STATEMENT of WORK

for
ASSESSMENT OF MINISTRY OF DEFENSE (HM FLŰ) ACQUISITION STRUCTURE

1.0 OBJECTIVE AND SCOPE

The Contractor shall provide analysis support as the Ministry of Defense (MOD) assesses and develops a
new approach to acquisition. This includes a high-level, qualitative assessment of the strengths and
weaknesses of the current acquisition function to identify areas needing greater attention and enable
accountability while identifying areas that require more focused follow up. In addition, a recommended
approach to automating, documenting and electronic records management for archiving acquisition
efforts will support openness and transparency. This effort includes analysis of the MOD’s acquisition:

 Organization Alignment and Leadership Structure

 Policies and Processes

 Human Capital

 Knowledge and Information Management

 Automation in Support of Acquisition – the development of a software based system for


continued use

The goals of this effort are to determine:

 Decision 1: Do opportunities exist to improve acquisition operations and information


management? “Where do the discrepancies/corruption actually occur?”

 Decision 2: Is there a clear link between modernization opportunities and meaningful cost
savings, performance gains and accountability and transparency in the acquisition process?
Based on what is available, how do we streamline costs and save money?

 Decision 3: Can performance gains be achieved within the current organizational structure,
within a reasonable time frame and with available funds? What can we do with what’s currently
available?
 In simplest terms, a detailed review will be conducted a random sampling of tenders over the last
36 months for the purpose o identifying corrupt practices.

2.0 BACKGROUND

With hundreds of billions of forints spent each year on military products and services, it is essential that
acquisition be handled in an efficient, effective, and accountable manner. Most government agencies
around the world have identified systemic weaknesses in key areas of acquisition. Hungary is committed
to establish a roadmap with the transformational goal to implement a process which provides a
managed approach to acquisition. This managed approach must meet the nation’s needs, improve the
visibility into the process and increase the speed with which items are delivered while integrating best
business practice and transparency. Fast Acquisitions, Save Money, Streamline Process, Get What’s
Needed As Quikly As Possible.

Implementation of a managed approach to providing capability to defense forces is complex and


requires consideration of a country’s strategic goals, economic constraints, political will and actual
needs. Most pressing, from a military perspective, is answering the question of what is needed to
accomplish the defense strategy. Furthermore, it is necessary to establish an appropriate management
structure and division of responsibility to carry-out acquisitions. A Capabilities Based Approach with
Capabilities Based Planning will lead to the development and delivery of solutions that provide value to
the nation and those charged with defense of the nation. This is more robsut and dependable that the
processes already in use by HM FLŰ.

3.0 GENERAL REQUIREMENTS

To support the analysis of the MOD and their current approach to acquisition it is necessary for the
contractor to work with MOD representatives and identify responsible organizations, personnel and the
processes in place to maintain effective internal control, which includes the plans, methods, and
procedures used to meet MOD acquisition goals and objectives.

This is a preliminary Statement of Work, which can be augmented as necessary. It will commence with a
two (2) week study/review of the Hungarian acquisitions, procurement, and tender process; this will
occur before execution of the formal work and at no cost to the government.

The contractor* shall evaluate the presence of internal controls used to safeguard the integrity of the
requirements and acquisition process, delivery of capability and preventing and detecting errors and

Page 2 of 13
fraud. Using the five standards of internal control—control environment, risk assessment, control
activities, information, and communications the contractor shall identify critical elements and critical
success factors or lack thereof across; Organization Alignment and Leadership Structure; Policies and
Processes; Human Capital; Knowledge and Information Management. The results will be used by the
MOD to conduct Business Process Engineering (BPR) and recertify or restructure the acquisition process.

*The contractor must be ultimately familiar with the Hungarian procurement process.

