Escolar Documentos
Profissional Documentos
Cultura Documentos
Department of ECE
JOINING REPORT
(To be sent by student within a week of joining by Registered Post to appointed Faculty
Advisor)
Telephone No.
E-mail
Telephone No.
E-mail :
Telephone No.
E-mail :
I hereby inform that I have joined the organization on for the Industry Internship Project
(Course Code _).
Certified that the above-mentioned student has joined our organization for the project semester in the industry.
Project Undertaken
Estimated duration
Project Description
(Additional Pages can be attached to give description of the Project)
P.T.O
--------------------------------------------------------------------------------------------------------------------
-
Internal Faculty Advisor
Scope of Project
(Application Area)
Date:
Signature of Student
Recommended Yes No
Approved Yes No
(Signature of HOD)
Date:
--------------------------------------------------------------------------------------------------------------------
-
Annexure – VIII A
Final Project Report
CONTENTS OF THE REPORT
- Cover page – on hard paper
- Inner page – same as cover page but on the soft paper
- Declaration
- Acknowledgement
- Summer Internship / training Certificate
- Index
1. Organization Overview
3. Existing
System
Introduction
Existing Software
or harware
4. Problem
Analysis Product
definition
Feasibility Analysis
Project Plan
6. Design
System Design
Notations
Detailed Design
Flowcharts
Pseudo code(if
any)
7. Testing
Functional testing
Structural testing
Levels of testing
Testing the project
8. Implementation
Implementation of the
project Conversion Plan
Post-Implementation and Software or hardware (if any) Maintenance
9. Project Legacy
Current Status of the project
Remaining Areas of concern
Technical and Managerial lessons learnt
The matter contained in the report should be typed in MS word (1.5 spacing) Times New
Roman,
12 pt or equivalent with other software.
Figures and tables may be inserted in the text as they appear or may be appended in
A total of THREE copies may be prepared – one for the student, second for the industry
coordinator and third for the institute.
--------------------------------------------------------------------------------------------------------------------
-
ANNEXURE – VIII B
PROJECT REPORT
Submitted by
(Name of student)
Registration No………..
Programme & Section …………
Department Of …………………………………
Lovely School of
DECLARATION
I hereby declare that the project work entitled (“Title of the project”) is an authentic record of
my own work carried out at (Place of work) as requirements of Industry Internship project for
the award of degree of (Relevant Degree ), Lovely Professional University,
Phagwara, under the guidance of (Name of Industry coordinator) and (Name of
Faculty coordinator), during July to December 2010).
(Signature of student)
Name of Student
Registration no:
Date:
Certified that the above statement made by the student is correct to the best of our
knowledge and belief.
Coordinator
--------------------------------------------------------------------------------------------------------------------
-
ANNEXURE- IX
Project
Name of Organization & Address:
External Project
Supervisor (with Phone No)
Period of evaluation: From To
M
Criteria a
Sr.No r
1.Punctuality k
2.Regularity of Work
4Improvement in Learning
5.Grasp of Application(s)
8.Technical Competency
Grand total
General Remarks / Observations with regard to deficiencies / problems / suggestions for improvements:
--------------------------------------------------------------------------------------------------------------------
-
ANNEXURE - X
Final Appraisal Performa by External Advisor (Industrial / Site Coordinator)
NAME OF THE ORGANISATION
_ _ _ _ _ _ _ _ _
INDUSTRY/SITECOORDINATOR
---------------------------------------------------------------------------------------------------------------------
ANNEXURE – XI
L O V E L Y P R O F E S S I O N A L U N I V E R S I T Y (Jalandhar-
Phagwara G.T. Road, Near – Cheheru Railway Bridge, Phagwara)
ATTENDANCE SHEET FOR THE TRAINEE
Project
Name of Organization & Address:
External Project
Supervisor (with Phone No)
Internship / training Commenced on Completed on
Lovely Professional
University
Department of ECE
Industry Internship Project Session 2010
Yes / No
2. Were they allotted specific projects?
Has the work done by the students been of value to Yes / No
the
3. Company?
Would you like to take LPU students again in next year? Yes / No
9.
A Excellent
B Good
C Fair
Signature
Name:
(Declaration by the student going on full term Industry Internship without Project Approval)
I, S/O, D/O
Registration No. , Roll No.
Section Programme
_ hereby solemnly affirm and declare that:
1. I wish to pursue Industry Internship Project with
3. I fully understand that I am proceeding on Internship without project approval on my own risk. In
case of the following, I may be awarded ‘F’ grade and I shall have to repeat the Internship or join the
regular courses to complete the term.
b. The allocated project / work is not worth spending full term (approx 5-6 months) with the
company i.e quantum of work expected is not worth 15 credits.
c. The project work on evaluation (evaluation on the basis of parameters prescribed in ‘Manual
of Industry Internship / Training Project for ECE department’) is found below the
satisfactory level
4. I understand that the University will call me to the campus for evaluation up to three times during
the internship. I shall attend all evaluations (at my cost and on time) where my work will be
evaluated for
originality, content and understanding for the purpose of the grade.
I, S/O, D/O
Registration No. , Roll No.
Section Programme
_ hereby solemnly affirm and declare that:
1. I wish to pursue Industry Internship Project with
3. I fully understand that In case of the following, I may be awarded ‘F’ grade and I shall have to repeat the
Internship or join the regular courses to complete the
company or
b. The allocated project / work is not worth spending full term (approx 5-6 months) with the
company i.e quantum of work expected is not worth 15 credits.
c. The project work on evaluation (evaluation on the basis of parameters prescribed in ‘Manual
of Industry Internship / Training Project for ECE department’) is found below the
satisfactory level
4. I understand that the University will call me to the campus for evaluation up to three times during
the internship. I shall attend all evaluations (at my cost and on time) where my work will be
evaluated for originality, content and understanding for the purpose of the grade.