N ITEM COMMENT ANSWER REMARK

O
1 1.2Basis for preparation Datas are not
Pages 2 available at Pre
The information FS or as
currently available is attachmenf
as follows:
(1) 1:50000 topographic
map
(2) runoff data of lasolo
hydroelectric project
(3) flood data
(4) regional geological map
(5) market price of some
Indonesian building
materials

2 Transmission
1.2 Status and planning of Line from
power systems Substation HPP
Pages 6 to the nearest
PLN GI not
Figure 1-3-1 schematic mention or draw.
diagram of electric power Length of
system of Sulawesi Tenggara Transmission
province Line as
Component E for
price is not
stated.
2. Hydrology From where the
Page 11 Data took from
The average annual flow of the dam which reference
site of the Padalere Hydropower and it has to be
Station is 125m3/s, the annual based on min 20
average annual runoff is 3930 million years Rainfall
m3, and the average annual runoff data period.
depth is 1768mm.

Data Run-Off and Flow distribution Refer to which


of HEP Data attachmenrt
??
Show Flow
Duration Curve
show P10m P30
and P90

Pages 11
Show the
Design FLood of HEP Tab 2-3-1
calculation
(the result very
high)

Pages 13
Figure 2-5-1: Water level flow Backup data and
relation of dam (hydropower house calculation
3. Engineering Geology
Pages 15 Affected by the fault, there
are two relatively small secondary Please show on
fault near the work area. The : fault drwg in not
strikes are NW-SE and NE-SW, Tunnel line on
this area.
which have a great impact on project.