Você está na página 1de 1

Page

1 of 1

Document No.: 19FTA86024G Revision: O


CONTRACTORS TOOLS, EQUIPMENT & PPE
Title:
INSPECTION CHECKLIST Process
Effective Date : 22 Mar 2018 EHS
Owner:

Project Name: Relocation materials @ dorm 3 Date: 10.15.18

Name of Contractor: UNITEC GLOBAL ENTERPRISES Location: Dorm 3 AND 2

Contractor Project In-Charge: LEMUEL LINGAD Safety Officer: MARK JAYSON YABES
(Signature over printed name) (Signature over printed name)

Condition Condition
Tools / Equipment PPE Remarks
Good Poor Good Poor
 
Screw Driver Safety Glass
 
Adjustable Wrench Safety Shoes
 
Open Wrench Hard hat w/ chin strap
 
Combination Wrench Safety Gloves
 
Pliers Sleeves
 
Measuring Tape Full Body Harness
 
Level Dust / face mask

Ladder

Pipe Bender

Flashlight

List all PPE User:

Name Signature Name Signature

Glen yabes

Jayson Javier

Jerwin narciso

Edizon rivera

Inspected By: OLIVER NASTOR


(Signature over Printed Name)

Prepare 3 copies: EHS (original copy), Security and Contractor

REVISION HISTORY

Change Change Effective


Revision Description and Reason of Change
Originator Analyst Date
Initial issue.
O A. Refugia Improvement for contractor safety management. E. Gozum 22 Mar 2018
As per ECO-NBOI-165729

VERIFY THAT THIS IS THE CORRECT REVISION BEFORE USE


TEM001458 Revision B

Você também pode gostar