CEPROJ2 CONFORMITY OF REVISIONS

Research Title : ____________________________________________________________________________________________________


_____________________________________________________________________________________________________________________
Adviser : _____________________________________

IMPLEMENTATION OF THE RECOMMENDED REVISIONS

Nature of Revision Previous Revision/s Made Page Reflected

Conductor types are based on the


Qualify bases of assumed
No basis conductors used on typical 24
conductor sizes in Table 3.2
households.

No presentation of results per Indicated per case presentation for


Presentation of results 35-43
case cases 1-9

Indication of legend Not Inputted N.A. for Not Applicable,


No legend 33-43
Applicable with legend under the table

a. Project size
a. Project size b.
Inverter
Restructure of initial screening b. Voltage 1. Voltage 6-8 of Appendix A
criteria c. Frequency 2. Frequency
d. Grid-tied 3. System protection
c. Grid-tied
Creation of template guide for Created DIS Technical Guide Form
None 21-22
DIS Assessment 4

Revision in figure With conclusion Revised DIS Process Flow 5 of Appendix A

Indention Wrong indention Corrected indention of paragraph 6-7 of Appendix A

Lastly, it is recommended in the


It is recommended in future
future study to include the timeline
Re-statement of study also to include timeline of
for conducting DIS utilizing the new 50
Recommendation the existing DIS of DU and its
DIS Technical Guide using
comparison…
SynerGEE.

No label if for customer of for


Labeling of forms Included label. 14-22 of Appendix A
DU use

Page 1 of 2
Nature of Revision Previous Revision/s Made Page Reflected

With “integration with DU’s Omitted “integration with DU’s


distribution sytem grounding” distribution sytem grounding” and
Re-statement of Criteria 7-8 of Appendix A
and “disconnect device” as “disconnect device” as criteria for
criteria for initial screening initial screening

With computation for voltage Omitted computation for voltage


Re-statement of Conclusion 44
unbalance unbalance

About the impact of PV RE Included the importance of DIS


Re-statement of Conclusion 49
Resource Technical Guide

Added definition of DIS Technical


Restatement of DIS Technical
lacking Guide, what is it for and how it will 1-2 of Appendix A
Guide Introduction
be used.

Restatement of DIS Technical Steps were discussed, included


lacking 6-11 of Appendix A
Guide Criteria standards and rules in the criteria

13, 23 and 31 of
Renumbering of Appendices Appendices I, II, III Used Appendices A, B and C
Appendix A

C Complied
N Not Complied Examination Committee Signature Date
C
ADVISER

PANEL 1
PANEL 2
PANEL 3
PANEL 4

REVIEWED BY:

CEPROJ2 INSTRUCTOR : DATE :

Page 2 of 2