Pending points of previous This is the 1st MRM meeting as per ISO 9001:2008 standards , however last MRM's
1 points were discussed & reviwed , These points also will be taken into consideration in MR Discussed
MRM meeting. the next MRM agenda meeting .
2 Review of Objectives
a Customer complaints
b Production Volumes
The objectives set in Aug 09 were reviewed & were found in line with the From Aug 09 to
COO Closed
targets set ( Refer annexure for the results of 4 objectives set) Oct 09
c Inprocess rejections
d Ontime delivery
In the Internal Quality Audit conducted on 7th & 9th Nov 09 - Total 14
3 Internal Quality Audit NC & 2 obs were found ( Refer the Annexure of Audt summary )
MR - Nil NIL
PPC - 1 NC 1 NC closed
Dispatch - 1 NC 1 NC Pending
Maintenance - 1 NC 1 NC closed
Purchase - 1 NC 1 NC Closed
Note : Final review by MR is pending for all the NCs & will be completed by 28th Nov 09 , Targets dates for completion are given in NCR reports
Temepred /HS Glass - 107 test done - 106 pass , 1 fial (approx 30
4 Process performance glasses were retempered job num 905 )
QC Manger Upto Oct 09 Closed
Roller wave test : 76 Test done - 76 test pass - Max value of Avg
dept found to be 0.19 mm in Job num 812 & 900 against the Target QC Manger Upto Oct 09 Closed
of 0.2 mm .
DGU Potlife Test - Total 64 Test done - 63 test pass - 1 fail due to
QC Manger Upto Oct 09 Closed
more fast curing time ( resetting done & made ok) .
DGU Butter fly - Total 60 Test done , 58 test pass - 2 fail ( resetting
QC Manger Upto Oct 09 Closed
done )
DGU Dessicant Test - Total 56 test done - 56 test pass QC Manger Upto Oct 09 Closed
DGU shore A Hardnesss - Total 58 Test done - 58 Test pass QC Manger Upto Oct 09 Closed
Lamination : Boil Test 15 Test done & 15 test pass QC Manger Upto Oct 09 Closed
Room Conditions - Daily basis 2 times reading taken , All found Below
QC Manger Upto Oct 09 Closed
30 Deg c
b Safety training Session Plan - 1 , Session Actual- 1 HR Admin Till Oct 09 Closed
c Fire fighting training Session Plan - 1 , Session Actual- 0 HR Admin Till Oct 09 Closed
d First Aid training Session Plan - 1 , Session Actual- 1 HR Admin Till Oct 09 Closed
9 Summary of Continuous This being the first
1] To Set Min Max Consumables list by each process / Deptt Production
Improvements Planned ( Benefit : Inventory cost will reduce , Stock problems will decrease By Next review MRM , improvements
Head / QC are planned &
& achieved ( BY Plant as minimium stock will be mainted by Stores & Purchase ) meeting
manger completion,
Manager & QA ) implementation will be
2] Control plan in details to be made for controlling the process at Production reviewed in next
By Next review
micro level. Detailed training to be provided to the workers for Head / QC meeting.
meeting
same . manger
3] Exsisting machine check list are not detailed one , hence there Production
By Next review
are chances of missing the checks before start up of machine . Head / QC
meeting
Detailed machine checklist to be made & introduced. manger
Production
5] Pls for re-training of all the operators & incharges for By Next review
Head / QC
Tempering, DGU & Lamination line by machine supplier. meeting
manger
Production
6] Introduction of format for recording , control & traceability of By Next review
Head / QC
Incoming farmas & Out going farmas meeting
manger
Production
By Next review
7] Enlarged area for stores planned in the new shade . Head / QC
meeting
manger
Production
8] Exsisting ceramic printing supplier to be discontinued , once the By Next review
Head / QC
New ceramic printing line is installed & commissioned . meeting
manger
Devaitions /Consession From Aug 09 to Till date , 5 Devaitions have been recorded for
10 minor issues related to asthetics looks & till date no complaints Plant Manager Oct-09 Closed
forms & details received for those deviations sent.
Prior to Aug 09 ,Total 12 feedbacks received & 1 form had negative
Mr Anoop
11 Customer Feed Back feecback form for delivery concern, From Aug 09 to Oct 09 Total 5
( Marketing)
Oct-09 Discussed
feedback forms received ,& no negative feed back received .
