Escolar Documentos
Profissional Documentos
Cultura Documentos
me/PrMaB
Table of Contents
1 Part I: AIMS Organization Context ....................................................................................... 5
1.1 Purpose ............................................................................................................................ 5
1.2 AIMS’s Vision, Mission and Goals .................................................................................... 5
1.3 Scope ................................................................................................................................ 6
1.4 Business Drivers and Objectives ...................................................................................... 6
1.5 AIMS Mandates ................................................................................................................ 7
1.6 Custodianship................................................................................................................... 9
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 2 of 113
https://t.me/PrMaB
7 References ....................................................................................................................... 98
12 Figures ............................................................................................................................112
13 Tables .............................................................................................................................113
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 3 of 113
https://t.me/PrMaB
Overview
Saudi Aramco’s journey in Asset Integrity Management (AIM) spans several decades and continues to be an
important part of the company’s corporate safety value. This is evident from its long safety history and pockets
of excellence in integrity already demonstrated in the company. Examples of these pockets of Excellence
include: Corrosion Management Program (CMP), Total Plant Reliability Management (TPRM), Inspection, Risk
Based Inspection (RBI), HAZOP, Environmental Protection Programs, High Integrity Protection System (HIPS), etc.
The AIMS Manual reinstates the long-standing journey of Saudi Aramco to achieve best-in-class in Asset Integrity
Management.
In addition, AIMS emphasizes/focuses on the key integrity elements: Risk Identification and Mitigation, Safety
Critical Elements, Integrity Performance Standards development/application, and Integrity Operating Windows.
To sustain high level of quality for Asset Integrity Management implementation, Internal/External Integrity
Assessment and Continuous Improvement processes are integrated as part of the AIMS. The AIMS Enablers
(Integrity Competencies, Integrity Information and Documentation, KPIs, AIMS Process Management, etc.)
ensure successful business implementation of AIMS and help achieve a unified company approach to Asset
Integrity Management.
This Manual supersedes and replaces previous AIMS issued documents, namely “Asset Integrity Management
Framework” and “Asset Integrity Management System – High-Level Guide”, both issued in August 2013.
It is expected that the Asset Integrity Management System (AIMS) will mature and be updated over time, as
experience is gained with systems, operational practices, and as new technologies become available. While the
components of AIMS are expected to remain stable, the specifics of its applications, solutions or execution may
evolve and be automated over the years.
Copyright © 2015 Saudi Aramco, All Rights Reserved. Revision 1.0 - 2015
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 4 of 113
https://t.me/PrMaB
1 Part I: AIMS Organization Context
1.1 Purpose
The purpose of this Manual is to define the Saudi Aramco Asset Integrity Management System (AIMS). It
provides a unified framework and methodology to manage Asset Integrity across the company and thereby
achieve business objectives pertaining to Asset Integrity.
This Manual provides a guide to management, engineers, project managers, project engineers, inspectors,
maintenance personnel, and technicians for implementing the various aspects of AIMS within their area of
responsibility. In particular, the AIMS Manual consists of a set of expectations and work processes governing
how Asset Integrity should be implemented and managed. By fulfilling these expectations and implementing the
associated work processes, organizations can achieve Operational Excellence (OE) in Asset Integrity
Management (AIM).
Asset Integrity is an integral part of the requirements of Saudi Aramco OE and Safety Management System
(SMS). While OE and SMS outline the needs, mandates and expectations for Asset Integrity, i.e. the “What” part,
the AIMS complements OE and SMS by outlining the “How” and the detailed work processes to implement and
maintain AIMS from design to decommissioning.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 5 of 113
https://t.me/PrMaB
1.3 Scope
The AIMS requirements stipulated in this Manual apply to all Saudi Aramco surface facilities and assets, such as
Refining, Gas, Oil and Petrochemical Plants, On-shore and Offshore hydrocarbon facilities, and Pipelines. The
AIMS scope covers the entire lifecycle of Saudi Aramco plant assets and hydrocarbon structures from design to
decommissioning; examples of plant assets are: Stationary Equipment, Rotating Equipment, Electrical,
Instrumentation, Control Systems, Communication Systems, Pipelines, etc.
In specific, the AIMS focus is the processes, systems, people, tools, and activities associated with:
1. Design and Build Integrity – Identify Safety Critical Elements and develop Integrity Performance
Standards & IOWs.
2. Operate and Safeguard Integrity - Operate while keeping process variables within their safety limits
through monitoring Integrity Operating Windows (IOW). Maintain Barriers and SCE integrity through
Assurance Requirements and Verification Tasks. Continuously assess and improve AIMS.
The scope and mandate of this Manual excludes Drilling, Aviation, Marines, Joint Venture, non-hydrocarbon
projects (i.e. residential buildings) and Third Party facilities, as the responsible organizations for these
assets/activities have their own specific Integrity requirements and mandates. However, in the future the scope
may include the above operation types and specific Asset Integirty Management requirement will be developed
accordingly in line with the AIMS Manual.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 6 of 113
https://t.me/PrMaB
5. Internal and External Assessments are periodically performed to assure Integrity and for continuous
improvement.
Various existing management systems such as OE, SMS, Total Plant Reliability Management (TPRM), Enterprise
Risk Management (ERM), and existing standards/procedures provide important support to the various
components of the AIMS. AIMS will build on these excellent initiatives and standards while setting the short-
term and long-term strategies and plans to better integrate, align, and implement Integrity throughout the
lifecycle of the assets.
The Project Management Organizations and each Project Manager are responsible for designing, constructing
and delivering assets/plants that meet company Integrity standards as per this AIMS Manual. The following
figure summarizes the AIMS Mandates for Projects:
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 7 of 113
https://t.me/PrMaB
1.5.2 AIMS Mandates for Operations
The Operations Manager is responsible for managing the operation of the assets to safeguard and maintain their
integrity as per this AIMS Manual. The following Figure summarizes the AIMS mandates for Plant Management:
CSD through its Division, Asset Reliability and Integrity Management Division (AR&IMD), has the mandates to
develop and maintain an effective AIMS that meets minimum industrial integrity requirements; AR&IMD shall:
1. Develop and maintain an effective AIMS with supporting KPIs and tools.
2. Align the risk management scheme used in AIMS with the corporate approach for Risk Management.
3. Support Projects and Operations in deploying and implementing AIMS.
4. Develop and deliver the required training courses and awareness programs.
5. Promote continual improvement for AIMS in projects and operations.
6. Conduct joint External Assessments for selected facilities or projects.
Note: More details on CSD and other departments’ Roles and responsibilities are shown in the Governance
section of this Manual.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 8 of 113
https://t.me/PrMaB
1.6 Custodianship
The custodian of this Manual is the Asset Reliability and Integrity Management Division (AR&IMD), Consulting
Services Department (CSD). AR&IMD/CSD custodianship implies:
Providing guidance and consultation to Projects and Operations regarding the Asset Integrity
requirements as outlined in this Manual.
Continuously seeking and assessing the feedback from implementing AIMS, and subsequently revising
and optimizing the AIMS Manual.
This Manual is available on the corporate e-Standards website under “Manuals”. For any additional information
or technical support, please contact AR&IMD/CSD.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 9 of 113
https://t.me/PrMaB
2 Part II: AIMS Framework
The AIMS Framework covers the entire lifecycle of the asset, from Design to Decommissioning. The AIMS
Framework encompasses the AIMS Organization Context, AIMS Processes, AIMS Enablers, and AIMS
Governance, needed to establish and then safeguard the integrity of the company’s assets. Figure 2.1 provides
the AIMS Framework for Projects (during Design, Procurement, Construction, and Commissioning Phases) while
Figure 2.2 provides the AIMS Framework for Operations (during “Operate and Maintain” Phase).
In Projects, the AIMS Processes consist of the following (see Figure 2.1):
1. AIMS Development for Projects (Figure 3.1: Process # AIMS-P-D-1 “AIMS Development for Projects” ):
a. Build Integrity in Design Phase.
b. Identification of Risk/Hazards and Mitigation/Barriers for Hazards.
c. Identification of the SCEs and developing the associated Integrity Performance Standards.
d. Developing IOW.
2. AIMS Execution in Projects (Figure 3.11: Process # OE – 4.1 "Design, Procurement, and Construction"):
a. Design and build Integrity during the design, procurement, and construction phases.
b. Verification of Integrity during commissioning.
3. AIMS Assessment for Project:
a. Conducting Internal Assessment (Figure 3.12: Process # AIMS-P-A-1 "Internal Assessment for
Projects").
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 10 of 113
https://t.me/PrMaB
b. Conducting External Assessment (Figure 3.13: Process # AIMS-P-A-2 "External Assessment for
Projects").
4. AIMS Continuous Improvement (Figure 3.14: Process # AIMS-P-C-1 "Continuous Improvement for
Projects"):
a. Creating Continuous Improvement process.
b. Identifying Integrity improvement opportunities.
c. Developing/tracking improvement plan.
During the “Operate and Maintain” phase, AIMS Processes consist of the following:
1. AIMS Development for Operation (Figure 4.1: Process # AIMS-O-D-1 "Development Process in
Operations"):
a. Identification/updating of Risk/Hazards and Mitigation/Barriers for Hazards.
b. Identification/updating of the SCEs and categorization of barriers.
c. Developing/updating the associated Integrity Performance Standards.
d. Developing/updating IOW.
2. AIMS Execution for Operation (Figure 4.2: Process # AIMS-O-E-1 "Execution process in Operations"):
a. Integrating AIMS with Plant Asset Management Plans.
b. Execution of IPS Verification Tasks (as part of the Maintenance and Inspection Plan).
c. Operating within IOW Limits.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 11 of 113
https://t.me/PrMaB
3. AIMS Assessment for Operation:
a. Conducting Internal Assessment (Figure 4.3: Process # AIMS-O-A-1 "Internal Assessment").
b. Conducting External Assessment (Figure 4.4: Process # AIMS-O-A-2 "External Assessment").
4. AIMS Continuous Improvement (Figure 4.5: Process # AIMS-O-C-1 "Continuous Improvement”):
a. Creating Continuous Improvement process.
b. Evaluating AIMS Implementation.
c. Identifying Integrity improvement opportunities.
d. Developing/tracking improvement plan.
In both Figures above, the AIMS Organization Context, AIMS Governance and AIMS Enablers are common
components of the Framework to both Projects and Operations. Details of these components, however, will
differ as applicable to the nature of activities within the two organizations.
AIMS uses the Plan-Do-Check-Adjust (PDCA) cycle to ensure the system is continuously being updated and
maintaining quality. The four phases of AIMS are aligned with the PDCA cycle as shown below (Plan –AIMS
Development, Do – AIMS Execution, Check – AIMS Assessment, Adjust – AIMS Improvement). Figure 2.3 shows
the flow of activities for implementing AIMS Processes for Operations.
Figure 2.3: Flow of activities for implementing AIMS Processes and the associated deliverables
AIMS Governance outlines the management functions and the various governing bodies who can provide
oversight and assurance that the system is fit-for-purpose and being applied correctly. The “AIMS Governance”
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 12 of 113
https://t.me/PrMaB
section of this Manual provides the detailed expectation and Roles and Responsibilities of various Saudi Aramco
entities.