4.0 SPECIFIC ANALYSIS AND SUPPORT TASKS


4.1 Task 1 - Organizational Alignment and Leadership Structure

Organizational alignment is the appropriate placement of the acquisition function in the agency, with all
stakeholders having clearly defined roles and responsibilities. The contractor shall review and analyze
the MOD acquisition framework and organization to determine if it optimizes the ability to acquire and
deliver capability most efficiently to ensure that leaders within the process are able to make strategic
decisions that achieve MOD-wide acquisition outcomes more effectively and efficiently.

Look for places where potential discrepancies/corruption can occur.

4.2 Task 2 – Policies and Processes

Implementing strategic decisions to achieve desired government outcomes requires clear and
transparent policies and processes that are implemented consistently. Policies establish expectations
about the management of the acquisition function which is complex and requires consideration of a
country’s strategic goals, economic constraints, political will and actual needs. Processes are the means
by which management functions will be performed and implemented in support of the MOD’s ability to
implement a managed approach to providing capability to Hungarian defense forces. The contractor
shall review and analyze current Policies and Processes and make recommendations to improve the
governance, planning, award, administration, and oversight of acquisition efforts, with a focus on
assuring that these efforts achieve intended results. Tender audit – where are the problems? Who
influences the process? Bureaucracy is not bad but there needs to be a way to reduce or
eliminate parliamentary influence in regards to what firm gets the contract.

4.3 Task 3 – Human Capital

Page 3 of 13
The value of an organization and its ability to satisfy customers depends heavily on its people. Within
the MOD and its leadership the goals are defense of a nation and its people. Successfully acquiring
goods and services and executing and monitoring contracts to help meet its missions requires valuing
and investing in the acquisition workforce. The contractor shall evaluate the personnel, training and
education structure in place to support the acquisition process and recommend strategic changes to
attract, develop, and retain talent, and creating a results-oriented culture within the acquisition
workforce.

4.4 Task 4 - Knowledge and Information Management

Effective knowledge and information management provides credible, reliable, and timely data to make
acquisition decisions. Each stakeholder in the acquisition process need meaningful data to perform their
respective roles and responsibilities.

 Those identifying government requirements, program and acquisition personnel who decide
which goods and services to buy Who influence what to buy?

 Project managers who receive the goods and services from contractors Is the project
management timeline legitimate?

 Commodity managers who maintain supplier relationships

 Contract administrators who oversee compliance with the contracts and the

 Finance department, that pays for the goods and services

The contractor shall identify shortfalls or gaps in the ability to provide knowledge and information
enabled decisions and recommend changes or establishment of new information management
capabilities.

4.5 Task 5 – Automation in Support of Acquisition

The MOD’s existing acquisition environment is perceived to be fragmented from both a system and
process perspective. It is perceived to have manual, duplicative business processes and external
influence providing limited visibility, limited integration with government/MOD strategy, limited budget
controls, and delivers limited lifecycle support. As a result of the previous four (4) tasks and using the
five standards of internal control the contractor shall make recommendations to establish an approach
to automating, documenting and electronic records management for archiving acquisition efforts. The

Page 4 of 13
automation in support of acquisition should be documented in the form of workflow/system diagrams in
the context of the current capabilities with recommended improvements. Whenever possible, reuse of
existing capabilities/assets that reflect MOD-wide standards and government-wide standards (or
recommended updates) shall be considered. The goal is to have an understanding of a system with
processes applied to achieve management/control, performance goals, fulfill business and technical
requirements, and increase knowledge management and information sharing.

4.6 Task 6 - Project Management

4.6.1 Work Breakdown Structure (WBS)


The Contractor shall establish a program control process to ensure mitigation of risks and minimal
schedule variances. A draft schedule/WBS shall be created to include the Tasks in this SOW. Both the
program control process and schedule/WBS shall be provided with the proposal. The schedule/WBS
shall be finalized and submitted for review and approval within ten (10) workdays after the contract
award kick-off meeting. The WBS will be updated monthly or as directed by the MOD lead. Figure (1)
provides an overview of the program schedule.

