STATION PROJECT REF. REPORT NO.

DATE:
ICS-ONGC- INSP/91/Inspection/Survey/5483223/20191119 19/11/2019
Mehsana
CUSTOMER NAME : ONGC - TPI - MEHSANA (2018-21)
CONSULTANT/EPC CONTRACTOR NAME : Hal Offshore Limited
MANUFACTURER/SUPPLIER NAME : Hal Offshore Limited
PROJECT/VENDOR P.O. NO. : P O No DLH/OES/MM/RVMP-MHN/X11JC16001/2017 dated
17/05/2017
ITEM/MATERIALS : Sobhasan Site Close Drain Pit & Instrument Rack Room
BATCH NO./ Sr. No. : -
QUANTITY : Sobhasan Site Close Drain Pit Bottom Raft Reinforcement Fixing Work
Under Progress And 0.954 M3 M15 PCC Work For Instrument Rack
Room Plinth Beam Done.
SPECIFICATIONS/DRAWINGS : Relevent Clause Of Specification-P6EC-STD-CI-S-1010 & Relevent
Drawing Of 1702-741-CI-D-1020, Rev-B1 , 1702-741-CI-D-1040 REV-
B2

IR
CODES/STANDARDS : IS.383 & 456 And M-30 Concrete Mix Design Report No.MAPTCEL/17-
18/02404 Dated.30-08-2018
DATE(S) OF INSPECTION : 19/11/2019 INSPECTION TYPE Stage
The undersigned Surveyor working under general terms and conditions of International Certification Services, did visit at
Hal Offshore Limited for Inspection of the above.
FINDINGS / OBSERVATIONS:
A) Visual: (Annexure A)
T
(1) Reinforcement Cutting And Bending Work And PCC Grade Varify And Found Satisfactory As Per Drawing
AF
a) Any other:
(1) OK

B) Dimensional: (Annexure B)
(1) Dimension Of Reinforcement Cutting And Bending Work And Dimension Of PCC Verified As Per Drawing And Found
R

Satisfactory

C) List of instruments/equipments used for facilitation inspection: (Annexure C)


(1) NA
D

D) Description of any jig/fixture/clamp used to facilitate inspection): (Annexure D)


(1) Nil

E) Calibration Certificates check for Measuring instruments/equipments/gauges etc: (Annexure E)


(1) Nil

F) Report(s) reviewed: (Annexure F)


(1) Essar Steel Mm Dia Of 10,12, 16, 20, 25 Invoice No.02620/2019 Dated.28-09-2019 Report No-
SGS/BAR/ESTL/HS/228, SGS/BAR/ESTL/HS/229, SGS/BAR/ESTL/HS/235, SGS/BAR/ESTL/HS/230,
SGS/BAR/ESTL/HS/231 Annexure F_1

G) Test(s) Witnessed: (Annexure G)


(1) Witnessed Random Of Reinforcement Cutting And Bending Work And Grade Of Concrete Verified And Found
Satisfactory As Per Drawing

H) Other: (Annexure H)
Reinforcement Work Witnessed Random Satisfactory At 4 RVMP Site Survey Done At Mehsana ONGC Site.
I) Deviation, if any: (Annexure I)
Nil
J) Identification / reference marking : (Annexure J)
Nil
ANNEXURES :Attached Inspection Visit :NA

Page 1 / 2 FI/01/Rev.5/ 13.01.2017


INTERNATIONAL CERTIFICATION SERVICES PVT. LTD.
INSPECTION REPORT

Order Completed Yes Comp. Date Continued on separate attachment : Yes


Distribution: Sign and Stamp: Dilip Kumar Patel
Original : ONGC - TPI - Inspection Engineer : Dilip Kumar Patel
MEHSANA (2018-21) Contact No. 9152004312
Email: dilipkumar.patel@icsasian.com
Copy : ICS Place : ICS-ONGC-Mehsana
Copy : Date : 19/11/2019
This Inspection report is issued without prejudice for the ends and purpose for which it was assigned. This is an Inspection Report only ; Release Note shall be prepared after review