Enablers facilitate effective and successful implementation of AIMS. For each Enabler, this Manual describes the
Objectives, Expectations and Roles of the organizations and individuals to ensure support for AIMS
implementation. The AIMS Enablers are:
1. Competency
2. Integrity Information & Documentation Management
3. Key Performance Indicators (KPIs)
4. Process Management
5. Management of Change (MoC)
6. External Resources
7. Tools & Technology
A key component of “AIMS Development” to prevent and mitigate risks is the “Hardware Barriers” and SCEs (See
Figure 2.4). The “Hardware Barriers” can be visualized as a series of control measures or “barriers”, which
either prevent the hazard from being realized, or limit the effects of the accident after the hazard has been
realized. When multiple barriers fail, there exists a possibility of a major accident. This is referred to as the
“Swiss Cheese Model”, developed by James T. Reason in 1990, as shown below.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 13 of 113
https://t.me/PrMaB
The categories of “Hardware Barriers” in AIMS are as follows:
1. Structural Integrity
2. Process Containment
3. Ignition Control
4. Detection Systems
5. Protection Systems
6. Shutdown Systems
7. Emergency Response
8. Life Saving
Though each barrier is represented as a single hardware entity; they are merely representative of a group of
Safety Critical Elements (SCEs) that actually form the physical barrier. For example, the “Process Containment”
barrier is comprised of Pressure Vessels, Heat Exchangers, Rotating Equipment, Tanks, Piping Systems, Pipelines,
Relief System, etc. All of these individual SCEs serve the same integrity purpose of maintaining process
containment so they are grouped together into one barrier. These hardware elements are supported by people
and processes that enable the hardware to perform its function. Table 2.1: Examples of SCEs provides some
additional examples of SCEs per Hardware Barrier.
Integrity Barrier Category Examples
Offshore Platform Structure, Piping support, Vessels support, Surface Structures, Heavy
Structural Integrity
Lift Cranes, Ballast Systems, Mooring Systems, and Drilling Systems.
Pressure Vessels, Heat Exchangers, Rotating Equipment, Tanks, Piping, Pipelines, Relief
Process Containment Valves, Flare System, Process Control System, Surge Relief Protection Systems, Well
Containment System, and Tanker Loading.
HVAC (Hazardous and Non-hazardous), Certified Electrical Equipment, Inert Gas System,
Ignition Control
Earth Bonding, and Fuel Gas Purge.
Fire Detection System, Combustible Gas Detection System, H 2S Detection System H2O-
Detection System in-Condensate Detection System, Tank Level Monitoring system and Vibration
monitoring system.
Deluge System, Fire/Explosion Protection System, Fire-water Systems, Passive Fire
Protection, Gaseous System, Power Management Systems, Foam Systems, Sand Filters,
Protection System
Chemical Injection Systems, Plant Data security system (Firewall, virus protection, and
Intrusion protection).
Life Saving Equipment Personnel Survival Equipment, Breathing Air Systems, Rescue Facilities, and Lifeboats.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 14 of 113
https://t.me/PrMaB
Another important building block of the AIMS Framework is the IOW; assets should be designed and operated
such that process variables are kept within established integrity limits. The IOW describes operating ranges for
equipment, plants, and assets. The intent of IOW is to cover parameters that can impact asset integrity or
process safety either immediately or over a longer period of time. Limits (Standard IOW Limits and Critical IOW
Limits) must be defined for each individual operating variable that could affect asset integrity (the “critical
operating variable”). Once IOW limits are defined for all critical variables, process control and emergency
systems are designed and programmed/configured to maintain asset operation within these IOW Limits, See
Figure 2.5.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 15 of 113
https://t.me/PrMaB
3 Part III: AIMS Implementation in Projects
Projects consist of three phases: design, procurement/construction, and commissioning. AIMS implementation
in Projects consists of four main steps:
AIMS Development in Projects
AIMS Execution in Projects
AIMS Assessment in Projects
AIMS Continuous Improvement
Operational Excellence Process #OE 4.1 Design, Procurement, and Construction, is the governing process for
Asset Management during designing, procuring, constructing and commissioning of capital projects. Subsequent
Sections 3.1-3.4 are additional requirements to fulfill Asset Integrity in projects. The following sections contain
the details (expectations and process) for each of these steps.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 16 of 113
https://t.me/PrMaB
For the design phase, projects are expected to fulfill the requirements listed in the Table 3.1:
# AIMS Requirements during Design Phase References
Preliminary hazard/Risk analysis during DBSP (FEL2) is SABP-A-033 (CMP); SAEP-393;
1
performed. SAEP-707 ; SAEP-366;
SAER-5437 Saudi Aramco HAZOP
Qualified personnel are assigned to conduct HAZOP. Guidelines;
2 Competent vendors/offices are assigned to Integrity related OE 4.1 Design, Procurement, and
activities during design phase. Construction;
Process Hazard Analysis studies (HAZOP, SIL, What-If, OE-5.2 “Environmental Protection”;
3 OE-9.1 “Communication of
Checklist, etc) are performed during Design.
Information”;
4 Risk Register is created. SCEs are identified. OE-9.2 “Accessibility to Information”;
OE-9.3 “Data Archiving and Information
Changes to design after HAZOP are captured/reviewed via Protection”;
5
MOC. OE-11.1 “Risk Management”;
OE-11.2 “Business Continuity
IPSs for each SCE are developed and documented Management (Contingency)”;
6
electronically and in hardcopy format. 11.3 “Business Continuity Management
(Emergency)”;
7 Critical variables are identified with corresponding limits. OE-12.5 “Learning organization”;
The following subsections (3.1.1 to 3.1.4) provide the details of building integrity in the design phase, specifically
addressing:
Risk Identification and Mitigation
Barrier and Safety Critical Element (SCE) Identification
Integrity Performance Standards (IPS) Development
Critical Variables identification and IOW development
For the above components development, the Figure below provides the AIMS Process steps for developing the
four components above, during the design phase (Figure 3.1). Incorporating Asset Integrity concepts and
elements into the design phase is an essential part of ensuring system safety, reliability and stability over the life
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 17 of 113
https://t.me/PrMaB
cycle of assets. For all project developments, the aspects described in the following sub-sections need to be
implemented, documented and incorporated into the Project’s AIMS.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 18 of 113
https://t.me/PrMaB
3.1.1 Risk Identification and Mitigation
Identifying hazards and quantifying risks are critical steps in developing any industrial project. Results of this step
are utilized to identify equipment (SCEs) that may require special treatment due to their significant impact in
either safety or operation. OE Process #11.1 shall be used as a basis to identify Risks/Hazards & mitigation.
Accountability
Department Manager
Responsibilities
Dept Manager Division Heads, RM Division Heads, RM Division Heads, RM Division Heads, RM Dept. Manager,
Coordinator, SMEs Coordinator, SMEs Coordinator, SMEs Coordinator, SMEs Division Heads
References
• Saudi Aramco Enterprise Risk Management Framework •
• ISO-31000
• All relevant Corporate and discipline specific GI’s, Guidelines, Procedures or publications that address risk management in any
form
• OE-11.2 “Business Continuity Management”
• OE-11.3 “Emergency Preparedness”
Performance Measures
Maturity of ERM Management of treatment plans
Risk activities overdue Actions overdue
Figure 3.2: Risk Identification and Mitigation Process (OE Process # 11.1)
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 19 of 113
https://t.me/PrMaB
3.1.1.1 EXPECTATIONS
Risk Identification, analysis and treatment/mitigation shall be conducted according to the latest revision of
Operational Excellence Process #OE 11.1 (Figure 3.2) while meeting the above Expectations. Some additional
instructions and clarifications for this process are described as follows:
Process for risk identification and mitigation needs to be performed for all Plant’s process units (i.e.
Cover the entire plant).
The selected process/technique for risk identification and mitigation must be commonly accepted and
used in Saudi Aramco. Such processes/techniques include Hazard Identification (HAZID), Hazards &
Operability Analysis (HAZOP), Failure Mode and Effect Analysis (FMEA), Hazards Analysis (HAZAN),
System Safety and Operability Studies (SAFOP), Safety Integrity Level (SIL) Study, and Quantitative Risk
Assessment (QRA).
Priority should be given to select more effective preventive and mitigation measures; Figure 3.3 provides
the typical hierarchy and effectiveness of mitigation measures (Hazard Control).
Where deemed necessary by the Risk Assessment, the AIMS will utilize the “barrier” concept to prevent
incidents that could initiate major accidents (explosion/fire) or minimize its effect, as depicted in Figure
3.4.
The outcomes of this process are the Risk Register and the analysis report. All identified mitigation
measures or risk treatment are assigned to a risk owner and fully implemented. The Risk Register and
report need to be communicated to groups and management.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 20 of 113
https://t.me/PrMaB
Figure 3.3: Hierarchy and Effectiveness of Mitigation Measures (Hazard Control)
The outcome of this step will provide the required input for the next stage in setting up an AIMS:
Identifying Safety Critical Elements.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 21 of 113
https://t.me/PrMaB
3.1.2 Barrier and Safety Critical Element (SCE) Identification
Process Steps
Identify High Risk
Document and
Gather PHAs & Hazards &
Identify SCES Repeat for all Units Distribute Finalized
Form the Team Hardware used as
SCE list
Prevention
Responsibilities
Project Manager Project Integrity Project Integrity Project Integrity Project Manager /
Project Integrity Coordinator / Project Coordinator / Project Coordinator / Project Project Integrity
Coordinator Project Team Disciplines / Team /Disciplines Team / Disciplines Coordinator / Project
Team SMEs / Proponent SMEs / Proponent SMEs / Proponent Team / Disciplines
SMEs / Proponent
3.1.2.1 EXPECTATIONS
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 22 of 113
https://t.me/PrMaB
3.1.2.2 PROCESS STEPS
In order to identify the Safety Critical Elements for the facility, the output from the Risk Assessment conducted
during project development should be used. The Risk Assessment should identify mitigation measures for each
risk. SCEs are all hardware identified as mitigation measures for the high risk hazards as defined by Saudi Aramco
Enterprise Risk Management (ERM) guidelines. The SCE list should be the complete cumulative SCEs identified
from all Risk Management methods used. The following are the steps to identify SCEs:
STEP 1: GATHER ALL PHAs & RISK REGISTER, AND FORM THE TEAM:
Step 1a: For the selected process unit, gather the Risk Register and PHA studies (See section
3.1.1.2 for the list of PHA studies that can be used).
Step 1b: For each selected process unit, extract the list of equipment from a management
system like SAP, EIS and/or from the Risk Register.
Step 1c: Review and assess the completeness of the list of equipment of Step 1b.
Step 1d: Gather the required drawings including P&ID and PFD.
Step 1e: Form a competent multi-disciplinary team with the required expertise for SCEs
identification. Membership of the team should include persons familiar with the unit process
and operations, control strategy and material properties, such as: Operations; Process
Engineering; Instrumentation/Process Control; Electrical; Loss Prevention/Safety; Inspection;
Maintenance; Operations; other specialists as required.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 23 of 113
https://t.me/PrMaB
Check if the compiled list of all SCE for the plant includes the SCE list of Appendix A.
