GENERAL NOTES :-

1. THIS DRAWING IS THE COPYRIGHT OF DG-BIM CONSULTANTS,


1 2 1 2 1 2 AND AS SUCH, MUST NOT BE RETAINED, COPIED OR USED
WITHOUT THE CONSULTANT'S AUTHORITY.
2. DO NOT SCALE FROM THE DRAWINGS.ONLY WRITTEN
DIMENSIONS TO BE FOLLOWED.
5200 5200 5200
3. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN
5000 5000 5000
METERS UNLESS NOTED OTHERWISE. ALL DIMENSIONS
TO BE VERIFIED ON SITE & APPROVED BY THE ENGINEER.
F1 100
PB2(200x400) RB2(200x400) 4. ALL DIMENSIONS AND LEVELS INDICATED IN THE
F1

100
A A A DRAWINGS ARE FROM UNFINISHED SURFACES.

C1 C1
5. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH

800
150THK FLOOR SLAB WITH SINGLE
OTHER RELEVANT ARCHITECTURAL, STRUCTURAL,MECHANICAL

1150
LAYER A-252 BRC MESH SLAB 160 THK.
AND ELECTRICAL DRAWINGS AND ALL RELEVANT

RB1(200x400)
SECTIONS OF THE SPECIFICATIONS.

PB1(200x400)

PB1(200x400)
1500 1500
6. DISCREPANCY IN THE DRAWINGS IF ANY,SHALL BE

RB1(200x400)
BROUGHT TO THE NOTICE OF THE CONCERNED ENGINEER

4000

4000

4000
3800

3800

3800
800 T10 AT 150 C/C
A A PRIOR TO THE CONSTRUCTION.

T10 AT 200 C/C


+0.15 m
G.F Lvl 800 7. GRADE OF CONC. SHALL BE- C-35
+3.300 m 8. GRADE OF BLINDING CONC. SHALL BE- C-15
RF Lvl 9. ALL LEVELS TO BE CROSS-CHECKED WITH ARCH. DRG.

1150
800
100
F1 F1
100

100
B B B
PB2(200x400) RB2(200x400)
C1 C1

FOUNDATION PLAN PLINTH BEAM FRAMING PLAN ROOF FRAMING PLAN

200 200
12x20THK MASTIC SEALENT GROUND FLOOR GRADE SLAB

12 THK FLEXEL BOARD


800 200
FFL (AS/ARCH. DRG.)
150THK FLOOR SLAB WITH SINGLE 50x50x5 ANGLE TO BE FIXED
LAYER A-252 MESH REINF.
F.F. LVL. F.F. LVL.
100THK BLIND CONC.
C-20 WITH 1000
N.G.L./FGL. GUAGE POLTTHENE SHEET
N.G.L./FGL.
100THK BLIND CONC. 100THK BLIND CONC.
C-15 WITH 1000 C-15 WITH 1000 WELL COMPACTED EARTH UPTO
GUAGE POLYTHENE SHEET GUAGE POLYTHENE SHEET
PLINTH BEAM 98% STANDARD PROCTOR DENSITT

1000
WATER PROOFING AS/SPECS. WELL COMPACTED EARTH UPTO
98% STANDARD PROCTOR DENSITY CABLE TRENCH T10 AT 200 C/C PLINTH BEAM
400

SOLID BLOCK WORK COL.TIES


T12 AT 200 C/C
100 100 WATER PROOFING
WATER PROOFING AS/SPECS.
AS/SPECS. COL.BARS
100

OR TO FIRM SOIL
BLINDING CONC.

1200(MIN.)
WELL COMPACTED EARTH UPTO
SOLID BLOCK WORK
98% STANDARD PROCTOR DENSITY REINFORCEMENT -C

200
REINFORCEMENT-D
100

100
TYP. SECTION FOR EXTERNAL PLINTH BEAM REINFORCEMENT -A
50xd
REINFORCEMENT-B

E
T10 AT 200 C/C (TTP)

T12 AT 200 C/C

100
100THK BLIND CONC.
C-15 WITH 1000
SECTION A-A GUAGE POLTTHENE SHEET
100 A/B 100

WELL COMPACTED EARTH UPTO


98% STANDARD PROCTOR DENSITT
200
SECTION 1-1
T16 - 8NOS.
TIES: T8 AT 150 C/C
400

SCHEDULE OF FOOTING
FOOTING FOOTING SIZE
A B C D
REMARKS
MKD. A B E (BOT. REINF.) (BOT. REINF.) (TOP REINF.) (TOP REINF.)

F1 1200 1200 400 T12 AT 150 C/C T12 AT 150 C/C T12 AT 200 C/C T12 AT 200 C/C REV. NO. DATE ISSUE OR REVISION DWN

DETAIL OF COLUMN C-1 CL OF FOOTING/COL.

100
SUMAIL INDUSTRIAL ESTATE
SCHEDULE OF PLINTH BEAMS P.C.C BED LINE
RIGHT FOOTING LINE CONSULTANT:
(R.H.S.)
SIZE(mm) BOTTOM STEEL TOP REINF. STIRRUPS DG BIM CONSULTING

EQUAL
REINFORCEMENT - B Muscat (Oman)+Bangalore(India).PC-131
TYPE EXTRA AT CONTINUOUS SUPPORT REMARKS. P.B No-1102, Mutrah,Sultanate of Oman.
WIDTH DEPTH STRAIGHT CURTAIL STRAIGHT LEFT SIDE (L/3) MIDDLE RIGHT SIDE (L/3)
LHS RHS Tel:0968-24819477,web:www.dgcon.com
BEAM

Email:info@dgcon.com,

REINFORCEMENT - A
PB-1 200 400 2-T12 -- 2-T12 -- -- 2L T8 AT 150 C/C 2L T8 AT 200 C/C 2L T8 AT 150 C/C
1
PB-2 200 500 2-T16 -- 2-T16 -- -- 2L T8 AT 150 C/C 2L T8 AT 200 C/C 2L T8 AT 150 C/C CL OF FOOTING/COL.
CLIENT:-

A
SYNERGY
BEAM PETROLEUM INTERNATIONAL
SCHEDULE OF ROOF BEAMS LEFT RIGHT
P.O.Box - 1413,PC-113, Ruwi
(L.H.S.) (R.H.S.) Sultanate of Oman

EQUAL
SIZE(mm) BOTTOM STEEL TOP REINF. STIRRUPS Email:
TYPE EXTRA AT CONTINUOUS SUPPORT REMARKS.
WIDTH DEPTH STRAIGHT CURTAIL STRAIGHT LEFT SIDE (L/3) MIDDLE RIGHT SIDE (L/3) PROJECT:
LHS RHS SUPPORT REINFORCEMENT DESIGNATION
PROPOSED EXPANSION WORK AT SUMAIL
RB-1 200 400 2-T16 -- 2-T16 -- -- 2L T8 AT 150 C/C 2L T8 AT 200 C/C 2L T8 AT 150 C/C
FOR SYNERGY PETROLEUM
100

RB-2 200 500 2-T16 2-T12 2-T16 -- -- 2L T8 AT 150 C/C 2L T8 AT 200 C/C 2L T8 AT 150 C/C
DRAWING TITLE :
EQUAL EQUAL
100 100
B LV ROOM DETAILS

DRAWN : DESIGN : CHKD : APPR : DATE:


TTP. COLUMN FOOTING PLAN M.S. A.J. P.M. D.R.K. 17.11.2013
SCALE- 1:20 JOB NUMBER: SCALE: SHEET:
DGC-13-116 1:50 A1

DRAWING NUMBER: REVISION:


S -LV-01 R0