FOUNDATION CONTRACTING L .L.C ~ "I' CiE IER · ~ .

Risk Ass No.: P-319-19/IGS/RA-01 Date: 22/01/2020 Project: PROPOSED RESIDENTIAL VILLA (G+l) ON PLOT NO. 615-0136, NADD AL SHIBA-2, DUBAI, UAE

everity Qualitative Description


Frequency Qualitative Description
5 Extreme Potential to cause more than 1 death or serious injury or illness to
5 Likely to occur during operation (frequently recorded) ersonnel , or cause maier damaae
c
·;: 4 Could occur during operation (recorded infrequently) 4 Serious Potential to cause a fatality, or serious injury/illness to personnel , or
~ cause serious damaae to eaot. or olant
~
3 Unli kely to occur (isolated recorded occurrence)
3 Moderate Potential to cause injury, illness or minor damage.
2 Very unlikely (seldom recorded occurrence) 2 Minimal Potential to cause iniurv, illness or damaae.
1 Not likely (no recorded occurrence)
Like lih ood lnsianificant Potential to cause iniurv, illness or damaae

7 Improper Handling Malpractice I • Whole operation should carried out under


Injury by Blast of 3 2 6 1 2 1
Improper handling competent supervisor
Hose
• Tool Box talk should be given before start of
work

Prepared by Assessed by Approved by

IGS Engr. IGS HSE Manager Consultant

_.-/

Page 3 of 3