For instance, an approach would be to consider SCEs to be all hardware identified as safeguards, prevention or
mitigation for the hazards quantified as High Risk. Process Hazard Analysis (PHA) results, if available, can also be
used to select (or validate) Safety Critical Elements, as illustrated in Figure 3.6 below for a HAZOP. In this
Example, the safeguard, “Level Transmitter”, is a SCE.
GW Deviation Causes Consequences Safeguards Recommendations By
No / No / Less Malfunction of L Gas blow-thru to Independent 1A) Review the need PTF
Less Level T5 or plugging the pressure level for SEPARATE Level
level leg separator transmitter for Taps for the
low level alarm LLA/LLSD transmitter
and shutdown
2B) Review ENG
As an additional example of the PHA study for control loops, an approach to select SCEs would be that all those
loops rated SIL 1 and above, including controllers, instruments, communications, and valves, are to be
considered SCEs (Table 3.3). The SCE list should be the complete cumulative SCEs identified from all Risk
Management methods used for these asset types.
Table 3.3: Criteria for determining SCE from risk studies (SIL)
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 24 of 113
https://t.me/PrMaB
3.1.3 Integrity Performance Standards (IPS) Development
Integrity Performance Standards define the critical functions, specific, verifiable, realistic and achievable
performance requirements with which the SCE shall comply with throughout the life cycle of the asset. Figure
3.7 shows the IPS development process. As an aid in this process, a generic template for IPS is shown in Figure
3.8.
An example of a generic IPS for Emergency Shutdown is illustrated in Figure 3.9. Appendix A contains a list of
IPSs categorized per barrier type. These generic templates need to be customized for the specific equipment
being maintained or assessed.
Process Steps
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 25 of 113
https://t.me/PrMaB
3.1.3.1 EXPECTATIONS
Assurance Requirements, Verification Tasks, and Acceptance Criteria shall be based on approved
company standards or company recognized international sources. Appendix A of this Manual provides a
List of generic Integrity Performance Standards that is commonly used in most projects and operating
facilities. These generic Integrity Performance Standards are readily developed and provide the minimum
requirement for Asset Integrity. These IPSs can be used as a basis for developing IPSs for new projects but
require customization for project specific requirements.
In the IPS shown in Figure 3.8, the left hand side is labeled “Integrity Performance Standards”; the
following three steps (below) will be used to develop these fields, namely SCE Goals, Functions,
Assurance Requirements, Verification Tasks, Frequency, and Referenced Standards. The right hand side of
the same figure “IPS Verification Results” will document the results once the IPS Verification Tasks are
conducted.
The following are the steps for developing the IPS:
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 26 of 113
https://t.me/PrMaB
Figure 3.8: Template of an Integrity Performance Standard and Its IPS Verification Results
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 27 of 113
https://t.me/PrMaB
Figure 3.9: Example of an IPS for ESD System with IPS Verification Results
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 28 of 113
https://t.me/PrMaB
3.1.4 Critical Variables Identification and IOW Development
Responsibilities
Project Manager; Process Project Manager; Process Project Manager; Process
Project Manager; Process
Engineer; Corrosion Engineer; Corrosion Engineer; Corrosion
Engineer; Corrosion Engineer
Engineer Engineer Engineer
References
SAEP-393; OE Process 12.4
SAEP-393 SAEP-393 SAEP-393
AIMS Manual (Enablers)
Figure 3.10: Process # AIMS-P-D-4 "Critical Variables Identification and IOW Development"
3.1.4.1 EXPECTATIONS
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 29 of 113
https://t.me/PrMaB
3.1.4.2 PROCESS STEPS
The process for critical variables identification and IOW development is described in the following key
steps:
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 30 of 113
https://t.me/PrMaB
3.2 AIMS Execution in Projects
Define Design
Identify Needs Procure and Commission
Requirements Design
for Projects Construct and Improve
and Limits
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 31 of 113
https://t.me/PrMaB
3.2.1 Build Integrity during Procurement and Construction Phase
3.2.1.1 EXPECTATIONS
Projects are expected to fulfill the requirement of the latest revision of Operational Excellence Process
#OE 4.1 (as applicable), the above expectations and the following requirements listed in the Table 3.4
below.
# AIMS Requirements during Procurement and References
Construction Phase
SAEP-12; SAES-A-202; SAEP-1154;
Procurement requirements for SCEs are followed per the SAEP-3101; SAEP-381; SAEP-135;
1
procurement Plan. SAEP-121; SAEP-122; SAEP-133;
SAEP-393; SAEP-329. SAEP-20;
SCE procurement packages contain proper storage
2 GI 2.710 Mechanical Completion
preparation instructions to manufacturer.
Certificate;
Once SCEs are received, verify proper storage measures were Process # OE – 4.1 “Design,
3 Procurement, and Construction”;
taken.
OE-10.1 “Change Management”;
4 SCEs are inspected for proper installation and damage. OE-12.5 “Learning organization”;
OE-3.2 “Employee Competency
5 Operational Readiness Plan is developed. Assessment and Development”;
OE-4.3 “Assets Monitoring and
Continuous Improvement”; OE-9.3
Competent Commissioning Team is formed prior to
6 “Data Archiving”;
Commissioning.
TPRM; Supply Chain Management
Commissioning Plan is developed and it includes all SCEs and Manual; Integrated Project Team
7 (IPT) Manual.
IOWs.
Table 3.4: AIMS Requirements during Procurement and Construction Phase
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 32 of 113
https://t.me/PrMaB
3.2.2 Verification of Integrity at Commissioning (Pre-commissioning, Commissioning, Startup)
Commissioning of Saudi Aramco facilities shall be in accordance the company standards and procedures
while meeting AIMS requirements. Commissioning shall confirm that plant operation meets process
safety requirements prior to handover or start-up.
3.2.2.1 EXPECTATIONS
Projects are expected to fulfill the requirement of Operational Excellence Process #OE 4.1 (as applicable),
the above expectations and the following requirements listed in the Table 3.5.
Integrity Performance Standards for all SCEs are AIMS Manual (Commissioning); OE-9.3
2
documented electronically and in hardcopy format. “Data Archiving”.
IPS Verification Tasks are included in the GI-2.710 “Mechanical Completion and
3 Maintenance Plans, Inspection Plans, and OIMs as Performance Acceptance of Facilities”.
applicable, and entered into SAP.
All SCEs are functionally tested before startup. SAEP-121 Operating Instruction for new
Facilities (including Operational Readiness
4
Plan); GI 1781.001 Inspection, Testing and
Maintenance of Fire Protection Equipment.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 33 of 113
https://t.me/PrMaB
IOWs are developed and verified to be within the SAEP-121 Operating Instruction for new
limits. Facilities (including Operational Readiness
5 Plan); SAEB-033 Corrosion Management
Program; SAES-L-133; and SAEP-393 Plant
Integrity Window.
Documents handover to Operation is completed. This SAEP-121 Operating Instruction for new
includes: Facilities (including Operational Readiness
Plan); SAEP-122 Project Records; Integrated
(1) All Project Handover documentations as per SAEP-
Project Team (IPT) Manual.
122 & SAEP-329.
(2) All Integrity Records including:
7 (a) All PHA studies conducted;
(b) Risk Register;
(c) List of SCEs;
(d) IPSs;
(e) IOWs developed records;
Pre-Startup Safety Review (PSSR) utilizing proper SAEP-121 Operating Instruction for New
8 checklist is conducted and documented prior to start- Facilities (including Operational Readiness
up. Startup procedure developed and reviewed. Plan); SAEP-329” Project Close-out Report”.
Table 3.5: AIMS Requirements during Commissioning Phase
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 34 of 113
https://t.me/PrMaB
3.3 AIMS Assessment for Projects
The Internal/External Assessment provides a picture of the current condition of Asset Integrity for the
project in reference to the AIMS Manual. The Assessment will inspire the Project Team to improve and
provide bases for formulating effective solutions or alternatives.
3.3.1.1 EXPECTATIONS
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 35 of 113
https://t.me/PrMaB
3.3.1.2 PROCESS STEPS
The process steps of the Internal Assessment for Projects are as follows:
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 36 of 113
https://t.me/PrMaB
DESIGN PHASE INTEGRITY ASSESSMENT
# Verification Tasks Performed Document
(Y/N) Title / Date
1 Preliminary Hazard/Risk Analysis during DBSP (FEL2).
N/A
Qualified personnel are assigned to conduct HAZOP. Competent
2 vendors/offices are assigned to Integrity related activities during
design phase. Competency of construction team for SCEs is verified.
3 HAZOP & applicable PHA studies during detailed design are completed.
4 Risk Register is created; SCE list is developed.
Table 3.6: AIMS Summary checklist for Project Internal/External Integrity Assessment (Design)
Table 3.7: AIMS Summary checklist for Project Internal/External Integrity Assessment (P&C)
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 37 of 113
https://t.me/PrMaB
COMMISSIONING PHASE INTEGRITY ASSESSMENT
# Verification Tasks Performed Document
(Y/N) Title/ Date
N/A
1 List of SCEs and their relevant information are incorporated in SAP.
Table 3.8: AIMS Summary checklist for Project Internal/External Assessment (Commissioning)
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 38 of 113
https://t.me/PrMaB
3.3.2 External Assessment for Projects
Process Steps
Develop
Plan for External Perform External Action and Track
Recommendations
Assessment Assessment Recommendations
and Generate ISR
3.3.2.1 EXPECTATIONS
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 39 of 113
https://t.me/PrMaB
3.3.2.2 PROCESS STEPS
AIMS Corporate Team shall conduct External Assessment for selected hydrocarbon capital projects.
The process steps for an External Assessment for projects are as follows:
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 40 of 113
https://t.me/PrMaB
3.4 AIMS Continuous Improvement for Projects
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 41 of 113
https://t.me/PrMaB
3.4.1 EXPECTATIONS
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 42 of 113
https://t.me/PrMaB
• Development plan for implementing changes.
• What resources are required for the improvement?
Determine the required capabilities (number and competencies of people) and resources (e.g.
tools).
Develop the required improvement action plans and recommendations for future projects.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 43 of 113
https://t.me/PrMaB
4 Part IV: AIMS Implementation in Operations
The AIMS implementation in Operations consists of four main steps:
AIMS Development in Operations
AIMS Execution in Operations
AIMS Assessment for Operations
AIMS Continuous Improvement
What follows are details (expectations, responsibilities, and process steps) for each of these steps.
Develop / Update
Identify/Update
Identify / Update Integrity Develop/update
Safety Critical
Risks & Mitigation Performance IOW and KPIs
Element (SCE)
Standards (IPS)
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 44 of 113
https://t.me/PrMaB
4.1.1 Risk Identification and Mitigation
4.1.1.1 EXPECTATIONS
The process for identifying/updating Risks and Mitigation is as described in section 3.1.1.
Periodically re-evaluate and revalidate the Risk Register.
Report & communicate the Risk Register to Plant Organizations and Management.
All identified mitigation measures or risk treatment are assigned to a risk owner and fully
implemented.
