System, LV System, Inspection, Installation

Education
Mumbai University Sep 2006 - Sep 2009
BACHELORS, Electrical Engineering
Mumbai (India)

Maharshtra State Board of Technical Education Aug 2002 - Feb 2006


ASSOCIATES, Industrial Electronics Technology
Mumbai (India)

Licenses & Certifications


AutoCAD Oct 2009 - Present
Cadd Centre

Primavera P6.2 Oct 2009 - Present


Cadd Centre

Você também pode gostar