Figure (1) – Project Schedule

4.6.2 Monthly Status Report (MSR)


The Contractor shall provide a Monthly Status Report (MSR) via electronic mail to the MOD Lead to
assist the Government’s ability to monitor performance in accordance with the WBS. Format for these
reports shall be Contractor provided, but in concurrence with the MOD Lead. These reports shall
include, at a minimum:

(a) Description of work accomplished for the month and its relation to the Tasks and WBS
(b) Concerns or issues that may impact performance, schedules, functionality or cost, etc. and
discuss proposed resolutions (Note: Providing notification of a potential impact to the contract
on the MSR does not alleviate the requirement to formally notify the MOD Lead of possible
contract issues)
(c) Other significant issues (schedule, technical, etc.) with proposed resolutions

Page 5 of 13
(d) Details of any cost reimbursable expenses (Travel/ODCs) to include the purpose, general costs,
remaining CLIN funded balance, and any planned expenditures for the following reporting
period and
(e) Additional reporting, as defined and required in the Task statements

4.6.3 Program Reviews and Meeting Attendance


The Contractor team shall provide a weekly informal Program Review (PR) with the MOD Lead at the via
teleconference. The objective of the PR is to brief the Government on general program status and to
discuss requirements, issues, risk assessment, and action items as required. The Contractor shall
electronically provide meeting minutes to the MOD Lead for each weekly PR, capturing discussion
points, issues, risk assessment, assignment of action items and status of previously assigned actions.
Additionally, the Contractor may be requested to attend various program meetings related to the effort.
Much of this to TBD

Ref Deliverables Due Date Government POC


Organizational Alignment & Leadership Draft -
4.1 MOD Lead
Findings Final -
Draft -
4.2 Policy & Process Findings MOD Lead
Final -
Draft -
4.3 Human Capital Findings MOD Lead
Final -
Knowledge & Information Draft -
4.4 MOD Lead
Management Findings Final -
Draft -
4.5 Draft Proposed System Diagram MOD Lead
Final -
Contracting Officer
4.6 Program Control Process With Proposal
MOD Lead
Draft – with proposal Contracting Officer
4.6.1 WBS (MS Project Schedule)
Final - MOD Lead
Contracting Officer
4.6.2 MSR Monthly
MOD Lead
NLT 2 workdays after
4.6.3 Ad Hoc Meeting Minutes MOD Lead
meeting

5.0 CONSTRAINTS
The Government anticipates the support of no more than two full time equivalents to support this effort
over a period of 10 months. Two (2) bodies x ten (10) months (20 months total).

6.0 KEY PERSONNEL

Page 6 of 13
The personnel listed below are considered essential to the work being performed under this contract.
Before removing, replacing, or diverting any of the listed or specified personnel, the Contractor must: (1)
Notify the MOD Lead reasonably in advance; (2) submit justification (including proposed substitutions)
in sufficient detail to permit evaluation of the impact on this contract; and (3) obtain the MOD Lead's
written approval. Notwithstanding the foregoing, if the Contractor deems immediate removal or
suspension of any member of its management team is necessary to fulfill its obligation to maintain
satisfactory standards of employee competency, conduct, and integrity. The Contractor may remove or
suspend such person at once, although the Contractor must notify MOD Lead prior to or concurrently
with such action. The list of personnel may, with the consent of the contracting parties, be amended
from time to time during the course of the contract to add or delete personnel.

Key Personnel: Chris Griffin, PMP PhD; Imola Destek, PMP

7.0 PLACE OF PERFORMANCE


Work is to be performed at Contractor facilities or on-site performance at the MOD or various
Government sites or other locations with travel as indicated per the table below.