For detailed Roles and Responsibilities see Section 6.3.10
4.1.2 Barrier and Safety Critical Element (SCE) Identification and Updating
4.1.2.1 EXPECTATIONS
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 45 of 113
https://t.me/PrMaB
4.1.3 Integrity Performance Standards (IPS) Development/Updating
4.1.3.1 EXPECTATIONS
The process for developing Integrity Performance Standards is described in section 3.1.3. During the
development of IPSs for plants, the developed generic Integrity Perofrmance Standards in Appendix
A can be used as a basis for developing IPSs with proper customization to site specific conditions or
plant specific requirements.
The Integrity Performance Standards need to be updated regularly.
For detailed Roles and Responsibilities see Section 6.3.12
4.1.4.1 EXPECTATIONS
The process for critical variables identification and IOW development/update is as described in
section 3.1.4. The list of Critical variables and limits need to be updated regularly.
Integrity KPIs for Operations need to be developed and updated periodically, see section 5.3.
For detailed Roles and Responsibilities see Section 6.3.13
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 46 of 113
https://t.me/PrMaB
4.2 AIMS Execution in Operations
Following the integrity that was established during Design, the objective of AIMS Execution, as depicted in Figure
4.2, is to ensure that Integrity is sustained through maintaining the barriers, and plant process is operating
within the integrity envelope.
Operational Excellence Element #4 is the overall umbrella for Asset Management; AIMS is one component of OE
Element #4. AIMS Section 4 complements Operational Excellence Element #4 “Asset Management”, namely OE
Process # 4.2 and OE Process # 4.3.
Fulfilling the requirement of sections 4.2-4.4 of this Manual will fulfill only the Asset Integrity requirements for
OE Process 4.2 “Safe, Reliable, and Efficient Operations and Maintenance” and OE Process 4.3 “Assets
Monitoring and Continuous Improvement”.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 47 of 113
https://t.me/PrMaB
4.2.1 Integrating AIMS Activities with Asset Management Plans
4.2.1.1 EXPECTATIONS
The key of a successful implementation of an Asset Integrity Management System mostly relies on the
proper identification and timely execution of the IPSs’ Verification Tasks that will ensure the SCE
functional requirements are fulfilled. The more information obtained from executing Verification Tasks,
the more chance any threat to the component’s integrity would be proactively detected and actions put
in place to avoid any unexpected failure. The integration of AIMS Activities with Plant Asset Management
Plans is described in the following key steps:
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 48 of 113
https://t.me/PrMaB
Select work jobs by priority.
Verify equipment availability.
Verify persons/workers availability/competency.
Prepare schedule.
4.2.2.1 EXPECTATIONS
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 49 of 113
https://t.me/PrMaB
Communicate results, corrective/preventive actions, and integrity response to the proper
organizations/individuals.
4.2.3.1 EXPECTATIONS
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 50 of 113
https://t.me/PrMaB
Determine root cause of exceedances or deviations.
Document/communicate results.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 51 of 113
https://t.me/PrMaB
4.2.4 Integrity Requirements during Operations
4.2.4.2 EXPECTATIONS - During Special Field Procedures (Test runs, Shutdowns, etc)
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 52 of 113
https://t.me/PrMaB
4.2.4.3 EXPECTATIONS - Decommissioning
4.2.5.1 EXPECTATIONS
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 53 of 113
https://t.me/PrMaB
4.3 AIMS Assessment for Operations
This section describes the AIMS Assessment and Measurement phase which is initiated after the AIMS Execution
phase has begun and the facility is ready to start assessing their AIMS implementation and measuring its
performance. During this phase, the facility conducts periodic Internal Assessment (Figure 4.3) once every year;
while the corporate AIMS team conducts periodic External Assessment, once every 3-5 years.
The Internal/External Assessment provides a picture of the current condition of Asset Integrity in the plant in
reference to AIMS Manual. The Assessment will inspire the organization to improve and provide basis for
formulating effective solutions.
Responsibilities
Plant Manager / Plant Integrity Coordinator Plant Manager Plant Manager /
Plant Organizations (Operations, Engineering, Maintenance, Plant Integrity Coordinator Plant Integrity Coordinator
Inspection) Plant Organizations Plant Organizations
(Operations, Engineering, (Operations, Engineering,
Maintenance, Inspection) Maintenance, Inspection)
References
AIMS Manual AIMS Manual AIMS Manual
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 54 of 113
https://t.me/PrMaB
4.3.1 Internal Assessment for Operations
4.3.1.1 EXPECTATIONS
The detailed process steps for AIMS Internal Assessments in operations are as follows:
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 55 of 113
https://t.me/PrMaB
Execution of Verification Tasks per schedule.
Maintaining process within Safe limit.
AIMS Assessment
Conducting Internal Assessment.
Conducting External Assessment.
AIMS Continuous Improvement
AIMS Performance including KPIs, trends and benchmarking
Perform Asset Level Assessment: Evaluate demonstration of integrity requirements in
documentation for all Assets in each Process Unit.
Determine if all Verification Tasks are being executed and meet the Acceptance Criteria.
Identify areas of strength and areas of improvement; analyze and evaluate.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 56 of 113
https://t.me/PrMaB
4.3.2 External Assessment for Operations
Process Steps
Identify
Action and Track
Perform External Assessment Recommendations
Recommendations
and Generate ISR
Process Steps Details
Form the External Assessment Team. Identify Action and track the
Prepare a plan and schedule for the External Assessment. recommendations & progress of
Identify and gather required documentation. timelines. recommendations and
Perform System Level Assessment and scoring for: Record results into periodically follow up to
- AIMS Development. Integrity Status Report completion.
- AIMS Execution. Approve Report. Close recommendations
- AIMS Assessment. Communicate report to by the due date.
- AIMS Continuous Improvement. Plant Management and Communicate closure of
- AIMS Performance. affected Groups. all recommendations to
Perform Asset Level Assessment for selected SCEs. Plant Management and
CSD.
Responsibilities
Plant Manager / Plant Organizations Plant Manager Plant Manager
Plant Integrity Coordinator Plant Integrity Coordinator Plant Integrity Coordinator
AIMS Corporate Team Plant Organizations Plant Organizations
AIMS Corporate Team AIMS Corporate Team
References
AIMS Manual AIMS Manual AIMS Manual
Figure 4.4: Process # AIMS-O-A-2 "External Assessment"
4.3.2.1 EXPECTATIONS
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 57 of 113
https://t.me/PrMaB
4.3.2.2 PROCESS STEPS
The detailed process steps for External Assessment in Operations are as follows:
STEP 1: PERFORM EXTERNAL ASSESSMENT:
Form the External Assessment Team; membership includes: AIMS Corporate Team, Plant Integrity
Coordinator, representatives from Plant Organizations- Operations, Maintenance, Engineering,
Inspection and Corrosion.
Prepare a plan and schedule for the External Assessment.
Identify and gather required documentation (See Appendix C for suggested list of documents) and
the staff to be interviewed.
Perform System Level Assessment and scoring for AIMS implementation. (Scoring shall be per AIMS
scoring Matrix available at the corporate AIMS website). This includes identifying areas of strength,
areas of improvement, analysis and evaluation. AIMS Enablers and Governance shall be considered
in all phases of AIMS implementation. The External System Level Assessment shall include:
AIMS Development
Identification and documentation AIMS Work processes.
Identification of Risks and Mitigation (Development of Risk Register and treatment plan).
Identification of SCE list.
Development of IPSs.
Development of IOWs and KPIs.
AIMS Execution
Integrating AIMS Activities with Asset Management Plans.
Execution of Verification Tasks per schedule.
Maintaining process within Safe limit
AIMS Assessment
Conducting Internal Assessment.
Conducting External Assessment.
AIMS Continuous Improvement
AIMS Performance including KPIs, trends and benchmarking.
Perform Asset Level Assessment: Evaluate demonstration of integrity requirements in
documentation for selected SCEs.
Determine if all Verification Tasks are being executed and meet the Acceptance Criteria.
Identify areas of strength and areas of improvement; analyze and evaluate.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 58 of 113
https://t.me/PrMaB
STEP 2: GENERATE ISR AND RECOMMENDATIONS
Identify recommendations and timelines.
Classify each recommendation in terms of criticality as either high, medium, or low.
Compile the Integrity Status Report by using the ISR Template Outline in Appendix B. The report shall
include:
System Level Assessment results, scoring, areas of strength, areas of improvement,
recommendations/ corrective actions.
Asset Level Assessment results, SCE Integrity Status (“Demonstrated” or “Not Demonstrated”)
and associated recommendations/corrective actions.
Conduct annual management reviews to ensure AIMS adequacy and effectiveness.
Approve ISR.
Communicate ISR.
STEP 3: ACTION AND TRACK RECOMMENDATIONS:
Action all recommendations resulting from the External Assessment.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 59 of 113
https://t.me/PrMaB
4.4 AIMS Continuous Improvement for Operations
4.4.1 EXPECTATIONS
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 60 of 113
https://t.me/PrMaB
4.4.2 PROCESS STEPS
Conduct internal and external benchmarking to AIMS and document the results for future reference.
Assess the benchmarking results internally and externally with best industry practices to help gauge
AIMS effectiveness in Operations.
Review KPI trends, Internal and External Assessment results, and continuously give feedback to
ensure AIMS suitability.
Evaluate the related technologies, tools and techniques to accelerate AIMS executions.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 61 of 113
https://t.me/PrMaB
STEP 4: DEVELOP/TRACK IMPROVEMENT ACTION PLANS:
Develop improvement action plans with priority, resources, responsibility and timeframe.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 62 of 113
https://t.me/PrMaB
5 Part V: AIMS Enablers
This section provides the organizational capabilities or enablers that are required to sustain leading performance
in Asset Integrity Management. For each enabler, the objective of the enabler, the expectations with regards to
Integrity functions, and the responsibilities of individuals and/or organizations to achieve the expectations are
provided.
5.1 Competency
5.1.1 Objectives
This Enabler will ensure the integrity competency and training needed for all staff for the establishment,
implementation, maintenance and continual improvement of AIMS.
5.1.2 Expectations
5.1.3 Responsibilities
Project Manager
Review the safety program and integrity competency/experience for contractors prior to awarding
the contract.
Assign competent and trained staff to perform the project’s Asset Integrity related tasks.
Allocate/schedule adequate training/courses to the Project team in the area of Asset Integrity
Management requirements and concepts.
Plant Manager
Allocate the required budget and resources for training.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 63 of 113
https://t.me/PrMaB
Division Head / Supervisor
Specify the integrity competencies required for all integrity-related job positions.
Assign competent and trained staff to perform Asset Integrity tasks.
Allocate/schedule adequate training/courses to plant staff in the area of Asset Integrity
Management requirements and concepts.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 64 of 113
https://t.me/PrMaB
5.2 Integrity Information and Document Management
5.2.1 Objectives
This enabler will facilitate accurate, complete, timely and easily accessible information and documentation for
effective and timely management of asset integrity.
5.2.2 Expectations
5.2.3 Responsibilities
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 65 of 113
https://t.me/PrMaB
Verify the accuracy of the Safety Critical Elements records prior to storing them.
Plant Integrity Coordinator / Project Integrity Coordinator
Take custodianship of integrity related records.
Periodically track the use and completeness of the stored Integrity Information and Documents.
Store and retain integrity records in an electronic database and hardcopy systems.
Archive all Integrity Status Reports and Assessments using both electronic and hardcopy systems.
