Você está na página 1de 2

Dik : T = 200⁰ C = 473,15 K

B = -388 Cm3/Mol

C = 26.000 Cm6/Mol

P = 10 Bar

R = 83,14 Cm 3Bar/Mol K

Suku Ke 1 V1= 3932.522000000000000 Cm3/Mol

Suku ke-2 P.V2/R.T = 1+(B/V1)


V2 = (1+(B/V1))*(R.T/P)
= 3544.522000000000000 Cm3/Mol

Suku ke -3 P.V3/R.T = 1+(B/V2)+(C/V2^2)


V3 = (1 + (B/V2) + (C/V2^2))* (R.T/P)
= 3493.911485542520000 Cm3/Mol

suku ke-4 P.V4/R.T = 1+(B/V3)+(C/V3^2)


V4 = (1 + (B/V3) + (C/V3^2))* (R.T/P)
= 3487.438468313790000 Cm3/Mol

suku ke -5 P.V5/R.T = 1+(B/V4)+(C/V4^2)


V5 = (1 + (B/V4) + (C/V4^2))* (R.T/P)
= 3486.596776044280000 Cm3/Mol

suku ke-6 P.V6/R.T = 1+(B/V5)+(C/V5^2)


V6 =(1 + (B/V5) + (C/V5^2))* (R.T/P)
= 3486.487096176980000 Cm3/Mol

suku ke-7 P.V7/R.T = 1+(B/V6)+(C/V6^2)


V7 = (1 + (B/V6) + (C/V6^2))* (R.T/P)
= 3486.472799958440000 Cm3/Mol
suku ke-8 P.V8/R.T = 1+(B/V7)+(C/V7^2)
V8 = (1 + (B/V7) + (C/V7^2))* (R.T/P)
= 3486.470936450830000 Cm3/Mol

suku ke-9 P.V9/R.T = 1+(B/V8)+(C/V8^2)


V9 = (1 + (B/V8) + (C/V8^2))* (R.T/P)
=3486.470693542050000 Cm3/Mol

suku ke-10 P.V10/R.T = 1+(B/V9)+(C/V9^2)


V10 = (1 + (B/V9) + (C/V9^2))* (R.T/P)
= 3486.470661878800000 Cm3/Mol

V1-V2 = 388.000000000000000
V2-V3 = 50.6105144574799000
V3-V4 = 6.47301722872999000
V4-V5 = 0.84169226951007700
V5-V6 = 0.10967986730020100
V6-V7 = 0.01429621853958450
V7-V8 = 0.00186350761032372
V8-V9 = 0.00024290877991007
V9-V10 = 0.00003166324995618

Você também pode gostar