Duration
Per Trip No.
# Site Location (Days) No. Trips Travelers

TBD – As proposed

8.0 ACCEPTANCE OF DELIVERABLES


One soft copy of all deliverables shall be provided to the MOD Lead and the designated Functional Lead,
where specified. The soft copy of all documents shall be provided in both a Microsoft Office 2003
compatible format and Portable Document Format (PDF). Deliverables will become the property of the
Government. Deliverables must incorporate Government review comments for acceptance. The
Government shall have a minimum of ten (10) working days to review deliverables and provide
comments. Products and deliverables found “unacceptable” shall be corrected and resubmitted within
ten (10) days of initial rejection.

9.0 SECURITY REQUIREMENTS - TBD

Page 7 of 13
The Contractor will have access to unclassified and classified data. For access to classified information,
the Contractor shall ensure that all personnel having access to classified information have the necessary
security clearances. Contractor personnel visiting any Government facility in conjunction with this
contract shall be subject to the standards of conduct applicable to Government employees. Site-specific
approval regarding access to sensitive materials, computer facility access, issue of security badges, etc.
shall be coordinated with the PO as required. All members of the U.S. team currently posses NATO
SECRET clearances and this can be verified via JPAS.

10.0 TRAVEL AND OTHER DIRECT COSTS (ODCs)


Travel and other direct costs (ODCs) will be preapproved as needed to support the requirements of this
statement of work and shall be provided on a reimbursement of cost basis. Travel shall be handled in
accordance with the Joint Federal Travel Regulations (JFTR), at the direction of the MOD Lead.
Unauthorized travel, or travel not coordinated with the MOD Lead, shall not be reimbursed.
Additionally, travel or other direct costs in excess of the approved funded value shall not be reimbursed.

Purchase of materials and equipment necessary to accomplish the requirements contained in this SOW
will be coordinated with and approved by the MOD Lead, or the designated representative, prior to
purchase and become the property of the Government. All travel and ODC requests must be sent
electronically in advance of purchase to the MOD Lead.

11.0 GOVERNMENT FURNISHED EQUIPMENT, INFORMATION, FACILITIES & SERVICES


The Contractor shall receipt for and maintain custody and accountability of any Government Furnished
Equipment (GFE) including hardware, software and Government Furnished Information (GFI) provided
during the course of performance of this effort. All GFE will be returned to the customer in “as is”
condition at the end of the period of performance.

12.0 PERIOD OF PERFORMANCE


The period of performance for this effort is 10 months, from XXXX through XXXX for the base period.
There is one (1) six month and one (1) twelve month option periods of performance, to be exercised if
and when needed.

13.0 POINTS OF CONTACT

Page 8 of 13
The MOD point of contact and person responsible for approving work (MOD Lead) incorporated by this
SOW is: DR Keszthely Gyula, Director HM FLU

Page 9 of 13
14.0 APPENDIX

QUALITY ASSURANCE SURVEILLANCE PLAN

1. Objective. This QASP serves as the principal basis for assessing overall performance quality
associated with the effort. This document will be used by the Government to assess the effectiveness of
the Contractor’s management and technical services. This QASP provides the methodology by which the
Contractor's performance will be monitored to determine compliance with established performance
objectives and to establish performance benchmarks that ensure a quantifiable basis for measuring
effectiveness. The plan is designed so that surveillance is limited to that which is necessary to verify the
Contractor is performing management and technical services satisfactorily and relates directly to
performance objectives of the performance objectives delineated in the SOW.

2. Government Surveillance. The contractor lead will identify an individual to function as the Technical
Representative for this task, and her/his authority will be limited to administering specific technical
aspects of the contract. The Technical Representative will not provide direction that is outside the
scope of responsibilities delineated under this task order. The designated individual will:

 Maintain a detailed knowledge of the technical requirements of the contract;


 Document Contractor performance in accordance with the QASP;
 Identify and immediately forward notifications of deficient, or non-compliant performance to
the Contracting Officer;
 Approve priorities of support, resources, and associated schedules.
3. Surveillance Methods. Surveillance of Contractor performance is the method used by the
Government to determine whether the Contractor is effectively and efficiently complying with all terms
and conditions of the task order. In addition to statistical analysis, the functional expertise of the
Technical Representative plays a critical role in adequately evaluating Contractor performance. The
below listed methods of surveillance shall be used in the administration of this QASP. The PRS contains
the performance objectives that are being measured.