Project team / SCE Owner or support organization (Inspection, Maintenance, Operations)
Collect data for Safety Critical Elements records using approved processes.
Record accurate data, results, deviations, observations, and recommendations.
Verify the accuracy of the Safety Critical Elements records prior to storing them.
Plant Information System Engineer (At the plant level)
Protect Plant systems, information and software through proper access control.
Verify that the plant firewall rules and anti-virus protection are up-to-date.
Ensure information and databases are periodically backed-up.
Information Protection Center (At the Corporate level)
Protect Project systems, information and software through proper access control.
Verify that plant Firewall rules and anti-virus protection are up-to-date.
Ensure information and databases are periodically backed-up for projects.
Engineering Knowledge and Resources Division
Properly control data and drawings required for the SCE.
Acquire the necessary tools and technology to facilitate efficient retrieval and utilization of stored
data and drawings for SCE.
Update the SCE drawings in a timely manner to support proper MoC process execution.
Add provision in I-Plant, SAP or other document management systems to readily identify documents
for SCEs.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 66 of 113
https://t.me/PrMaB
5.3 Key Performance Indicators
5.3.1 Objectives
The main objective of the Asset Integrity KPI, both for Projects and Operations, is to provide the different levels
of the organization (Managers, Supervisors, Engineers and Operators) with a tool to easily and continuously
monitor asset integrity status, and facilitate the decision making process to correct deviations and re-establish
and maintain asset integrity.
5.3.2 Expectations
What follow are the list of common AIMS KPIs (Tables 5.1 to 5.5) followed by template of the AIMS Dashboard
(Tables 5.6-5.7 and Figure 5.1).
Objective Measure the status and effectiveness of asset Integrity management within a plant and across the
company in preventing incidents.
Formula = Count of hazardous releases incidents + count of fire incidents + count of integrity failures incidents
including structural, chemical, mechanical and/or electrical
Data Source To be provided by plant or projects. (Lagging KPIs)
Table 5.1: AIMS Common KPIs - Number of Integrity
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 67 of 113
https://t.me/PrMaB
2. Number of Fatalities or Major Injuries due to Integrity Incidents
Definition Number of fatalities or major injuries due to integrity incidents
Objective Measure the number of fatalities or major injuries due to integrity incidents within a plant and across
the company
Formula = 𝑁𝑢𝑚𝑏𝑒𝑟 𝑜𝑓 𝑓𝑎𝑡𝑎𝑙𝑖𝑡𝑖𝑒𝑠 + 𝑁𝑢𝑚𝑏𝑒𝑟 𝑜𝑓𝑚𝑎𝑗𝑜𝑟 𝑖𝑛𝑗𝑢𝑟𝑖𝑒𝑠
Data Source To be provided by plant or projects. (Lagging KPIs)
Table 5.2: AIMS Common KPIs - Number Of Fatalities or major injuries
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 68 of 113
https://t.me/PrMaB
Barrier Barrier Strength High Level Status
Table 5.7: Example of a Dashboard for AIMS KPIs Showing Barriers/SCEs Status
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 69 of 113
https://t.me/PrMaB
Figure 5.1: Example of Summary Dashboard for AIMS Showing Barriers/SCEs Status
5.3.3 Responsibilities
Project Manager
Develop the project specific Integrity KPIs and IOW to be able to assess asset integrity
implementation status.
Collect and automate the collection for KPIs data for projects.
Plant Supervisor / Engineers
Develop the field specific Integrity KPIs and IOWs to be able to continuously monitor the asset
integrity condition.
Collect and automate the collection for KPI data.
Plant Information System Engineer
Configure/program the various Asset Management Systems to allow concerned individual access to
Integrity KPIs and IOW status.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 70 of 113
https://t.me/PrMaB
5.4 Process Management
5.4.1 Objectives
The objective of this enabler is to ensure effective and complete execution of an organization’s Asset
Integrity processes.
5.4.2 Expectations
The Project’s specific processes pertaining to Asset Integrity include the following Processes:
AIMS Development in Projects.
AIMS Execution in Projects.
Internal Integrity Assessment for Projects.
External Integrity Assessment for Projects.
AIMS Continuous Improvement for Projects.
The field organization specific processes pertaining to Asset Integrity include the following processes:
AIMS Development in Operations.
AIMS Execution in Operations.
Internal Integrity Assessment for Operations.
External Integrity Assessment for Operations.
AIMS Continuous Improvement for Operations.
5.4.3 Responsibilities
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 71 of 113
https://t.me/PrMaB
Plant Manager / Division Head / Supervisors
Develop and maintain the required plant business processes pertaining to Asset Integrity
Management requirement.
Integrate Asset Integrity Management processes with existing field procedures,
maintenance/inspection plans, and operating instructions.
AR&IMD (AIMS Corporate Team)
Develop and maintain the External Integrity Assessment Processes for Projects and Operations.
Develop and maintain a Continuous Improvement process for AIMS.
Integrate Asset Integrity Management processes with existing division activities.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 72 of 113
https://t.me/PrMaB
5.5 Management of Change
5.5.1 Objectives
The objective of this enabler is to ensure changes or additions (both temporary and permanent) to plant process
and SCEs are managed through the MoC process, so that the plant process and SCEs’ safety and integrity are not
compromised.
5.5.2 Expectations
5.5.3 Responsibilities
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 73 of 113
https://t.me/PrMaB
5.6 External Resources
5.6.1 Objectives
This enabler will avail the competent external resources (contractors) to support AIMS related activities in
projects and operations including the establishment, implementation, maintenance and continual improvement
of AIMS.
5.6.2 Expectations
5.6.3 Responsibilities
Service Requestor
Determine the AIMS related activities that can be outsourced.
Review the safety program and integrity competency/experience for contractors prior to awarding
the contract.
Develop a detailed scope of work.
Review previous lessons learned.
Assess the contractor’s previous performance, qualification, and financial positions documents.
Identify the impact of performance and risks on the projects.
Consult Contracting and Law departments as needed and as applicable.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 74 of 113
https://t.me/PrMaB
5.7 Tools & Technology
5.7.1 Objectives
Tools and technologies shall be acquired to improve reliability and effectiveness of AIMS processes.
5.7.2 Expectations
5.7.3 Responsibilities
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 75 of 113
https://t.me/PrMaB
6 Part VI: AIMS Governance
6.1 Objective
The objective of AIMS Governance is to establish a mechanism for monitoring the actions, mandates and
decisions of the Saudi Aramco Organization(s) toward implementing and managing an effective AIMS in
processing plants and Projects. It describes roles and responsibilities in the AIMS which will be handled at
Facilities or Projects (local level) and at Engineering Services (central level).
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 76 of 113
https://t.me/PrMaB
15. The AIMS Corporate Team will conduct External Integrity Assessment for selected hydrocarbon projects.
The assessment shall follow the guidelines presented in the “AIMS Assessment” Sections of this Manual.
The external review may include other Governance Support organizations in coordination with OE.
16. AIMS implementation shall build on existing company programs, such as but not limited to: SMS, OE,
CMP, TPRM, ERM, RBI, etc
17. AIMS governance and implementation shall build on existing governing systems and company
procedures. The following examples of references are expected to be followed, as applicable, as part of
the governance of AIMS processes.
General Instructions
GI 6.006 Loss Prevention Compliance Reviews
GI 6.011 Quarterly Safety Inspections
GI 289.000 “Audit Communication/Reporting Procedure
GI 0002.600 Plant/Unit Acceptance after T&I Shutdown
GI 2.710 Mechanical Completion Certificate
GI-0400.001 Quality Management Roles & Responsibilities
GI 2.710 Mechanical Completion Certificate
Manuals
Inspection Manual
Supply Chain Management Manual
Integrated Project Team (IPT) Manual
Saudi Aramco Project Risk Management Guide
Total Plant Reliability Management
Industry Standards:
ISO55000, “Asset management — Overview, Principles and Terminology”.
ISO 55001, “Asset management —Management Systems Requirements”
ISO55002, “Asset management — Guidelines for the Application of ISO 55001”.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 77 of 113
https://t.me/PrMaB
6.3 Roles and Responsibilities for the AIMS Processes
The following general Roles and Responsibilities are applicable to the Consulting Services Department (CSD):
Consulting Services Department
Develop and maintain an effective AIMS with supporting KPIs and tools.
Align the risk management scheme used in AIMS with the corporate approach for Risk management.
Develop a Continuous Improvement process for AIMS encompassing a formal review with
Management. The AIMS system shall be reviewed and updated at least once every 5 years.
Support Projects and Operations in deploying and implementing AIMS.
Promote continual improvement for AIMS in projects and operations.
Develop and deliver the required training courses and awareness programs.
Conduct joint External Assessment for selected facilities or projects.
Evaluate and/or develop tools and service providers to support expedition of AIMS implementation.
Participate in major incidents investigation involving Asset Integrity Management System failures.
Develop a process for External Assessment for Projects.
Develop a process for External Assessment for Operations.
The following general Roles and Responsibilities are applicable throughout the project cycle:
Project Management Organizations Department Head
Responsible and accountable for implementing and maintaining AIMS within project execution
cycles as applicable.
Provide Leadership for the implementation and continuous improvement of the AIMS within
projects and provide the required resources.
Project Manager
Incorporate AIMS requirements as applicable to the design, procurement, construction and
commissioning phases of the projects.
Designate appropriate Project Integrity Coordinator(s) to each Project. It is up to the Project
Manager discretion to decide where to fit the Project Integrity Coordinator, i.e. to assign it to an
individual (Project Integrity Coordinator) for coordination, or to an existing entity within the project,
or to distribute the function across Project engineers, each one for his area or discipline.
Verify that key HSE management aspects/issues have been identified and addressed as per this
Manual and other Company applicable requirements.
Incorporate Integrity-related lessons learned from previous projects into the current project cycles.
Engage and obtain Proponent’s approval for key projects documents (high level design, detailed
design, Construction plan, commissioning plan, pre-startup, etc), changes to design or equipment,
and modifications.
Obtain the Proponent’s concurrence for asset maintainability plan, reliability, inspection plan,
information and document management system, and any issues that may hinder normal and safe
operations.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 78 of 113
https://t.me/PrMaB
Coordinate the preparation and submittal of the Integrity Status Report per project phase to
management and project stakeholders.
Proponent
Participate actively (management and SME) in pre-design and design for the projects ensuring
Integrity and HSE are addressed.
Review, specify and concur on asset maintainability plan, reliability, inspection plan, information and
document management system, and any issues that may hinder normal and safe operations.
Ensure competent proponent representatives are participating in the project’s activities including
reviewing and approving key projects’ documents (high level design, detailed design, Construction
Plan, Commissioning Plan, pre-startup, etc), changes to design or equipment, and modifications.
Take the lead in AIMS related activities following the MCC and up to the startup of the plant.
Project Integrity Coordinator
Identify the Asset Integrity related activities, tasks, and/or studies in project, and provide technical
support with regards to their implementation.
Coordinate Internal Integrity Assessment and External Integrity Assessment.
Coordinate preparations and submittal to management the Integrity Assessment Report for various
Project phases.
Support various project teams working on AIMS, follow up on recommendations (arising from
assessment and studies) to completion.
