Você está na página 1de 1

Risk Assessment/Management Form

Ref:
Section / Dept: civil Activity: Risk Assessment- Location/Area :
Contractor :- Sand Filling

Proba
bility
Proba
Sl Basic Job Potential Consequence Current control measures Init Addition

Resid
ual
Risk rating Ri

risk
bility
N Steps Hazard ial al sk
o. Ris control ra
k measure ti
P E A R P
n E A R
Use stopper at the time of g
unloading

Collapse of No motor boy will stay behind


Unloading of soil/pits,hit to the vehicle and maintained
1 Get Injury/Fatality
safe distance from the vehicle 2 0 0 2 2 4
sand at site aperson,collaps-e
of soil.

Safe access shall be provided


for unloading the sand/soil
Strict supervision to be provided for
the job 1 0 0 0 2 2
Shifting of sand to Slip of iron pan
2 the tunnel from the hand, Get Injury Persons shall be deployed in the job
manually Slip of man with safety shoe , helmet, jacket,
goggles and rubber hand gloves
1 0 0 0 2 2
Workers will provided with full body
Falling from Get Injury due to safety harness
3 Working at height
height fall Take height work permit before
starting the activity
Prepared By Approved By Reviwed By
Contractor Contractor Contractor
Date Date Date

1of1

Você também pode gostar