 Demonstration. A qualification method that is carried out by operation and relies on observable
functional operation. It does not require the use of instrumentation or special test equipment;
 Inspection. A qualification method that is carried out by visual examination of software code,
data captured in special test equipment, documentation, or hard copy printouts. The government
will inspect software drops for bugs and content; and

Page 10 of 13
 Analysis. A qualification method that is carried out by examining and assessing the application of
techniques in order to determine if they are appropriate and sufficient.
4. Performance Requirements/Factors of Performance The performance requirements set forth in this
section correspond to the SOW paragraphs delineated in the table. Enclosure (1) of this document
provides standards for performance for specific requirements:

4.1 Organization Alignment and Leadership Structure: The contractor shall be evaluated on their
ability to deliver and assessment of how the MOD aligns acquisition with strategy, missions and
needs and documents the commitment from leadership.

4.2 Policies and Processes: The contractor shall be evaluated on their ability to identify how the MOD
establishes, maintains or manages against documented policies and procedures, effectively
manages the acquisition process and promotes successful outcomes of major acquisitions and
documents recommended changes.

4.3 Human Capital: The contractor will be evaluated on the analysis of the current acquisition
workforce, the planning development and training of the workforce and documenting
recommended changes.

4.4 Knowledge and Information Management: The contractor will be evaluated on the identification
of information and technology that support acquisition and management decisions, the integrity of
the data and the ability to store, retrieve and mind data for knowledge and information transfer.

4.5 Automation in Support of Acquisition: The Contractor will be evaluated on the quality of their
engineering and technical efforts to document the process and capability to automate, document
and perform electronic records management to archiving acquisition efforts.

4.6 Project Management: The Contractor will be evaluated on the quality of their overall technical
acquisition and management strategy, ability to preclude, or resolve issues, ability to execute a
comprehensive program management schedule, and effectiveness of their use of resources to
meet planning goals and schedules.

Page 11 of 13
Enclosure 1 – Evaluation Criteria

PERFORMANCE REQUIREMENTS SURVEY (PRS)

Performance Quality Method of


SOW Performance Standard
Objective Level 1 Surveillance

Organization Acceptable performance has been met


Alignment and when the quality of the information Excellent
Analysis
Leadership Structure 4.1 gathered and recommendations Acceptable
Demonstration
support has been determined to meet Poor
the program objectives.

Policies and Acceptable performance has been met


Processes when the quality of the information Excellent
Analysis
4.2 gathered and recommendations Acceptable
Demonstration
support has been determined to meet Poor
the program objectives.

Human Capital Acceptable performance has been met


when the quality of the information Excellent
Analysis
4.3 gathered and recommendations Acceptable
Demonstration
support has been determined to meet Poor
the program objectives.

Knowledge and Acceptable performance has been met

Information when the quality of the information


Excellent
Management gathered and recommendations Analysis
4.4 Acceptable
support has been determined to meet Demonstration
Poor
the program objectives.

Automation in Acceptable performance has been met


Support of when the quality of the engineering Excellent
Inspection
Acquisition 4.5 and technical support has been Acceptable
Demonstration
determined to meet the program Poor
objectives..

Page 12 of 13
Performance Quality Method of
SOW Performance Standard 1
Objective Level Surveillance

Acceptable performance has been met


when the quality of technical
acquisition and management strategy Excellent
Inspection
Project Management 4.6 support has been determined to meet Acceptable
Demonstration
the program objectives using optimal Poor
resources, compliant with prescribed
schedules.

Page 13 of 13