Lead appropriate AIMS multidisciplinary team to address major Integrity system failures during the
project.
Ensure that all SCEs Integrity activities and IOW development in the project are performed, reviewed
and tracked.
Ensure all IPSs, SCEs Inspection Plans, and Maintenance Plans are developed and imported into SAP.
Integrity activities in the project are performed, reviewed and tracked.
Act as the custodian of the Asset Integrity data, ISR, and KPIs, during the project.
The following general Roles and Responsibilities are applicable thought-out the “Operate and Maintain”
Phase:
Plant Management
Responsible and accountable for implementing and maintaining AIMS at the Plants as applicable.
Provide leadership for the implementation of the AIMS within the Plant and provide the required
resources.
Ensure that all SCEs Integrity status in his facilities is reviewed and tracked following associated
Integrity Performance Standards and verification schemes.
Designate appropriate Plant Integrity Coordinator (or Plant Integrity Coordination group). It is up to
the plant management’s discretion to decide where to fit the asset integrity functions, i.e. to assign
it to an individual (Plant Integrity Coordinator) for coordination or to an existing entity or to
establish a new entity (Plant Integrity Coordination group) for this purpose. The assigned individual
or entity is expected to have independence in reporting to plant management to avoid impacting its
assurance function.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 79 of 113
https://t.me/PrMaB
Plant Integrity Coordinator
Develop a clear vision on where Asset Integrity in the plant is heading, which should be in line with
the overall vision of the organization and this Manual.
Clarify the plant’s Asset Integrity mission that is put to achieve that vision, which should be based on
the Asset Integrity Management Manual.
Identify the Asset Integrity programs, tasks, initiatives and/or studies that are applicable to the
facility, and provide technical support with regards to their implementation.
Provide Leadership for the implementation of the AIMS within the plant and coordinate the required
resources with Plant Management.
Lead an appropriate AIMS multidisciplinary team to address initial AIMS implementation and major
Integrity undertakings.
Supports various plant’s team/entities working on AIMS, follow up on recommendations to
completion, and roll-out of AIMS to the rest of the facilities.
Ensure that all SCEs Integrity status in his facilities is reviewed and tracked following associated
Integrity performance standards and verification schemes.
Liaise with any concerned Engineering Services department or other concerned departments such as
Loss prevention or Fire protection as necessary to correct any SCE, System gaps or on any areas of
improvement.
Act as the custodian of Asset Integrity data, ISR, KPIs, either generated by SAP or collected from
other sources.
Prepares and submits to management the Integrity Status Report for the facilities with copies to
CSD/AR&IMD.
Project Manager
Assign competent and trained staff to perform Risk Assessment.
Ensure the business process for Hazards/Risk identification and mitigation are performed as
scheduled.
Project Integrity Coordinator
Coordinate/verify the various PHA and Risk Management studies and ensure proper documentation
and communication to concerned individuals/groups within the projects.
Risk Champion / Risk Management Coordinator
Implement the necessary tools and techniques to conduct risk assessment.
Review risk information and risk reports for key themes and concerns and escalate risks as
appropriate.
Advise management on the level of risk and the effectiveness of risk management.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 80 of 113
https://t.me/PrMaB
Address credible risks.
Escalate major risk or un-treated risks.
Risk Professional / Project Team / Disciplines’ SMEs
Conduct Risk Assessment as required and document all results.
Project Manager
Assign competent and trained staff for Barrier/SCE Identification
Plan and budget for the SCE identification process.
Review and approve the finalized SCE list.
Project Integrity Coordinator
Coordinate the identification of SCE and selection of barriers based on the asset/plant function.
Project Team / Disciplines SMEs
Identify SCEs and Barriers for all process units.
Review and finalize the report.
Proponent
Participate in the SCE identification process.
Review and approve the finalized SCE list.
Project Manager
Assign competent and trained staff for IPS Development.
Plan and budget for IPS Development.
Project Integrity Coordinator
Coordinate the development (customization) of the Integrity Performance Standards.
Project Team / Disciplines SMEs
Develop IPSs for all SCEs.
Review IPSs with the Proponent.
Proponent
Participate in the IPS development process.
Review and approve the finalized IPS.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 81 of 113
https://t.me/PrMaB
Plan and budget for the project process for determining the list of critical process variables and IOW
design document.
Project Integrity Coordinator
Ensure (coordinate) identification of critical variables and development of IOWs.
Disciplines SMEs (Project Assigned Process Engineer)
Define critical variables as well as upper and lower limits to minimize damage.
Disciplines SMEs (Project Assigned Corrosion Engineer)
Assist Process Engineers in defining critical variables and limits.
Proponent
Participate in the IOW development process.
Review and approve the finalized IOW design document and list of critical process variables.
Project Manager
Assign a Project Integrity Coordinator for the project.
Plan, budget and avail resources for performing and executing asset integrity tasks.
Verify AIMS tasks are completed per the schedule with the right quality.
Ensure personnel with adequate Integrity Competency are included in the Commissioning Team.
Ensure SCEs and IOW are included in the Commissioning Plan.
Ensure QA/QC Plan is executed and followed.
Project Engineers
Verify AIMS tasks are completed per the schedule.
Overlook the SCE procurement packages development for SCEs. The package should contain: (1)
Material Specification; (2) Shipping requirements; and (3) proper storage instructions.
Ensure an Operational Readiness Plan is developed with SCE plans (plan for Functional Testing of
SCEs, plan for performing SCEs Verification Tasks; plan for IOW verification).
Ensure SCEs and IOW are included in the Commissioning Plan.
Ensure QA/QC Plan is executed and followed.
Project Integrity Coordinator(s)
Track all AIMS related activities to completion.
Report incomplete activities to the Project Manager.
Proponent
Participate and review asset integrity planned tasks and outcomes.
Project Inspection
Verify proper storage measures for SCEs were taken per procurement documentation.
Inspect all SCEs for damage from shipping.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 82 of 113
https://t.me/PrMaB
Inspect SCEs for proper installation and damage.
Execute QA/QC plan.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 83 of 113
https://t.me/PrMaB
Approve the commissioning and start-up procedures and approves the Performance Acceptance
Certificate.
Assign a Senior Operations Representative/(s) per SAEP-121 to prepare and implement the
Operational Readiness Plan as applicable per SAEP-121. The ORP includes but is not limited to, the
development of:
o Operations and maintenance organizations.
o Hiring and development plan for required resources.
o Operations and Maintenance strategies.
o Health, Safety & Environment (HSE) Management.
o Commissioning and Startup Plan.
o Interface plan with EPC and other contractors and vendors.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 84 of 113
https://t.me/PrMaB
o As-Built drawings (hard and soft copies).
o OSI data, RBI reports and database, Project Manuals, Piping Specification, Equipment.
Datasheets, etc.
o Project records for archiving as per OE-9.3 “Data Archiving and Information Protection”.
o Project close out report as per SAEP-329.
o Technical integrity review report and turnover checklist.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 85 of 113
https://t.me/PrMaB
PROPONENT ACCEPTANCE COMMITTEE
The Acceptance Committee members from the Construction Agency, Inspection Department, Loss
Prevention, and the Proponent will designate their representatives per GI-2.710. The Acceptance
Committee responsibilities include:
Commission and safe start-up upon the approval of the MCC to start the performance
acceptance tests as per the approved commissioning procedure.
Prepare and implement the Operational Readiness Plan as applicable per SAEP-121.
Verify and update operating envelopes/alarms.
Complete the Performance Acceptance Certification per GI-2.710.
Project Manager
Lead Internal Assessment (with participation of assigned project engineers, proponent, design office,
materials suppliers, and construction agency, as needed) for each project to verify the extent of
implementation of AIMS at: 1) the end of design phase, 2) the end of procurement/construction
phase, and 3) the end of the Commissioning.
Track the progress of any recommendations generated as a result of the assessment performed at
the end of the design phase and end of the procurement/construction phase; ensure all
recommendations generated are closed before commissioning.
Project Engineers
Assess the project in their areas of responsbilities to verify the extent of implementation of AIMS at:
1) the end of design phase, 2) the end of procurement/construction phase, and 3) the end of the
Commissioning.
Implement Recommendations from ISR and update the status (as applicable).
Project Integrity Coordinator
Coordinate compilation of the results into an Integrity Status Report. The report is signed by the
Assessment Team and Project Manager, and communicated to the project owner and proponent.
Coordinate Internal Assessment (with participation of assigned project engineers, proponent, design
office, materials suppliers, and construction agency, as needed) for each project to verify the extent
of implementation of AIMS at: 1) the end of design phase; 2) the end of procurement/construction
phase, and 3) the end of commissioning.
Track the progress of any recommendations generated as a result of the assessment performed at
the end of the design phase and end of the procurement/construction phase; ensure all
recommendations generated are closed before Commissioning.
Project Team
Provide documentation required for an Internal Assessment.
Implement the recommendations from the ISR and update the status.
Proponent
Review and approve the Integrity Status Report.
Verify the completion of all Asset Integrity recommendations.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 86 of 113
https://t.me/PrMaB
6.3.8 External Assessment for Projects (Projects)
Project Manager
Allocate the required resources for the External Assessment and post assessment activities.
Co-Lead External Assessment (with participation of assigned project engineers, proponent, design
office, materials suppliers, and construction agency, as needed) for each project to verify the extent
of implementation of AIMS at: (1) the end of design phase, (2) the end of procurement/construction
phase and (3) the end of the Commissioning.
Track the progress of any recommendations generated as a result of the assessment performed at
the end of the design phase, and the end of procurement/construction phase; ensure all
recommendations generated are closed before commissioning.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 87 of 113
https://t.me/PrMaB
Proponent
Review and approve the Integrity Status Report.
Verify Completion of all Asset Integrity recommendations.
Plant Manager
Ensure the business process for hazards/risk identification and mitigation are performed as per the
schedule with the right quality.
Review and approve the final reports of the PHA Study.
Division Heads
Oversee the business process for hazards/risk identification and mitigation and the schedule.
Assign competent and trained staff to perform the Risk Assessment.
Assign appropriate resources and SMEs and ensure actions are completed.
Monitor and control the quality and implementation of Risk Management in the plants.
Review and approve the final reports of the PHA Study.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 88 of 113
https://t.me/PrMaB
Risk Champion
Implement the necessary tools and techniques to conduct the Risk Assessment.
Review risk information and risk reports for key themes and concerns and escalate risks as
appropriate.
Advise Plant Management on the level of risk and the effectiveness of risk management.
Escalate major risk or un-treated risks.
Plant Organizations Representatives / Disciplines SMEs (Engineering / Maintenance /
Inspections / Operations)
Identify/assess risks and evaluate existing relevant controls (if any)
Participate in developing appropriate treatment plans
Plant Integrity Coordinator
Coordinate analysis of hazard and risk data to feed the AIM system.
6.3.11 Barrier and Safety Critical Element (SCE) Identification and Updating (Operations)
Plant Manager
Ensure SCEs are periodically updated as scheduled.
Review and approve the list of SCEs.
Division Heads
Assign competent and trained staff for Barrier/SCE Identification
Review and approve the list of SCEs.
Integrity Coordinator
Coordinate the identification of SCE and the selection of barriers based on the asset/plant function.