12 Changes in SOP & QSM No Issues MR Oct-09 Closed
Resource needs to any It is planned to have a Manual grinding team on contract Basis for
13 Plant Manager By Nov09 end Inprocess
grinding work of edge polishing & minor repair works like scratches
Inprocess rejections
1 ( Excluding RM & Dispatch % NA 2% 4.46
,Transport Breakage
Average 4.8
Total Rejections
( Customer complaints +
2 Dispatch & Transit % NA 3% 6
breakage+RM defects
+Inprocess rejections)
Average 6.4
Customer complaints
3
Registered
Nos NA NA 4
Customer complaints 3nos
Accepted
Nos 4
/month
No of orders Nos NA NA 88
% Accpeted complaints
on Order basis
% NA 2% 4.55
Average 4.4
4 Production Volumes
Tempered Production FG SQM NA 25000 15988
DGU Production FG SQM NA 9000 7223
Laminated Production FG SQM NA 1833 0
Total Production
Volumes
FG SQM NA 35833 23211
Average 21312
Tempered Rejection SQM NA NA 406.1
DGU Rejection SQM NA NA 398.2
Laminated Rejection SQM NA NA 0.0
% Rejection Tempered % NA 0.50% 2.5
Average 3.6
% Rejection DGU % NA 0.20% 5.5
Average 4.7
% Rejection Laminated % NA 1% 0.0
Average 0.0
5 Ontime Delivery
Total orders Nos NA NA ,-
Total Delivery on time Nos NA NA ,-
% On time Delivery % Na 80% ,-
Average ,-
t Ltd ( Objectives ) Year 09-10
1st Quarter 2nd Quarter 3rd Quarter 4th Quarter
May.09 June.09 July.09 Aug.09 Sept.09 Oct.09 Nov.09 Dec.09 Jan.10
4 6 4 1 2 2
3.4
#DIV/0! ###
4.7
#DIV/0! ###
3.3
### ###
#DIV/0! ###
15316.4
5478.7
723.3
0 0
0 12552.4
### ###
#DIV/0! 2.3
### ###
#DIV/0! 2.9
### ###
#DIV/0! 0.9
### ###
#DIV/0! 53.2
Customer complaints analysis
Break up
Total no of Total no of
%
Month complaints complaints Customer Not an Production extra
Accepted
registered accepted error complaint error short
April.09 4 4 100 0 0 4 0
May.09 4 4 100 0 0 4 0
June.09 7 6 86 1 0 5 1
July.09 5 4 80 1 0 4 0
Aug.09 2 1 50 1 0 1 0
Sept.09 4 2 50 2 0 2 0
Oct.09 9 2 22 7 0 2 0
Nov.09 #DIV/0!
Dec.09 #DIV/0!
Jan.10 #DIV/0!
Feb.10 #DIV/0!
March.10 #DIV/0!
Total 35 23 66 0 12 0 22 1
April .10 #DIV/0!
May.10 #DIV/0!
June.10 #DIV/0!
July.10 #DIV/0!
Aug.10 #DIV/0!
Sept.10 #DIV/0!
Oct.10 #DIV/0!
Nov.10 #DIV/0!
Dec.10 #DIV/0!
Jan.11 #DIV/0!
Feb.11 #DIV/0!
March.11 #DIV/0!
#DIV/
Total 0 0 0 0 0 0 0
0!
Quater1 Aug 09 ~oct 09 Target Actual Avg Nov 09 Corrective actions : No Actions taken as res
Aug-09 1
3nos
Sep-09 2 2
/month
Nov 09 Corrective actions : No Actions taken as res
3nos
2
/month
Oct-09 3
Jul-10 6
ysis
up Break up
0
0
0
0 0 22 1 3 0 5 5 3 0 0
0
0
0
0
0
0
0
0
0
0
0
0
0 0 0 0 0 0 0 0 0 0 0
ere planned as in some cases only cleaning & chipping issue was observed
ions were given to respective process owners for avoiding such issues in future.
ions :
n load & year ending completion work , errors increased to an Avg 9 , against an target of 3 .
ting people make mistakes in basic things.
ake necessary actions against the respective operators , make them aware about loss to company interms
cement & discussed about about putting new fresh diploma holders in each process & informed HR
as .
inal inspection team at dispatch stage after 1~2 months to control rejections if rejection rate continues.
individual process owners to discuss about the inprocess rejections as well.
ernal mistake register for all deptts with 1 ~2 months , same to submit to Quality deptt , final summary will
ction will be taken on respective process owners.
ions :
ection team deputed in Dispatch stage , effective from 9th july 2010
ma engineers were appointed & training started.
from 22nd of July 2010
was decreasing as all process were being monitored for control of rejections for basic reasons.
charges about loss in comany in terms of money
ion were taken for this quater , only monitoting of the data & discussion with respective process owers is
Break up
1
1
1
1 1
0 1 1 1 1 1 0 0
0 0 0 0 0 0 0 0
Replacement Analysis Year 09~10 ( Only Process Reject
Cutting Grinding Drilling Edge Deletion
Process
Nov.09
Dec.09
Jan.10
Feb.10
March.10
Total 123 189.8 271 549.3 59 112.89 40
Process Rejection Exculding Dispatch & RM Defects )
Edge Deletion Ceramic Tempering Insulating Lamination
0 0
0 0
0 0
0 0
0 0
163.88 93 186.32 2464 ###
% Rejection
4.46
2.46
7.54
2.78
2.95
2.11
1.33
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
Devaitions / concession
Customer complaints
Month Deviation Avg
against deviations
Aug-09 0 0
Sep-09 5 2 0
Oct-09 0 0
Nov-09 0
Dec-09 ### 0
Jan-10 0
Feb-10
Mar-10 ###
Apr-10
May-10
Jun-10 ###
Jul-10
Aug-10
Sep-10 ###
Oct-10
NIL
Hard copy pasted in files
Feed back forms
Month Feedback forms Avg
Aug-09
Sep-09 5 5
Oct-09
Nov-09
Dec-09 #DIV/0!
Jan-10
Feb-10
Mar-10 #DIV/0!
Apr-10
May-10
Jun-10 #DIV/0!
Jul-10
Aug-10
Sep-10 #DIV/0!
Oct-10