It is the process through which we can evaluate our problem and can done it in proper manner,
there are many problems which we cannot evaluate it the way we want it to be held . Decision
making is the way we want it to be held .pDecision making can be regarded as the mental
processes (cognitive process) resulting in the selection of a course of action among several
alternatives. Every decision making process produces a final choice The output can be an action
or an opinion of choice.

p p
p
Problem on which I want to make decision is water shortage in my building, we are facing many problems

Such as..

1.p Goad shedding


2.p Specific person who controls the supply of water in building
3.p Shortage of water
4.p Shortage of funds
5.p Storage tank of water is not big enough for building
6.p Geakage of water through pipes
7.p Confliction of water time with load shedding
8.p Blockage in main line from WAPDA
9.p Waste of water
10.pDeficiency of water in boring well

a p  p


1.p We can dig a well.
2.p We can complain WAPDA.
3.p We can buy a water sucking machine.
4.p We can purchase water .
5.p We can examine our pipe lines.
6.p We can minimize the usage of water .
7.p We can set timing of water through which everyone can have water.
8.p We can construct new water tank with more space.
9.p We can fix the pipe line by which water is been waste.
10.pWe can allow 2 to 3 persons to manage or to start machine at the time when water is coming .
11.pWe can construct a small tanks separately in individual flat .

a 
 


c  
 
  

12.pWe can demand WAPDA to change water lines if they were broken or blocked

13.pWe could have temporary water lines from our neighbors .

à aa paÃa Ãp p


Evaluating the alternatives solution is like which solution attract us more comparatively with other solution
and which is more economical for us because we have to see all the aspects while making a decision .we want
100% advantage when we make any decision.

S.noSolutions Time Cost Responsible


1. We can dig a well. 6 days 80,000/- President of building
Union
2. We complain wapda 15 days - Government

3. We can buy water 3 hrs 15,000/- President of building


Union
4 We can buy a water sucking machine 1 day 20,000/- President of building
Union
5 We can examine our pipe lines 2 days 8,000/- President of building
Union
6 We can minimize the usage of water 1 hr - President of building
Union
714.p We can set timing of water through which 2 days - President of building
15.p everyone can have water. Union

816.p We can construct new water tank 15 days 150,000/- President of building
17.p with more space. Union

9 We can fix the pipe line by which water 3 days 25,000/- President of building
is been waste Union
10 We can allow 2 to 3 persons to manage or to start 7 days 16,000/- President of building
machine at the time when water is coming Union
11 We can construct a small tanks separately in 10 days 10,00,000/- President of building
individual flat Union

 
a 



c  
 
  

p
p p p
ppppIn this part we will make things to be work properly and can have the tendency to work for long time . in this
we have to evaluate the effective solution for the problem.

As above chart shows all the solutions , we have decided to dig a well by this our problem can permanently be
remove.

 p p p


I will try to do all this by myself if union allows me but if they don¶t , I will help them by calling the labor who
can dig the well

  ppp
To control this problem effectively and to get rid of water shortage, It will be the responsibility of the president
of union and union itself to check the well after 3 months .