Review and approve the list of SCEs.
Plant Organizations Representatives / Disciplines SMEs (Engineering / Maintenance /
Inspections / Operations)
Identify/update SCEs pertaining to their area of responsibilities.
Review the finalized SCE list.
Division Heads
Ensure Integrity Performance Standards are periodically updated as scheduled.
Assign competent and trained staff for IPS Development and update.
Approve the finalized IPSs for the plant.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 89 of 113
https://t.me/PrMaB
Plant Integrity Coordinator
Coordinate the development (customization) and periodic update of the Integrity Performance
Standards.
Document and store the IPSs electronically and using hardcopies, with sufficient access to concerned
staff within the plant.
Plant Organizations Representatives / Disciplines SMEs (Engineering / Maintenance /
Inspections / Operations)
Develop/update the IPS pertaining to their area of responsibilities.
Review the finalized IPSs.
Plant Manager
Review the weekly summary for the IOWs’ variables exceeding the limits.
Division Heads
Review the weekly summary for the IOWs’ variables exceeding the limits.
Provide the required resources for the proper identification of critical variables and development of
Integrity Operating Windows.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 90 of 113
https://t.me/PrMaB
6.3.14 Integrating AIMS Activities with Asset Management Plans (Operations)
Plant Manager
Ensure that all IPS Verification Tasks are incorporated in the Maintenance Plan, Inspection Plans and
OIMs.
Approve the schedule of IPS activities as part of the Maintenance and Inspection Plans.
Division Heads
Ensure that the IPS Verification Tasks related to Maintenance are incorporated in the Maintenance
Plan (SAP PM).
Ensure that the IPS Verification Tasks related to Inspection are incorporated in the Inspection Plans.
Ensure that the IPS Verification Tasks are incorporated in the applicable OIMs.
Review and approve the schedule of IPS activities.
Assign competent resources.
Plant Organizations (Maintenance / Inspection / Engineering / Operations)
Plan Integrity related PM activities (from the Integrity Performance Standards) as per the company
approved procedure and schedule.
Plan Inspection Integrity related Inspection activities (from the Integrity Performance Standards) per
the company approved procedure and per schedule.
Verify that all other Verification Tasks from the Integrity Performance Standards are being
conducted as well as the results are being documented.
Compile a list for completed vs overdue activities and recommendations.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 91 of 113
https://t.me/PrMaB
Resolve assigned corrective actions/preventive and recommendations for all failed Verification Tasks
in a timely manner. Redo failed Verification Tasks after corrective actions if necessary.
Document results of Verification Task activities, failed Verification Tasks, required corrective actions,
recommendations, and/or any necessary Integrity Response (Preventive or Mitigative). Compile a list
for completed vs overdue activities and recommendations.
Update integrity status after corrective actions or recommendations are implemented.
Communicate results, corrective/preventive actions, and integrity response to the proper
organizations/individuals.
Plant Manager
Conduct at least one annual review meeting for all plant units that includes SCE status, KPIs, IOWs
and a summary of Integrity Status Report.
Expedite the closure of any outstanding recommendations.
Review and approve final report.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 92 of 113
https://t.me/PrMaB
Once all recommendations pertaining to Internal Assessment are closed, communicate the closure
status to Plant Management.
Plant Organizations (Operations, Engineering, Maintenance, Inspection)
Perform assessment that include:
AIMS Execution within each Plant/Unit
AIMS Enablers
AIMS Continuous Improvement within each Plant/Unit
AIMS Governance
Review random IOW weekly reports for exceedances; review KPIs.
Identify areas of strength and areas of improvement; analyze, evaluate and score.
Develop the final assessment report.
Implement any recommendation arising from the assessment.
Plant Manager
Assign the necessary resources for the External Assessment.
Review External Assessment Integrity Status Report.
Expedite the closure of any outstanding recommendations.
Review and Endorse the improvement implementation plan.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 93 of 113
https://t.me/PrMaB
AIMS CORPORATE TEAM
Coordinate and plan with the plant the External Assessment tasks and responsibilities.
Review, assess, score and verify documents used for:
a. AIMS Development.
b. AIMS Execution.
c. AIMS Continuous Improvement.
d. AIMS Enablers.
e. AIMS Governance.
Compile results into an Integrity Status Report.
Identify gaps and propose recommendations to close gaps.
Track the progress of recommendations and periodically follow up to completion.
AIMS External Assessment Team (Plant’s Representatives in the Team)
Participate and Perform AIMS Assessment jointly with AIMS Corporate Team.
Identify gaps and propose recommendations to close gaps.
Review final Assessment Report.
Plant Organizations (Maintenance/ Inspection / Engineering / Operations)
Implement assigned recommendations pertaining to their responsibilities.
Plant Manager
Create AIMS process to continually improve AIMS, as per AIMS Process AIMS-O-C-1.
Verify intended improvement is achieved.
Verify implementation of improvement actions.
Division heads
Assign AIMS evaluation responsibilities and track improvement action plans implementation.
Verify implementation of improvement actions.
Verify intended improvement is achieved.
Plant Integrity Coordinator
Coordinate and conduct AIMS continuous improvement meeting.
Document improvement action plan and update management on the status of implementation.
Verify and report implementation of improvement actions and consistently follow up on
recommendations.
Plant Organizations (Maintenance / Inspection / Operations / Engineering)
Participate and Contribute to the AIMS continuous improvement Process.
Evaluate the need for changes to the AIMS processes and procedures.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 94 of 113
https://t.me/PrMaB
Review KPIs trends, Internal and External Assessment results, and operations feedback.
Assess the benchmarking results internally and externally.
Develop the required improvement action plans with priority, resources, responsibility and
timeframe.
Implement assigned improvement actions.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 95 of 113
https://t.me/PrMaB
Develop/modify new standards or procedures as needed by CSD/AR&IMD to support AIMS
governance.
Ensure any Verification Tasks pertaining to SCEs are not modified in SAP as part of any optimizations
without the approval of CSD/AR&IMD.
Support customizing maintenance data management system (SAP/PM) as required by CSD/AR&IMD
to accommodate the AIMS classification and allow reporting maintenance data to measure AIMS
performance.
6.4.6 PEDD
Identify/update the Asset Integrity competencies in accordance with the guidelines of Saudi Aramco
C-MAP and MySkills systems.
Incorporate and update Asset Integrity competencies in applicable C-Maps.
Develop and deliver the required in-company courses related to Asset Integrity Management
covering Operations and Projects.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 96 of 113
https://t.me/PrMaB
6.4.7 Engineering Knowledge and Resources Division
As applicable, incorporate AIMS requirements to instill AIMS assurance and integrity system
requirements into the applicable standards and procedures.
Initiate a corporate alert for Integrity related major issues requiring immediate actions from Saudi
Aramco organizations or operations.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 97 of 113
https://t.me/PrMaB
7 References
5. ISO55000, “Asset Management — Overview, Principles and Terminology”, First Edition, 2014.
7. ISO55002, “Asset Management — Guidelines for the Application of ISO 55001”, First Edition, 2014.
8. ASME B31.8S “Managing System Integrity of Gas Pipelines”.
9. API - 584 “Integrity Operating Windows”.
10. SAEP-393 “Integrity Operating Windows”.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 98 of 113
https://t.me/PrMaB
8 Definitions and Acronyms
Definitions:
Term Definition
Asset Integrity “Asset Integrity” is the ability of an asset to perform its intended function as per
the design intent while safeguarding life, the environment and property.
Asset Integrity “Asset Integrity Management System” is the system of people, work processes,
Management practices and tools to maintain and assure Asset Integrity.
System
Safety Critical SCEs are the assets whose failure will cause or contribute to major incidents, or
Elements will prevent the escalation of incidents.
Major Incidents Major Incidents are fire, explosion, or release of a dangerous substance that will
cause death or major injury, major damage to structure or plant or loss of stability.
Acronyms:
AI Asset Integrity
AIF Asset Integrity Framework
AIM Asset Integrity Management
AIMS Asset Integrity Management System
AR&IMD Asset Reliability & Integrity Management Division
CMP Corrosion Management Program
CSD Consulting Services Department
DBSP Design Basis Scoping Paper
EH&S Enviroment, health and Safety
EI Equipment Integrity
ERM Enterprise Risk Management
ES Engineering Services
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 99 of 113
https://t.me/PrMaB
FMEA Failure Mode and Effect Analysis
HAZID Hazards Identification
HAZOP Hazard and Operability Study
HIPS High Integrity Protection System
NOL Normal Operating Limit
IOW Integrity Operating Windows
IPS Integrity Performance Standard
ISR Integrity Status Reports
KPI Key Performance Indicators
MAR Major Accident Risk
MoC Management of Change
MWI Maintenance Work Instructions
OE Operational Excellence
OIM Operation Instruction Manual
PHA Process Hazard Analysis
PIAF Plant Integrity Assurance Framework
PS Process Safety
P&ID Piping and Instrumentation Diagrams
PFD Process Flow Diagrams
PM Preventive Maintenance
PTW Permit to Work
QA/QC Quality Assurance/Quality Control
RBI Risk Based Inspection
RCA Root Cause Analysis
RCFA Root-Cause Failure Analysis
RCM Reliability Centered Maintenance
RFI Risk Focused Inspection
RM Risk Management
SAEP Saudi Aramco Engineering Procedure
SAER Saudi Aramco Engineering Report
SAES Saudi Aramco Engineering Standard
SAIF Saudi Aramco Inspection Framework
SAFOP System Safety & Operability
SCE Safety Critical Elements
SIL Safety Integrity Level
SIS Safety Instrumented System
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 100 of 113
https://t.me/PrMaB
SMS Safety Management System
SOL Safe Operating Limit
SSIV Sub-Sea Isolation Valves
TPRM Total Plant Reliability Management
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 101 of 113
https://t.me/PrMaB
9 Appendix A: List of Integrity Performance Standards
The following are a list of Integrity Performances Standards; more IPSs may be added in the future. These
Integrity Performances Standards are developed and available on the AIMS website
(https://sharek.aramco.com.sa/orgs/30003036/SitePages/AIMS.aspx). For any additional information please
contact AR&IMD/CSD.
Barrier Safety Critical Elements (Structural Integrity)
SI SI001 Sub-sea Structures
SI SI002 Topside Surface Structures
SI SI007 Structure for Multiple Piping (pipe rack)
Safety Critical Elements (Process Containment)
PC PC001 Pressure Vessels
PC PC002 Heat Exchangers
PC PC002a Shell and Tube Heat Exchanger
PC PC002b Fin Fan Heat Exchanger
PC PC003 Rotating Equipment
PC PC003a Pumps
PC PC004 Tanks
PC PC005 Piping Systems
PC PC006 Pipelines
PC PC007 Relief System
PC PC008 Well Containment
PC PC009 Gas Tight Floor
PC PC013 Oil-in-Water Control
PC PC014 Mechanical Handling Equipment
PC PC015 Gas Fire Heaters
Safety Critical Elements (Ignition Control)
IC IC001 Hazardous Area Ventilation
IC IC002 Non-hazardous Area Ventilation
IC IC003 Certified Electrical Equipment
IC IC004 Earth Bonding
IC IC005 Fuel Gas Purge System
IC IC006 Chemical Tanks Inert Gas Blanket System
IC IC007 Miscellaneous Ignition Control Components
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 102 of 113
https://t.me/PrMaB
Barrier Safety Critical Elements (Detection System)
DS DS001 Fire and Gas Detection
DS DS002 Dew Point Measurement
DS DS003 PROCESS ANALYZER
DS DS004 Combustible and Toxic Gas Detection
Safety Critical Elements (Protection System)
PS PS001 Deluge Systems
PS PS002 Fire and Explosion Protection
PS PS003 Helideck Foam
PS PS004 Firewater Pumps
PS PS005 Firewater Ring Main
PS PS006 Passive Fire Protection
PS PS007 Gaseous Fire Protection Systems
PS PS008 Fire Water Spray (FWS) Systems
PS PS009 Sprinklers Systems
PS PS010 Power Management Systems
PS PS011 Fixed Foam Systems
PS PS012 Sand Filters
PS PS013 Chemical Injection Systems
PS PS016 Meteorological Data Gathering Systems
PS PS018 Oily Water Drainage System
Safety Critical Elements (Shutdown System)
SD SD001 Emergency Shutdown Systems(ESD)
SD SD002 De-Pressurization System
SD SD003 High Integrity Protection System
SD SD004 Well Isolation
SD SD005 Pipeline Isolation Valves
SD SD006 Process Emergency Shutdown Valves (ESDVs)
SD SD007 Sub-Sea Isolation Valves (SSIVs)
SD SD009 Utility Air Systems
SD SD010 Emergency Shutdown Valve (ESDV)
Safety Critical Elements (Emergency Response)
ER ER001 Temporary Refuge-Primary Muster Areas
ER ER002 Escape and Evacuation Routes
ER ER003 Emergency Escape Lighting
ER ER004 Communication Systems
ER ER005 Uninterrupted Power Supply (UPS)
ER ER007 Emergency Power
ER ER008 Manual Fire Fighting Equipment
ER ER008b Fire Extinguishers
ER ER008c FIRE Hose reels
ER ER009 Process Control and Alarms
ER ER009a Integrity Operating Windows Control
ER ER010 Open Hazardous Drain Systems
ER ER011 Open Non-hazardous Drains System
ER ER012 Wind direction
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 103 of 113
https://t.me/PrMaB
Barrier Safety Critical Elements (Emergency Response)
ER ER012a Wind socks
Safety Critical Elements (Life Saving)
LS LS001 Personal Survival Equipment (PSE)
LS LS001a Safety Showers
LS LS002 Rescue Facilities
LS LS004 Tertiary Means of Escape
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 104 of 113
https://t.me/PrMaB
10 Appendix B: Integrity Status Report Outline
The Integrity Status Report (ISR) is a document that provides an overview of the status of all the AIMS
components. It is compiled using the data gathered during the Internal and/or External Assessment process.
Below is the suggested template for the Integrity Status Report (ISR).
Section 1: Introduction
Provide overview of the Capital project that was assessed. Provide the date of the PHA.
Provide checklist of outcomes (Table 3.6) for the Design Phase Integrity requirements.
Provide checklist of outcomes (Table 3.7) for the “Procure and Construct” Phase requirements.
Provide checklist of outcomes (Table 3.8) for the Commissioning Phase Integrity requirements.
Summary of the status of implementation for each of the Enablers across each phase of the
project.
Provide a summary and /or table showing areas of improvement & recommendations (using
80/20 rule) with timelines.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 105 of 113
https://t.me/PrMaB
OPERATIONS INTEGRITY STATUS REPORT TEMPLATE
Section 1: Introduction
Provide the name and date of the most recent PHA or PHA revalidation.
Summary table of SCE Integrity Status (“Demonstrated” and “Not Demonstrated”). See Table 5.6
and Table 5.7.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 106 of 113
https://t.me/PrMaB
11 Appendix C: List of Documentation for Assessment
The following section provides lists of suggested Documentation per discipline that can be used during Internal
Assessment and External Assessment.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 107 of 113
https://t.me/PrMaB
Piping System master List.
Piping isometrics & Safety Instruction Sheet (SIS).
Line designation table.
Integrity Performance Standard.
Inspection Department Assessment Report per SAEP-308.
Internal assessment Report by facility.
Cathodic Inspection Program operation log.
Equipment Inspection Schedules.
Failure investigations, e.g. RCA/RCFA.
KPIs, Dashboards, and Operational Matrixes.
Audits over the last 2 years on Safety Critical Equipment and any non-compliance;
A copy of the most recent HSE-MS audit report;
Inspection reports and maintenance records;
Integrity Operating Windows or Operation Log;
MoC request for last 5 years
Repairs to process containments
RBI reports;
RV quality manual and related personnel certificates and checklists
Operations checklists and logs
Structures
o Identified Structure
o Inspection records
o Maintenance Records
o Inspection Plan
o MoC related requests
o Incident and near miss log
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 108 of 113
https://t.me/PrMaB
Calibration Log.
Maintenance strategy.
Incident and near miss log.
Emergency Shutdown System including initiator and final elements:
o SAP list of equipment.
o Instrument installation schedule sheets.
o Cause and effect document.
o SIL study documentations (If applicable).
o All ESD tags.
o PM lists for ESD system.
Rotating Equipment:
Installation, operation, and maintenance manual (instructions).
Specification sheet (data sheet).
Cross sectional Drawings (if not included in the maintenance manual) outline drawing (dimensional),
etc.
Bill of material complete part list.
RPL (required part list) - minimum to be stocked by stores or local vendor.
Performance curves (if applicable).
Design change data.
Computer input forms if available.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 109 of 113
https://t.me/PrMaB
Equipment PM Task and plan.
Vibration route and historical notifications. (applicable for equipment without continuous condition
monitoring)
OEM operation & maintenance manual.
Operation reading sheet.
Certified dimensional outline drawing.
Mechanical seal assembly.
o If Dry Gas Seal include gas schematic, control alarm and trip setting.
o If wet seal include component drawing and data like overhead tank.
Lube oil assembly/arrangement/component drawing, list of connecting and components data
sheets.
An alignment diagram including recommended limits.
Electrical System:
Integrity Performance Standard.
Routine history of work carried out in past 60 months.
Maintenance strategy.
Maintenance routines.
Hazardous area drawings.
Electrical safe work procedures (e.g. Electrical Safety Rules, and Electrical Safety Operational
Procedures).
Failure investigations, e.g. RCA/RCFA.
KPIs, Dashboards, and Operational Matrixes.
Audits over the last 2 years on Safety Critical Equipment and any non-compliance.
Inspection reports and maintenance records.
Inspection Programs Assessment Reports.
Operation logs.
MoC Documents.
Cause & Effect, Process Flow Diagrams, and P&IDs.
Ignition Control equipment (Ex equipment, grounding etc).
SAP listing of electrical equipment.
Electrical Classification Drawings.
UPS drawings.
Single Line diagrams.
PM lists.
Load Flow studies.
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 110 of 113
https://t.me/PrMaB
Inspection and Test certificates (from Inspection and POD).
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 111 of 113
https://t.me/PrMaB
12 Figures
Figure 1.1: AIMS Vision, Mission, Goals, and Value Proposition ............................................................ 5
Figure 2.1: AIMS Framework for Projects ............................................................................................. 10
Figure 2.2: AIMS Framework for Operations ........................................................................................ 11
Figure 2.3: Flow of activities for implementing AIMS Processes and the associated deliverables ........ 12
Figure 2.4: Hardware Barriers and SCEs ............................................................................................. 13
Figure 2.5: Integrity Operating Window for a Critical Variable............................................................... 15
Figure 3.1: Process # AIMS-P-D-1 “AIMS Development for Projects” ................................................... 18
Figure 3.2: Risk Identification and Mitigation Process (OE Process # 11.1).......................................... 19
Figure 3.3: Hierarchy and Effectiveness of Mitigation Measures (Hazard Control) ............................... 21
Figure 3.4: SCE Barrier Concept .......................................................................................................... 21
Figure 3.5: Process # AIMS-P-D-2 "Barrier and SCE Identification" ..................................................... 22
Figure 3.6: Criteria for determining SCE from risk studies .................................................................... 24
Figure 3.7: Process # AIMS-P-D-3 "IPS Development" ........................................................................ 25
Figure 3.8: Template of an Integrity Performance Standard and Its IPS Verification Results ................ 27
Figure 3.9: Example of an IPS for ESD System with IPS Verification Results ...................................... 28
Figure 3.10: Process # AIMS-P-D-4 "Critical Variables Identification and IOW Development" .............. 29
Figure 3.11: Process # OE – 4.1 "Design, Procurement, and Construction" ......................................... 31
Figure 3.12: Process # AIMS-P-A-1 "Internal Assessment for Projects" ............................................... 35
Figure 3.13: Process # AIMS-P-A-2 "External Assessment for Projects" .............................................. 39
Figure 3.14: Process # AIMS-P-C-1 "Continuous Improvement for Projects" ....................................... 41
Figure 4.1: Process # AIMS-O-D-1 "Development Process in Operations" ........................................... 44
Figure 4.2: Process # AIMS-O-E-1 "Execution process in Operations" ................................................. 47
Figure 4.3: Process # AIMS-O-A-1 "Internal Assessment" ................................................................... 54
Figure 4.4: Process # AIMS-O-A-2 "External Assessment" .................................................................. 57
Figure 4.5: Process # AIMS-O-C-1 "Continuous Improvement” ............................................................ 60
Figure 5.1: Example of Summary Dashboard for AIMS Showing Barriers/SCEs Status ....................... 70
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 112 of 113
https://t.me/PrMaB
13 Tables
Table 2.1: Examples of SCEs............................................................................................................... 14
Table 3.1: Required Activities during Project Design Phase ................................................................. 17
Table 3.2: Examples of PHA Studies per Equipment type .................................................................... 24
Table 3.3: Criteria for determining SCE from risk studies (SIL)............................................................. 24
Table 3.4: AIMS Requirements during Procurement and Construction Phase ...................................... 32
Table 3.5: AIMS Requirements during Commissioning Phase.............................................................. 34
Table 3.6: AIMS Summary checklist for Project Internal/External Integrity Assessment (Design) ......... 37
Table 3.7: AIMS Summary checklist for Project Internal/External Integrity Assessment (P&C) ............. 37
Table 3.8: AIMS Summary checklist for Project Internal/External Assessment (Commissioning) ......... 38
Table 5.1: AIMS Common KPIs - Number of Integrity .......................................................................... 67
Table 5.2: AIMS Common KPIs - Number Of Fatalities or major injuries .............................................. 68
Table 5.3: AIMS Common KPIs - Property Loss/Damage or Financial Loss ......................................... 68
Table 5.4: AIMS Common KPIs - Integrity Barriers Strength ................................................................ 68
Table 5.5: AIMS Common KPIs - Assets IOW Compliance .................................................................. 68
Table 5.6: Example of a Dashboard for AIMS KPIs Showing Barrier Strength ...................................... 69
Table 5.7: Example of a Dashboard for AIMS KPIs Showing Barriers/SCEs Status ............................. 69
Saudi Aramco: Confidential Asset Integrity Management System Manual Page 113 of 113
https://t.me/PrMaB